JOB HAZARD ANALYSIS Company: R2L PROJECT AND CONSULTANCY SERVICES Project: TAPA KING AYALA MALLS VERMOSA Given by: J U L I E T C A N S U L O Date: JA N UA R Y 1 0 , 2 0 2 4 ACTIVITY 1. Toolbox meeting, mobilization, demobilization 2. Preparation of tools, equipment and materials 3. Concrete chipping, frame works,concreting (CHB Laying, plumbing works, layout and restoration) HAZARD RISK miscommunication Physical injury a) Defective tools equipment and materials including unguarded power tools. a) Unsafe behavior for digging b) Misuse of tools c) Scattered materials a) Hand and foot injury. b) Back pain (ergonomics) c) Slip, trip and fall a) Hand injury risk b) Dust Inhalation/eye irritation c) Slipping and tripping CONTROL a) Secure work permit prior to start activities. b) work area assessment. c) Conduct toolbox meeting and discussed daily activities and task. d) d) Coordination with other contractors. ) Conduct daily inspection of a tools, equipment and materials prior to start the activities. b) All moving parts of power tools shall be securely guarded. c) Use safety gloves and safety shoes. d) Applied proper lifting techniques. e) Buddy-buddy system f) Conduct proper 5s g) Make sure unused tools, equipment and materials are secured barricade. a) Right kind of tool/PPE for the job must be implemented. b) Adequate supervision for employees while at work. c) Buddy-buddy system d) Maintain clean, smooth 4. Hot works and cutting (mechanical works) 5. Drilling (ceiling works, carpentry, masonry) 6. Use of defective/damaged ladder a) Electrocution b) Inexperienced personnel c) Fire Hazards Smoke, toxic inhalation a) Struck by flying object b) Inhalation of dust c) scattered materials a) Eye irritation b) Cardio infection c) Slip, trip, a) Use of defective/damaged ladder a) Fall of person/collapse of ladder walking and working surface. e) Clean up slippery materials. a) All equipment shall be turned off when not in use. b) Use panel/Extension and breaker c) Personnel working with power tools,equipment Personnel working with power tools,equipment protection d) 1.1 Combustibles around the work area shall be removed/protected. 1.2 Portable fire extinguisher shall be available. 1.3 Provide warning sign for every hot works a) Use face shield and spectacles b) Provide and install protective covering c) Conduct proper 5s a) Ensure that all parts of the ladder are in good condition. b) Ensure that ladder is properly setup. c) One personnel will hold the ladder below to support stability of the ladder. d) Use full body harness and hook the lanyard on an anchorage if needed. e) Place and set-up ladder on a stable and level ground. f) Always maintain three point contact on the ladder when 7. Painting works 8. Use of temporary power supply a) Health hazard b)Improper/unsafe practices for storing materials c) Fire hazards a) Unskilled electricians b) b) Unauthorized shutdown/ power interruption of service c) ) Energized lines d) Unsorted materials a) 1.1 Inhalation of dust 1.2 harm to skin and eye b) Slipped caused by spilled materials -Electrocution/injury - Equipment Damage - Pilferage - Excess materials and waste -ripping Hazard climbing, working and going down. g) Ladder must not have lose steps/rungs and no worn out parts. h) Do not over extend when working on ladder. i) Set up ladder away from access area. a) Used proper PPE during application 1.1 Quick removal of spilled materials 1.2 Wash thoroughly before eating and at the end of the day b) Paints shall be stored in a well ventilated flammable storage. c) No painting should be carried out nearby hot works activity. A)Temporary electrical installation shall be done only certified electricians. b) Coordination from the client shall be obtained prior to any shutdown during power tapping and isolation. C) Temporary wiring shall be protected from possible damage and cuts. d) Ensure wire and cables are properly spliced. e) Injury fatality and equipment damage shall be reported to the client F)All extension cords and temporsry power supply shall be protected by breakers. G) Flammable materials shall be segregate from non-flammable materials Prepared By: Juliet Cansulo Safety Officer H) Make sure all unnecessary materials will be pull out of work area and placed to designated area. I) Maintain pathways free from any obstacle. J) Errect barricades/flagging around from the unsecure and unused materials from the work areas.