Inspection Release Certificate (IRC) PROJECT NO : XXXXXX CUSTOMER: TANAP ASSIGNMENT NO: GEO-TPI-011 PO NO AND REV: TIS-002 REV P3-0 Inspector: AB Supplier: Nuova Pignone International S.r.l. Address: XXX Firenze Italy Contact Name: SC Phone: E-mail: IRC NO: Supplier Ref No.: Sub Supplier: INSPECTION REPORT NO: IRC-GEO002 Rev.02 VARIOUS N/A Various Address: N/A Contact Name: N/A XXXXX Phone: N/A SC@ge.com E-mail: N/A This Inspection Release Certificate provides documentation that the purchase order requirements for verification of quality, with the appropriate documentation, have been satisfactorily completed for the items indicated below. Complete Shipment Partial Shipment Last Partial Shipment IMPORTANT: The Supplier must obtain authorization to ship from the designated project personnel in addition to this inspection release before the shipment can be made. A copy of this IRC shall NOTbe transmitted from the Assigned Inspector to the Supplier. If this release is part of the Major Package Management Execution Plan, it must be approved by the Package Engineer. The Package Engineer will obtain approvals from Engineering and other stakeholders identified in the plan. PURCHASE ORDER ITEMS RELEASED Qty Ordered PO Line Item No. Qty Released Description Tag # 4.1 1 1 Main Line Turbo-Compressor Package 1 – CS5 CS5-XXX-101 CS5-KU-22-101 5.1 1 1 Main Line Turbo-Compressor Package 2 – CS5 CS5-XXXX-201 CS5-XXX-201 Comments and / or Conditions (Note – Conditional items must receive Inspection Services Coordinator approval before issuing IRC) Conditionally released, shall read in conjunction with attached WTA No. WTA-GEO-FIPL-002 and Punch List Nos. GEOMLV-FIPL-GEO-MLV-FIPL-013; 023; 029; 030; 031; 032; 037; 042; 043; 045; 046; 047; 048; 049; 053 Note 1: For details of released items, please refer to the attached cargo list and corresponding packing List. Note 2: IRC revised due to Revised packing list reflecting actual material shipped for CS5 compressors; AM; 26 September 2021. This certificate is a clearance of inspection only and does not relieve the supplier of contractual obligations. SUPPLIER (only required if IRC has conditions): Name: Date: Nuova Pignone International S.r.l. (GEO) Suppliers ITP has been signed off as complete by Supplier and Inspector: Non Conformance Reports Closed out: Yes No Yes Yes Suppliers Documentation Package has been reviewed by Inspector and is complete: TIS-PCD-QAC-GEN-002 No NA NA Supplier Punch List Items complete:(seePLs&WTA-GEO-FIPL-002 attached ) Rev 7 (24-Aug-16) 26-09-2021 No Yes NA No NA Page 1 of 2 Inspection Release Certificate (IRC) PROJECT NO : XXXXXX CUSTOMER: TANAP ASSIGNMENT NO: GEO-TPI-011 PO NO AND REV: TIS-002 REV P3-0 IRC NO: INSPECTION REPORT NO: IRC-GEO002 Rev.02 VARIOUS ASSIGNED INSPECTOR : Name: AB X Date: 26-09-2021 Date: 26-09-2021 Date: NA 26.06.2021 INSPECTION SERVICES COORDINATOR: Name: AM MAJOR PACKAGE ENGINEER Name: NA Distribution: Engineering Inspector Inspection Services Coordinator Expediter Major Package Engineer (if applicable) TIS-PCD-QAC-GEN-002 Rev 7 (24-Aug-16) Page 2 of 2