Sector: ELECTRICAL AND ELECTRONICS Qualification Title: ELECTRICAL INSTALLATION MAINTENANCE NC II AND PERFORM ROUGHING-IN ACTIVITIES, Unit of WIRING, AND CABLING WORKS FOR SINGLE-PHASE DISTRIBUTION, POWER, Competency: LIGHTING, AND AUXILIARY SYSTEMS PERFORMING ROUGHING-IN ACTIVITIES, WIRING, AND CABLING WORKS FOR Module Title: SINGLE-PHASE DISTRIBUTION, POWER, LIGHTING, AND AUXILIARY SYSTEMS Logo here Complete Training Center Name and Address Here HOW TO USE THIS COMPETENCY-BASED LEARNING MATERIAL MODULE TITLE: PERFORM ROUGHING-IN ACTIVITIES, WIRING, AND CABLING WORKS FOR SINGLE-PHASE DISTRIBUTION, POWER, LIGHTING, AND AUXILIARY SYSTEMS. This is a Competency-Based Learning Material for the Module: PERFORMING ROUGHING-IN ACTIVITIES, WIRING, AND CABLING WORKS FOR SINGLEPHASE DISTRIBUTION, POWER, LIGHTING, AND AUXILIARY SYSTEMS. This learning material contains activities for you to complete. It covers the Knowledge, Skills and Attitudes required to complete the competency. You are required to go through a series of learning activities in order to complete each of the learning outcomes of this module. In each learning outcome, Learning Elements and Reference Materials are available for your further reading to assist you in the required activities. You are expected to accomplish all the required activities and to answer the self-check after each learning element. Please note that you need to have 100% correct answers to each self-check to pass the activity. You are required to obtain answer sheets, which are available from your trainer or at the end of each learning element, to reflect answers for each self-check. If you have questions, please do not hesitate to ask your facilitator for assistance. Recognition of Prior Learning (RPL) You may have acquired some or most of the knowledge and skills covered in this learning material because you have: Actual experience on the job. Already completed training in this area. BENEFITS OF RPL Gives credit for knowledge and experience. Reduces duplication of learning. Reduces costs of obtaining formal credentials. Gives immediate feedback and determines which competencies need verification and testing. Identifies training gaps. Training (is individualized and results in a recognized certificate). Assists in professional development. Allows for better use of time and resources. Potentially saves on training costs. So, if you can demonstrate to your trainer that you are competent in a particular skill, you do not have to do the same training again. Or, if you feel you have the skills, talk to your trainer about having them formally recognized. You may also show your Certificates of Competence from previous training. And if your acquired skills are still updated / relevant to the module, they may become part of the evidence you can present for RPL. A Record of Achievement is also provided for your trainer to fill-in upon completion of this module. This module was prepared to help you achieve the required competencies and Learning Outcomes in Install Electrical Metallic / Non-Metallic (PVC Conduit), Install Wire Ways and Cable Trays, Install Auxiliary Terminal Cabinet and Distribution Panel, Prepare for Cable Pulling and Installation, Perform Wiring and Cabling Layout, Notify Completion of Work. It will serve as a source of information for you to acquire the required knowledge, skills, attitude, and inherent behaviour for the UNIT OF COMPETENCY NO. 1: PERFORM ROUGHING-IN ACTIVITIES, WIRING, AND CABLING WORKS FOR SINGLE-PHASE DISTRIBUTION, POWER, LIGHTING, AND AUXILIARY SYSTEMS for the ELECTRICAL INSTALLATION AND MAINTENANCE NC II qualification; and with minimum supervision or help from your trainer. This material will aid you in acquiring the competency at your own pace, independently. To achieve the full benefit of this module: Talk to your trainer and agree on how you will both organize your training on this unit. Read through the Competency Based Learning Material carefully. It is divided into sections which cover all the skills and knowledge you need to successfully complete this module. Most probably, your trainer will also be your supervisor. He / She will be there to support and show you the correct way to do things. Ask for help if you need one. Your trainer will tell you about the important things you need to consider when doing the activities. It is important you listen and take notes. You will have plenty of opportunities to ask questions and undergo rigid practice. This will help you in achieving competency in your new skill. Ample practice will improve your speed, memory and confidence. Talk with more experienced colleagues and ask for guidance. Answer self-checks at the end of each section to test your own progress. When you finished each element and feel that you are ready, demonstrate the activities outlined in the learning material to your trainer. As your work through the activities, your trainer will be taking note of your performance. He / She will be providing feedback on your progress. Your readiness for assessment will be reflected in his/her report, if and when you have successfully completed each element. INTRODUCTION TO THE MODULE UNIT OF COMPETENCY : PERFORM ROUGHING-IN ACTIVITIES, WIRING, AND CABLING WORKS FOR SINGLE-PHASE DISTRIBUTION, POWER, LIGHTING, AND AUXILIARY SYSTEMS MODULE TITLE : PERFORMING ROUGHING-IN ACTIVITIES, WIRING, AND CABLING WORKS FOR SINGLEPHASE DISTRIBUTION, POWER, LIGHTING, AND AUXILIARY SYSTEMS MODULE DESCRIPTOR : This module covers the knowledge, skills and attitudes on installing electrical metallic and non-metallic conduit, wire ways and cable clamp, auxiliary terminal cabinet and distribution frame panel board/safety switch and used in roughing-in based on the required performance standards. This module also covers the outcomes required in preparing for cable pulling and installation, performing wiring and cabling lay-out and notifying completion of work for single-phase distribution, power, lighting and auxiliary systems. NOMINAL DURATION 4 Hours : Introduction: This module contains information and learning activities in Performing Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting and Auxiliary Systems. Upon completion of this module and you feel confident that you have had sufficient practice, you may request your Trainer to arrange an appointment with a registered Assessor for your assessment. The results of the assessment will be recorded in your Competency Achievement Record. SUMMARY OF LEARNING OUTCOMES: At the end of this Competency-Based Learning Material, the learners are expected to meet the following learning outcomes: LO 1. Install Electrical Metallic / Non-Metallic (PVC Conduit) LO 2. Install Wire Ways and Cable Trays LO 3. Install Auxiliary Terminal Cabinet and Distribution Panel LO 4. Prepare Cable Pulling and Installation LO 5. Perform Wiring and Cabling Layout LO 6. Notify Completion of Work ASSESSMENT CRITERIA Critical Aspects of Assessment Evidence of the following is critical: LO 1. Install Electrical Metallic/Non-Metallic (PVC Conduit): 1.1 Correct drawings are interpreted based on job requirements. 1.2 Correct quantities of conduit, fittings and accessories are determined as per job requirements. 1.3 Tools and equipment are selected as per job requirements. 1.4 Conduit is assembled ensuring that fittings are fully inserted and tightened as per job requirements. 1.5 Conduit is bent with bends not exceeding 90° as per job requirements. 1.6 Conduit couplings and elbows are installed as per job requirements. 1.7 Conduit is threaded in line with job requirements. 1.8 Safety procedures are followed in line with standard operating procedures (SOP’s). LO 2.1 2.2 2.3 2.4 2.5 2. Install Wire Ways and Cable Tray: Correct drawings are interpreted to determine job requirements. Correct quantities of materials are selected as per job requirements. Tools and equipment are selected as per job requirements. Wire ways and cable trays are installed as per job requirements. Safety procedures are followed in line with SOP’s. LO 3.1 3.2 3.3 3.4 3.5 3.6 3. Install Auxiliary Terminal Cabinet, and Distribution Panel: Correct drawings are interpreted to determine job requirements. Correct quantities of materials are selected as per job requirements. Tools and equipment are selected as per job requirements. Auxiliary terminal cabinet is installed as per job requirements. Auxiliary main distribution frame is installed as per job requirements. Safety procedures are followed in line with SOP’s. LO 4. Prepare for Cable Pulling and Installation: 4.1 Necessary tools, equipment, materials and personal protective equipment (PPE) are prepared in line with job requirements. 4.2 Cable pulling & installation requirements and constraints from plan and site inspection are identified as per job requirements. 4.3 Cable lay out & installation equipment is set up in accordance with manufacturer's and job requirements. 4.4 Site is made safe and secure for cable installation. 4.5 Suitable protective clothing is selected and required safety devices are used. 4.6 Support structure is assessed as safe for normal working conditions. LO 5. Perform Wiring and Cabling Layout: 5.1 Safety procedures are followed based on safety regulations PPE are identified and selected in line with safety requirements. 5.2 Tools, equipment, pulling compound and safety requirements are identified and obtained for the lay out and installation. 5.3 Pulling materials is properly installed and tensioned to required specifications. 5.4 Cable is secured permanently to support structure in accordance with standard installation procedures. 5.5 Bending radius and loops tolerance is observed for cable materials at all times. 5.6 Schedule of wire cutting lists is followed based on estimates, quantity and sizes to avoid wastage. 5.7 Further instructions are sought if unplanned events or conditions occur. 5.8 Checking of quality of work is done in accordance with instructions and requirements. LO 6. Notify Completion of Work: 6.1 Final checks are made to ensure that work conforms with instructions and job requirements. 6.2 Supervisor is notified upon completion of work. 6.3 Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures. 6.4 Work area is cleaned up and made safe according to OHSA regulations. Context of Assessment and Resources Implications: Context of Assessment must ensure that: Assessment should include practical demonstration either in the workplace or through a simulation activity, supported by a range of methods to assess underpinning knowledge. Assessment must relate to the individual’s work area or area of responsibility. Demonstration of skills on more than one occasion. Evidence shall show that the knowledge and associate skills for planning installations of integrated systems have been acquired. All knowledge and skills detailed in this module is contextualized to current industry practices and technologies. Resource Implications must ensure that: This module should be assessed as it relates to normal work practices using procedures, information, and resources typical of a workplace, including OHS policy and work procedures and instructions. Suitable work environment, facilities, equipment, and materials to undertake actual work as prescribed in this module, which would include using a formal learning and assessment environment. Where simulation is considered a suitable strategy for assessment, conditions for assessment must be authentic and as far as possible reproduce and replicate the workplace and be consistent with the approved industry simulation policy. The resources used for assessment should reflect current industry practices in relation to plan the installation of integrated systems. Critical Aspects of the Qualification: Evidence of the following is essential: The critical aspects of evidence are considered all prerequisites must be met. Evidence for competence in this module shall be considered holistically. Each element and associated performance criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines”. A representative body of performance criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. Implement Occupational Health and Safety workplace procedures and practices, including the use of risk control measures as specified in the performance criteria. Apply sustainable energy principles and practices as specified in the performance criteria. Demonstrate an understanding of the required skills and knowledge as described in this module. Demonstrate an appropriate level of skills enabling employment. Conduct work observing the relevant Anti-Discrimination legislation, regulations, polices and workplace procedures. Demonstrated consistent performance across a representative range of contexts in the performance criteria. Assessment Methods: Competent performance with inherent safe working practices is expected in the Industry to which this module applies. This requires that the specified required skills and knowledge are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the required skills and knowledge described in this module. The following methods may be used to assess competency for this module: Observation of practical candidate performance. Simulated practical exercises. Role plays. Oral and written questions. Program/ Course : Unit of Competency : Module : ELECTRICAL INSTALLATION AND MAINTENANCE NC II Perform Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Performing Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Learning Outcome No. 1: Install Electrical Metallic/Non-Metallic (PVC Conduit) Assessment Criteria: 1.1 Correct drawings are interpreted based on job requirements. 1.2 Correct quantities of conduit, fittings and accessories are determined as per job requirements. 1.3 Tools and equipment are selected as per job requirements. 1.4 Conduit is assembled ensuring that fittings are fully inserted and tightened as per job requirements. 1.5 Conduit is bent with bends not exceeding 90° as per job requirements. 1.6 Conduit couplings and elbows are installed as per job requirements. 1.7 Conduit is threaded in line with job requirements. 1.8 Safety procedures are followed in line with standard operating procedures (SOP’s). References: Martin, Isaac. The Complete Guide to Wiring: DIY Home electrical Installations & Repairs with Step-By-Step Guide 2020. Isaac Martin. Simmons, Phil, and Mullin Ray C. Electrical Wiring – Commercial 16th Edition 2018. Cengage Learning. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring Updated 7th Edition 2018. Quanto Publishing Group USA, Inc. Herman, Stephen L. Electrical Wiring – Industrial 15th Edition 2015. Cengage Learning. Trandem, Bryan, Publisher. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring 2011. Cengage Publishing International. Home Skills. Wiring – Fix Your Own Lights, Switches, Receptacles Boxes, Cables & More. Cool Springs Press. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Home Wiring 2001. Creative Publishing International. McReynolds, Ray. Step-By-Step Guide Book to Home Wiring 1st Edition1982. Step-By-Step Guide Book, Co. INFORMATION SHEET NO.: 1 / UC NO.: 1 INSTALL ELECTRICAL METALLIC/NON-METALLIC (PVC CONDUIT) Introduction Before cables and conductors are installed, standard non-metallic conduit end bells must be installed to prevent damage to the cables and conductors. The contractor must trim the inside and outside of cut ends to remove rough edges. Cut ends of sectional conduit must butt or come together for the full circumference thereof. All open ends of nonmetallic conduit must be immediately capped to keep moisture and debris out. Types of Conduits, Fititngs, and Its Usage Learning Ojectives: After reading this Information Sheet, you should be able to: 1. Identify Different Typs of Conduits and Fittings. 2. Determine the Usage of Conduit and Fittings. In this session, you will be able to gain knowledge, skills and attitude on installing electrical metallic and non-metallic conduit, wire ways and cable clamp, auxiliary terminal cabinet and distribution frame panel board/safety switch and used in roughing-in based on the required performance standards. In this session, we will also identify the different types of conduits and fittings used in roughing-in activity for single-phase distribution, power, lighting and auxiliary systems and determine its usage. Raceway An enclosed channel of metal or nonmetallic materials designed expressly for holding wires, cables, or bus bars, with additional functions as permitted in this Code. Raceways include, but are not limited to, rigid metal conduit, rigid nonmetallic conduit, intermediate metal conduit, liquid tight flexible conduit, flexible metallic tubing, flexible metal conduit, electrical nonmetallic tubing, and electrical metallic tubing, under floor raceways, cellular concrete floor raceways, cellular metal floor raceways, surface raceways, wire ways, and bus ways Conduits Conduits pipe is the most common electrical raceways used in all types of construction. With respect to the type of materials used, conduit may be classified into: 1. Metallic such as steel pipes, aluminum, etc. 2. Non-metallic such as plastic pipes. Purposes of Electrical Conduits: 1. To provide a means for the running wires from one point to another. 2. To physically protect the wires. 3. To provide a grounded enclosure. 4. To protect the surroundings against the effect of fault in the wiring. 5. To protect the wiring system from damage by the building and occupants. 6. To protect the building and the occupants from damage by the electric system. With respect to its make, Conduit may be classified as: 1. Rigid Metal. 2. Flexible Metal. 3. Rigid – Non-Metal. 4. Flexible – Non-Metal. 5. PVC Conduit. Electrical Conduits & Fittings Electrical conduits are metal, plastic or fiber pipes designed to protect electrical cables and wires. They’re used in just about every residential and commercial establishment, especially for wiring that is either exposed, or fitted outdoors. Since they are essentially a safety feature, you should select the material, size and fittings based on the environment of the installation and the type of wiring it will be housing. When it comes to options, there are almost as many types of conduits as there are wires and cables, and they can be broadly classified into metallic and nonmetallic variants. Here are some of the most common types under these categories: Type of Metallic Conduit 1. Rigid Metallic Conduit (RMC) or Rigid Steel Conduit (RSC) serves the same purpose as with the Electrical Metallic Tubing. It is designed to protect the electrical wiring of building from electrical hazard due to faulty wiring. It is usually installed buried in concrete wall floor and ceiling, in masonry or similar materials. It is also used for exposed and concealed work, and it provides maximum protection when there is mechanical damage. For this wiring method to be effective, safe and reliable, it is a must that it should follow the Philippine Electrical Code (PEC) standard and specifications. 2. Electrical Metallic Tubing (EMT) – These are by far the most commonly used conduits, even though they’re not technically conduits at all (they’re actually classified as tubing). EMTs are usually called “thin-walls”, since they have a much thinner wall than RMCs, which is why they should not be used in places where they’re likely to encounter stresses. These are also available in galvanized steel or with a rust- resistant coating, and can be used in most indoor and outdoor applications, as ground conductors, embedded in concrete and for direct burial too. They are much lighter and bend easily, and fittings for EMTs are both readily available and inexpensive. 3. Intermediate Metallic Conduit (Ferrous Metal) – The intermediate metallic conduit is listed threaded raceway of circular cross section with coupling which can be straight tapped conduit coupling. Intermediate metallic conduits are available in trade sizes ½” through 4inches. 4. Flexible Metallic Tubing (FMT). Flexible metallic tubing is a kind of wiring installation which is commonly used for external motor terminal connection. It is being manufactured in the form of a coil. A flexible conduit consists of flexible steel tube which is made from convex to concave metal strip in a spiral winding with length from 50 to 200 feet. Type of Non-Metallic Conduit 1. Rigid Polyvinyl Chloride Conduits (PVC) – PVC conduits are available in both Schedule 40 and 80, which are basically ratios of the thickness of the wall to its outer diameter. Both have the same outer diameter, which means a Schedule 40 conduit will have a thinner wall, so it is not permitted for installations where the conduit will be exposed to physical stresses. Most commonly, the sections have one belled end and can be joined together, or to fittings using solvent welding. PVC conduits are rated for almost any application, especially since they are flame retardant, resistant to sunlight and very affordable. However, they cannot be used in hazardous locations, as ground conductors or in locations where they are exposed to ambient temperatures over 50°C. 2. Flexible Electrical Nonmetallic Tubing (ENT) Electrical non-metallic tubing (ENT) is flexible corrugated plastic tubing that is moisture-resistant and flame- retardant. It is easy to bend and installs with snap-lock or glued plastic fittings. Unlike EMT, non-metallic tubing cannot install in exposed locations, so it is commonly used inside walls. In addition to installation in standard wood- or metalframe walls, ENT can be installed inside concrete block structures and can be covered with concrete. Due to the blue color of one common brand of this conduit, ENT is nicknamed smurf tube, after the Smurfs cartoon characters. Conduit Fittings Conduit fittings are available in a huge variety of sizes, shapes and materials, and they’re normally used for connecting runs of conduit together, and for connecting conduit ends to boxes, enclosures or electrical devices. Fittings are needed to connect conduits to boxes or enclosures of different sizes and when the direction of most metallic conduits has to be changed. There are also straps and clamps, which are used to provide additional support to conduits and to keep them secured. You may need to use special types of fittings if a conduit run is likely to be exposed to moisture, vapors, or hazardous conditions. Types of Fittings Section 110-3 of the NEC requires all the components to be listed and labeled, so all listed parts meet certain construction and performance requirements. However, the Code does not specify the material used for the fittings, of which there are several. This will be determined by availability, design considerations or personal preference. If you’re unsure about how the conditions will affect the fittings, you can contact a manufacturer with details of your application, consult a local distributor, or get an engineering recommendation. Conduit fittings can be listed as follows, based on the function they serve and how they are installed: 1. Conduit Bodies. A conduit body can be used to provide pulling access in a run of conduit, to allow more bends to be made in a particular section of conduit, to conserve space where a full size bend radius would be impractical or impossible, or to split a conduit path into multiple directions. Conductors may not be spliced inside a conduit body, unless it is specifically listed for such use. Conduit bodies differ from junction boxes in that they are not required to be individually supported, which can make them very useful in certain practical applications. Conduit bodies are commonly referred to as condulets, a term trademarked by Cooper CrouseHinds Company, a division of Cooper Industries Conduit bodies come in various types, moisture ratings, and materials, including galvanized steel, aluminum, and PVC. Depending on the material, they use different mechanical methods for securing conduit. Among the types are: a. L-shaped bodies ("Ells") include the LB, LL, and LR, where the inlet is in line with the access cover and the outlet is on the back, left and right, respectively. In addition to providing access to wires for pulling, "L" fittings allow a 90 degree turn in conduit where there is insufficient space for a full- radius 90 degree sweep (curved conduit section). LR L-Right C ondu let LB L-Box C ondu let LL L-Left C ond ulet b. T-shaped bodies ("Tees") feature an inlet in line with the access cover and outlets to both the cover's left and right. c. C-shaped bodies ("Cees") have identical openings above and below the access cover, and are used to pull conductors in a straight runs as they make no turn between inlet and outlet. d. Conduit Bends. To save time, equipment and labor costs, you can tackle changes in the direction of a conduit with pre-fabricated bends. Commonly called „factory bends‟ or „elbows‟, they are available in a variety of lengths and curvatures, and according to NEC requirements, you can bend certain tubings by hand, using a mechanical bender, or a hydraulic bender for larger ones. However, an installation may require a lot of bends, and bending conduits on location might damage them or reduce the internal diameter. Even with the use of factory bends, the NEC does restrict the number of bends you can have between pull boxes to a maximum of 360°, including offsets at the box or enclosure. e. Elbow is the bent section of the conduit or tubing used to change raceway direction or by pass obstruction. f. Nipples are short length of conduit or tubing materials used to extend a conduit system. Nipples are used between conduit or tubing and items such as boxes or enclosures between two boxes. g. Coupling is a device connecting two pieces of pipes in order to extend their length. Each length of IMC is furnished with coupling on one end, to permit a joint. h. Bushings and Locknuts. Bushings create a smooth entry point to conduits without any sharp edges, protecting the conductors from damage during wire pulls. They are also extremely important when the conduit system enters an enclosure or bus box. A bushing is installed on the inside of the box opening and threaded into the conduit end, separating the conductors from the edges of both the opening and the conduit end. Locknuts are threaded on the inside, with teeth on one surface or both, which grip the surface. They installed on both sides of the opening to ensure that both the conduit and bushing are held firmly in place. If the locknut has teeth on only one side, that side should face the box. i. Connectors. It is used to attach metallic or non-metallic conduit to the junction or utility boxes. j. Strap and Clamps. Electrical materials used to hold and anchor electrical conduits in its proper position. k. Reducers and Reducing Washers. A reducer is a special kind of combination coupling that allows you to connect raceways of one trade size to larger or smaller ones. Although it’s generally better to use a pull box, reducers are handy for areas that have limited space. Reducing washers, or threaded reducers, are similar to hubs, except both the inner and outer surfaces are threaded. They are used to connect conduits to enclosure or box openings that have a larger diameter, with locknuts on both sides to fasten them in place. Electrical installation for conduits and fittings required to follow the PEC provision. And try your knowledge by answering the Self-Check 1.1. and compare your answer to Answer Key1.1. SELF-CHECK NO.: 1 / UC NO.: 1 INSTALL ELECTRICAL METALLIC/NON-METALLIC (PVC CONDUIT) Instruction: Choose the correct answer and encircle the letter of your choice. Identify Conduit and Fittings 1. It is fittings used to hold and anchor electrical conduits in its proper position. A. Bending. B. Offset. C. Conduit Bending. D. Strap and Clamps. 2. What type of conduit designed to protect the electrical wiring of building from electrical hazard due to faulty wiring? A. Electrical Metal Tubing. B. Rigid Steel Conduit. C. Poly Vinyl Chloride. D. Armored Cable (BX). 3. What type of fitting is used to secure EMT to metallic boxes? A. Connector. B. Adapter with Lock Nut. C. Condulets. D. Coupling. 4. It is a type of fitting which is used to change direction. A. Connector. B. Coupling. C. Adaptor. D. Elbow. 5. It is a short length conduit or tubing which is used to extend a conduit system and used between conduit and tubing such as boxes or enclosures between two boxes. A. Connector. B. Coupling. C. Nipple. D. Condulets. ANSWER KEY NO.: 1 / UC NO.: 1 INSTALL ELECTRICAL METALLIC/NON-METALLIC (PVC CONDUIT) 1. D. 2. B. 3. B. 4. D. 5. C. Program/ Course : Unit of Competency : Module : ELECTRICAL INSTALLATION AND MAINTENANCE NC II Perform Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Performing Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Learning Outcome No. 2: Install Wire Ways and Cable Trays Assessment Criteria: 2.1 Correct drawings are interpreted to determine job requirements. 2.2 Correct quantities of materials are selected as per job requirements. 2.3 Tools and equipment are selected as per job requirements. 2.4 Wire ways and cable trays are installed as per job requirements. 2.5 Safety procedures are followed in line with SOP’s. References: Martin, Isaac. The Complete Guide to Wiring: DIY Home electrical Installations & Repairs with Step-By-Step Guide 2020. Isaac Martin. Simmons, Phil, and Mullin Ray C. Electrical Wiring – Commercial 16th Edition 2018. Cengage Learning. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring Updated 7th Edition 2018. Quanto Publishing Group USA, Inc. Herman, Stephen L. Electrical Wiring – Industrial 15th Edition 2015. Cengage Learning. Trandem, Bryan, Publisher. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring 2011. Cengage Publishing International. Home Skills. Wiring – Fix Your Own Lights, Switches, Receptacles Boxes, Cables & More. Cool Springs Press. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Home Wiring 2001. Creative Publishing International. McReynolds, Ray. Step-By-Step Guide Book to Home Wiring 1st Edition1982. Step-By-Step Guide Book, Co. INFORMATION SHEET NO.: 2 / UC NO.: 1 INSTALL WIRE WAYS AND CABLE TRAYS Introduction in the electrical wiring of building, a cable tray system is used to support insulated electrical cables used for power distribution, control, and communication. Cable trays are used as an alternative to open wiring, or electrical conduit systems, and are commonly used for cable management in commercial and industrial construction. They are especially useful in situations here changes to a wiring system are anticipated, since new cables can be installed by laying then in the tray, instead of pulling them through a pipe. According to the National Electrical Code (NEC), a cable tray is a unit or assembly of units or sections and associated fittings forming a rigid structural system used to securely fasten, or support cables and raceways. After reading this Information Sheet, you will be able to: 1. Determine the correct materials for the job. 2. Identify the correct quantity of materials for a job. In the previous sessions, you have already identified the different types of conduit and fittings used in wire ways and wire tray. In this session, we will discuss the terminology used in pipe bending, compute take up for stubs and determine the bending types. Bending Bending is a technique used in various metal forming processes with the aim of increasing the fabrication capabilities of plumbing and electrical fixtures. The pipe can be bent at varying angles and in different directions. The simplest curve turns the tube at an angle of 90 degrees forming an elbow. Back-To-Back: Two ninety degree bends in one conduit, usually with both stubs turned up on the same plane forming a “U”. Electrical Metallic Tubing (EMT): conduit made to protect conductors and cables, also known as thin-wall. Manufacturedin10‟lengths, in sizes ranging from 1/2” to 4”. EMT sizes 1/2”, 3/4”, 1”, and 1 1/4” can be bent using a hand bender. Hand Benders: Benders having a full shoe that the pipe is formed around. Used for hand bending EMT, IMC, and Rigid pipe. Gain: The amount of pipe gained (saved) by bending on a radius and not at right angles. Kick: A bend of less than 90 degrees placed in a conduit to change direction. Leg Length: The longest part of a ninety degree bend. Ninety Degree Bend: Any radius bends in a conduit that changes the direction of the pipe ninety degrees. O. D.: Outside diameter of a pipe. Offset: Two identical bends placed in a conduit to change direction or elevation of the pipe run. Radius: The relative size of the bent portion of a pipe. Reference Point: A mark used to locate the edge of an obstruction for bending saddles. Shrink: The amount a conduit reduces in total length after an offset is bent. Stub: The shortest part of a ninety degree bend. Take-Up: The amounts that must be subtracted from the desired stub length of a ninety degree bend to ensure that the bend is accurate. Instructions for 90 Degree Bends Take-Up Table for Stubs Paper Size Take-Up ½” EMT 5” ¾” EMT – ½” Rigid 6” 1” EMT – ¾” Rigid 8” 1 ¼” EMT – 1” Rigid 11” To bend a ninety degree bend, you first determine your desired stub height. Then, you subtract the take-up for the size pipe that you are bending from the desired stub height and mark the pipe. Example: You want to bend a 15” stub using 1/2” EMT. Because the take up for 1/2” EMT is 5”, you will subtract 5” from 15” 15” – 5” = 10” Then, using a pull-push rule: measure from the end of the pipe back 10”. Mark the pipe at10”. Next, align the mark that you have made with the arrow on the bender. Being careful to keep the arrow at your mark, put the pipe and bender on the floor. With your foot, bend the pipe until it is bend ninety degrees. Use a torpedo level to check for accuracy. SELF-CHECK NO.: 2 / UC NO.: 1 INSTALL WIRE WAYS AND CABLE TRAYS Directions: Use the constant take-up for 1/2”, 3/4”, 1”, and 11/4” EMT to solve the following questions. 1. If you are bending a 54” stub on a ¾” conduit how far from the end of the conduit will you put your bending mark? 2. If you put the arrow on the bender 22” from the end of a 1 ¼” conduit, what will the stub height be? 3. The conduit size is 1”. The arrow mark is at 52”. What will the stub height be? 4. You want to bend a 26 1/2” stub on a 1/2” conduit. Where will you put your bending mark? For the problems below, fill in the blanks with the correct answer. You want to bend a 19 5/8” stub. Where will you mark your pipe when it bending: 5. 1/2” EMT? 6. 1 1/4” EMT? 7. 1” EMT? You want to bend a 31 3/4” stub. Where will you mark your pipe when it bending: 8. 3/4” EMT? __________ 9. 1/2” EMT? __________ 10.11/4” EMT? __________ ANSWER KEY NO.: 2 / UC NO.: 1 INSTALL WIRE WAYS AND CABLE TRAYS 1. 48”. 2. 33”. 3. 60”. 4. 2 1 1/2”. 5. 14 5/6”. 6. 8 5/8”. 7. 11 5/8”. 8. 25 3/4”. 9. 26 3/4”. 10. 20 3/4". Program/ Course : Unit of Competency : Module : ELECTRICAL INSTALLATION AND MAINTENANCE NC II Perform Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Performing Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Learning Outcome No. 3: Install Auxiliary Terminal Cabinet and Distribution Panel Assessment Criteria: 3.1 Correct drawings are interpreted to determine job requirements. 3.2 Correct quantities of materials are selected as per job requirements. 3.3 Tools and equipment are selected as per job requirements. 3.4 Auxiliary terminal cabinet is installed as per job requirements. 3.5 Auxiliary main distribution frame is installed as per job requirements. 3.6 Safety procedures are followed in line with SOP’s. References: Martin, Isaac. The Complete Guide to Wiring: DIY Home electrical Installations & Repairs with Step-By-Step Guide 2020. Isaac Martin. Simmons, Phil, and Mullin Ray C. Electrical Wiring – Commercial 16th Edition 2018. Cengage Learning. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring Updated 7th Edition 2018. Quanto Publishing Group USA, Inc. Herman, Stephen L. Electrical Wiring – Industrial 15th Edition 2015. Cengage Learning. Trandem, Bryan, Publisher. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring 2011. Cengage Publishing International. Home Skills. Wiring – Fix Your Own Lights, Switches, Receptacles Boxes, Cables & More. Cool Springs Press. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Home Wiring 2001. Creative Publishing International. McReynolds, Ray. Step-By-Step Guide Book to Home Wiring 1st Edition1982. Step-By-Step Guide Book, Co. INFORMATION SHEET NO.: 3 / UC NO. 1 INSTALL AUXILIARY TERMINAL CABINET AND DISTRIBUTION PANEL Introduction Distribution Board In the construction area, the main distribution board shall be of the totally enclosed, free standing type, made of galvanized sheet steel of 2mm minimum thickness properly reinforced and braced, made up of vertical sections. Each incoming circuit shall occupy a cubicle with its own door. It shall be properly ventilated and vermin proof and specially treated for anti-corrosion. The board shall be constructed to be suitable for interchangeability of breakers and for future extension. The board shall be suitable for top or bottom cable connections, and shall be provided with gland plates, removable for drilling on site. Rigid Steel Conduit (RSC) Learning Objective: After reading this information sheet you will be able to: 1. Determine steps and techniques in RSC cutting and bending. 2. Perform cutting and bending Rigid Steel Conduit. In the previous sessions, you were able to identify the pipe bending vocabulary used in pipe bending. Also, you were able to calculate take-up for stubs. This skill is essential for electrical pipe installation. In this session, you will be able to gain the knowledge and skills on rigid steel conduit bending and cutting for pipe installation. It is a must that, as a EIM student you the skills and knowledge on installing conduit/pipes for wire ways with the provision 00 Philippine Electrical Code (PEC). Rigid Steel Conduit (RSC) A rigid steel conduit serves the same purpose as with the Electrical Metallic Tubing. It is designed to protect the electrical wiring of building from electrical hazard due to faulty wiring. It is usually installed buried in concrete wall floor and ceiling, in masonry or similar materials. It is also used for exposed and concealed work, and it provides maximum protection when there is mechanical damage. For this wiring method to be effective, safe and reliable, it is a must that it should follow the Philippine Electrical Code (PEC) standard and specifications. PEC Provisions The Philippine Electrical Code is a set of rules and regulations which govern all electrical wiring. The following standard and specifications must be followed in installing Rigid Metal Conduit: Standard Size of RSC Rigid metal conduit has smooth inside diameter. Its standard length follows the gas pipe which is 10 feet and a diameter from ½”, ¾”, up to 6 inches. Installation Under Atmospheric Condition? Protected by enamel. Conduit protected only with enamel is permitted only in indoor occupancies not subjected to severe corrosive influences. Dissimilar metal. Contacts of metal to another metal must be avoided in installing RSC to prevent the possibility of galvanic reaction. Corrosion protection. Conduits fitting with corrosion protection are permitted to be installed in concrete, direct earth burial or in areas subjected to corrosive influences. Number of conductors inside the conduit The table below shows the number of conductors permitted in a single conduit. Maximum number of conductors allowed in trade size conduit from ½” - 3 inches. Bends Rigid steel conduit can also be bent using a hickey or conduit bender. It follows the same procedure as that in bending electrical metallic tubing. Bend on Electrical Metallic Tubing Suppose the right angle bend is to be made and that the conduit is to have a rise of 18” above the floor. Assuming that the conduit is ½ in diameter, subtract 5” from the rise of 18” that leaves 13”. Hook the bender over the rigid metal conduit so that the arrow on the bender points to a point 13 inches from the end of the metal conduit as shown in figure 2. If the size of the conduit is ¾, subtract 6”. If the size is 1”, subtract 8” from the desired measurements. The different bends that are common in a conduit installation are that the following: 1. Right-angle bends. 2. Off-set bends. 3. Cross-over or saddle bends. 4. Goose neck bends. Figure 1: Shown the application on the above-mentioned bend In bending a metal conduit, a pipe bender or hickey is commonly used by electricians. There are several methods however, that are used in bending in the absence of hickey, like the one illustrated below. Figure 2: Methods of Bending Bending 90-degrees angle on metal rigid conduit 1. Lay the conduit on the ground and slip the hickey on the conduit where the first bend is to be made. 2. If it is necessary, thread the ends of the conduit before bending. 3. Step on rigid conduit and bend it at 20 to 30 degrees at a time. 4. The bend must be gradual and equal to a radius 6 times the diameter of the conduit. 5. The hickey should be move downward after applying pressure to it. 6. The rigid conduit may be held on a pipe vise instead of stepping on it. Bending a 90˚ angle; on ½ thin-wall metal conduit, or Electrical Metal Tubing (EMT). Layout the right angle bends 1/2” Electrical Metal Tubing (EMT) or thin wall conduit. From the rise, subtract 5” for ½” conduit, 6” for ¾” and 8” for 1” conduit. Supposed the desired rise of a bend is 16” you will have 11” left. Hook the bender over the conduit. Let the arrow on the bender point to the 11” marks from the end of the conduit. Illustration below shows the movements and position of the hickey in making the 90 degree bend on a conduit. Apply pressure on the handle of the Bender, while one foot is stopping on the conduit and the other on the bender. Bending a Rigid Conduit for an Off-set 1. Determine the distance of the first bend (from one end of the conduit) and the throw of the off – set. 2. Insert the hickey just a few centimeters from the end of the conduit and make the first bend. 3. With the hickey in upside down position, slip the conduit in the jaw of the hickey and make the second bend to complete the off-set. SELF-CHECK NO.: 3 / UC NO.: 1 INSTALL AUXILIARY TERMINAL CABINET AND DISTRIBUTION SYSTEM Instructions: Read the following statements carefully and write your answers on the space provided for. 1. ____________________ It is the standard length of Rigid Steel Conduit. 2. ____________________ A tools use for bending rigid steel conduit. 3. ____________________ A two identical bends placed in a conduit to change direction or elevation of the pipe run. 4. ____________________ A simplest bend in a conduit. 5. ____________________ A U-shaped bend with a 90 degree on it send. ANSWER KEY NO.: 3 / UC NO.: 2 INSTALL AUXILIARY TERMINAL CABINET AND DISTRIBUTION SYSTEM 1. 10 feet. 2. Hickey. 3. Back-To-Back. 4. 90 degrees bend. 5. Back-To-Back. Program/ Course : Unit of Competency : Module : ELECTRICAL INSTALLATION AND MAINTENANCE NC II Perform Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Performing Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Learning Outcome No. 4: Prepare for Cable Pulling and Installation. Assessment Criteria: 4.1 Necessary tools, equipment, materials and personal protective equipment (PPE) are prepared in line with job requirements. 4.2 Cable pulling & installation requirements and constraints from plan and site inspection are identified as per job requirements. 4.3 Cable lay out & installation equipment is set up in accordance with manufacturer's and job requirements. 4.4 Site is made safe and secure for cable installation. 4.5 Suitable protective clothing is selected and required safety devices are used. 4.6 Support structure is assessed as safe for normal working conditions. References: Martin, Isaac. The Complete Guide to Wiring: DIY Home electrical Installations & Repairs with Step-By-Step Guide 2020. Isaac Martin. Simmons, Phil, and Mullin Ray C. Electrical Wiring – Commercial 16th Edition 2018. Cengage Learning. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring Updated 7th Edition 2018. Quanto Publishing Group USA, Inc. Herman, Stephen L. Electrical Wiring – Industrial 15th Edition 2015. Cengage Learning. Trandem, Bryan, Publisher. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring 2011. Cengage Publishing International. Home Skills. Wiring – Fix Your Own Lights, Switches, Receptacles Boxes, Cables & More. Cool Springs Press. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Home Wiring 2001. Creative Publishing International. McReynolds, Ray. Step-By-Step Guide Book to Home Wiring 1st Edition1982. Step-By-Step Guide Book, Co. INFORMATION SHEET NO.: 4 / UC NO. 1 PREPARE FOR CABLE PULLING AND INSTALLATION Introduction Cable pulling is the moving of lengths of cable from one place to another in order to install a connection of some type between disparate areas. Fiber optic cables should always be pulled by the strengthened yarn fibers inside the outer jacket. This strength member can be exposed by removing a small portion of the jacket with a three-hole cable stripper. After reading this session, you will be able to: 1. Determine tools used in cutting and reaming conduit pipes. 2. Perform cutting of conduit with the use of hacksaw. In the previous sessions, you were able to determine steps and techniques in pipe bending. This skills and knowledge is essential in preparing and installing conduits/pipes. In this session, you will be able to perform pipe cutting and reaming. Which is essential in installing electrical raceway? Cutting Conduits Using Hacksaw When cutting any conduit with a hacksaw, use a blade with 18 to 32 teeth per inch. A blade with fewer teeth hangs up, binds, or even breaks. Put the blade in the hacksaw frame (with the teeth pointing forward) so that the teeth cut when you push the saw forward. Place the pipe in the vise so that there is ample room between the vise and the cut. The conduit is cut with a hacksaw or pipe cutter. For easy and safe way of cutting, a bench vise is recommended so that the pipe can be held firmly while it is being cut. Preparing and Cutting Pipes for Installation 1. A hacksaw is the most important cutting tool for sawing metal to size. 2. There are many different types of hacksaws, but in general they consist of a fixed or adjustable frame with a renewable hacksaw blade. 3. The hacksaws illustrated show one with a straight handle and one with a pistol grip handle. 4. Hacksaw blades are classified by length and the number of teeth per 25 mm cutting edge. 5. For cutting conduit pipe, blades with a pitch of 24 teeth or 32 teeth per 25 mm of the cutting edge are recommended. 6. Pipes to be cut must be held steady and prevented from rotating by holding them in a suitable vise. This is a self-locking, hinged pipe vise and is available in a number of sizes. 6. The portable folding pipe vise is very practical as a mobile workplace and is used especially on building sites. 7. Chain pipe vises are made to hold pipes with an outside diameter of up to 8" or 200 mm. They are mounted on solid benches. 8. Open the vise and insert the pipe so it is horizontal and parallel to the jaw serrations. 9. Keep the part which is to be cut as close to the jaws as possible in order to stop vibrations 10. Before you cut any conduit pipes, make sure you have measured and marked the correct length exactly 11. Check that the blade is lightly tightened in the frame and that the teeth point forward. 12. Take up the hacksaw and position yourself as shown here, with yourself shoulder pointing in the direction you intend to cut. Note the position of the feet, which allows free and controlled movement of the body when cutting. 13. Before finishing the cutting operation, the pipe must be supported with the left hand. 14. This will prevent the blade of the hacksaw being damaged. Ream After cutting the pipe with hacksaw or pipe cutter, it leaves burrs. This must be removed to avoid damage of wire insulation when the wire is inserted in to the pipe. A reamer or round file can be used to remove burrs. Threads Since rigid metal conduit is commonly used in wet places, sealing of termination can be best done if the pipe is threaded. These will prevent water from entering the conduit. The use of dies and dies stock keep the end of the pipe threaded. The sizes of dies stock ranges from ½ to 6inches. SELF-CHECK NO.: 4 / UC NO.: 1 PREPARE FOR CABLE PULLING AND INSTALLATION Instructions: Read the following statements carefully and write your answers on the space provided for, 1. What are the different bends that are common in a conduit installation? 2. Tools used in cutting Rigid Steel Conduit. 3. What is the meaning of RSC? 4. A process in putting threads in pipes. 5. A process in cleaning the burrs to avoid wire damage. ANSWER KEY NO.: 4 / UC NO.: 1 PREPARE FOR CABLE PULLING AND INSTALLATION 1. Right-angle bend, Off-set bend, Cross-over bend, Goose-neck bend. 2. Hacksaw. 3. Rigid Steel Conduit. 4. Threading. 5. Reaming. Program/ Course : Unit of Competency : Module : ELECTRICAL INSTALLATION AND MAINTENANCE NC II Perform Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Performing Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Learning Outcome No. 5: Perform Wiring and Cabling Layout Assessment Criteria: 5.1 Safety procedures are followed based on safety regulations PPE are identified and selected in line with safety requirements. 5.2 Tools, equipment, pulling compound and safety requirements are identified and obtained for the lay out and installation. 5.3 Pulling materials is properly installed and tensioned to required specifications. 5.4 Cable is secured permanently to support structure in accordance with standard installation procedures. 5.5 Bending radius and loops tolerance is observed for cable materials at all times. 5.6 Schedule of wire cutting lists is followed based on estimates, quantity and sizes to avoid wastage. 5.7 Further instructions are sought if unplanned events or conditions occur. 5.8 Checking of quality of work is done in accordance with instructions and requirements. References: Martin, Isaac. The Complete Guide to Wiring: DIY Home electrical Installations & Repairs with Step-By-Step Guide 2020. Isaac Martin. Simmons, Phil, and Mullin Ray C. Electrical Wiring – Commercial 16th Edition 2018. Cengage Learning. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring Updated 7th Edition 2018. Quanto Publishing Group USA, Inc. Herman, Stephen L. Electrical Wiring – Industrial 15th Edition 2015. Cengage Learning. Trandem, Bryan, Publisher. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring 2011. Cengage Publishing International. Home Skills. Wiring – Fix Your Own Lights, Switches, Receptacles Boxes, Cables & More. Cool Springs Press. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Home Wiring 2001. Creative Publishing International. McReynolds, Ray. Step-By-Step Guide Book to Home Wiring 1st Edition1982. Step-By-Step Guide Book, Co. INFORMATION SHEET NO.: 5 / UC NO. 1 PERFORM WIRING AND CABLING LAYOUT Introduction In performing wiring and cabling layout, the shape of the cabling layout used to link devices is called the physical topology of the network. This refers to the layout of cabling, the locations of nodes, and the interconnections between the nodes and the cabling. Installation Methods and Wiring Techniques The electrical wiring scope must cover installation, testing, supply and commissioning of all accessories, wiring, switches, conduits, spur outlets, and many more. Thus, electrical wiring needs further attention, especially for building projects. Several factors are to be considered before doing the actual installation work whether for commercial, residential or industrial wiring. Electrical experts should also consider factors like wall and floor construction, installation requirements, type of ceiling, building construction, etc. In this session we will cover the concept of electrical wiring, including the different wiring systems and installation methods and the basic wiring preparation. This will serve as a guide for learners and electrical professionals in dealing with various electrical works. The Major Importance of Appropriate Electrical Wiring Electrical wiring that is done inappropriately is a risk and a fire hazard. It is the major responsibility of electricians to trace any electrical ambiguities. That is why, they need to have a broader electrical experience, in-depth knowledge and a license to deal with such issues. For others, wiring seems to be as simple as lights on and off. However, there is an intricate process going on deeper than the surface that only qualified electricians know. Connection circuits that are poorly designed are unsafe and can damage electronic gears and appliance motors. A poorly designed connection circuit delivers the incorrect amperage. The process of connecting numerous accessories for the distribution of electrical energy from the meter board to home equipment is called electrical wiring. Electrical wiring installation can be done using two methods: Joint box or Tee system and Loop – in the system. Both are discussed as follows: Below are the two common installation methods for electrical wiring. 1. Joining Box or Tee System In this installation method, connections to any appliances are prepared through joints. The joints are made from joint boxes using appropriate connectors and joints cutouts. This method of wiring doesn’t consume cable sizes. Electrical experts have to take note that this installation might be expensive in a few cases. Structure for this system will be made easier using builder trends software. It’s a trend that must be considered by electrical contractors. 2. Looping System This wiring installation method is universally used in any electrical method. Other appliances and lamps are connected in a parallel position so that every appliance can be separately controlled. When the connection is required, the feed conductors are being lopped in by getting it directly to the terminal and then fetching it forward again to the next points. The light and switch feeds are carried around the circuit by a series of loops. It will be carried around from one point to another until the last on the circuit is reached. The line or phase conductors are lopped either in a box or switchboard. For a much better understanding of the concept of wiring, below are a few examples of the wiring circuits. Single bulb controlled only by a one-way switch. In this wiring circuit, the hot wire is typically connected to one terminal directly to the switch. The other terminal is connected directly to the positive bulb terminal. Two bulbs controlled by a one-way switch. Two bulbs are usually connected with supply wires in parallel. A separate one-way switch will route it. This type of wiring sample is known for its simplicity. Single blub controlled by two-way switches. The wiring is termed as staircase wiring wherein a light lamp will be controlled from two primary sources. This type of wiring is used for bedrooms to switch on/off from two sources. Go-down wiring. This type of wiring is used in long passages, tunnel-like structures and long passages. It follows a linear sequence for switching the lights from one end and to the others. Fluorescent lamp controlled by a one-way switch. In this circuit, the phase wire is going to be connected to one end of the switch. Yet, another end switch will be connected to the ballast (choke). One electrode of the lamp is connected to the other neutral terminal and choke. Socket outlet wiring. The outlet passes the current and holds a plug when the power is routed directly to the socket. The radial socket connection and a single socket connection are present. Basic Wiring Preparation As we are now discussing the sequence of steps for wiring and understanding the wiring system’s types, other considerations like the preparation of cables, wires, and other electrical tools are also included. Using a crew schedule software is also one of the important considerations needed to take. Furthermore, the following considerations listed below are included in the wiring preparation. 1. The specifications of the wire vary on a few factors – the insulation type, the number of conductor strands, the cross-section area, and the strands’ diameter. 2. The type of conductor to be used can either be stranded wire or solid wire conductor. Single solid wires are often utilized where rigid connections are required and these wires aren’t flexible enough. Thus, stranded conductors are mostly preferred when it comes to electrical installations. 3. Select the wires depending on the color codes that are being mentioned by several standards like black for neutral, green for earth, red for phase wires and so on. Electrical contractors have to know all wiring colors, whether in cables or wires. Important tasks like this are best monitored using a task scheduler software. This software tool guarantees an efficient way of handling and scheduling tasks. 4. Electricians have to be selective when it comes to the components they will have to use. When choosing for switches, receptacles, electrical boxes, or any other elements, make sure to base it upon rating and size. Furthermore, start wiring the components as one by following the wiring diagrams tools, and so on. 5. Numerous basic electrical tools are mandatorily required when it comes to installation works. Some of the tools used include strippers, cutters, pliers, testers, etc. Additionally, electrical contractors are also considering to use builder software for scheduling and project management purposes. 4 Basic Electrical Wiring Techniques There are several basic wiring techniques every electrician must know about. Having in-depth knowledge and practical experience can help experts in dealing any form of electrical issue. Below are some of the most applied wiring techniques. 1. Casing and Capping Wiring In this wiring type, the cable will run through a wood casing with parallel grooves appearing at regular intervals. The case is expected to be fixed to either walls or ceilings using screws. It will then be fully covered with a cap to protect the wires. This system is considered to be considerably expensive, yet there is a huge possibility of short circuit risks resulting in some fire hazards. Electrical contractors need to trace possible hazards earlier. The best way to handle bombarding issues is through the application of construction scheduling software. Listed below are the materials used for casing wiring: PVC or VIR insulated wires. Capping (wood or plastic made). Capping or casing joints. Casing enclosure (wood or plastic made) Advantages of this type of wiring scheme are: Strong and durable wiring. Inexpensive and easy to install. Any wiring customization can be done. Safe from dust, rain, smoke and steam. No risk of shock due to capping and casing. 2. Cleat Wiring Here, cables that are PVC insulated are being used. The cables will be fasted directly to the walls using wood, porcelain or plastic cheats. Everything will be installed at different intervals, usually 6km. apart. This wiring is affordable but usually good enough for temporary applications. It isn’t even suitable for residential electrical wiring. Listed below are some of the common materials used in cleat wiring: Weatherproof cables. Lots of screws. PVC or VIR insulated wires. Plastic cleats or porcelain cleats (2-3 grooves). This type of wiring has some advantages: East for detecting faults. Easy to repair. Addition and alteration is easy. Easy and Cheap wiring. 3. Batten Wiring One of the most important wiring methods applied today is the batten wiring. In this wiring, insulated wires will run through the wooden battens. The battens are fixed on walls and ceilings using either screws or plugs. The cables are fitted directly onto the battens. Link clips are used as well and it will be fastened with rust-resistant nails. Basic materials used for batten wiring are the following: TRS or CTS cables. Tinned brass buckle clip (link clip). Brass pins. Advantages of this type of wiring scheme are listed below: Installations are way easier. Appearance is much better. Cheaper material costs. Easy and flexible customization. Lesser chances of leakage current. 4. Conduit Wiring PVC cables are often used in conduit wiring. If the pipes are running through the ceilings and wall surface, surface conduit wiring is the best term. On the other hand, if pipes run inside the wall surface and it will be covered with plastering, it is termed as concealed conduit wiring. Surface wiring is used mainly for industrial applications in order to interlink heavy motors. Lastly, concealed wiring is utilized for residential purposes. Materials used for conduit wiring: Metallic conduit (class A and B). Non-metallic conduit. PVC or VIR insulated cables. Coupling. Screws. Rigid offset. 2-hole strap. Locknut. The main advantages of this wiring are the following: The safest wiring of all. No risks of mechanical wear and tear or fire. No risk of cable insulation damage. Long-lasting and no risk of shock. Key Takeaways If you are doing electrical works, it is crucial to be familiar with the concept of wiring, with more in-depth understanding, knowledge and practical experience. In that way, you can better implement any electrical works needed in the projects. Always be reminded that electrical wiring should be installed safely and correctly by electrical standards and regulations. Supporting Cables WIRING TIPS Attaching conductors to screw type terminals: Strip 13 mm to 19 mm of insulation from the wire. Then, using needle nose pliers; form a three-quarter loop in the uncovered conductor. Hook the conductor clockwise around the screw so that as you tighten the screw, the loop of wire will close and form a tight connection. Make sure the insulation on the conductor does not extend under the screw as this will make a poor connection. Use of wire connectors The most common method of connecting conductors is to use a wire connector. The recommended practice for making this connection is as follows: 1. Remove the insulation to expose the ends of the conductor in accordance with the manufacturer’s instructions. 2. Hold stripped ends together, with ends of the wire even. 3. Push connector firmly against the wire ends and twist on the connector. When running cables through joists and studs, be sure to drill the holes large enough so the cables are not pinched or crushed. Metal Protectors Use approved metal plates in situations where the cable is too close to the front of the studs or joists. SELF-CHECK NO.: 5 / UC NO.: 1 PERFORM WIRING AND CABLING LAYOUT Instruction: Choose the correct answer and encircle the letter of your choice. 1. If this is done inappropriately there’s a greater risk of a fire hazard or risk of injury. A. Electrical Wiring. B. Electrical Conductors. C. Electrical Insulation. D. Electrical Boxes. 2. __________ have to be selective when it comes to the components they will have to use. A. Masters. B. Electricians. C. Supervisors. D. Management. 3. This is the most common method of connecting conductors. A. Lead Connectors. B. Casing Joints. C. Wire Connectors. D. Casing Enclosures. 4. The process of connecting numerous accessories for the distribution of electrical energy from the meter board to home equipment. A. Electrical Panels. B. Electrical Wiring. C. Electrical Enclosures. D. Electrical Cleats. 5. This refers to the physical topology of the network. A. Cabling Lay-ins. B. Cabling Layouts. C. Cabling Joints. D. Cabling Insulations. ANSWER KEY NO.: 5 / UC NO.: 1 PERFORM WIRING AND CABLING LAYOUT 1. A. Electrical Wiring. 2. B. Electricians. 3. C. Wire Connectors. 4. B. Electrical Wiring. 5. B. Cabling Layout. Program/ Course : Unit of Competency : Module : ELECTRICAL INSTALLATION AND MAINTENANCE NC II Perform Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Performing Roughing-In Activities, Wiring, and Cabling Works for Single-Phase Distribution, Power, Lighting, and Auxiliary Systems Learning Outcome No. 5: Notify Completion of Work Assessment Criteria: 6.1 Final checks are made to ensure that work conforms with instructions and job requirements. 6.2 Supervisor is notified upon completion of work. 6.3 Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures. 6.4 Work area is cleaned up and made safe according to OHSA regulations. References: Martin, Isaac. The Complete Guide to Wiring: DIY Home electrical Installations & Repairs with Step-By-Step Guide 2020. Isaac Martin. Simmons, Phil, and Mullin Ray C. Electrical Wiring – Commercial 16th Edition 2018. Cengage Learning. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring Updated 7th Edition 2018. Quanto Publishing Group USA, Inc. Herman, Stephen L. Electrical Wiring – Industrial 15th Edition 2015. Cengage Learning. Trandem, Bryan, Publisher. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Wiring 2011. Cengage Publishing International. Home Skills. Wiring – Fix Your Own Lights, Switches, Receptacles Boxes, Cables & More. Cool Springs Press. Black & Decker Home Improvement Library. Black & Decker: The Complete Guide to Home Wiring 2001. Creative Publishing International. McReynolds, Ray. Step-By-Step Guide Book to Home Wiring 1st Edition1982. Step-By-Step Guide Book, Co. INFORMATION SHEET NO.: 6 / UC NO. 1 NOTIFY COMPLETION OF WORK Introduction Preliminary testing and visual inspections shall be conducted prior to acceptance and operational tests to avoid delays. The contractor must submit for approval; his testing procedure for each electrical system. Tests shall be conducted by contactor according to the approved testing procedure. All tests shall be conducted & recorded and submitted during handing over. Electrical acceptance tests shall be conducted to assure that electrical materials; and their installations are in accordance with contract documents, regulatory agencies, applicable codes and standards listed herein, and that they may be energized. Operational tests shall be conducted to assure capability of equipment and systems to perform as specified and designed. Quality Assurance Testing and testing equipment shall conform to the latest edition of reference specifications specified herein and to applicable codes and requirements of IEC. The Personnel engaged in the testing of electrical equipment and systems shall have a minimum of five (5) years of continuous experience in the testing of the equipment and systems to be tested. Submit evidence of such qualifications to the Engineer. Contractor shall furnish testing equipment as required. Testing equipment, meters and instruments shall have been properly calibrated and certified within (6) months prior to testing and shall be in satisfactory condition to perform its functions. Contractor shall provide an appropriate and stable source of electrical power to the test locations. Perform tests in the presence of the Employer's Representative. Electrical equipment and installation shall meet acceptance and operational tests. Promptly repair or replace defective work and repeat the tests until the particular system and component parts thereof receive the approval of the Engineer. Any damages resulting from tests shall be repaired and/or damaged materials replaced, to the satisfaction of the Engineer. It is essential that certain trades and manufacturer's technical representatives be present during the testing. These representatives shall include: 1. Electrical subcontractor who is thoroughly familiar with the project as to its intent, what equipment has been provided and how it is supposed to operate. 2. Supplier of equipment particularly where packaged equipment has been provided. 3. Manufacturer's representative who is thoroughly familiar with the operation of the equipment. The operation of the electrical installation by the Employers does not constitute an acceptance of the electrical installations. Final acceptance will depend on Contractor's demonstration of compliance with contract documents, completion of adjustments as specified and required, and submission of required documentation and certification of approval by governing authorities. Continuity tests shall be performed using direct current and audible bells or buzzers. Use of telephones is not acceptable. Safety devices such as rubber gloves and blankets, glow detectors, hot sticks, helmets, eye shields, protective screens and barriers, danger signs, etc. shall be used to adequately protected and warn personnel in the vicinity of the tests. APPLICATIONS Equipment that can be paralleled under any conditions including interlock defeat shall be tested for proper phasing using hot-phase hot-stick or other approved methods. This includes, but is not limited to, primary selector switches, automatic transfer switches, tie breakers and busses, etc. at medium and low voltage levels. Full load currents of feeders serving single phase loads shall be measured to assure an equal load balance on each phase. Branch circuits shall be reconnected if necessary to achieve this balance. Megger values specified are minimum acceptable values at an ambient temperature of 60 degrees F and low relative humidity. Contractor shall convert readings to equivalent values at 60 degrees F if measurements are taken under other conditions. The phase rotation at busses, panels, switchboards, switchgear, etc., shall be checked and verified using a phase sequence meter for consistency and conformity to recognized standards, i.e. A-B-C left to right, top to bottom, front to back, when facing front of the equipment, and to provide an A-B-C (1-2-3) clockwise rotation. Where electrical installations and extensions of existing systems, or in new buildings at existing sites, phase rotation shall conform to the existing. TESTS Low Voltage Wire and Cable (600 Volts and Less). 1. Wire and cable shall be tested for continuity, freedom from short circuits and grounds and meggered to assure adequate insulation resistances for each conductor. Test to be recorded & submitted. 2. Test Voltages: Megger instrument shall be 1000 volts DC applied for one minute. 3. Acceptable Test Results: Insulation resistance between phase conductors and any phase conductor to ground shall be not less than 2 megohms for connected conductors and 100 megohms for disconnected conductors. Motor Control Centers and Panel boards 1. Equipment shall be tested for continuity, freedom from short circuits, and grounds and meggered to assure adequate resistances. 2. Test Voltages: Megger instrument shall be 1,000 volts DC for equipment rated 380 volts and 500 volts DC for equipment rated 220 volts, applied for one minute. 3. Acceptable Test Results: Insulation resistance phase and any phase to ground shall be not less than 100 megohms for equipment rated 380 volts and 25 megohms for equipment rated 220 volts. Switchboards 1. Test electrical and mechanical interlock systems for proper operation and sequencing. 2. Test ground connections as specified under "Earthing System”. 3. Perform ratio and polarity tests on instrument current and potential transformers. 4. Perform insulation resistance tests on each bus section, phase to phase and phase to ground as specified under "Motor Control Centers (MCC) & (MSPs) (EMSPs) and all Panel boards." Prior to performing insulation resistance tests on buswork, isolate the buswork by racking out or opening circuit breakers and disconnects, short circuit and ground current transformer secondaires, remove potential transformer primary fuses and assure grounding of the enclosure. 5. Perform control wiring performance test using the approved manufacturer's elementary diagrams. 6. For selective switchboard and switchgear arrangements, verify proper phasing between the line and load stabs of the tie breaker cubicle busses using hot-phase hot-stick techniques, A-A, B-B, C-C. 7. Test disconnect switches as specified under "Circuit and Motor Disconnects." 8. Perform an insulation resistance test at 1000 volts DC on each circuit breaker for one (1) minute from pole-to-pole and from each pole-to-ground with breaker closed and across open contacts of each phase. Insulation resistance shall not be less than 100 megohms. 9. Set, calibrate and adjust protective device setting of each circuit breaker in accordance with the approved coordination study using secondary current injection. INSPECTIONS When your work is completed at certain stages, the wiring will need to be checked by the electrical inspector. Permit fees normally cover only the rough-in inspection and final inspection. If extra inspections are required to facilitate construction schedules or remedy defects identified by an inspector, additional inspection fees will apply. Rough-in inspection This inspection is made before the wiring is covered by insulation, a vapour barrier, or wallboard. Before calling an electrical inspector for the rough-in inspection, the following work must be completed: The wiring for all lights, switches and receptacles must be installed in the walls, secured to the structural members, and terminated in the outlet boxes. All the connections, joints and bonding in the outlet boxes must be completed. Only the conductors required for the connection of the light fixtures, receptacles or switches should be left unconnected. Final inspection The electrical installation must be complete. The light fixtures, receptacles and switches must be installed and connected. The electrical circuits in the panel must be clearly identified as well. Finally, the cover plates for receptacles and switches must be installed. SELF-CHECK NO.: 6 / UC NO.: 1 NOTIFY COMPLETION OF WORK Instruction: Read the following statements carefully, and indicate your answers on the space provided for. 1. _______________ This inspection is made before the wiring is covered by insulation, a vapour barrier, or wallboard. 2. _______________ This shall be conducted to assure that all electrical materials; and their installations are in accordance with contract documents, regulatory agencies, applicable codes and standards listed herein, and that they may be energized. 3. The _______________ shall provide an appropriate and stable source of electrical power to the test locations. 4. _______________ specified are minimum acceptable values at an ambient temperature of 60 degrees F and low relative humidity. 5. _______________ shall be tested for continuity, freedom from short circuits and grounds and meggered to assure adequate insulation resistances for each conductor. ANSWER KEY NO.: 6 / UC NO.: 1 NOTIFY COMPLETION OF WORK 1. Rough-in Inspection. 2. Electrical Acceptance Test. 3. Contractor. 4. Megger Values. 5. Wire and Cables. TASK SHEET NO.: 1.1 Title: Performance Objective: Supplies Materials: Tools Equipment: Develop Skills in Bending Metallic Conduit Given in bending metal conduit, you should be able to use hickey bender on the following standard size of conduit in order to bend properly. / Hack Saw. Hickey Bender. / Hockey Bender. Bending Metallic Conduit Steps Procedures: Assessment Methods: 1. Use the rigid-sized pipe bender or hickey for each size of conduit. 2. Make a level on the floor. / 3. The bend must be gradual and equal to a radius 6 times the diameter of the conduit. 4. Apply pressure on the handle of the hickey bender; depends on the specific direction. 5. Good housekeeping and safety practices are applied in line with job requirements. Demonstration with Oral Questioning. Role-plays. Direct Observation. TO ACCESS MORE ABOUT THE MODULE PLS CONTACT: 09610392852