KSK Mahanadi Power Company Ltd. 6 X 600 MW Power Plant Power from knowledge Issue No: 1 Issue Date: KMPCL / Opr. / LP HEATER/ 01 SOP FOR LP HEATERS Revision: 0 Revision Date: File no: Standard Operating Instruction FOR LP HEATERS STANDARD OPERATING PROCEDURE FOR LP HEATERS Prepared by: Reviewed by: Approved by: Signature: Name: Abinash Mishra Designation: Assistant Manager Signature: Name: Designation: Signature: Name: Designation: Page 1 of 9 KSK Mahanadi Power Company Ltd. 6 X 600 MW Power Plant Power from knowledge Issue No: 1 Issue Date: KMPCL / Opr. / LP HEATER/ 01 SOP FOR LP HEATERS Revision: 0 Revision Date: Page 2 of 9 File no: OBJECTIVE: For Smooth Operation of LP HEATERS SCOPE: This SOP is applicable for LP HEATERS. INTRODUCTION: LP HEATERS LP feed water heaters is an important equipment in regenerative system of power plant it uses steam extraction of the steam turbine to heat boiler feed water and reach the required feed temperature, so as to increase thermal efficiency and ensure unit output. LP heater system of this unit adopts single series, horizontal large bypass arrangement, includes 4 LP heaters( LP heater #5 #6 #7&8). Each LP heaters consists of 3 zones, Desuperheating, condensing and drain cooling. LP heaters Technical Data:ITEM Unit LP heater-5 LP heater-6 LP heater-7,8 THE NUMBER OF EACH UNIT EQIPMENT 1 1 1 Type Single horizontal type Heat-transfer area m2 1050 1050 600 Design temperature of the shell side °C 260 200 150 Design pressure of the shell side MPa 0.6 0.6 0.6 Design temperature of the tube side ºC 170 150 150 Design pressure of the tube side MPa 4 4 4 Difference of upper end °C 2.8 2.8 2.8 Difference of lower end °C 5.6 5.6 5.6 Prepared by: Reviewed by: Approved by: Signature: Name: Abinash Mishra Designation: Assistant Manager Signature: Name: Designation: Signature: Name: Designation: KSK Mahanadi Power Company Ltd. 6 X 600 MW Power Plant Power from knowledge Issue No: 1 S No 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Issue Date: KMPCL / Opr. / LP HEATER/ 01 SOP FOR LP HEATERS Revision: 0 Revision Date: File no: PRECHECKS AND ACTION BY FIELD ENGINEER Description Ok Not Ok Work permit on various LP heaters, drip valves, level gauges, water side valves, NRVs, etc., cancelled and men, material removed from these areas. The unit is synchronised and LP/LP bypass valves are closed. The instrument air is charged to various drip valves and valves are checked for the operation on auto. All the pressure gauges, local level gauges, root valves and various instrument impulses lines are charged or in service. The 415 V power to various motorised valves is available. Check that LPH-7A, 8A, 7B, 8B condensate inlet/outlet valves are in open condition and bypass valve is in closed condition. Ensure all the shell side heater vents drain are in open condition. Check that all the isolating valves of the LP heater level controllers are full open for all the heaters. Charge the local level gauges for all the LP heaters. Check that LPH-6 condensate inlet/outlet valves are in open condition and bypass valve close. LP HEATERS normal & emergency drain to flash tank manual valve should be open . Prepared by: Reviewed by: Approved by: Signature: Name: Abinash Mishra Designation: Assistant Manager Signature: Name: Designation: Signature: Name: Designation: Page 3 of 9 Remarks KSK Mahanadi Power Company Ltd. 6 X 600 MW Power Plant Power from knowledge Issue No: 1 Issue Date: SOP FOR LP HEATERS Revision: 0 Revision Date: S No PRECHECKS AND ACTION BYDescription DESK ENGINEER 18. S No 1. 19. 2. 3. 20. 4. 5. 6. 7. 8. 9. While making normal drain & emergency drain valve in auto. Description Check that Emergency control valve set point is 10 or 20 mm Work on various heaters, dripSovalves, levelcontrol gauges, higherpermit than normal drainLP control valve. that level water side valves, NRVs, etc.,valve. cancelled and men, material done by normal drain control removed from these areas. Check the condensate temperature after LPH-7A, 8A, 7B, 8B and and LPH 5 The should gradually The LPH unit is6 synchronised andtemperature LP/LP bypass valves are closed. increase. The is charged to various drip valves and valves Closeinstrument the heaterair vents from local. are checked for the operation on auto. All the pressure gauges, local level gauges, root valves and various instrument impulses lines are charged or in service. The 415 V power to various motorised valves is available. 11. Check that LPH-6 condensate inlet/outlet valves are in open condition and bypass valve close. 14. 15. 16. 17. Ok Not Ok Remarks Ok Not Ok Remarks Charge the local level gauges for all the LP heaters. 10. 13. Page 4 of 9 File no: Check that LPH-7A, 8A, 7B, 8B condensate inlet/outlet valves are in open condition and bypass valve is in closed condition. Ensure the entire shell side heater vents drain are in open condition. Check that all the isolating valves of the LP heater level controllers are full open for all the heaters. For LPH 7A, 8A and LPH 7B, 8B put the normal drain valve control switch to control mode. The valve starts modulating to maintain the LP heater level. 12. KMPCL / Opr. / LP HEATER/ 01 Open the extraction steam isolating valve to LPH6. Open MOV after NRV & after MOV temperature is almost same. Put the normal drain valve control switch to auto mode. The valve starts modulating to maintain the LP heater level. Check the condensate inlet / Outlet valves for the LPH5 are open and bypass valve closed. Open the extraction steam isolation valve to LPH5 Put the normal drain valve control switch to auto mode. The valve starts modulating to maintain the LP heater level. Prepared by: Reviewed by: Approved by: Signature: Name: Abinash Mishra Designation: Assistant Manager Signature: Name: Designation: Signature: Name: Designation: KSK Mahanadi Power Company Ltd. 6 X 600 MW Power Plant Power from knowledge Issue No: 1 Issue Date: KMPCL / Opr. / LP HEATER/ 01 SOP FOR LP HEATERS Revision: 0 Revision Date: File no: Page 5 of 9 OPERATING PROCEDURE – Sr. No. RESPONSIBILITY UCE DE FE EE Description 1. The unit load is around5 % with both set of auxiliaries running.(30Mw). 2. Work permit on various LP heaters, drip valves, level gauges, water side valves, NRVs, etc., cancelled and men, material removed from these areas. 3. 4. 5. 6. 7. 8. 9. 10. The unit is synchronised and LP/LP bypass valves are closed. The instrument air is charged to various drip valves and valves are checked for the operation on auto. All the pressure gauges, local level gauges, root valves and various instrument impulses lines are charged or in service. The 415 V power to various motorised valves is available. Check that LPH-7A, 8A, 7B, 8B condensate inlet/outlet valves are in open condition and bypass valve is in closed condition. Ensure all the shell side heater vents drain are in open condition. Check that all the isolating valves of the LP heater level controllers are full open for all the heaters. Charge the local level gauges for all the LP heaters. 11. For LPH 7A, 8A and LPH 7B, 8B put the normal drain valve control switch to control mode. The valve starts modulating to maintain the LP heater level. Prepared by: Reviewed by: Approved by: Signature: Name: Abinash Mishra Designation: Assistant Manager Signature: Name: Designation: Signature: Name: Designation: KSK Mahanadi Power Company Ltd. 6 X 600 MW Power Plant Power from knowledge Issue No: 1 Issue Date: KMPCL / Opr. / LP HEATER/ 01 SOP FOR LP HEATERS Revision: 0 Revision Date: File no: Page 6 of 9 12. Check that LPH-6 condensate inlet/outlet valves are in open condition and bypass valve close. 13. Open the extraction steam isolating valve to LPH6. 14. Open MOV after NRV & after MOV temperature is almost same. 15. Put the normal drain valve control switch to auto mode. The valve starts modulating to maintain the LP heater level. 16. Check the condensate inlet / Outlet valves for the LPH5 are open and bypass valve closed. 17. Open the extraction steam isolation valve to LPH5 18 Put the normal drain valve control switch to auto mode. The valve starts modulating to maintain the LP heater level. 19. While making normal drain & emergency drain valve in auto. Check that Emergency control valve set point is 10 or 20 mm higher than normal drain control valve. So that level control done by normal drain control valve. 20. Check the condensate temperature after LPH-7A, 8A, 7B, 8B and LPH 6 and LPH 5 The temperature should gradually increase. 21. Close the heater vents from local. Prepared by: Reviewed by: Approved by: Signature: Name: Abinash Mishra Designation: Assistant Manager Signature: Name: Designation: Signature: Name: Designation: √ KSK Mahanadi Power Company Ltd. 6 X 600 MW Power Plant Power from knowledge Issue No: 1 KMPCL / Opr. / LP HEATER/ 01 SOP FOR LP HEATERS Issue Date: Revision: 0 Revision Date: Page 7 of 9 File no: PLANNED SHUTDOWN : 1. 1 2. √ Close extraction check valve. Close extraction MOV 3. Close inlet and outlet valves of condensate water of respective LPH. 2 4. Before taking LPH out from service ensure LPH bypass MOV (water side) is 3 open. 5. Close extraction check valve. 4 EMERGENCY SHUT DOWN: 1 2 3 √ Causes: Heater drain control valves are not operating properly so should be checked from local. Due to tube leakage, condensate may enter the LPH & increase the level. Effect: If level goes to HH then water can go to turbine through NRV (if they are passing) which leads to turbine blade erosion. Action: Heater emergency drain valve should be opened fully .If still level is going high, the corresponding LPH will be bypassed from steam & water side automatically (water side bypass valve will be open in auto). Important Note: - References: KMPCL LP heater EOM Manual. P&ID of LP heater. DCS logics Prepared by: Reviewed by: Approved by: Signature: Name: Abinash Mishra Designation: Assistant Manager Signature: Name: Designation: Signature: Name: Designation: √ √ √ √ √ √ √ √ √ √ √