Uploaded by FATHIN FAHMY

GROUP ASSIGNMENT BJMQ 3113 A231

advertisement
Assignment 1
(Group Assignment) (25%)
Course Code
Course Title
Semester
Date
BJMQ 3113
Quality Management System
A231
10 Dec 2023
You are required to develop a Quality Management System (QMS) documentations based on the
requirements stated in ISO 9001:2015 for the company that YOU HAD JUST ESTABLISHED (based on the
product that you have developed – refer to Quiz 1). In order to execute the project your group shall follow the
subsequent steps:
1. Develop a MASTER PLAN for the project (the master plan should include a master schedule/Gantt chart
(milestone chart) of your project.
2. Assign the TASK and RESPONSIBILITY for each member in your group.
3. Draw the entire BUSINESS PROCESS FLOW of your company.
4. Develop and document QUALITY POLICY and QUALITY OBJECTIVES of your company.
5. Develop and document a QUALITY MANNUAL of your company. (The quality manual shall INCLUDE all the
relevant clauses in ISO 9001:2015)
6. Develop and document FIVE (5) PROCEDURES for your company
•
Managing risks and opportunities (6.1)
•
Creating documented information (7.5)
•
Controlling external providers (8.4)
•
Managing internal Audit (9.2)
•
Conducting management review (9.3)
7. Document at least FIVE (5) WORK INSTRUCTIONS for activities relevant to your company.
The documentation structure shall follow the requirements stated in the ISO 9001:2015. All documents shall
be compiled into ONE file (PDF) and submit by GROUP LEADER through UUM Online Learning Zone
Portal.
Submission Date:
21 Feb 2024
Assessment Criteria:
Criteria
Mark
Master Plan
Task and responsibility
Business process flow
Quality Policy
Quality Objectives
Quality Manual
Procedures
Work instructions
Total
5%
5%
5%
5%
10%
30%
20%
20%
100%
END
Weightage
(%)
25%
Download