L OF QUANTITIES FOR DEEP 750FT BOREHOLE DRILLING WITH THICK HDPE CASING ITEM DESCRIPTION PRELIMINARIES 1 Mobilize to site all necessary equipment, materials and personnel and demobilize on completion. (a) Prepare site for drilling including (b) Setting up of rig, construction of mud pit etc. and dismantling and cleaning up of site on completion (c) Make provision of stabilizing the soft ground at the rig position with concrete to prevent sinking SUB-TOTAL-PRELIMINARIES (Carried to summary) QTY UNIT L.S L.S L.S RATE(N) AMOUNT(N) 150,000 450,000 150,000 150,000 450,000 150,000 750,000 www.edlinetech.com 2. (a) (b) (c) (d) (e) (f) (g) (h) 3. (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) BOREHOLE CONSTRUCTION Drill 350mm hole to accommodate 250mm diameter conductor casing Supply and install 300mm conductor casing Drill 250mm diameter borehole in sedimentary formation to accommodate installation of 140mm diameter casing pipe Carrying out test and submit borehole report Supply and install 140mm diameter HDPE casing pipe to API standard Supply and install 140mm diameter HDPE screens (16 bar) Supply and install casing aligning tool Supply and install gravel pack materials around the screen area and 5m above the top screen SUB-TOTAL-BOREHOLE CONSTRUCTION (carried summary) BOREHOLE COMPLETION Complete backfilling, sealing and cement grouting of upper part of borehole down to 8m from ground level Carryout borehole alignment test Carryout verticality test Develop borehole by back washing and jetting Develop borehole by airlifting with a compressor Develop borehole by over pumping until water is clear and sand free Supply and install of stainless steel submersible pump capable of delivering 10m3/hr at 60m Head complete with control panel and drop cable Supply and install 50mm diameter threaded riser pipes Construct and paint well head complete with fittings and 0.5m × 0.5m × 0.5m concrete pad Carryout a constant rate pumping to determine the yield of the borehole after development Collect and analyse water sample ( chemical and bacteriological) Disinfect pump, risers and borehole with chlorine 30 30 220 L,S 200 12 1 DESCRIPTION Preliminaries Borehole construction Borehole completion TOTAL Add 7.5 vat Total cost 30,000 15,000 40,000 300,000 15,000 40,000 45,500 65,000 900,000 300,000 8,800,000 300,000 3,000,000 480,000 45,500 65,000 13,890,500 Hr L.S L.S L.S 6 Hr 1 60 2 6 L.S No M L.S Hr L.S L.S B0REHOLE COMPLETION (carried to summary) SUMMARY ITEM 1 2 3 M M M L.S M M No L.S 80,000 90,000 20,000 80,000 90,000 120,000 30,000 80,000 500 24,000 50,000 40,000 00,000 180,000 80,000 000 30,000 24,000 50,000 40,000 00,000 1,384,000 AMOUNT 600,000 12,030,000 1,384,000 14,014,000 14,014,000