RELATÓRIO DE INSPEÇÃO VISUAL DE
SOLDAGEM
Number:
VS16.220811-01
Revision:
0
Date:
11/08/23
Visual Weld Test Report
FOR24A_08
Bariontec
CLIENTE/Client:
MKG Equipamentos
OBRA/Job:
DESCRIÇÃO/Description:
-
TAG:
DESENHO/Drawing/REVISÃO/Revision
BASKET
QTD.
DFN-000925
PROCEDIMENTO DE INSPEÇÃO/REVISÃO
Inspection Procedure/Revision
6
1
CRITÉRIO DE ACEITAÇÃO/REVISÃO
Acceptance Standards/Revision
PRT41
6
1250
ILUMINAÇÃO/Light Intensity(Lux)
ASME VIII Div.1 Ed.2021
WELDERS
JUNTA
EPS
TODAS
ACE
TE01
S1
S1
-
-
-
-
-
-
-
-
-
-
25
TEMPERATURA/Temperature ºC
-
0
DESCONTINUIDADES/Discontinuities
PLANO SOLDA/Welding Plan/REVISÃO/Revision
PASSE
Pass
-
MD
TR
RE
AA
ES
PR
FP
DI
LAUDO
Report
S1
-
-
-
-
-
-
-
-
A
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
R
CONSUMÍVEIS DE SOLDA/Filler Metals
INSTRUMENTOS/Instruments
ER316L Ø2,4 HEAT: 36REC652A
LUPA
-
-
-
OBSERVAÇÕES/Observations
Em amostragem de 20% , soldas realizadas conforme parâmetros do procedimento de soldagem (EPS).
LEGENDA/Legend
B - Bisel
TR - Trinca/Crack
PR - Porosidade/Porosity
R - Raíz/Root External Face
RE - Respingo/Spatter
FP-F. Penetração/Lack Penetration
R - Reprovado/Repproved
A - Aprovado/Approved
E - Enchimento/Fill
AA - Abertura de Arco/Welding Arc
DI - Dep. Insuficiente/Under Fill
ACE - Acabamento/Cap External
ES - Escória/Slag
MD - Mordedura/Undercut
INSPECTOR
APPROVAL
AUTHORIZED INSPECTOR
Date,
11/08/23
Date,
11/08/23
Date,
11/08/23
CUSTOMER/SUPERVISION
Date,
11/08/23
PÁGINA 1/2