SP-1131: MRB Delivery Quality Check Number of People Involved _1_ Total Lead Time ______ Special Requirements Procedure Overview Instructions and Explanations Key Point Images MRB Handover Requirement Vendor Handover MRB 1) IM coordinator will get email notification from to PDO. 1- E-mail notification to IM coordinator vendor that MRB is loaded in live link or DCS 2- Folder structure 2) IM coordinator will download the MRB folder & MRB structure will be as shown in the image 2 3) MRB folder should contain CSV file of all Documents listed on VDS, including A00, A01 & A02. All VDS document should be approved with code A or Certified Final (CEF) and As Built (ASB) stamped on drawings. (refer SP-1131) Business Improvement IM, UOI4 Version: 1.0 3-CSV file Date: May 2020 Page: 1 of 5 SP-1131: MRB Delivery Quality Check 3.1. Coversheet Template 3.1 MRB Template for MRB (A00), shall include all information such as (project name /PO# / doc. title/doc# / revision/ date /approval code/ stamp & signature) 3.2. MRB Vendor Document Schedule – VDS (A01), ensure: - drawings are split into sheets and delivered as a separate file, for VDRL doctypes containing tags (ie PEFS/UEFS (D02), SLD 3.2 VDS (A01) (D03), etc). Eg PEFS drawing type with 11 sheet will deliver 11 files - Other drawings are collated and group as one file against doctype, for VDRL doctypes which does not contain tags (ie C02, C04, C03, etc. Eg a 15 sheet sectional drawings will be delivered as one file of C04 with 15 sheets. - Non-drawing VDRL doctypes generated from each sections like E00, L00, G00, etc, are collated and delivered under section codes like E00. Eg L00 VDRL doctype includes delivery of L01, L03, L05, L06 & L07; all shall collated and delivered against L00 doctype - In all cases, when a handover file is greater than 200MB, then it shall be split as per SP-2065. Business Improvement IM, UOI4 Version: 1.0 Date: May 2020 Page: 2 of 5 SP-1131: MRB Delivery Quality Check 3.3 MRB Index (A02) 3.3. MRB Index (A02) IM Coordinator must confirm that the count of the documents, which are in MRB Index, are matching the count of the documents in VDS. Also, the same and exact document numbers in the VDS must be the same as in the MRB Index 3.4 MRB QC list 3.4.MRB QC Checklist: IM Coordinators shall reference checklist, to ensure key QC points were covered i. CSV file: must be prepared by vendor to ensure that the CSV contains exact count and matching document numbers & revision, as found in the VDS and MRB index. ii. The document title information required in the CSV must match the Document titles given in the MRB Index and in the respective coversheets of the documents in the MRB iii. The document Status information required in the CSV must match the Stamp status (CEF) on the coversheets of the documents in the MRB. iv. The document type information required in the CSV must be available within the list of vendor document types in the approved PLIP for the concerned project, Business Improvement IM, UOI4 Version: 1.0 Date: May 2020 Page: 3 of 5 SP-1131: MRB Delivery Quality Check and the VDRL requirement for the scope of work/material to be delivered/constructed/ installed by the concerned vendor/third party. v. The ‘File Name’ information required in the CSV must be the same as the file name given to each PDF file in the MRB followed by ‘.pdf’ vi. IM coordinator should ensure there is no duplicate document numbering Note: (refer MRB QC Checklist - image 3.4) 3.5. a) Shows VDRL Section 3.5. IM Coordinator refer Section 3 & 4 of MRB filing structure, to ensure that all drawings are captured as defined in 3.2 above, irrespective of the number of sheets per PDF file. Business Improvement IM, UOI4 Version: 1.0 Date: May 2020 Page: 4 of 5 SP-1131: MRB Delivery Quality Check 3.6 showing stamp of “Certified for Final” 3.6 IM Coordinator must check every section of MRB (not just section 3 & 4) to ensure that their coversheets have the Certified Final & As-Built stamp respectively. 3.7 IM Coordinator must check all documents of the MRB to ensure that they are legible and clear enough for use during Operations and Maintenance. Business Improvement IM, UOI4 Version: 1.0 Date: May 2020 Page: 5 of 5