Uploaded by muhammadmehdi71730

Q1+2

advertisement
A Software Quality Assurance (SQA) plan is essential for ensuring the quality of a hospital
management system. The plan outlines the processes, standards, and activities that will be used
to verify and validate the software. Below is an example outline for an SQA plan for a hospital
management system:
1. Introduction

Purpose of the SQA plan
The main goal of this SQA plan is to establish a methodical approach to guarantee the quality of
the Hospital Management System throughout its development life cycle. As a guiding document,
the SQA plan describes the procedures, approaches, and actions that will be used to attain and
uphold a high standard of quality in the software deliverables. This plan explains the qualityrelated expectations and standards to all stakeholders, including developers, testers, project
managers, and clients. It outlines the procedures and standards for confirming that the software
satisfies the requirements and that the development processes are being carried out correctly.

Scope of the plan
From requirements gathering to deployment, every stage of the software development life cycle is
covered by the scope. Defect detection and prevention, industry standard compliance, and user
expectations for functionality and performance are among the goals. One of the scopes of the SQA
plan is to make sure the requirements appropriately represent the needs of administrators, other
stakeholders, and healthcare professionals.

Objectives of SQA
The objectives of Software Quality Assurance (SQA) for a Hospital Management System (HMS)
are to ensure the development and delivery of a high-quality software product that meets the
specific needs and requirements of healthcare providers, administrators, and other stakeholders.
2. Project Overview

Brief description of the hospital management system
The Hospital Management System (HMS) is a comprehensive software solution designed to
streamline and optimize various administrative, clinical, and operational processes within a
healthcare institution. This system acts as a centralized platform that unifies and oversees various
hospital operations with the goals of increasing productivity, enhancing patient care, and
assisting administrators and healthcare professionals in making better decisions.

Project goals and objectives
The Hospital Management System (HMS) project’s objectives generally concentrate on boosting
operational effectiveness, ensuring the provision of high-quality patient care, and improving
healthcare services. The Hospital Management System aims to achieve the following objectives:
Efficient Patient Management: Simplify the admission, appointment, and registration procedures
for patients to guarantee effective and well-organized patient management.
Optimized Resource Utilization: Increase productivity and reduce waste, better allocate and use
hospital resources, such as beds, medical supplies, and staff.
Improved Appointment Scheduling: Provide an easy-to-use and effective system for scheduling
appointments for patients and healthcare professionals, minimizing wait times and optimizing
doctor schedules.
Secure Patient Information Management: Ensure the security and confidentiality of patient
information by implementing robust data protection measures and complying with healthcare data
privacy regulations.

Key stakeholders and their roles
Hospital Administration
Role: Assign the HMS project strategic direction and oversight. Set priorities, approve budgets,
and make sure they are in line with the hospital's overarching objectives.
Healthcare Professionals
Role: They use the HMS for managing prescriptions, scheduling appointments, providing patient
care, and gaining access to patient records. Comment on the functionality and usability of the
system.
Patients
Role: Use patient portals to communicate with healthcare providers, make appointments, and
access medical records to engage with the HMS. Share your thoughts on the user experience.
Finance Department
Role: Use the HMS for billing, invoicing, and financial reporting. Make sure that all financial
transactions are accurate and that billing laws are followed.
Project Managers
Role: Oversee the planning, scheduling, and progress monitoring of the entire HMS project. Make
sure the project stays on course, stays under budget, and achieves its goals.
Software Developers
Role: Create, implement, and manage the HMS software. Work closely with administrators and
healthcare professionals to comprehend requirements and put in place the features that are
required.
3. SQA Responsibilities

Roles and responsibilities of the SQA team
To guarantee the Hospital Management System's (HMS) effectiveness, dependability, and quality,
the Software Quality Assurance (SQA) team is essential. Throughout the software development
life cycle, the team is in charge of implementing quality assurance procedures into place and
managing them.
SQA Manager
Manages the complete SQA procedure and guarantees that it complies with project and company
goals.
Develops the overarching SQA plan and strategy, among other duties.
Carries out SQA activities throughout the project life cycle in coordination with other project
stakeholders.
Assigns duties and oversees the SQA team.
Examines and accepts reports and deliverables related to SQA.
Updates project management on the state of quality assurance initiatives.
SQA Engineers
Carry out quality control procedures, locate and fix errors, and guarantee commitment to quality
guidelines.
Create and carry out test cases and plans in accordance with project specifications.
Perform a range of testing procedures, such as acceptance, system, integration, and unit testing.
Determine, record, and rank software flaws.
Work together with developers to expedite the resolution of defects.
Conduct examinations and assessments of the project deliverables and make sure that established
quality standards are followed in the software development processes.
Documentation Specialist
Ensure that all SQA activities have accurate and thorough documentation maintained.
Create and update the SQA plan.
Make and maintain test cases, test plans, and other documentation of testing.
Record flaws and the fixes for them.
Participate in the HMS project's overall documentation.
Configuration Management Specialist
Oversee HMS source code and related artifacts version control and configuration management
procedures.
Installs and maintains the version control systems
Establish and implement processes for configuration management.
Make sure that changes are accurately documented and that baselines are set.
Oversee the HMS versions' release and implementation.
Reporting Specialist
Establish, gather, and evaluate metrics to evaluate the HMS project's quality and advancement.
Set up quality assurance key performance indicators (KPIs).
Gather and evaluate information about the status of testing, the rate of defects, and other
appropriate metrics.
Provide reports on SQA tasks and project quality on a regular basis.
Provide analysis and suggestions based on metrics.
Test Automation Engineers
Create and manage automated test scripts to improve the coverage and efficiency of testing.
Find areas where the HMS can be automated for testing.
Create automated test scripts to accomplish repetitive testing tasks such as performance testing
and regression testing.
Run automated tests and evaluate the outcomes.
Maintain and update automated test scripts to accommodate changes in the HMS.

Collaboration with other project teams (development, testing, etc.)
Development Team Collaboration
The development team and other stakeholders collaborate to define project goals, requirements,
and milestones during the planning stage.
Developers comprehend functional and technical requirements in close collaboration with system
architects and business analysts.
To discuss progress, obstacles, and upcoming tasks, set up regular communication channels, such
as stand-up meetings that happen every day or every week.
To address any queries or worries about the implementation of features and functionalities,
promote open communication.
To make sure the code complies with the specifications, is maintainable, and follows coding
standards, conduct regular code reviews.
Early in the development process, developers and testers work together to find and fix problems.
Testing Team Collaboration
Early project involvement by testing teams will help them comprehend requirements and offer
testability feedback.
Work with fellow business analysts to specify acceptance criteria and test scenarios.
Work with the development team to draft a thorough test plan that addresses all phases of testing,
such as system, user acceptance, integration, and unit testing (UAT).
To comprehend the technical specifics of features and create test cases that address both
functional and non-functional aspects, collaborate closely with developers.
Make sure your test cases are thorough and address a range of situations.
Work alongside developers to replicate and comprehend defects that have been reported.
Keep lines of communication open to discuss fixing defects and confirming fixes.
Work together in order to incorporate automated testing into the pipeline for continuous
integration with the development team.
Make sure that automated tests cover essential features and help to accelerate and improve the
quality of testing.
SQA (Software Quality Assurance) Team Collaboration
Work together with the development and testing teams to ensure that the SQA procedures are in
line with the overall aims and objectives of the project.
Make sure the software development life cycle seamlessly incorporates quality assurance
procedures.
Work together with testing teams to establish metrics and key performance indicators (KPIs) for
evaluating the status and caliber of projects.
Report on SQA operations and the project's general status regularly.
Work together with every team to find areas where procedures, instruments, and approaches can
be continuously improved.
Have retrospective meetings to get suggestions and ideas for enhancements.
Assist the training coordinator in making sure team members receive training on quality assurance
procedures and resources.
Lead information-sharing meetings to help the project teams share best practices.
User and Stakeholder Collaboration
Involve stakeholders and end users in the UAT procedure to make sure the HMS satisfies their
needs and expectations.
Work closely with users to collect their feedback and make the necessary modifications.
Create feedback loops with stakeholders to get their opinions on performance, usability, and any
other needs.
Make sure that in later development iterations, user feedback is taken into account.
4. SQA Processes

Documentation Review:
The Hospital Management System project documentation review will be carried out through a
collaborative meeting review methodology. This approach guarantees in-the-moment
conversations between team members, important stakeholders, and pertinent parties to improve
the overall quality of project documentation and coincide with it with the specific requirements of
the system

.Code
Review:
Since the code of the Hospital Management System is written in C++, we will be doing code
reviews by examining the initial components instead of doing a thorough analysis of the entire
code.

Testing Processes:
We will employ both white-box and black-box testing methodologies. For these testing techniques,
test cases will be created, and a thorough review report will be recorded.
5. SQA Standards and Guidelines
A Hospital Management System (HMS)'s quality and dependability can only be guaranteed by
setting and adhering to Software Quality Assurance (SQA) standards and guidelines. When
suitably adjusted to the particular requirements of the HMS project, these standards and guidelines
can aid in the development of a strong framework for quality assurance, ensuring the delivery of
an excellent and legally compliant hospital management system.

Industry Standards
ISO 9001: Quality Management System
Purpose: The goal of ISO 9001 is to provide standards for a quality management system. It is a
globally accepted standard.
Relevance: Ensures adherence to globally accepted quality management principles during the
HMS development process.
ISO 13485: Medical Devices - Quality Management Systems
Purpose: ISO 13485 specifies requirements for a quality management system that are specifically
relevant to the medical device industry.
Significance: Verifies that the HMS conforms to medical device-specific quality management
standards.

Internal coding standards and conventions
IEEE 1063: Standard for Software User Documentation
Goal: Establishes the structure and content of software user manuals.
Relevance: Ensures that the HMS user manual is clear and consistent.
Internal Coding Standards
Goal: Specifies formatting, naming conventions, and code writing guidelines.
Relevance: Enhances team-wide consistency, readability, and maintainability of code.
Guidelines for Code Reviews
Goal: Describe the steps and standards involved in carrying out code reviews.
Relevance: Guarantees that code is methodically examined for correctness, conformity to
guidelines, and possible problems found

Testing standards and guidelines
IEEE 829: Standard for Software Test Documentation
Goal: Establishes a uniform structure for different types of test documents, including test plans
and test cases.
Significance: Offers a methodical approach to recording and overseeing testing operations.
Standards set forth by the International Software Testing Qualifications
ISTQB (International Software Testing Qualifications Board) Standards
Goal: A set of guidelines for software testing, including test procedures, test design strategies,
and test management, are provided by the ISTQB.
Relevance: Guarantees that testing procedures conform to internationally accepted best practices.
Availability Guidelines for Testing:
Goal: Specifies standards and procedures for evaluating the HMS's usability for people with
disabilities.
Relevance: Guarantees that a wide variety of users can access and utilize the HMS.
6. Metrics and Measurements

Definition of key performance indicators (KPIs) for SQA
Defect Density
Definition: Defects found per thousand lines of code, or the number of defects found per unit of
code size.
Objective: Evaluates how well the testing procedure finds defects.
Testing Efficiency
Definition: The proportion of successfully completed test cases to all test cases that were run.
Goal: Evaluates how well the testing procedure performs in terms of successful validations.
Test Coverage
Definition: The proportion of the system that test cases cover.
Goal: Denotes the degree of testing done on various parts and functionalities.
Code Review Effectiveness
Definition: The proportion of serious problems found in code reviews.
Goal: Evaluates how well code reviews identify possible problems in advance.
Test Automation Coverage
Definition: The proportion of serious problems found in code reviews.
Goal: Evaluates how well code reviews identify possible problems in advance.

Process for collecting and analyzing metrics
Method of Data Collection
Establish procedures and tools for tracking defects, gathering data on testing activities, and
conducting code reviews.
Frequent Locations for Data Collection
Establish regular timeframes or benchmarks, like the conclusion of every sprint or development
cycle, for gathering metrics data.
Metrics Collection Automated
Include automated methods for gathering data from defect tracking, version control, and testing
tools.
Methods of Data Analysis
Create processes for evaluating gathered data in order to extract insightful information.
Analyze trends and patterns using statistical techniques to pinpoint areas that need improvement.
Cause-Related Analysis
Analyze the underlying causes of any critical problems found in metrics.
To address flaws and inefficiencies at their root, identify their underlying causes.

Regular reporting of SQA metrics to project stakeholders
Reports on a Schedule: Set up a regular reporting schedule, like weekly or monthly reports, for
SQA metrics to project stakeholders.
Presentation of the Dashboard: Present metrics in a way that is easy to understand by using
charts, dashboards, and visual representations.
Narrative Insights: Measures should be accompanied by narrative insights and explanations to
set the scene, draw attention to noteworthy developments, and highlight trends.
Comparative analysis: To evaluate performance in relation to expectations, compare current
metrics with historical data or industry benchmarks.
Practical Suggestions: Include doable suggestions for ongoing improvement that are based on
metrics analysis.
Feedback sessions with stakeholders: Hold frequent feedback sessions with stakeholders to
talk about metrics, resolve issues, and get suggestions for enhancements.
Openness and Responsibility: Encourage a transparent and accountable culture by providing all
pertinent stakeholders with open access to metrics and progress reports.
7. Training and Competency

Training programs for SQA team members
Healthcare Domain Training:
Goal: Educate the SQA team on the healthcare domain, including industry jargon, legal
requirements (like HIPAA), and the unique difficulties associated with healthcare software.
Recognizing the Architecture and Workflow of HMS:
Goal: Assure that the SQA team is well-versed in the HMS architecture, workflows, and how
different modules like electronic health records, patient management, and billing—interact with
one another.
Compliance and Security Training:
Goal: To guarantee that the team complies with industry standards, offer training on patient data
security, healthcare data compliance, and privacy laws.
Instruction in Healthcare Workflow Testing:
Goal: Gain experience testing workflows unique to the healthcare industry, including those
involving patient admissions, lab testing, prescription administration, and discharge procedures.
Training for Patient Experience and Usability:
Goal: Become more proficient in evaluating and guaranteeing the HMS's usability and good patient
experience.
Coordination and Communication Instruction:
Goal: Educate the group on testing integrations for smooth data exchange with external entities,
labs, and other healthcare systems.
Training for Telemedicine Testing:
Goal: Prepare the group to evaluate telemedicine features and guarantee the seamless incorporation
of virtual consultation features.

Evaluation of SQA team competency
Domain-specific Evaluations:
Method: Conduct assessments to gauge the team's comprehension of particular HMS workflows,
compliance requirements, and healthcare domain concepts.
Exercises in Scenario-Based Testing:
Method: Design scenario-based testing exercises that mimic actual healthcare situations and
assess the team's capacity to recognize and resolve possible problems.
Examining test plans and cases:
Method: Examine test cases and test plans on a regular basis to determine how well they match
the requirements of the healthcare domain and the unique features of the HMS.
Audits of Security and Compliance:
Method: Perform audits to make sure the SQA team complies with healthcare data protection
regulations and security best practices.
Feedback from Usability Testing:
Method: Gather input on the effectiveness of the usability testing efforts, including observations
about how well the HMS satisfies the requirements of medical professionals and enhances
patient experiences.
Results of Interoperability Testing:
Method: Evaluate interoperability test results to make sure the HMS can successfully interface
with external systems and facilitate smooth data exchange.

Continuous improvement plans
Mechanism of Feedback:
Provide a feedback channel so that the SQA team can share their thoughts on the training they
received, the difficulties they encountered, and the areas in which they felt more support was
required.
Incorporate User Input:
Actively seek out and take into account end-user and healthcare professional feedback to
improve the testing procedure.
Post-Deployment Assessments:
After significant releases, carry out post-implementation reviews to find areas where testing
procedures and techniques need to be improved.
Acquiring Knowledge from Imperfections:
Examine any flaws found during testing and take advantage of the chance to grow and learn from
them.
Frequent exchange of knowledge Sessions:
Plan frequent knowledge-sharing meetings where team members can discuss insights discovered
while testing particular HMS features.
Instruction Refreshers:
Organize recurring refresher training sessions to ensure that the team remains informed about
developments in the healthcare industry, regulatory mandates, and HMS upgrades.
Interdepartmental Cooperation:
To improve cross-functional knowledge, encourage cooperation with other HMS project teams,
such as the development and user experience teams.
Trade Shows and Online Seminars:
To stay up to date on industry trends and best practices, encourage participation in software
testing and healthcare conferences and webinars.
Programs for Certification:
Assist colleagues in acquiring pertinent certifications in software testing and healthcare IT to
bolster their professional backgrounds.
8. Tools and Resources

SQA tools used for code review, testing, and defect tracking
Code Evaluation:
Tool: GitHub/GitLab Review of Pull Requests:
Goal: Enables feedback, version control, and collaborative code review.
Qualities:
Commenting inline during code review.
utilizing version control integration to monitor modifications.
Testing:
Tool: Selenium is an automated testing tool.
Goal: Conducts automated testing of web applications in various browsers.
Features: Multi-programming language support.
Combining testing frameworks for effective test scripting integration.
Unit testing tool: JUnit/TestNG
Frameworks for creating and executing unit tests are the goal.
Features: Test configuration annotations.
testing with parameters for various inputs.
Tool: Postman is a tool for testing APIs.
Helps make testing web services and APIs easier.
Features include an easy-to-use interface for creating and submitting HTTP requests.
Allows API test automation.
Defect Tracking:
Tool: Jira as a Defect Tracking Tool:
Goal: Oversees and coordinates the development of software and the fixing of problems.
Features: Workflows for the defect lifecycle that are customizable.
Integration with testing tools and code repositories.
Tool: Bugzilla
An open-source defect tracking system is the goal.
Features: Detailed bug reporting and tracking tools.
Email integration for notifications

Hardware and software resources required for SQA activities
In the context of the Hospital Management System, the SQA team can efficiently carry out code
reviews, testing, and defect tracking tasks by utilizing a combination of these SQA tools and
assigning suitable hardware and software resources. The success of the quality assurance process
as a whole is influenced by regular updates, training, and keeping up with developments in
technologies for statistical quality assurance.
Hardware Resources
Exceptional Workstations:
The goal is that SQA team members need strong workstations to run resource-intensive testing
tools and processes.
Test servers that are dedicated:
Goal: Dedicated servers for conducting performance testing and simulating real-world
conditions.
Infrastructure for Virtualization:
Goal: Makes it possible to build virtual testing environments to evaluate compatibility between
various operating systems and configurations.
Infrastructure for Networks:
Goal: dependable, fast network connectivity so that the HMS system can be accessed and tested.
Software Resources
Software for Test Management:
Tools for test case management, execution, and reporting, such as Zephyr or TestRail.
Tools for Database Management:
The goal is to manage and query databases using SQL Server Management Studio or comparable
tools.
Tools for Continuous Deployment and Integration (CI/CD):
Goal: Build, test, and deployment process automation using Jenkins, GitLab CI, or related
technologies.
Tools for Cooperation and Communication:
Goal: SQA team members can collaborate and communicate more effectively by using tools like
Microsoft Teams and Slack.
Tools for Documentation:
Use Confluence, the Microsoft Office Suite, or comparable programs to create and manage SQA
documentation.
Tools for Testing Browser Compatibility:
The goal is to test the HMS on a range of devices and browsers using tools such as Sauce Labs
and BrowserStack.
Version Control Framework:
The goal is to use Git, SVN, or comparable tools for code development collaboration and version
control.
Tools for Security Testing:
Tools such as Burp Suite and OWASP Zap are used to test the HMS's security.
Tools for Monitoring and Logging:
Tools like Nagios and ELK Stack are used to monitor system performance and log errors.
9. Schedule and Milestones

Timeline for SQA activities throughout the project life cycle
The SQA team assures an organized and thorough approach to quality assurance throughout the
whole Hospital Management System project life cycle by following this schedule and hitting these
benchmarks. A key factor in the overall effectiveness of the SQA procedures is regular
communication and cooperation with other project teams.
Project Start-Up:
Planning for SQA (Weeks 1-2):
Create a thorough SQA plan that details approaches, techniques, and resource needs.
Determine the important parties and what part they play in the SQA process.
Requirements and Design Phase:
Check the Requirements for Weeks 3–4:
Start going over the functional and non-functional requirements to find any possible problems
early on.
Work together with stakeholders to guarantee completeness and clarity.
Design Inspection (Weeks 5–6):
Examine design documents to make sure they comply with specifications.
Check for adherence to coding standards and design principles.
Development Phase:
Reviews of Code (Ongoing):
To identify coding errors and guarantee adherence to coding standards, implement routine code
review procedures.
For efficiency, incorporate automated code analysis tools.
Comparing unit testing to parallel development
Create and run unit tests concurrently with the coding stage.
Make sure all essential functionalities are covered by unit tests.
Testing Integration (Week 10–12):
As modules are finished, start the integration testing process.
Assure effective coordination and communication between the testing and development teams.
Phase of Testing:
Testing the system (weeks 13–15):
Conduct thorough system tests that cover all possible outcomes.
Check that various modules and functionalities are integrated.
Testing for User Acceptance (Week 16–18):
During UAT, work together with end users to make sure the system lives up to their expectations.
Respond to criticism and problems found during UAT.
Testing Performance (Week 19–20):
To make sure the HMS can handle expected loads, test its performance.
Adjust performance in light of test findings.
Phase of Deployment and Maintenance:
Testing for Regression (Ongoing):
Continuous regression testing should be used to make sure that defects are not introduced by new
updates.
For efficiency, automate regression testing.
Monitoring Following Deployment (Week 21–24):
Keep an eye out for any problems or performance concerns with the HMS in the real-world
setting.
Apply any updates or patches that are required in light of actual usage.

Milestones and deliverables for SQA processes
Approval of SQA Plan (End of Week 2):
Product: The approved SQA plan.
Milestone: The first stage of SQA activity planning is finished.
End of Week 4 Requirements Review Completed:
Deliverable: A report outlining the issues found during the requirements review.
Milestone: Verification of the completeness and clarity of the requirements.
End of Week 6 Design Inspection Report:
Deliverable: A report on the design inspection that includes recommendations and issues found.
Milestone: The design inspection phase is finished.
Reports on Code Reviews (Ongoing):
Deliverable: Continual reports on code reviews.
Milestone: Constantly raising the bar for standard compliance and code quality.
Sign-Off on Integration Testing (Week 12 End):
Deliverable: A report detailing the results and issues found during integration testing.
Milestone: System testing readiness and module integration validation.
UAT Completion Report, Week 18's End:
Deliverable: UAT completion report with comments and information on how to resolve issues.
End-user validation of the HMS is a milestone.
End of Week 20 Performance Testing Results:
Deliverable: A report on performance testing that includes results and optimizations.
Milestone: Confirmation that the HMS can manage expected loads.
Framework for Regression Testing Implemented (Ongoing):
Deliverable: Regression testing framework that is automated.
Milestone: Regressions can be found and addressed efficiently.
End of Week 24 Post-Deployment Monitoring Report:
Deliverable: A monitoring report with conclusions and suggestions following deployment.
Milestone: Verification of HMS functionality and stability in an operational setting.
10. Risks and Contingencies

Identification of potential risks to SQA activities
Limitations on Resources:
Risk: Inadequate staffing and testing equipment, among other resources.
Impact: Compromised test coverage and testing activity delays.
Reduction of damage: Members of the team should receive cross-training to increase resource
flexibility. Work together with the project management group to assign extra resources as
needed.
Modifying Requirements:
Risk: Project requirements are subject to frequent changes during the development stage.
Impact: Potential flaws, scope creep, and testing delays.
Reduction of damage: Create a strong change control procedure. Communicate with stakeholders
on a regular basis to set testing requirements.
Integration Difficulties:
Risk: Difficulty integrating various HMS modules.
Impact: Possible flaws in the live environment, delays in integration testing.
Reduction of damage: Put continuous integration techniques into practice. Test integration
frequently and early.
Privacy and Data Security Concerns:
Risk: Possible privacy violations or security flaws.
Impact: Legal ramifications and compromised patient data.
Prevention: Perform extensive security testing.
Update security measures frequently in accordance with industry best practices.
Technological Stack Interoperability:
Risk: Problems with the selected technology stack's compatibility.
Impact: Testing activities may be disrupted and systems may fail.
Prevention: During the planning stage, confirm that the technology stack is compatible. Update
and patch technological components on a regular basis.
Absence of User Participation in UAT:
Risk: User Acceptance Testing (UAT) participation among users is low.
Impact: Possible usability problems and insufficient feedback.
Prevention: Throughout the development process, maintain close communication with end users.
Tell stakeholders exactly how important UAT is.
SQA Team Not Getting Enough Training:
Risk: The SQA team may not have received enough training on new tools or techniques.
Impact: Potential testing oversight and decreased efficiency.
Establish a formalized training program as a mitigation measure.
Offer opportunities for ongoing learning.

Contingency plans for mitigating risks
The robustness of the SQA process within the Hospital Management System project will be
improved by routinely monitoring possible risks and quickly putting backup plans into action. This
will help to ensure successful testing and quality assurance results. Following are some backup
plans for reducing risks.
Limitations on Resources:
Cross-train team members to perform various roles as a backup plan.
Next Steps:
Determine the team's critical competencies.
Lead training programs to improve cross-functional skills.
Ensure a reserve of backup resources.
Modifying Conditions:
Backup Plan: Establish a strong change management procedure.
Steps to Take: Keep track of all modifications and how they affect testing.
Inform stakeholders and the SQA team of changes on a regular basis.
If more resources are required, set them aside for testing.
Integration Difficulties:
Early and regular integration testing is the backup plan.
Steps to Take: Put continuous integration procedures into practice.
Test the integration of modules as they are developed.
Create a space specifically for integration testing.
Privacy and Data Security Concerns:
Security testing and regular updates are part of the Contingency Plan.
Next Steps:
Perform penetration tests and security audits on a regular basis.
Keep up with the most recent security flaws and threats.
Work together with security professionals to quickly resolve issues that are found.
Technological Stack Interoperability:
Contingency Plan: Ascertain compatibility in advance of planning.
Next Steps:
Conduct thorough evaluations of the technology stack.
Updates and patches for every component should be kept up to date.
Provide backup plans for important parts.
Absence of User Participation in UAT:
Contingency Plan: Throughout the development process, work closely with end users.
Next Steps:
Arrange frequent get-togethers with end users.
Make sure they understand how important it is for them to participate in UAT.
Provide tools that are easy to use for gathering feedback.
SQA Team Not Getting Enough Training:
Create a formalized training program as a contingency plan.
Next Steps:
Determine precise training requirements by conducting frequent evaluations.
Invest in outside workshops and training courses.
Urge colleagues to obtain the necessary certifications.
11. Communication Plan

Communication channels within the SQA team
Meetings as a team:
Weekly is the frequency.
Goal: Talk about current initiatives, difficulties, and advancements.
Participants: The whole SQA group.
Everyday Stand-Ups:
Daily (during critical phases) frequency
Goal: Concise updates on each person's work, obstacles, and collaboration.
Participants: Members of the SQA team.
Platforms for Collaboration:
Tools: Microsoft Teams and Slack
Updates, fast questions, and real-time communication are the goals.
Participants: Members of the SQA team.
Email correspondence:
Formal documentation, the exchange of comprehensive data, and project announcements are the
goals.
Participants: Members of the pertinent SQA team.
Tools for Task Management:
Tools: Trello and Jira
The goal is to assign duties, keep track of tasks, and evaluate results.
Participants: Members of the SQA team.
Collaboration on Documents:
Tools: Microsoft Office Online and Google Workspace
Goal: Sharing reports and cooperatively editing documentation.
Participants: Members of the pertinent SQA team and document owners.

Reporting mechanisms to project management and stakeholders
Status Reports Every Week:
Weekly is the frequency.
Beneficiary: Project Manager, Interested Parties
Content: Summary of duties finished.
Current state of the ongoing projects.
Issues found and the state of their resolution.
Quarterly Reports:
Frequently: Upon reaching every significant milestone
Beneficiary: Project Manager, Interested Parties
Content: Recap of significant accomplishments.
Metrics for the advancement of the test.
Recommendations and lessons learned.
Reports of defects:
Whenever necessary (during testing phases)
Recipients: Project Manager, Development Team
Content: Summary of the flaws found.
each defect's priority and severity.
recommendations for mitigation or settlement.
Reports on UAT Feedback:
Regularity: Following User Acceptance Testing (UAT) completion
Recipients: End users, Project Manager
Content: Synopsis of UAT operations.
An overview of user comments and problems found.
Suggestions for development.
Reports on Performance Testing:
Often: Following the conclusion of performance evaluations
Recipients: System Administrators and Project Managers
Content: Performance test results.
examination of the behavior of the system at various loads.
Suggestions for optimizing performance.
Hazard and Unpredictability Reports:
Regularity: As required (when major risks are identified)
Beneficiary: Project Manager, Interested Parties
Content: Determining possible threats to SQA operations.
Plans for contingencies to minimize risks.
Status of emergency plans put into action.
Complete Report on Release:
Usually at the conclusion of the project
Beneficiary: Project Manager, Interested Parties
Content:
A summary of the whole SQA procedure.
An overview of the test findings.
Important indicators and accomplishments.
Suggestions for upcoming initiatives.
Frequent Gatherings of Stakeholders:
Frequency: Every two months or as required
Receiver: Interested Parties
Content: Executive summaries of project developments.
answering questions and concerns from stakeholders.
requesting opinions and recommendations.
12. Approval and Sign-off

Criteria for SQA plan approval
Entire Coverage:
Criteria: Every facet of the SQA process, such as testing approaches, procedures, roles and duties,
and resource needs, should be thoroughly covered by the SQA plan.
Compliance with Project Goals:
Criteria: The Hospital Management System project's overarching aims and objectives should be in
line with the SQA plan.
Clearly defined roles and duties:
Criteria: To ensure accountability for every step of the quality assurance process, roles and
responsibilities within the SQA team should be clearly defined.
Standards and Methodologies for Testing:
Criteria: To ensure uniformity and adherence to industry best practices, the plan should specify the
testing standards and methodologies to be used.
Method of Risk Management:
Criteria: A strong risk management strategy that identifies potential hazards and lays out mitigation
plans should be part of the SQA plan.
Allocation of Resources:
Criteria: Enough manpower, equipment, and infrastructure should be set aside to carry out SQA
tasks in an efficient manner.
Plan of Communication:
Criteria: A thorough communication plan that identifies the channels, frequencies, and parties
participating in the process of communication should be included in the plan.
Process of Review and Approval:
Criteria: It should be made clear how test plans and reports, among other SQA deliverables, are
reviewed and approved.
Flexibility and Scalability:
Criteria: The plan must be flexible enough to adjust to changing conditions and scalable to account
for modifications in the project's requirements or scope.
Measurable Measures:
Criteria: Measurable metrics for evaluating the efficacy of the quality assurance procedure should
be defined in the SQA plan.

Sign-off process by project stakeholders
Examine and Comment:
Process: Stakeholders thoroughly examine the SQA plan, which includes project managers,
product owners, and important users.
Regarding lucidity, comprehensiveness, and congruence with project objectives, input is gathered.
Editing and clarification:
Procedure: The SQA team takes into account any input it receives and updates the SQA plan as
necessary.
Stakeholders receive clarifications on any questions or issues.
Meeting of Approval:
Procedure: To present the updated SQA plan, a formal meeting with the pertinent stakeholders is
arranged.
The SQA team adds more context and explains the changes made in response to comments.
Illustration of Crucial Components:
Process: The SQA team walks through the main components of the plan, including communication
channels, risk management techniques, and testing methodologies. Stakeholders are able to raise
queries and request more information.
Assurance of Alignment:
Procedure: Stakeholders attest to the updated SQA plan's compliance with project goals and
expectations.
During this phase, any unanswered questions or concerns are addressed.
Official End-of-Sign:
Procedure: A formal sign-off is obtained once stakeholders are satisfied with the SQA plan and its
compliance with project requirements.
Stakeholders attest in writing to their approval.
Distribution of the Licensed Scheme:
Procedure: All pertinent team members and stakeholders receive a copy of the approved SQA plan.
The project team keeps an easy-to-access central repository.
Ongoing Evaluation:
Process: Over the course of the project, the SQA plan is continuously reviewed.
Stakeholders are promptly informed of any modifications or updates to the plan.
This SQA plan serves as a roadmap for ensuring the quality of the hospital management system
throughout its development life cycle. It should be reviewed and updated regularly to accommodate
changes in project requirements, technology, or organizational processes
Now the
Hospital Management System Review Report
1. Executive Summary
The Hospital Management System was reviewed focusing on functionality, structure, and
adherence to best practices.
2. Introduction
The primary purpose of the review of the Hospital Management System is to ensure the software's
quality, reliability, and maintainability. The review aims to identify both positive aspects and areas
for improvement in the codebase, contributing to the overall enhancement of the system's
functionality. The review will encompass the entire codebase of the Hospital Management System.
This includes but is not limited to, modules responsible for patient registration, login
authentication, data display, and any other functionalities integral to the system's operation.
Objectives:
Evaluate Functionality and User Experience:
Assess the functionality of critical system components such as patient registration, login, and data
display, ensuring they meet the specified requirements.
Identify Opportunities for Optimization:
Identify areas where code optimization can be implemented to enhance system performance and
resource utilization.
Validate Data Integrity Measures:
Verify that the code incorporates robust data validation mechanisms, preventing invalid or
inconsistent data entries.
Review Error Handling:
Evaluate the effectiveness of error-handling mechanisms, ensuring that users receive informative
messages in case of unexpected situations.
3. Functionalities
3.1. Registration and Admission

Strengths:
Registration Logic: The logic for patient registration includes a check for duplicate
entries, preventing the addition of patients with the same name and age.
Login Validation: The login functionality verifies patient credentials, providing feedback
on the success or failure of the login attempt.
Areas for Improvement:
Streamlining data entry to reduce redundancy: Streamlining data entry to
reduce redundancy involves optimizing the process of entering information into a
system to eliminate unnecessary duplication and enhance efficiency so that one
entry doesn’t get duplicated multiple times resulting in ambiguity.
3.2. Patient Management
Strengths:
Data Display: The displayPatients() function effectively presents patient data in a tabular format,
enhancing readability.
Comprehensive patient records:
By consolidating information such as diagnostic reports, medication history, treatment protocols,
and follow-up care, comprehensive patient records enable healthcare professionals to make
informed decisions, tailor treatments to individual needs, and coordinate care seamlessly.
Effective patient tracking:
Effective patient tracking refers to the seamless and accurate monitoring of patients throughout
their healthcare journey. This involves utilizing technology and systems that enable healthcare
providers to easily trace and manage patients' progress from admission to discharge.
Areas for Improvement:
Enhancing search and retrieval functionalities: Enhancing search and retrieval functionalities
involves improving the capability of a system to efficiently and accurately find and access
information. It will include in making the system more efficient for users to access.
3.3. Appointment Scheduling
Strengths:
Well-organized scheduling system: It will facilitate the efficient coordination of patient visits and
healthcare provider availability allowing patients to book appointments conveniently.
Reminder mechanisms: The reminder mechanism will help improving patient engagement and
appointment adherence. It operates by automating the process of notifying patients, healthcare
providers, or administrative staff about upcoming appointments or medical tasks. Users can
configure their reminder preferences, including communication channels (such as email, SMS, or
phone calls).

Areas for Improvement:
Optimization for handling emergency appointments: Optimization for handling emergency
appointments will involve prioritizing urgent cases, ensuring rapid access to care. This includes
implementing a streamlined process for immediate appointment scheduling, quick communication
to relevant healthcare providers, and efficient allocation of resources. Therefore if any emergency
occurs there is a proper way to handle it without having to risk the patients.
4. Security

Strengths:
Access controls and user authentication: It will include ensuring data security and privacy by
preventing unauthorized access to sensitive information. It could be done by putting user
authentication mechanisms, such as password protection and multi-factor authentication, verify
user identities, safeguarding patient data and maintaining compliance with privacy regulations.
Audit trail for system activities: The implementation of an audit trail for system activities within
the Hospital Management System (HMS) is a notable strength. This enables broad monitoring and
tracking of user interactions, ensuring accountability and transparency in the system. The audit
trail is vital for identifying potential security holes, investigating incidents, and maintaining a
secure and compliant healthcare environment.

Areas for Improvement:
Regular security assessments and updates: Routine assessments help identify vulnerabilities or
gaps in the system's security architecture, allowing for prompt remediation. Regular updates to
security protocols, software, and patches are essential to lessen emerging threats and ensure the
system remains resilient against evolving cybersecurity risks.
5. User Interface

Strengths:
Intuitive design: A design that refers to a user interface or product design that is inherently easy
to understand and use, requiring little to no explanation for users to grasp its functionalities. It
consists of elements that are organized and presented in a way that aligns with users' expectations
and prior knowledge, making the interaction with the product or system feel natural.
User-friendly navigation: The user-friendly navigation enhances the overall user experience,
ensuring that users can swiftly and effectively perform their tasks within the system making the
functionalities and operations understandable.

Areas for Improvement:
Consistency in UI elements across modules: There is room for improvement in achieving
consistency across UI elements and modules. Ensuring uniformity in design elements, such as
buttons, icons, and layouts, throughout different sections of the system is crucial.
6. Performance

Strengths:
Responsive system performance: Users experience a system that promptly responds to
commands and requests, facilitating efficient navigation and task execution. This responsiveness
contributes to a positive user experience and ensures timely access to critical information within
the healthcare environment.

Areas for Improvement:
Regular performance monitoring and optimization: To further enhance the performance of the
HMS, there is a need for regular performance monitoring and optimization. Implementing a
systematic approach to monitor system performance. Regular optimization measures, such as code
improvements, database tuning, and infrastructure upgrades, can then be implemented to address
any performance issues proactively.
7. Documentation

Strengths:
Comprehensive system documentation: Comprehensive system documentation provides users,
administrators, and developers with detailed insights into the functionalities, configurations, and
processes within the HMS. This serves as a valuable resource for understanding and utilizing the
system effectively.

Areas for Improvement:
Ensuring documentation is kept up-to-date: In a dynamic healthcare environment, the HMS
may undergo updates, feature enhancements, or changes in configurations. The documentation
must be regularly reviewed and revised to reflect these changes accurately. This guarantees that
users have access to current and reliable information, facilitating proper system utilization and
minimizing confusion.
8. Testing

Strengths:
White box and black box testing: The testing procedures for the Hospital Management System
(HMS) demonstrate strength in employing both white box and black box testing methodologies.
White box testing examines the internal logic and structure of the system, while black box testing
assesses its functionality without detailed knowledge of the internal code. This dual approach
ensures a comprehensive evaluation of the HMS, covering both code-level intricacies and userlevel functionalities.

Areas for Improvement:
Enhancing test coverage for critical functionalities: Despite the existing strengths, there is a
necessity to enhance test coverage specifically for critical functionalities within the HMS.
Expanding test coverage for critical functionalities helps identify potential vulnerabilities or issues
in mission-critical aspects of the system, allowing for proactive resolution of these concerns.
9. Recommendations:
The Hospital Management System (HMS) exhibits strengths in its intuitive design, responsive
system performance, and rigorous testing procedures, employing both white-box and black-box
testing methodologies. Notable strengths include comprehensive system documentation, userfriendly navigation, and an audit trail for system activities. However, areas for improvement
include ensuring documentation remains up-to-date, enhancing test coverage for critical
functionalities, achieving consistency in UI elements across modules, and conducting regular
security assessments and updates. Recommendations for the HMS include implementing
proactive performance monitoring, fostering consistent user interface design, expanding test
coverage for critical features, and providing ongoing user training and support. By
addressing these recommendations, the HMS can evolve into a more robust, secure, and usercentric healthcare management system, aligning with regulatory standards and ensuring the
efficient delivery of healthcare services.
10. Conclusion:
In conclusion, the review of the Hospital Management System (HMS) highlights several
commendable strengths, including its intuitive design, responsive system performance, and
comprehensive testing procedures. The system's user-friendly navigation, audit trail for system
activities, and dual approach to testing through white box and black box methodologies are notable
strengths. However, areas for improvement have been identified, such as ensuring documentation
remains up-to-date, enhancing test coverage for critical functionalities, achieving consistency in
UI elements across modules, and conducting regular security assessments and updates. The
recommendations provided focus on proactive measures to address these areas, fostering a more
robust, secure, and user-centric healthcare management system. By implementing these
recommendations, the HMS can continue to evolve, meeting the needs of healthcare professionals,
administrators, and regulatory standards, ultimately ensuring the efficient and quality delivery of
healthcare services.
11. Approval
Obtain relevant stakeholders' approval for the review report.
Download