E-Service guide Revision No.: 1 page 1 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Indicate the service is available on e-service portal (http://am.abudhabi.ae/EServices) Revision No.: 1 page 2 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Strategic planning Department 3 Department of Public Relations and Communications 4 Municipality Theatre Reservation 5 Town Planinng Sector 8 Urban Planning Department 9 Services Lines Accessories Accreditation 10 Service Corridors Approval 12 Department of building license 14 Building Permit 15 Preparation of Architectural and Construction Plans 19 Permit for Parking Shades outside Land Borders 21 License for Major Projects 23 Maintenance and Decoration Permit 26 Building Permit Renewal 28 Pouring Concrete 31 Technical Certificates Issuance 33 Architectural and Construction Plans Approval 35 No Objection Certificate for Temporary Electricity Connection 37 No Objection Certificate for Permanent Electricity Connection 38 Retrival of Construction Waste Removal Deposit 40 Planned or Existing Project Amendment Permit 42 No Objection Certificate for Engineering Office licence Issuance and renewal 44 Building Demolition Permit 46 Regional Data Management 48 Land Plots Demarcation 49 Land Plot Approximate Demarcation 51 Qibla Determination 52 Land Construction Level Demarcation 54 Existing Fence Verification 56 Approved Services Lines Verification 58 Executed Services Plans Verification 60 Ground Control Point Coordinates 62 Site Clearance of Survey Control Points 64 Maps Issuance 65 Digital Data Licence 67 Digital Data Request 69 Land Plot Coordinates Digital Specification 71 73 Building-free Land Certificate 74 Infrastructure sector and municipal assets 75 Infrastructure & Services 76 Geophysical Study Approval 77 Internal Roads and Infrastructure Department 78 Permanent Entrance Permit 79 Traffic Accidents Damages Estimation 81 No Objection Certificate for Roads and Infrastructure Assets 83 Permit for Using Roads and Infrastructure Assets 85 Roads and Infrastructure Assets Disclosure 88 Department of Public Health 90 Veterinary Health Certificates 91 No Objection Certificate for Construction Sector 92 Municipal Service Sector 94 Department of Lands & Properties 95 Mortgage Release 96 Grant Registration 98 Heirs Registration 100 Lease Contract Termination 102 Properties Sale and Purchase Registration 104 Registration of Sale and Purchase through the Court 106 Mortgage Registration 108 Mortgage Alteration 110 Investment Contract Revocation 112 Properties Certificate 114 Merging Lands 116 Investment Contract Registration 118 Ownership Deed 120 Provisional and Industrial Lease Contracts Registration 122 Copies from the Municipality Records 126 Lease Contract Registration 128 Land Verification Certificate 130 Land Borders Annexation 132 The division of the land 134 Allocated Land Site Change 136 Communal Houses Allocation 138 Sign a commitment to let the evaluater to visit and enter the site 140 Temporary Lands Allocation 142 In-Kind Share Concession 144 Evaluation Certificate 146 Legal Name Change 148 Land Layout 150 Increasing Land Plot Area 152 Bequest Registration 154 To Whom it May Concern Certificate 156 Rental Units Registration 157 Permit for Land Usage by Projects 160 Registrar Relocation 162 Endowment Registration 164 Regional Service Sector 166 Department parks and recreational parks 167 Fighting Homes Palm Diseases 184 Site free Certificate of Irrigation Networks 185 Greenery Work Permit 186 Community Service Department 172 Gardens and Parks Reservation 173 Non Muslims Cremation Permit 175 Sports Facilities Reservation 177 Public Works Permit 179 Wedding Halls Reservation 181 182 Department parks and recreational parks 183 Fighting Homes Palm Diseases 184 Site free Certificate of Irrigation Networks 185 Greenery Work Permit 186 Support and Assistance sector 188 Tenders and Contracts Department 189 Commodities Purchase 190 Forage Card Issuance 192 Food Distribution Card 194 Accounts Department 196 Properties Contracts Renewal 197 To Whom it May Concern Properties Certificate 199 Grneral Manager office 201 Investment Office 202 Signs and Advertisements Permits 203 Strategic planning Department Revision No.: 1 page 3 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Department of Public Relations and Communications Revision No.: 1 page 4 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-PR&C-SC-01 Municipality Theatre Reservation Customers Description All Business Citizens This service aims to provide a stage for government, semi-government and private to provide events and celebrations in line with the standards and requirements of the competent authorities Please follow the following steps: Workflow 1- Access to the website for bookings 2- See the schedule and the rental value specified, and to follow specific steps to book 3- Provide the required documents 4- Review the client to manage the municipal offices (as soon as the text message is received approval) to complete the booking and payment of the rental value during a period not exceeding 3 three working days starting from the day following the receipt of the text message 5- Delivery check insurance worth AED 2000 and receipt amount Document Documents Special Conditions An official letter addressed to the Municipality of Al Ain to book a theater of the requesting party (stating the name of the person references) copy Passport or identity card copy (for citizens) Passport and has a residency page copy (for expatriates) Theatrical text with a leave of absence from the National Media Council passport with a picture of representatives (in the case of plays) copy Hits program in the case of celebrations copy Check worth AED 2000 - to secure reservations theater (in the case of checks on behalf of individuals: requires the presence of an official from the authorization to do so) out Revision No.: 1 page 5 Revision Date : 5/5/2014 Approval notification sent via email to the client, to be presented by him to manage the municipal offices Document Code.:AACM-CS-GL01 Fees Nil - The necessity to present the identity card in all transactions of Al Ain Municipality - The necessity to attach a photocopy of the passport or photocopy of ID ( for citizens speakers) and photocopy of the passport page with accommodations ( for arrivals speakers ) , and exempt all who are above the age of ( 18 years and under) . - The necessity to attach the theatrical text permission from the National Media Council in the administration of the play and attach a copy of the theatrical version, and the application will be considered cancelled in case of not attaching. - The necessity to attach the effectiveness program in the case of the celebrations, and the application will be considered canceled in in case of not attaching. - The necessity for a customer 's - E-mail within the (mandatory) requirements to record the application in the booking system. - Special Conditions - The obligation to pay the rental value within 3 working days from the day following the receipt of the text message of the preliminary approval to book the theater, where the public relation management has the right to cancel the booking in case of exceeding the allowable period for payment. - In case that the customer exceeded the allowable period of payment (defined above), the management of the municipal offices can receive the payment from him and perform his application provided that it does not exceed the allowable period with two days only. - Exemption (governmental and semi - governmental authorities and the public welfare authorities and community clubs) of the value of the booking and insurance. - The earliest period reservation of the theater is after 8 working days. - Maintain the theater clean, and not causing any damage. - The customer is responsible for the damage caused by misuse. - Revision No.: 1 page 6 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 - In case of damage, the Public Relation and Communications Management will notify the customer with the possibility of payment in cash at the offices of the service or through the insurance check, in the case that the client desires to pay cash, the payment is going to be received by the municipal offices and deposited into the book a theater specified account. - In the case of payment through the deduction from the insurance check, the check is delivered by the management of the municipal offices to accounts management in order to work according to the followed procedure 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 7 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector Town Planinng Sector Revision No.: 1 page 8 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Urban Planning Department Revision No.: 1 page 9 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-UP-SC-01 Services Lines Accessories Accreditation Customers Description All Business Citizens This service aims to permit the use and digging of land to extend the services lines for governments and semi-governments agencies which an NOC is issued against them for the use of public lands in establishing the department by the Head of State or the Executive council Please follow the following steps: Workflow Documents Fees 1- Apply the request 2- Receiving the accreditation letter with a certified plan Document Special Conditions (Cover Latter) copy Check list Paper Copy Key Plan Drawing size 1:10000 or 1:20000 scale of the city and 1:5000 desert areas Copy Accreditation scheme 1:1000 or 1:2000 scale of the city or (1:5000 desert areas - (1) size (A3) copy (Digital Data) equivalent to the requirements of town planning in terms of the program type, coordinates, symbols and colors used in accordance with the agreement concluded with the applicant - Nil - The necessary to present the identity card in all transactions of Al Ain Municipality Special Conditions - Commitment to the approved schemes and check with services section in the department if there is any change. - check with area section after determining services lines accessories before implementation. Revision No.: 1 page 10 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 - Submit the executive diagrams "As Built Drawing" in digital format immediately upon completion of the implementation conforms to the adoption issued with the submission of additional information for the line. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 11 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-UP-SC-02 Service Corridors Approval Customers Description All Business Citizens This service aims to adopt a spin-off sectors of the service lines is arrange spaces offs (segments) allocated for the extension of service lines in service description technical and contiguous to achieve the best use of available land. Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents 3- Receive book Muammtd with a certified scheme Document Documents Fees Special Conditions Cover Latter Original Check List Paper Copy Key Plan Drawing that covers the area of the project Copy Accreditation scheme 1:1000 or 1:2000 scale of the city or (1:5000 desert areas - (1) size (A3) 2 coppies Nil - The necessary to present identity card in all transactions of Al Ain Municipality - Availability of digital data license for the company. Special Conditions - Providing ducts (Ducts)) in every intersection according to the requirements of each service separately in terms the required diameter. - Providing ducts (Ducts) the future services lines, especially against electrecity stations and water reservoirs and pumping stations. - These ducts must be on the same ducts straightening services segments avoiding work Manholat or additional inspection rooms except for the roundabouts and bridges. Revision No.: 1 page 12 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 13 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector Department of building license Revision No.: 1 page 14 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-CP-SC-01 Building Permit Customers Description All Business Citizens The service aims to issuance of a building permit (new / add / building after demolition). Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents 3- Payment of fees 4- Pay Insurance of removal of construction waste Document Documents Revision No.: 1 Special Conditions Valid trade license of the contractor copy Insurance payment receipt on behalf of the executing company ( in the case of the lapse of one year to pay insurance audit, and if you add umbrellas or demolition conditional license there is no need to pay insurance ) copy Adoption of the signing of the court to the contractor copy A formal letter from the government agency or consultant (if any) commissioned by the contracting company to receive license - original Engineer Contractor business card or residence or origin factor data from the Ministry of Labour or investor Card ( not required for interior design license ) copy Investor card ( graduate certificate requests Eng ) card Eng accept if ( loan , a civil engineer , architect, engineer assistant ) ) copy Updated plot plan copy No-objection certificate from the Department of Health and Safety (EHS) page 15 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 copy To Whom It May Concern certificate issued by the Town Planning Sector approve the architectural plans and construction copy service lines detection books ( water electric - Contacts - Drainage ) If a new building or building added out within the increase Health plans approved by the Abu Adoption of site water tank ( not Dhabi Sewerage Services ( in the case required in public housing and camp of a sewage) out companies , shops and additions except in the case of adding Villa ) copy Technical assets pledged to the contractor ( and the consultant if any) out Roads Department approval (if new construction or in the case of adding gate width of four meters ) original Form AACM-CP-CF-15 copy Fees Fees Cost Special accommodation 50 Public housing 50 Commercial Property / Commercial 100 Real Estate Commercial / Industrial 100 Real Estate Commercial / Residential investment 100 Commercial Property / permanent residential - Commercial Villa 100 Temporary shop 100 Farms 50 Commercial Property / car wash 100 Commercial Property / Supermarkets 100 Column GSM / Etisalat or Du 100 Government buildings 100 Labour Camp / Camp Companies 100 Mosques 50 Umbrellas license Revision No.: 1 Site handover letter issued by cities planing & Area Department (if a new building - or building a wall around the increase - original. page 16 Revision Date : 5/5/2014 2000 per umbrella Document Code.:AACM-CS-GL01 Insurance fees removal of construction waste: Commercial - Commercial: such as: Supermarket / Society / Bank / commercial ......... 20000 Residential buildings: such as: habitable investment / private housing / public housing 10000 Commercial - Industrial: such as: factories / industrial ..... 5000 Public buildings: such as: Camp corporate / government installations / mosques ..... 20000 In the case of add-on residential buildings: Add buildings of no more than 2.60 m 3000 Add buildings more than 2.60 m 5000 In the case of fences by area: Walls of a length not exceeding 150 m 2000 Fences length of 150 m - 250 m 4000 Walls of a length exceeding 250 m 5000 Farms: such as: private housing within the farm / lounge within the farm ........ 5000 - In case of the hardcopy approved amendment or renewal a copy of the architectural and structural plans, approved by the Department of Building Permits must be provided. Special Conditions - In the case of reconstruction after demolition:a copy of demolition permit (in the case of reconstruction after demolition) no need for a list of services lines - For firms camp: You must provide a copy for valid lease contract Certified by Property Management Access 800555 info@am.ae City Center (Main Building) Revision No.: 1 page 17 Revision Date : 5/5/2014 0097126715550 Northern Sector Document Code.:AACM-CS-GL01 Link Western Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 18 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-CP-SC-02 Preparation of Architectural and Construction Plans Customers Description All Business Citizens The service aims to prepare architectural and construction plans by the administration to work additions (within an area of 100 square meters) Please follow the following steps: Workflow 1- Refer to construction permits section (additions unit) to apply the request without consultant Document Special Conditions y Documents Approved site plan - no more than two months copy The proposed site plan copy New plot plan (no more than two months) copy Identity Card Original proposed on CD-ROM copy y New plot plan (no more than two months) Proposed on CD-ROM : copy Fees Special Conditions copy The proposed site plan copy The approved site plan copy Identity Card Nil - The presence of the applicant or his representative - In case of unknown diagram, inspection is going to be done. Access Revision No.: 1 page 19 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 20 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-CP-SC-03 Permit for Parking Shades outside Land Borders Customers Description All Business Citizens The service aims to issue a license umbrellas cars outside the boundaries of the plot Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents 3- Payment of fees Document Special Conditions A formal letter from the government agency or consultant (if any) commissioned by the contracting company to receive license original Valid business license issued by the Emirate of Abu Dhabi to the contractor (* Allows for decoration companies from outside the Emirate of Abu Dhabi in the event of decorative license application only) copy Adoption of the signing of the court to the contractor copy Engineer Contractor business card or residence or origin factor data from the Ministry of Labour or investor Card (not required for a license decorative and umbrellas license cars outside the boundaries of the coupon) copy Investor card (Eng accept card in case of loan, a civil engineer, architect, engineer assistant) out Documents New voucher plan Revision No.: 1 copy No-objection certificate from the Department of Health and Safety (EHS) copy To Whom It May Concern certificate issued by the Town Planning Sector approve the architectural plans and construction copy page 21 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 The approval of the Department of Transport - Original Model AACM-CP-CF-15 Fees Special Conditions Detection service lines letter (telecommunications, electricity, water, sanitation) out copy Fees Cost Permit 2000 Per umbrella - The presence of the authorized representative of the contractor to sign 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 22 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector AACM-CP-SC-04 License for Major Projects Customers Description All Business Citizens The service aims to issue a business license progress of major projects such as a processing site license (without drilling) and license digging foundations and support aspects of drilling note that large enterprises are Hotels - malls - development projects - commercial centers - schools - hospitals - commercial buildings - industrial buildings - government projects that exceed two floors Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents 3- Payment of fees 4- Pay Insurance of removal of construction waste Document Documents A formal letter from the government agency or consultant (if any) commissioned by the contracting company to receive license out Copy Valid business license issued by the Emirate of Abu Dhabi to the contractor (allowing decoration companies from outside the Emirate of Abu Dhabi in the event of decorative license application only) copy Contractor signature approved by the court : copy Engineer Contractor business card or residence or origin factor data from the Ministry of Labour or investor Card (not required for a license decorative and umbrellas license cars outside the boundaries of the coupon) : copy Investor card (Investor card(request for graduation certificate of the Enginee) Engineer accept card (in case of loan, a civil engineer, architect, engineer assistant) copy Revision No.: 1 Special Conditions page 23 Revision Date : 5/5/2014 Updated Site plan Document Code.:AACM-CS-GL01 Fees Revision No.: 1 copy No-objection certificate from the Department of Health and Safety (EHS) copy Form AACM-CP-CF-06 copy Form AACM-CP-CF-15 copy In the event of a processing site license (without drilling) copy Site speech delivered from the Gaza cities and Area Planning copy Roads approval copy In the case of a license digging foundations and support aspects of drilling - Wrote detection service lines (telecommunications, electricity, water, sanitation) out copy Approval of the adoption of Section diagrams on the consolidation method in the case of drilling copy Pledged technical assets out of the building Private House Public House Commercial Property Commercial / Industrial Property Commercial Property / Residential investment Commercial Property / permanent residential - Commercial Villa Temporary shop Commercial Property / car wash Commercial Property / Supermarkets Antenna GSM / Etisalat or Du Government buildings Mosques Umbrellas license Insurance fees removal of construction waste: Commercial - Commercial: such as: Supermarket / Society / Bank / commercial... Residential buildings: such as: habitable investment / private housing / public housing Commercial - Industrial: such as: factories / industrial ..... Public buildings: such as: Camp corporate / government installations / mosques ..... In the case of add-on residential buildings: Add buildings of no more than 2.60 m Add buildings of more than 2.60 m In the case of fences by area: Fences of a length not exceeding 150 m Fences length of 150 m - 250m Fences of a length exceeding 250 m page 24 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Special Conditions دجوي ال 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 25 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-CP-SC-05 Maintenance and Decoration Permit Customers Description All Business Citizens The service aims to license issuance and maintenance decor. Please follow the following steps: Workflow Documents 1- Apply the request 2- Provide the required documents 3- Payment of fees 4- Pay Insurance of removal of construction waste Document Special Conditions A formal letter from the government agency or consultant (if any) commissioned by the contracting company to receive license out Valid business license issued by the Emirate of Abu Dhabi to the contractor (* Allows for decoration companies from outside the Emirate of Abu Dhabi in the event of decorative license application only) copy New plot plan Signature approval of the contractor approved by the court : copy copy contractor Report about project work Projected horizontal scheme if there to be executed: copy were breakers gypsum boards certified by the department to adopt management plans of building permits (if applicable) Fees Fees Revision No.: 1 Cost Demolition Wall 50 Special accommodation 100 Public housing 100 Commercial Property 100 Industrial Property 200 page 26 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Special Conditions دجوي ال 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 27 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector AACM-CP-SC-06 Building Permit Renewal Customers Description All Business Citizens This service aims to renew the license in the absence of direct construction work after the withdrawal of the license during the period of 6 months and 0% completion rate also include updating building permit (add or change consultant / add or change contractor) Please follow the following steps: Workflow 1- Submission of the application 2- Provide the required documents 3- Payment of fees 4- Pay Insurance of removal of construction waste Document Special Conditions General Requirements: A formal letter from the government agency or consultant (if any) commissioned by the contracting company to receive license Original Valid business license issued by the Adoption of the signing of the court Emirate of Abu Dhabi to the contractor to the contractor : copy ( * Allows for decoration companies from outside the Emirate of Abu Dhabi in the event of decorative license application only) : copy Documents Engineer Contractor business card or residence or origin factor data from the Ministry of Labour or investor Card ( not required for a license decorative and umbrellas license cars outside the boundaries of the coupon : copy Investor card ( graduate certificate requests Eng ) card Eng accept if Copy ( loan, a civil engineer , architect, engineer assistant copy Revision No.: 1 page 28 Revision Date : 5/5/2014 New voucher plan No-objection certificate from the Department of Health and Safety (EHS): copy Document Code.:AACM-CS-GL01 Model AACM-CP-CF-15 : copy Model AACM-CP-CF-04 : copy : Book of the Advisory renewal request Building permit ending out with the proportion of out achievement Renew books revealed on the lines of Speech delivery site ( in the case services ( telecommunications , that the percentage of completion zero electricity, water , sanitation ) in the ) Original case of receipt of the license and not to proceed with construction for a period of 6 months out Technical assets pledged to the contractor and ( Consultative if any ) based on the completion rate Original Book a waiver from former consultant for the design and supervision of the total in the event of a change or consultant for overseeing full only in the case of adding a consultant and received all financial dues from the owner with the proportion of achievement and has no conflict from courts Original y: Book of the former Advisory pledge design ( in the case of adding a consultant ) out The consultant 's new book , pledging Technical assets pledged for the full supervision of the project to building contractor and consultant ( by determine the percentage of the completion rate )Original achievement or undertaking design and supervision ( in the event of a change consultant) Original Building permit in the case of receipt of the Contractor original or copy : Book a waiver from the previous Book online delivery of urban planning contractor for the project to receive all sector and the space (if construction his dues with the proportion of zero percent ) achievement from the owner and the consultant or an official letter from the court to withdraw the project or FGB for housing loans citizens out copy Fees Special Revision No.: 1 Technical assets pledged to the contractor ( and the consultant if any) Original Nil - : Special conditions to add or change the consultant page 29 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 - in case of hardcopy approved amendment or renewal : Attach a copy of the architectural and structural diagrams approved by the Department of Building Permits - : Special conditions to add or change the- contractor Conditions - In case of not starting construction for a period of 6 months from issuing the license , the book list of service lines must be renewed (communications, water, electricity, sewage) - In case of of industrial land related to Higher Corporation for Specialized Economic Zones a non-objection letter for industrial lands of the Higher Corporation for Economic Zones, should be providede. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 30 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector AACM-CP-SC-07 Pouring Concrete Customers Description All Business Citizens this service aims to investgate infrastructure and floors Please follow the following steps: Workflow Documents 1- Submission of the application 2- Provide the required documents Document Special Conditions New voucher plan : copy Book of space required legal attributed to the site and determine the land's natural level of the reference attributed : copy Book by the consultant to select the type of insulation in the case of water level (less than 10 m) and the type of steel used and the depth of incorporation Architectural and structural plans approved by the consultant and the owner and management of building permits : copy Fees Special Conditions Access Soil testing report : copy Nil - Provide all the security and safety precautions at the site - The presence of architect of the project for Contractor in order to be duly receipt process 800555 info@am.ae City Center (Main Building) Revision No.: 1 copy page 31 Revision Date : 5/5/2014 0097126715550 Northern Sector Document Code.:AACM-CS-GL01 Link Western Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 32 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-CP-SC-08 Technical Certificates Issuance Customers Description All Business Citizens The service aims to technical certification (certificate of completion of the building and completion certificate) Please follow the following steps: Workflow Documents 1- Submission of the application. 2- Exit engineer to the site to preview. 3- Receipt of the certificate. " Document Special Conditions Complete the certification requirements of the building Land : copy scheme Valid construction license : copy Outline of the general location of the building (layout) : copy Book connect the power supply : copy Connect the power delivery of the electric : copy Book by the consultant and completion rate of 100% : copy Land copy scheme Book of the Advisory specified completion rate : copy Fees Special Conditions Access Valid construction license : copy (layout) Nil - The presence of consultant engineer and contractor engineer. 800555 info@am.ae City Center (Main Revision No.: 1 : page 33 Revision Date : 5/5/2014 0097126715550 Northern Sector Document Code.:AACM-CS-GL01 Link Western Sector Building) Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 34 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-CP-SC-09 Architectural and Construction Plans Approval Customers Description All Business Citizens The service aims to audit the architectural drawings and construction Please follow the following steps: Workflow Documents 1- Submission of the application through the Internet (MMS) Document Special Conditions Approved site plan describing elevations of the property management: copy General scheme for all new buildings and old dimensions and defections: copy Colorful perspective explains the nature and design idea: copy Office undertaking for design and supervision: copy Or the signature authorization from the office : copy Valid Office license: copy Horizontal projections and the surface Architectural drawings sector-specific architecture and interfaces described longitudinal and latitudinal passes, one by the longitudinal and transverse drawer (if any) : copy axes and the use of names in the blanks and ornaments, projections and elevations, elevations, finishes and colors used shown by the percentage of out building : Structural Graphics: copy Soil testing report: copy Structural calculations: copy All program requirements and the requirements of sustainability: copy Graphics by rules and regulations and laws Universal Building Code Revision No.: 1 copy The approval of the Civil Defense : copy The approval of the Department of Transport : copy Approval of the Abu Dhabi Urban Planning: copy Property management approval in case the site was leased to the municipality page 35 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 copy Attachments approvals of the competent bodies, according to the allocation of land (Endowments of the mosques, the Abu Dhabi Tourism Authority of hotels, Abu Dhabi Education Council for schools, etc.) : copy Fees Nil Special Conditions دجوي ال 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 36 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-CP-SC-10 No Objection Certificate for Temporary Electricity Connection Customers Description All Business Citizens The service aims to connect an electric current to a temporary work location Please follow the following steps: Workflow Documents Fees Special Conditions 1- Apply the request in customers service centers and provide the required documents. Document Special Conditions Building Permit new version copy Nil - construction permit must be newly issued (one year from date of issue) 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 37 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector AACM-CP-SC-11 No Objection Certificate for Permanent Electricity Connection Customers Description All Business Citizens This service aims to connect the power supply to the building after the completion of realization Please follow the following steps: Workflow 1- Submission of the application 2- Provide the required documents Document Special Conditions A letter from the consultant showing completion of the project copy Plot plan updated version Building permit (if applicable) copy (lay out) outline of the general location of the building copy Concreting revealed Documents Revision No.: 1 copy Letter from Abu Dhabi Company for sewage extensions health copy A letter from the status of connections extensions copy Book Advisory request to connect the electric current to the end of the business with the construction indicate the percentage (in the case of construction) copy To clarify for all interfaces and the perspective of the building Photos A letter from the Department of Urban Planning numbering of the building (in the case of building space on the ground and connect the electrical current only) copy Approved plans from the Department of Construction Main licenses page 38 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Fees Special Conditions Consent of the Survey Section (in the case of construction and deliver an electric current only) copy The approval of the Higher Corporation for Specialized Economic Zones of its lands in the area beware) copy The approval of the Civil Defense (except public housing and private housing) copy The approval of the Department of Transport (except public housing and private housing) copy Nil - The presence of consultant engineer and contractor engineer. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 39 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector AACM-CP-SC-12 Retrival of Construction Waste Removal Deposit Customers Description All Business Citizens The service aims to secure construction waste recovery after the completion of the implementation of the project Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents Document Documents Special Conditions Concreting cast (in the case of construction) copy Insurance copy receipt The company's trade license copy Building completion certificate (if applicable) copy Building Permit : copy Plot plan : copy Outline of the general location of the building (layout) in the case of construction (new - Add-on) Fees Nil Special Conditions دجوي ال 800555 Access Revision No.: 1 info@am.ae copy 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector page 40 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 41 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-CP-SC-13 Planned or Existing Project Amendment Permit Customers Description All Business Citizens The service aims to issuance of a license amendment to an existing project or scheme Please follow the following steps: Workflow Documents Revision No.: 1 1- out the application in the customer service center. 2- Payment of fees. Document Special Conditions Certified scheme for the voucher original Architectural and structural drawings modified accredited by the consultant and the contractor and the owner and construction permits section out Computational copy memos Soil testing report copy Book assigned owner of the Advisory Office of the amendment or addendum copy Previous building permit copy Approved plans as the new owner ( in All plots received previously and that the case of changing the name of the got her the change to be written off owner of the project ) out by the circuit out Adoption of the new consultant that does not have any reservations to the design or what has been implemented by the previous consultant ( in the event of a change consultant) copy A letter from the Advisory copy Book of the appointment of the new Advisory owner (in the event of a change consultant) copy Book waiver of the former Advisory and agreed to this change (in the event of a change consultant) copy page 42 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Delivery of credit insurance from financial copy A formal letter from the government agency or consultant authorized by the owner commissioned a contracting company that received the license copy Contractor 's business license valid copy Signature approved by the court oiginal Fees Special Conditions Insurance copy receipt Book Building Inspection Department (depending on the type of amendment ) copy Table formwork copy Card Engineer Contractor Nil - Be sure to mention the type of amendment and previous license number on all architectural and construction diagrams by the Department of construction permits. - The presence of the designated representative of consultant Office personally. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 43 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector AACM-CP-SC-14 No Objection Certificate for Engineering Office licence Issuance and renewal Customers Description All Business Citizens The service aims to license and renew an engineering consulting offie. Please follow the following steps: Workflow Documents 1- Refer to Licensing Services Section (Department of Building Permits) 2- Provide the required documents 3- Receiving the approval Document Special Conditions Certificate of Registration at Department of Planning and Economy - Original Professional license for office - Original Signature approval and seal of the Lease office contract approved by office approved by the court - Original. Property Department at Al Ain City Municipality - Original Valid residence for office workers Original Certificates of experience for office workers - Original Office workers' passports : copy Educational certificates for office workers - original The names of the office workers and previous work carried out by the Office Fees copy Nil - Experience of the architect is not less than (10) years Special Conditions - Experience of civil engineer is not less than (5) years - Provide observer and draftsman Access Revision No.: 1 page 44 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 info@am.ae 0097126715550 Town Planning general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 45 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link AACM-CP-SC-15 Building Demolition Permit Customers Description All Business Citizens this service aims to issue license for domlition of the building Please follow the following steps: Workflow 1- Submission of the application 2- Provide the required documents 3- Payment of fees 4- Pay Insurance of removal of construction waste Document Documents Special Conditions A formal letter from the government authority or consultant (if any) commission the contracting company to receive license copy Valid trad license issued by the Emirate of Abu Dhabi to the contractor (* Allows for interior design companies from outside the Emirate of Abu Dhabi in the event of decorative license required only) copy Adoption of the signing of the court to the contractor copy Engineer Contractor business card or residence or origin factor data from the Ministry of Labour or investor Card (not required for a license decorative and umbrellas license cars outside the boundaries of the coupon) copy Investor card (graduate degree is Eng) Engineer accept the card anyway (loan, a civil engineer, architect, engineer assistant) Revision No.: 1 copy New voucher plan copy No-objection certificate from the Department of Health and Safety (EHS) page 46 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 copy Model AACM-CP-CF-15 copy Book of property management to approve the demolition copy Book approval from the Civil Defense demolition copy Wrote remove the lines of electricity and water services, telecommunications and sanitation certified by the competent authorities SOA copy General location scheme described in Part to be demolished certified inspector of the region (in the case of partial demolition) copy Certificate from the Al Ain Distribution Company on electricity supply to the building (not less than 15 years) (for the demolition of parole) Fees Nil Special Conditions دجوي ال 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 47 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector Regional Data Management Revision No.: 1 page 48 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-SD-SC-01 Land Plots Demarcation Customers Description All Business Citizens This service aims to put signs on the corners of the plot for the purpose of starting construction. Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents 3- Payment of fees Document Special Conditions Demarcation (new) Site plan does not exceed the duration (6 months) copy Original copy - Documents Identity card Certification schemes and compliance with the site plan data Value attributed to the approved by the proposal does not exceed the duration (6 months) in the absence of existing road to the site A letter commissioned by the owner to the consultant to do the project copy Minutes delivery site Identity card out copy Building Permit copy Site plan does not exceed the duration (6 months) copy y y Identity card Original Site Plan copy Fees Revision No.: 1 page 49 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Fees Cost Multi-storey commercial land 100 Residential land 50 Other uses 20 - The necessary to present identity card in all transactions of Al Ain Municipality Special Conditions - The presence of the designated representative - In the case of selecting land for the study purpose: the presence of the person or the formally designated authoruty 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 50 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector AACM-SD-SC-02 Land Plot Approximate Demarcation Customers Description All Business Citizens This service aims to detect lands allocated to citizens. Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents Document Documents Fees Special Conditions Special Conditions Site plan does not exceed 6 months copy Identity card Original Nil - The necessary to present the identity card in all transactions of the Al Ain Municipality - Presence of designated person 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 51 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-SD-SC-03 Qibla Determination Customers Description All Business Citizens This service aims to indicate the direction of prayer Kibla Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents 3- Payment of fees Document Special Conditions Identity card : Original A letter commissioned by the owner to the consultant to do the project copy Site plan does not exceed the duration (6 months) copy Documents Site plan does not exceed the duration (6 months) Identity card out Certification schemes and compliance with the site plan data copy The value attributed to the approved by the proposal does not exceed the duration (6) months in the case of an existing road to the site A letter commissioned by the consultant to the contructor to do the project Fees Special Conditions Revision No.: 1 copy copy Nil - The necessary to present the identity card in all transactions of the Al Ain Municipality page 52 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 - The presence of the designated representative 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 53 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-SD-SC-05 Land Construction Level Demarcation Customers Description All Business Citizens This service aims to indicate the level of the ground. Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents 3- Payment of fees Document Documents Fees Special Conditions Access Revision No.: 1 Special Conditions Site plan does not exceed the duration (6 months) copy Building Permit copy The value attributed to the approved by the proposal does not exceed the duration (6 months) - Minutes delivery site Copy Identity card Copy Fees Cost Multi-storey commercial land 100 Residential land 50 Other uses 20 - The presence of the designated representative - The necessary to present identity card in all transactions of Al Ain Municipality 800555 info@am.ae page 54 Revision Date : 5/5/2014 0097126715550 Document Code.:AACM-CS-GL01 Link City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 55 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-SD-SC-06 Existing Fence Verification Customers Description All Business Citizens This service aims to lift the corners of the fence and update the system. Please follow the following steps: Workflow Documents 1- Apply the request 2- Provide the required documents Document Special Conditions Building Permit: copy Site plan does not exceed the duration (6 months) Copy Minutes delivery site Copy Layout of the approved building plans copy Fees Special Conditions Identity card Nil - The necessary to present identity card in all transactions of Al Ain Municipality - The presence of the designated representative 800555 Access Working Hours Revision No.: 1 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Sunday - Thursday: 8:00 am 3:00 pm page 56 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector call center hours: 24/7 Revision No.: 1 page 57 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-SD-SC-07 Approved Services Lines Verification Customers Description All Business Citizens This service aims to send a surveyor to make sure the field of health status and locations of signs paths of service lines, and the extent of compliance with the approved plans. Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents Document Documents Fees Special Conditions Services check list form Copy Approved plans Digital Copy Nil - The necessary to present identity card in all transactions of Al Ain Municipality - The presence of the 800555 Access Special Conditions designated representative for the requesting party. info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Revision No.: 1 Sunday - Thursday: 8:00 am 3:00 pm call center hours: page 58 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector 24/7 Revision No.: 1 page 59 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-SD-SC-08 Executed Services Plans Verification Customers Description All Business Citizens This service aims to make sure the field of operational accuracy of the data provided by the consultant by sending a surveyor for the site, before merging the data in the system Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents Document Documents Fees Special Conditions Services check list form Copy A digital copy of the drawings services DGN format FILE copy Identity card original Nil - The necessary to present identity card in all transactions of Al Ain Municipality - The presence of the designated representative for the requesting party 800555 Access Working Hours Revision No.: 1 Special Conditions info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Sunday - Thursday: 8:00 am 3:00 pm page 60 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector call center hours: 24/7 Revision No.: 1 page 61 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-SD-SC-09 Ground Control Point Coordinates Customers Description All Business Citizens This service aims to get the coordinates and values of the reference points for the completion of cadastral surveying work of the projects in the city of Al Ain Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents 3- Payment of fees Document Documents Fees Special Conditions Model checking Survey copy Scheme to the project site in JPG or PDF format copy Fees Cost Provide a set point Surveyors 50.0 - The presence of the Working Hours Revision No.: 1 designated representative for the requesting party - The necessary to present identity card in all transactions of Al Ain Municipality 800555 Access Special Conditions info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: page 62 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 63 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-SD-SC-10 Site Clearance of Survey Control Points Customers Description All Business Citizens This service aims to get a notice stating that the project site is frre of spatial control points. Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents Document Documents Fees Special Conditions Special Conditions Schemes of the project site ( hard copy or soft copy ) copy Nil - The necessary to present identity card in all transactions of Al Ain Municipality - The presence of the designated representative 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 64 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-SD-SC-11 Maps Issuance Customers Description All Business Citizens This service aims to issue a variety of sizes and maps appropriate standards for Al Ain areas of the city and its territory or at the request of the client. Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents 3- Payment of fees Document Documents Special Conditions An official letter addressed to the Director of Town Planning Sector or Spatial Data Manager (optional) copy Fees Fees Special Conditions Cost Paper maps 20 Digital maps 50 Satellite maps paper 150 - The necessary to present identity card in all transactions of Al Ain Municipality 800555 Access Working Revision No.: 1 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: page 65 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector Sunday - Thursday: 8:00 am 3:00 pm Hours call center hours: 24/7 Revision No.: 1 page 66 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-SD-SC-12 Digital Data Licence Customers Description All Business Citizens This service aims to issue a digital data licence as a prerequisite to apply for digital data Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents Document Documents Fees Special Conditions Signature approved by Court copy valid trade license copy commissioning the project copy to whom it may concern certificate from the authority executing the project copy Identity card original Nil - The necessary to present identity card in all transactions of Al Ain Municipality - Project consultant commitment to the terms of the data exchange agreement and provide the spatial data department with the executive data every six months 800555 Access Revision No.: 1 Special Conditions info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector page 67 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 68 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-SD-SC-13 Digital Data Request Customers Description All Business Citizens This service aims to provide digital geographic data for as many layers as the client's need for the project area Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents Document Documents Fees Special Conditions Project site map copy Permit to exchange of digital data : copy Identity card original Nil - Only consultant can apply for this service Special Conditions - The consultant office must have a valid digital data license - The necessary to present identity card in all transactions of Al Ain Municipality 800555 Access Working Hours Revision No.: 1 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Sunday - Thursday: 8:00 am 3:00 pm page 69 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector call center hours: 24/7 Revision No.: 1 page 70 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-SD-SC-14 Land Plot Coordinates Digital Specification Customers Description All Business Citizens This service aims to provide the coordinates of the corners of ribs coupon specific reference number Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents Document Documents Fees Special Conditions Site plan or plot reference number copy Commissioned letter by the owner to the Consultant copy Identity card original Nil - The necessary to present identity card in all transactions of Al Ain Municipality 800555 Access Special Conditions info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Revision No.: 1 Sunday - Thursday: 8:00 am 3:00 pm call center hours: page 71 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector 24/7 Revision No.: 1 page 72 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Revision No.: 1 page 73 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-SD-SC-04 Building-free Land Certificate Customers Description All Business Citizens This service aims to issue a certificate that the land is free of buildings. Please follow the following steps: Workflow 1- Apply the request 2- Provide the required documents Document Documents Special Conditions New plot plan copy Or New certificate of property : copy Fees Special Conditions Identity card original Nil - The necessary to present identity card in all transactions of Al Ain Municipality - the presence of the owner or his representative 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 74 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector Infrastructure sector and municipal assets Revision No.: 1 page 75 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Infrastructure Revision No.: 1 page 76 Revision Date : 5/5/2014 Services Document Code.:AACM-CS-GL01 AACM-IC-SC-01 Geophysical Study Approval Customers Description All Business Citizens This service aims to oversee the geophysical study scientific ways to check the soil before starting the implementation of projects in the eastern region of the Emirate of Abu Dhabi. Please follow the following steps: Workflow 1- Enter project data through the electronic service system 2- Download attachments via electronic service system 3- Download the final report of the study Documents Nil Fees Nil Special Conditions - Geophysical requirements for Al Ain Municipality. Access 800555 info@am.ae 0097126715550 general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 77 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Internal Roads and Infrastructure Department Revision No.: 1 page 78 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-RI-SC-01 Permanent Entrance Permit Customers Description All Business Citizens he service aims to issuance of a license amendment to an existing project or scheme Please follow the following steps: Workflow 1- Provide the required documentation and record demand in the customer service center. 2- Receiving a work permit entrance permanently. " Document Special Conditions Voucher Number Scheme (Site Layout Plan) for the design of the building described him interfaces and portals approved by the Department of Building Permits Documents copy Fees Identity card - original Nil - The necessity to present identity card in all transactions of Al Ain Municipality Special Conditions - The application is received for Contractor only, in case a citizen submit the application he is directed to check with contractor to provide the service. - In case that there are no obstacles in front of the entrance, obstacles are lifted on the owner expense. - All attachments are received in a single file format (pdf) 800555.0 Access Revision No.: 1 info@am.ae 9.712671555E10 City Center (Main Building) Northern Sector Eastern Sector Southern Sector page 79 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 80 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-RI-SC-02 Traffic Accidents Damages Estimation Customers Description All Business Citizens This service aims to estimate the value of municipal assets for damaged infrastructure and parks as a result of traffic accidents Please follow the following steps: Workflow 1- Submission of the application 2- According to the customer wish, the amount of the value of the damage will be paied to the Municipality or a letter to the insurance company will be issued 3- Receiving the clearance Document Documents Fees Special Conditions Sa'ed Report copy Identity Card copy Nil - The necessity to present identity card in all transactions of Al Ain Municipality - .In case the client submited the police report, the site should be reviewed which takes two working days 800555 Access Working Hours Revision No.: 1 Special Conditions info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: page 81 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 82 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-RI-SC-03 No Objection Certificate for Roads and Infrastructure Assets Customers All Business Citizens Description "This service aims to issue a certificate of no objection to the road infrastructure assets, which include the following: - Connecting rain water drainage network with a new rain water drainage network list. - Extension Services / down next to the existing assets. - Remove or deport the road furniture such as (columns Lighting - Manhol the rain water drainage - Paintings traffic - infantry corridor - positions - through the service). Workflow Nil Documents Revision No.: 1 Document Special Conditions Identity card original Pledged by the consultant overseeing the copy Site Pledge from the obligation to pay the amounts contractor specific financial management of internal roads and infrastructure in violation copy Planned adoption of the path of the service sector, urban planning and space valid copy Flipchart of the site with the GPS copy Scheme and longitudinal cross section in case of request for extension of services / down beside the existing assets copy Provide a detailed explanation of the method of execution in case of request for extension of services / down beside the existing assets copy Illustrative Table for all the spaces required in case of request for extension of services / down beside the existing assets copy A detailed timetable for action in case of request for extension of services / down beside the existing assets page 83 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 copy Planned adoption of vertical and horizontal sections of roads copy Clarify the method of discharge and connectivity details copy Design schemes to divert rainwater map with all data and calculations copy Remove or deport furniture the way Copy coupon scheme Design plans for road lighting copy Fees lighting Studies as per specifications of Al Ain City Municipality Nil - The necessity to present identity card in all transactions of Al Ain Municipality Special Conditions - provide a pledged by the project consultant to supervise the works. - provide a legally authorized pledged to preserve the assets and bear responsibility of any damage resulting from the works of Contractor - All attachments is received in a single file format (. Pdf) by the designated representative of contractor or consultant 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 84 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-RI-SC-04 Permit for Using Roads and Infrastructure Assets Customers All Business Citizens Description Through this service to the issuance of permit to use the assets of ways, which include groundwater discharge network rainwater drainage, pitching tents and exhibitions, installation of signboards and advertising, download the pavement to the entrance of the project (temporary), use parts of roads and sidewalks, installation of umbrellas and download berthpositions after the approval of the concerned authorities (Department of Transport / Town Planning Sector and space). Workflow Nil Document Special Conditions Groundwater discharge in the rain water drainage network Identity card of the applicant out Flipchart for the proposed Lkhaddmat with Coordinates copy Pitching tents and exhibitions Identity card of the applicant out No. coupon copy Flipchart of the site required spaces copy The approval of the concerned authorities Installation of signboards and Billboards Documents Identity card of the applicant out copy Book Management Investment Office (Commission regulate and control the ads) Method of execution ( Plate ) Form my determination to shape the rules of painting copy Photos showing the location of work with the building copy The approved plan put paintings from the Gaza cities and Area Planning copy Download the entrance to the pier project ( tentative ) Identity card of the applicant out Revision No.: 1 page 85 Revision Date : 5/5/2014 Voucher Number Document Code.:AACM-CS-GL01 copy Building permit with the project data copy Use parts of roads and pavements The applicant's identity card out Flipchart of the site with the GPS copy Chart shows the dimensions of the space to be used copy Photos showing the building and the space to be used copy A timetable for the work Installation of umbrellas and download No. coupon the pavement of the positions after the approval of the concerned authorities ( Department of Transport , Town Planning Sector and spacThe applicant's identity card original Fees copy Flipchart of the site with the GPS copy Book the approval of the Department of Transport or the Town Planning Sector and the space in the event of request installation umbrellas and download the pier parking Nil - The necessity to present of identity card in all transactions of of Al Ain Municipality Special Conditions - provide a legally authorized pledged to preserve the assets and bear responsibility of any damage resulting from of business. - All attachments is received in a single file format (. Pdf) by of the designated representative of of contractor or consultant. 800555 Access Working Hours Revision No.: 1 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Sunday - Thursday: 8:00 am 3:00 pm page 86 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector call center hours: 24/7 Revision No.: 1 page 87 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-RI-SC-05 Roads and Infrastructure Assets Disclosure Customers All Business Citizens Description Please follow the following steps: Workflow 1- Submission of the application 2- Download attachments 3- Receipt of the book revealed about the origins of roads and infrastructure Document Special Conditions Review phrases (water and electricity) Identity card of the applicant - original Coupon scheme (Site Plan) Flipchart of Al Ain Distribution Company with the desired path Documents copy Revealed about the origins of roads, rainwater drainage networks Identity card of the applicant - original Voucher No / flipchart of the site Fees Special Conditions Nil - The necessity to present of identity card in all transactions of of Al Ain Municipality - All submitted documents in a single file in PDF format by the the designated representative of of of contractor or consultant 800555 Access Revision No.: 1 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector page 88 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 89 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Department of Public Health Revision No.: 1 page 90 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-PS-SC-01 Veterinary Health Certificates Customers Description All Business Citizens This service aims to issue certificates of veterinary health for meat, to deport leather within the state, for the transfer of animals from livestock markets to the cities of the other State, to deport the skins of slaughterhouses eye to the outside of the state, to transport carcasses from slaughterhouses to an outside or inside the country, for the transfer of animals from livestock marketsCentral to the slaughterhouse, issue قوقنcertificates animals Bhzaúr the slaughterhouses and livestock markets, issuing certificates of disposal of infected animals and disease epidemiology and health certification for transfer irregularities slaughter from slaughterhouses eye to the other cities of the state. Please follow the following steps: Workflow Documents Fees Special Conditions 1- Submission of the application 2- Receive the certificate Document Special Conditions Identity card - original trade license Nil - The client must have a file in the munacipility Access 800555 info@am.ae (companies) 0097126715550 general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 91 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-PS-SC-02 No Objection Certificate for Construction Sector Customers All Business Citizens Description Please follow the following steps: Workflow 1- Submission of the application with the required documents. 2- Provide the necessary information about the work required (new construction _ renew _ amend _ Add _ maintenance _ demolition). 3- If the company is registered in the system, but it prohibited the client must go to the Department of Health. Document Special Conditions y y () (-) y Documents Fees Valid commercial license copy Site plan for the new building copy form H in the case of large projects registered copy form 01 in the case of (nonregistered) or the lack of company information copy Plan the environment and health and safety copy Nil - .The necessity to present Emirates identity card in all transactions of Al Ain Municipality Special Conditions Revision No.: 1 - In case that the trade license is issued from other emirates or the main branch of the company in Abu Dhabi or the western region no registeration for the company and does not claim any documents except in case of new construction (delivery site map) and large enterprises (Fill Form Form H) and delivery of the Plan of environment, Health and safety. page 92 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 93 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector Municipal Service Sector Revision No.: 1 page 94 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Department of Lands Revision No.: 1 page 95 Revision Date : 5/5/2014 Properties Document Code.:AACM-CS-GL01 AACM-L&P-SC-01 Mortgage Release Customers Description All Business Citizens This service aims to raise mortgage signal from the earth and become encumbered owner free disposition Please follow the following steps: Workflow 1- Record demand 2- Payment of fees Document Documents Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Identity Card (if not updated in the system of land) copy Letter of the mortgage authority copy Fees Special Conditions Nil - The necessity to present the identity card in all transactions of the Al Ain Municipality - It is possible to be pay off a specified mortgage for a land or any lands or all the lands. The number of the mortgage intended to be paid off should be mentioned in the dismortage letter. 800555 Access Revision No.: 1 Power of attoreny if the agent info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector page 96 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 97 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-02 Grant Registration Customers Description All Business Citizens This service aims to be the owner of the gift of his possessions drug controls by the court legitimacy. Please follow the following steps: Workflow 1- Record demand in the customer service center. 2- Payment of fees. " Document Documents Special Conditions Passport and family book of the donor in case of non-availability in the system copy Passport and family book of the transferee in case of non-availability in the system copy The identity of the donor card and transferee in case of non-availability in the systemm copy Valid tade license of Real Estate Managemente (in the case of companies) copy Court Message origin or a true copy Fees Adoption of the gift of the court Nil - The necessity to present the identity card in all transactions of the Al Ain Municipality Special Conditions - in case of main relatives (father, mother, son, daughter, wife, grandfather, grandmother of the parties) fees of AED 2000. - in case of branches relative (sister, brother, uncle, aunt, uncle, aunt) a 2% fees. - Address the Property Registration Section in property management for the valuation of the property intended to be granted in the case of 2%. Revision No.: 1 page 98 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 - The grant involves the entire land or share / part of the land provided that no division for the land. - A donation is not allowed for the public houses and industrial land and the granted farms . - In case that the land is mortgaged , the mortgaged authorities should be addressed 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 99 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-03 Heirs Registration Customers Description All Business Citizens This service aims to be the owner of the gift of his possessions drug controls by the court legitimacy. Please follow the following steps: Workflow 1- Determine the percentages 2- Registration application Document Documents Fees Special Conditions Access Special Conditions Aletter sent by the court to the municipality for the implementation of the rule of inheritance copy Letter of inheirtance limitation replica All passports of heirs (if not updated in the system of land) copy Syndication is all the heirs (if not updated in the system of land) copy Identity cards of all the heirs (if not updated in the system of land) copy Nil - The necessity to present identity card in all transactions of Al Ain Municipality - In the case that the land is registered in the name of the heirs the transaction is considered a waiver of specified right one and fees are collected for it. 800555 info@am.ae City Center (Main Revision No.: 1 page 100 Revision Date : 5/5/2014 0097126715550 Northern Sector Document Code.:AACM-CS-GL01 Western Sector Building) Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 101 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-04 Lease Contract Termination Customers Description All Business Citizens This service aims to terminate the lease and the abolition of all the agreed conditions, including (to terminate the contract, the closure of the contract, and the cancellation of the contract). Please follow the following steps: Workflow Documents 1- Submission of the application 2- Provide the required documents 3- Payment of fees Document Special Conditions Tenant Documents (passport, national ID, modern identity for citizens in case they are not available in the system passport, residence, ID card for noncitizens): copy Lessor documents (passport, national ID, modern identity for citizens in case they are not available in the system passport, residence, ID card for noncitizens) copy Draft of the lease (and not printing handwritten) 3 copies of original Trade license for companies copy The contract to be canceled / terminate / close two originals The decision of the dispute resolution committee or certified by the court procedures. (In the event of termination) : copy Clearance from the Al Ain Distribution Company Fees Special Conditions Revision No.: 1 copy Nil - The necessity to present the identity card in all transactions of the Al Ain Municipality - You can not cancel a lease if there Internal contracts or the contract for internal leasing page 102 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 - In the case of changing the leases of the commercial licenses the license should be cancelled or amend the new title for commercial license - Power of attorney in the case of attorney - Terminate the contract issued by the municipality under the judgment of the Court - Close the expired contract based on the unwillingness of the parties to renew the contract - Cancel the contract based on the desire and satisfaction of the parties of the contract - The presence of the applicant or his attorney and bring a copy of the power of attorney 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 103 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-05 Properties Sale and Purchase Registration Customers Description All Business Citizens This service aims to seller concession on indigenous rights and dependency for a property to the buyer which is recorded in land administration system Please follow the following steps: Workflow 1- Submission of the application 2- Payment of fees 3- Receiving the approved contract Document Documents Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Identity Card (if not updated in the system of land) copy Land verification certificate not exceeding one month copy Search certificate of land not exceeding 15 days copy Evaluation certificate copy If it is a sale and purchase process (for companies), then a trade license should be submitted too which should be 100% local copy Procuration and the purchase process should be stated explicitly original Fees Fees Special Conditions Properties Sale and Purchase Registration Cost 2% of the highest price Special Revision No.: 1 page 104 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 - The necessity to present of identity card or all transactions of of Al Ain Municipality - It's allowed to sell a complete land, or share of the land or part of the share Conditions - It is not allowed to sell an allocated living lands and farms - Temporary land cannot be sold - Public houses can be sold if they are inherited only with the permission of the Ministry of Presidential Affairs 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 105 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-06 Registration of Sale and Purchase through the Court Customers Description All Business Citizens This service aims to seller concession on indigenous rights and dependency for a property to the buyer based on the court order and are recording the process of buying and selling in the land administration system. Please follow the following steps: Workflow 1- Submission of the application 2- Provide the required documents 3- Payment of fees Document Special Conditions A letter from the court Documents original or true copy Passport (if not up to date in the system of land) : copy Family book (that were not updated in the system of land) copy Identity Card (if not updated in the system of land) copy Letter of procuration if available Fees Fees Cost Registration of Sale and Purchase through the Court 2% of landselling price - Present identity card in all transactions of Al Ain Municipality - It's allowed to sell a complete land, lot of the land or part of the lot Special Conditions - Land verification certificate is not required - The original judgment document should be attached or true copy of it and attach a letter addressed to the municipality with the enforcement of the judgement Access Revision No.: 1 page 106 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 107 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-07 Mortgage Registration Customers Description All Business Citizens This service aims to record mortgage to ensure the rights of the owner and the current side. Please follow the following steps: Workflow Documents Fees 1- Submission of the application 2- Provide the required documents 3- Payment of fees Document Special Conditions Passport (if not up to date in the system of land) : copy Family book (that were not updated in the system of land) : copy Identity Card (if not updated in the system of land) : copy Mortgage contract : (3) original copies Agency in the case of the legal agent - In the case of minors must bring a original permission subject to a minor share of the competent courts Is determined by the type of message on the mortgage foreclosure Mortgage of first grade Mortgage to second-degree Mortgage third degree Possessory pledge Nil - The necessity to present identity card in all transactions of Al Ain Municipality Special Conditions - In case of minors, permission of mortgage should be brought for minor share from the competent courts. - It's not allowed to put into mortgage a morgaged land with another mortgage for the same level. - The mortgage could be applicable on more than a land. Mortgage type is determined according to Revision No.: 1 page 108 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 - the letter of the mortgage authority (first level mortgage, second level mortgage, third level mortgage , possession mortgage. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 109 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-08 Mortgage Alteration Customers Description All Business Citizens This service aims to convert / change / modify the source of a mortgage from one side to the other. Please follow the following steps: Workflow 1- Apply the request. 2- Provide the required documents 3- Payment of fees Document Documents Special Conditions Passport (if not updated in the system of land) copy Family book (if not updated in the system of land) copy Emirates ID (if not updated in the system of land) copy Letter approve the transfer of mortgage from new mortgage copy Letter of non-objection from the previous bank (in the case of changing the point of foreclosure) copy Fees Cost Modify the terms mortgage contract or real estate mortgage without increasing the amount of mortgage. Fees Revision No.: 1 Increase the value of mortgage 50 0.001 of the difference between the amount of registered mortgage and the new amount Replace the mortgaged property with another property 1000 Conversion Mortgage 200 page 110 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Extend the repayment period of the mortgage contract 1000 Minimum charge 50 Maximum charge 1000000 - When you add a second mortgage or a third on the same land does not allow the system to add new mortgage with the same level of the previous mortgage and the client must address one of the mortgage autourities to change the level of mortgage - You must specify the reason for the refusal of the demand of the change in the mortgage system. Special Conditions - The label of the change is extracted from the system of mortgage and pastes on the contract. - You can change the type of mortgage and the level. - Mortgage can be transferred from the land / several land to the land / several other lands. - The necessity to present the identity card in all transactions of the Al Ain Municipality. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 111 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-09 Investment Contract Revocation Customers Description All Business Citizens This service aims to terminate the contract of investment and the elimination of all the conditions agreed upon. Please follow the following steps: Workflow Documents Fees Special Conditions Access 1- Record demand in the customer service center. 2- Payment of fees. " Document Special Conditions Draft of investment contract : three original copies Investment contract to be drafted: original copy Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Identity Card (if not updated in the system of land) copy Power of attoreny in the case of proxy copy Nil - The necessity to present identity card in all transactions of Al Ain Municipality - system does not allow to cancel investment contracts if they contain investment contracts or internal leases 800555 info@am.ae City Center (Main Building) Revision No.: 1 page 112 Revision Date : 5/5/2014 0097126715550 Northern Sector Document Code.:AACM-CS-GL01 Western Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 113 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-10 Properties Certificate Customers Description All Business Citizens A certificate showing the customer's property and indicate the manner of tenure and the certificate is issued at the request of the customer Please follow the following steps: Workflow 1- Apply the request 2- Payment of fees 3- Receiving a certificate of property Document Special Conditions Passport (if not updated in the system Family book (if not updated in the of land): copy system of land): copy Documents Emirates ID (if not updated in the system of land): copy Attorney in case of the presence of representative Fees Trade license if the owner is a company or organization: copy copy Nil - The necessity to present Emirates ID in all transactions of Al Ain City Municipality Special Conditions - Owners must present themselves or who is on behalf of them with legal power of attorney in case of updated special data for the land - Must be the client's file in the municipality and in the absence of his presence are starting to make a person to create a file Access 800555 info@am.ae City Center (Main Building) Revision No.: 1 page 114 Revision Date : 5/5/2014 0097126715550 Northern Sector Document Code.:AACM-CS-GL01 Western Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 115 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-11 Merging Lands Customers Description All Business Citizens This service aims to integrate earths adjacent to become one land. Please follow the following steps: Workflow 1- Submission of the application 2- Provide the required documents 3- Payment of fees Document Documents Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Identity Card (if not updated in the system of land) copy the trade license (for companies) copy Integration Message copy copy Fees Special Conditions Merger, if any decree Agency in the case of a proxy Nil - The necessity to present identity card in all transactions of Al Ain Municipality Special Conditions Revision No.: 1 - If the land is mortgaged to multiple mortgages levels, these mortgages are transferred to the merged territory automatically after termination process, which requires approval the mortgaged authorities. - If the land is mortgaged to mortgages with matching levels, the system will not allow to pass through the process of termination unless the landowner obtains a letter from banks approving on changing the level of mortgages. Note that the modifying the previous mortgage is an independent process of the system. page 116 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 117 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-12 Investment Contract Registration Customers All Business Citizens Description This service aims to document the investment contract as agreed between the parties. Workflow Nil Documents Fees Document Special Conditions Documents tenant (passport, national ID, modern identity for citizens in case they are not available in the system a passport, residence, identity for noncitizens) : copy Lessor documents (passport, national ID, modern identity for citizens in case they are not available in the system a passport, residence, identity for noncitizens) : copy Investment contract : Number (3) original copies Department of Real Estate license valid : copy Nil - The necessity to present of identity card in all transactions of of Al Ain Municipality Special Conditions - System will not allow registration of the lease or investment contract if the use of the land is agricultural or public house. - Registration of investment contracts is possible on industrial land owned by the municipality. 800555 Access Working Hours Revision No.: 1 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Sunday - Thursday: 8:00 am 3:00 pm page 118 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector call center hours: 24/7 Revision No.: 1 page 119 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-13 Ownership Deed Customers Description All Business Citizens This service aims to issue an ownership deed of real estate and property at the request of the customer (including the new ownership deed to the property, Replacement, and instead of corrupted). Please follow the following steps: Workflow 1- Apply the request 2- pay the fees in case of not new issuance 3- receive the ownership deed Document Documents Special Conditions Passport (if not updated in the system of land) copy Family book (if not updated in the system of land) copy Emirates ID (if not updated in the system of land) copy Old ownership deed in the case of replacement Original Circular Letter from the police in the event of loss of title to the property copy Fees Fees Cost Ownership Deed fee no fees for first time issuance, Otherwise 500 Dh - The necessity to present of Emirates ID in all transactions of of Al Ain City Municipality. Special Conditions - The presence of the owner or legal representative. - No ownership deeds for temporary lands. - When you issue the ownership deed replacement, submit a letter from the police station stating the loss of property. Revision No.: 1 page 120 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 121 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-14 Provisional and Industrial Lease Contracts Registration Customers Description All Business Citizens This service aims to registration and renewal and collecting rent industrial land and temporary leased from the government (including industrial land, camps, businesses, farms, Azab, schools, health facilities, lounges,,,). Please follow the following steps: Workflow 1- Submission of the application 2- Pay Service fees. 3- Reciving the label. Document Special Conditions y Documents Revision No.: 1 Passport (if not updated in the system of land ) copy Family book ( if not updated in the system of land ) copy Emirates ID ( if not updated in the system of land ) copy Attorney in case of the presence of representative original copy Valid trade license in case of companies copy Factory license of the Abu Dhabi Chamber ( in the case of factories) Copy Passport (if not up to date in the system of land ) copy Family book ( that were not updated in the system of land ) copy Identity Card ( if not updated in the system of land ) copy Trde license copy page 122 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 A report originating from Ministry of labour (not less than 20 workers) copy Civil Defense Certificate ( Meet Terms of safety ) copy A certificate from the Department of Health ( warehouses Affairs ) copy Certificate ( completion percentage ) for the project copy Attorney in case of the presence of representative copy y Passport (if not up to date in the system of land ) copy Family book ( that were not updated in the system of land ) copy Identity Card ( if not updated in the system of land ) copy Business license copy License from the Health Authority Abu Dhabi copy Civil Defense Certificate ( Meet Terms of safety ) copy A certificate from the Department of Health copy Certificate ( completion percentage ) for the project copy Agency in the event of failure to attend his relationship copy In the case of registration and renewal Passport (if not up to date in the of contract educational projects system of land ) Revision No.: 1 copy Family book ( that were not updated in the system of land ) copy Identity Card ( if not updated in the system of land ) copy Business license copy Approval of the Abu Dhabi Education Council copy Civil Defense Certificate ( Mostofi Terms of safety ) copy A certificate from the Department of Health ( warehouses Affairs ) page 123 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 copy Certificate ( completion percentage ) for the project copy Agency in the event of failure to attend his relationship copy Fees Passport (if not up to date in the system of land ) copy Family book ( that were not updated in the system of land ) copy Identity Card ( if not updated in the system of land ) copy Business license copy A certificate from the Environment Agency copy Civil Defense Certificate ( Mostofi Terms of safety ) copy A certificate from the Department of Health ( warehouses Affairs ) copy Certificate ( completion percentage ) for the project copy Certificate of Abu Dhabi Food Control Authority ( Mostofi conditions ) copy Agency in the event of failure to attend his relationship copy Nil - The necessity to present the identity card in all transactions of the Al Ain Municipality - The owner presents himself or his representative Special Conditions - It's allowed to create a process of registering a lease on a territory which does not have owners - process of registering will not allow the user to create more than one lease on the same land - Lease registration process can be applied to industrial land owned by the municipality - in case of camps companies , regulatory reporting period will be after the payment of the fees Access Revision No.: 1 page 124 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 125 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-15 Copies from the Municipality Records Customers Description All Business Citizens This service aims to copy any document required by the owner of its property file either paper or electronic file, also includes a re-print of the contract. Please follow the following steps: Workflow 1- The presence of the owner or his legal representative to the 2- Department of Property Registration city of Al Ain Municipality - Ground Floor 3- Recieve the document 4- Payment of fees Document Documents Fees Special Conditions Passport (if not updated in the system of land) copy Family book (if not updated in the system of land) copy Identity Card (if not updated in the system of land) copy Power of Attoreny if the agent copy Fees Cost Copies from the Municipality Records 50.0 - The necessity to present of the Emirates ID in all transactions of of the Al Ain City Municipality. Special Conditions - The owner presents himself or the legal representative. - present the ID or power of attorney. - The types of the documents that can not be provided: decrees, internal correspondence. Access Revision No.: 1 page 126 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 127 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-16 Lease Contract Registration Customers Description All Business Citizens This service aims to document the leases to become formal in nature, and include the following actions: - Registration of the lease (less or more than 4 years). - Renewal of the lease. - Amendment of the lease by the tenant. - Amendment of the lease by the lessor. Please follow the following steps: Workflow 1- Submission of the application 2- Payment of fees. Document Documents Special Conditions tenant Documents (passport, national ID, modern identity for citizens in case they are not available in the system - passport, residence, ID card for non-citizens) copy Lessor tariff documents (passport, national ID, modern identity for citizens in case they are not available in the system - passport, residence, ID card for non-citizens) copy Lease (printed, not handwritten) Three original copies You want to modify lease two originals Commercial license for companies copy In the case of subletting must have renter's license valid Real Estate Management copy Fees Fees Revision No.: 1 Cost Registration leases less than four years AED 100 Registration leases four years and more 1% of the contract value page 128 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Amendment of the lease AED50 - The necessity to present the identity card in all transactions of The Al Ain Municipality - In the case of the internal lease the tenant must have the license of managing the real estate . - approval of the the lessee and the lessor in case of amendment. Special Conditions - In case that there is court request compelling a one of the contract parties to renewal process of the contract is done without reference to the other party and the right holder has to provide judicial order in case of renewal. - Building registeration details must be updated department of building contracts. in the registration - It's not allow to register the lease if the use of the land is residential villas added with social approval from the Committee of multiple units. - Not allowed to rent apartments and unlicensed units from the competent authorities. - Not allowed to lease land assigned for a particular purpose unless explicitly stated in the lease agreement between the owner and municipality such as factories, hospitals, schools, companies 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 129 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-17 Land Verification Certificate Customers Description All Business Citizens This service aims to issue a certificate of research at the request of the client and explain restrictions Kalrhen and registered investment on that land Please follow the following steps: Workflow Documents Fees Special Conditions 1- Submission of the application 2- Payment of fees 3- Receive the certificate Document Special Conditions Passport (if not up to date in the system of land) : copy Family book (that were not updated in the system of land) : copy Identity Card (if not updated in the system of land) : copy Agency in the case of a proxy : copy Nil - The necessity to present the identity card in all transactions of the Al Ain Municipality - certificate of search is not issued for temporary land. - legal representative has to come 800555 Access Working Revision No.: 1 info@am.ae in the absence of owner . 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: page 130 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector Sunday - Thursday: 8:00 am 3:00 pm Hours call center hours: 24/7 Revision No.: 1 page 131 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-18 Land Borders Annexation Customers Description All Business Citizens This service aims to combine the entire corridor or equally between private residential land and agreed to certain conditions and controls. Please follow the following steps: Workflow Documents Fees 1- Register 2- Provide the required documents 3- Receiving no objection certificate Document Special Conditions Passport (if not up to date in the system of land) : copy Family book (that were not updated in the system of land) : copy Identity Card (if not updated in the system of land) :copy trade license (for companies) : copy Annexation request letter Original In the case of annexation of the entire corridor, you should bring approval of neighbor copy Nil - The necessity to present the identity card in all transactions of Al Ain Municipality - Verification that there are no buildings opposite to annexation. Special Conditions - Annexation does not result the line construction exceeding, line regulation or existing services. - The annexation does not affect the main official entrances to the neighboring plots. - The landlord bears the cost of transferring services, if any - If the annexation is more than 6 meters, it will be referred to the Land Commission Revision No.: 1 page 132 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 133 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-19 The division of the land Customers Description All Business Citizens This service aims to divide the piece of land at the request of the client. Please follow the following steps: Workflow Documents 1- Submission of the application 2- Payment of fees after the study and approval of the application Document Special Conditions Passport (if not up to date in the system of land) : copy Family book (that were not updated in the system of land) : copy Emirates Identity Card (if not updated in the system of land) : copy Partition resolution issued by the court replica Fees letter from the client requesting the division if it was within the approved cases and the types of permitted use division Fees Cost Land Division 2000.0 - The necessity to present the Emirates identity card in all transactions of Al Ain Municipality Special Conditions - The mortgage of the divided land turns to (many land mortgage) on the result lands automatically after the approval of the mortgaged parties. - There is decision that prevents the division of residential land, except the lands which are allocated to partners and the provisions of the courts and the lands previously merged. - It must be a shared land.. Access Revision No.: 1 800555 info@am.ae page 134 Revision Date : 5/5/2014 0097126715550 Document Code.:AACM-CS-GL01 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 135 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-20 Allocated Land Site Change Customers Description All Business Citizens This service aims to change the location of the land dedicated (include: private residential land, temporary, countryside. Please follow the following steps: Workflow 1- Submission of the application 2- Determine land 3- Adoption of real estate registration Document Documents Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Emirates Identity Card (if not updated in the system of land) copy Land change request letter out customized Fees Vowed not to claim to be the plot subject of change its position Nil - The necessity to present the Emirates identity card in all transactions of Al Ain Municipality. Special Conditions Access - The serviceis provided one time only unless that there is exceptions. - The system evenly distributes rations in case there is more than one owner has been granted land 800555 info@am.ae City Center (Main Revision No.: 1 page 136 Revision Date : 5/5/2014 0097126715550 Northern Sector Document Code.:AACM-CS-GL01 Western Sector Building) Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 137 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-21 Communal Houses Allocation Customers Description All Business Citizens Through this service to the allocation of housing for citizens and housing is determined by the relevant committee in the event of non-specific customization, and, if selected customization housing is allocated based on specific Emiri decree. Please follow the following steps: Workflow 1- The client logs demand in the customer service center. 2- Determine the housing after the approval of the Commission. 3- Adoption of the real estate registration Document Documents Fees Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Identity Card (if not updated in the system of land) copy Nil - نيعلا ةنيدم ةيدلب تالماعم عيمج يف ةيوهلا ةقاطب زاربإ ةرورض - يواستلاب صصحلا عيزوتب ماظنلا موقي, كلام نم رثكأ دوجو لاح يف نكسملا هُحنم مت. Special Conditions - صيصختلل لباق نكسملا ربتعي, كلام دوجو مدع لاح يف/ىلع كالم نكسملا. - صيصختلا رمأ سفن ىلع صيصخت يتيلمع ءاشنإ نم ماظنلا عنمي, رييغت بلط وأ ناكملا بحس بلط قيرط نع لوألا بلطلا كف لاح يف الإ صصخملا نكسملا عقوم. - The necessity to present the identity card in all transactions of Al Ain Municipality Revision No.: 1 page 138 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 - The system distributes the shares equally, if there is more than one owner has been granted the residence. - The residence is considered customizable, in the absence of the owner / owners of the residence. - The system prevents creating two allocation processes on the same customization order, except in the case of decoding the first application by application of withdraw the place or the application to change the location of residence location. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 139 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-22 Sign a commitment to let the evaluater to visit and enter the site Customers Description All Business Citizens This service aims to allocate land to citizensaccording to the edicts, then the slots are determined by the relevant committee in the Municipality in case of the non-specific customization, and if the edict was customizated, then the slot will be allocated according to that. Please follow the following steps: Workflow 1- Submission of the application 2- Provide the required documents Document Documents Fees Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Identity Card (if not updated in the system of land) copy Nil - The necessity to present the identity card in all transactions of Al Ain Municipality Special Conditions - The system distributes the shares equally in case there is more than one owner has been granted the residence - The slot is considered customizable, in the absence of the owner / owners of the residence - The system prevents creating two allocation processes on the same customization order, except in the case of deactivating the first application by withdrawing it or change land site allocation Access Revision No.: 1 page 140 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 141 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-23 Temporary Lands Allocation Customers Description All Business Citizens This service aims to allocate land according to interim orders of the High Commissioner coupons are determined by the relevant committee (Industrial, camps Enterprises, Azab, health facilities, factories, farms Animal Production) Please follow the following steps: Workflow 1- Apply the request. Document Documents Fees Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Emirates ID (if not updated in the system of land) copy Portrait copy Limitation of succession in the case of the heirs copy Nil - The necessity to present the identity card in all transactions of Al Ain City Municipality Special Conditions - The process of customization of lands is not complete unless it's assured that the registration fee of the lease is paid and the payment of the rent for the first year at least. - Land plan will be issued for temporary lands if requested by the customer except the farms; the certificate is issued to whom it may concern. - The presence of the applicant or his representative Access Revision No.: 1 800555 info@am.ae page 142 Revision Date : 5/5/2014 0097126715550 Document Code.:AACM-CS-GL01 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 143 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-24 In-Kind Share Concession Customers Description All Business Citizens This service aims to sign a waiver its right owner / his share of the land, or at his house Please follow the following steps: Workflow 1- Registration application 2- Payment of fees 3- Final approval Document Special Conditions Judgment and a letter from the court original Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Identity Card (if not updated in the system of land) copy Business license in the case of companies Documents Fees Special Conditions Nil - The necessity to present the identity card in all transactions of Al Ain Municipality. The original court judgment or the true copy. 800555 Access Revision No.: 1 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector page 144 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 145 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-25 Evaluation Certificate Customers Description All Business Citizens This service aims to issue an evaluation certificate based on client request. Please follow the following steps: Workflow 1- Submission of the application 2- Provide the required documents 3- Payment of fees Document Documents Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Identity Card (if not updated in the system of land) copy Building Permit copy Request for valuation of property originally Fees Special Conditions Access Fees Cost Certificate fee 1000.0 - The necessity to present the identity card in all transactions of Al Ain Municipality - Sign a commitment to let the evaluater to visit and enter the site 800555 info@am.ae City Center (Main Revision No.: 1 Completion building certificate or building free land certificate page 146 Revision Date : 5/5/2014 0097126715550 Northern Sector Document Code.:AACM-CS-GL01 Western Sector Building) Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 147 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-26 Legal Name Change Customers Description All Business Citizens This service aims to change / modify the name of the owner / construction company on a book from Oadarh Court of Residency and Foreigners Affairs. Please follow the following steps: Workflow 1- Submission of the application. 2- Payment of fees. 3- Receipt of the poster. Document Documents Special Conditions Adoption of the name change from Passport (if not up to date in the the court or the Department of system of land) copy Residency and Foreigners Affairs copy Family book (that were not updated in the system of land) copy Fees Emirates Identity Card (if not updated in the system of land) copy Fees Cost Legal Name Change 50.0 - The necessity to present the identity card in all transactions of Al Ain Municipality Special Conditions - The amendment of the person / the company should be given if the amendment creates a correspondent name. - The amendment of the name lets the system user to amend the person details. Access 800555 info@am.ae City Center (Main Building) Revision No.: 1 page 148 Revision Date : 5/5/2014 0097126715550 Northern Sector Document Code.:AACM-CS-GL01 Western Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 149 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-27 Land Layout Customers Description All Business Citizens This service aims to print maps and plans for the property of the client. Please follow the following steps: Workflow Documents Fees Special Conditions 1- Submission of the application 2- Provide the required documents 3- Payment of fees Document Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Fees Cost Land Layout 200.0 - The necessity to present the identity card in all transactions of Al Ain Municipality. A legal representative should be available in case of the absence of the owner. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Revision No.: 1 Sunday - Thursday: 8:00 am 3:00 pm call center hours: page 150 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector 24/7 Revision No.: 1 page 151 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-28 Increasing Land Plot Area Customers Description All Business Citizens This service aims to increase the area of public housing or land after the completion of the technical requirements of the Town Planning Sector and space. Please follow the following steps: Workflow Documents Fees 1- Submission of the application. 2- Pay the service fee. 3- Assess the amount of increase in the area (public housing are exempt from fees rating by the decision of the Executive Council). 4- Pay the amount of assessment increase the area of land Document Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Identity Card (if not updated in the system of land) copy trade license of legal persons (in the case of companies) copy Fees Service Request Cost 2000 AED - The necessity to present the identity card in all transactions of Al Ain Municipality - Verification of the absence of the buildings constructions opposite to the increase. Special Conditions - Increase does not result the line construction exceeding, line regulation or existing services. - The increase does not affect the main official entrances to the neighboring plots. - The landlord bears the cost of transferring services, if any Revision No.: 1 page 152 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 153 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-29 Bequest Registration Customers Description All Business Citizens This service aims to registration rights of the testator recommended to them by inheritance according to the terms and conditions of the courts Please follow the following steps: Workflow 1- Apply the request. 2- Pay the service fee. Document Documents Fees Special Conditions Access Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Emirates ID (if not updated in the system of land) copy trade license of legal persons (in the case of companies) copy Message client's request to increase space original Nil - The necessity to present the identity card in all transactions of Al Ain Municipality. - A legal representative should be available in case of the absence of the owner. 800555 info@am.ae City Center (Main Building) Revision No.: 1 page 154 Revision Date : 5/5/2014 0097126715550 Northern Sector Document Code.:AACM-CS-GL01 Western Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 155 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-30 To Whom it May Concern Certificate Customers Description All Business Citizens This service aims to issue a certificate To Whom It May Concern for different purposes (for Azab, companies camps, change the reference number of land owners) and based on the client's request to be submitted to government departments or other entities Please follow the following steps: Workflow Documents Fees Special Conditions 1- Submission of the application 2- Signature Document Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Nil - The necessity to present the identity card in all transactions of Al Ain Municipality. The service is requested by the the owner or the representative. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 156 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-31 Rental Units Registration Customers Description All Business Citizens This service aims to provide a temporary land use permit for construction companies for the purpose of managing contracts. Please follow the following steps: Workflow Documents Revision No.: 1 1- The lessor fill form data and account opening options 2- The account is opened to the applicant and notified with the account number, user name and password 3- The lessor fill a data entry form with his own real estate 4- Property registration / units Document Special Conditions opening the account attachments :- Data Form and options of opening an account copy A valid passport of the owner and the person authorized to sign and delegate copy Valid residence of the person authorized to sign and delegate copy Family Book of the owner (for all citizens) copy National identity card valid for the owner and the person authorized to sign and delegate copy Approved signature form authenticated by the court (if you select the option of blind signature) copy Procuration letter for the legal representative of the owner copy Trade license (for companies only) copy Associate membership of the Chamber of Commerce and Industry (companies only) page 157 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Fees copy Legal procuration letter to authorize the signature or for the Company establishment or authorization letter from the company (for companies only) copy Electronic copy of the terms and conditions of lease used by the owner (if any) with the provision of hard copy signed by the person authorized to sign copy Attachments for the registration of real estate: - Real estate data entry form (the owners and property management companies) copy Data entry form for the valid leases (owners and property management companies) copy Property management contract registered by the municipality and of each property (real estate management companies only) copy Fees Cost For each property, paid once 1000 for each unit, paid once 5 Openning the account Special Conditions - The necessity to present the identity card in all transactions of Al Ain Municipality. - In case that the lessee does not have a bank account, a bank account will be opend for him 800555 Access Working Revision No.: 1 free info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: page 158 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector Sunday - Thursday: 8:00 am 3:00 pm Hours call center hours: 24/7 Revision No.: 1 page 159 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-32 Permit for Land Usage by Projects Customers Description All Business Citizens This service aims to provide a temporary land use permit for construction companies for the purpose of saving construction materials or reclamation. Please follow the following steps: Workflow 1- Submission of the application 2- Payment of fees if the government land or attach the written consent of the owner of the land if the land was non-governmental 3- Signature recognition and pledged to use the land for a legitimate purpose 4- Receipt of the permit Document Documents Fees Special Conditions Building Permit copy trade license copy Request a temporary use of the land for the purpose of stating the voucher number copy Consent of the owner of the land if the land was non-governmental copy Fees Land Owned by government Cost 1000.0 - The necessity to present the Emirates identity card in all transactions of Al Ain Municipality. Special Conditions - Consent of the owner for the used land in case that the land is nongovernment owned. - No fee is taken if the land was owned by non-government. Access Revision No.: 1 page 160 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 161 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-L&P-SC-33 Registrar Relocation Customers Description All Business Citizens This service aims to move employees from the President Commissioner property registration department for the ratification of the signing of the stakeholders in the contracts and behaviors that are registered with the Department of registering property in accordance with the provisions of the Regulations Please follow the following steps: Workflow Documents 1- The client by calling 800 555 mobile car Medicine 2- Payment of fees Document Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in the system of land) copy Fees Fees Special Conditions Access Cost Transmission service charge documented within the city of Al Ain 1500 AED Documented transmission service charge outside the city of Al Ain (Abu Dhabi 4000 AED - The necessity to present the identity card in all transactions of Al Ain Municipality 800555 info@am.ae 0097126715550 general help hours: Working Hours Revision No.: 1 Sunday - Thursday: 8:00 am 3:00 pm call center hours: page 162 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 24/7 Revision No.: 1 page 163 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-L&P-SC-34 Endowment Registration Customers Description All Business Citizens This service aims to register benefit of a Property to its owners in accordance with the provisions of laws Please follow the following steps: Workflow Documents Fees Special Conditions Access 1- Submission of the application. 2- Payment of fees. Document Special Conditions Passport (if not up to date in the system of land) copy Family book (that were not updated in copy the system of land) Identity Card (if not updated in the system of land) original Endowment letter by the Court original Endowment implementation letter from the court original Fees Cost Endowment registration fee 50.0 - The necessity to present the identity card in all transactions of Al Ain Municipality. - The endowed property cannot be disposed by transferring. 800555 info@am.ae City Center (Main Building) Revision No.: 1 page 164 Revision Date : 5/5/2014 0097126715550 Northern Sector Document Code.:AACM-CS-GL01 Western Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 165 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Regional Revision No.: 1 Service Sector page 166 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Department parks and recreational parks Revision No.: 1 page 167 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-P&R-SC-01 Fighting Homes Palm Diseases Customers Description All Business Citizens This service aims to control pests palm houses. And accessories. Please follow the following steps: Workflow 1- Documents Nil Fees Nil Special Conditions Client connection Pest Control Department at the following numbers (037020240 - 037020241) and provide the required data in terms of identifying the region, street, house number, phone number, and specify the type of injury, if possible - Palm blights are pest control only in homes Access 800555 info@am.ae 0097126715550 general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 168 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-P&R-SC-02 Site free Certificate of Irrigation Networks Customers Description All Business Citizens This service aims to issue a certificate of absence of irrigation systems and accessories. Please follow the following steps: Workflow Documents Fees Special Conditions 1- Submission of the application 2- Receive the certificate Document Special Conditions Approved plans for the site of the Town Planning & survey Sector on the floppy disk format. Jpg copy Message from the owner of the project copy Nil - The necessity to present the identity card in all transactions of Al Ain Municipality. In case that there are watering lines through the workcourses, a permit will be issued to change the watering line. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 169 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-P&R-SC-03 Greenery Work Permit Customers Description All Business Citizens This service aims to issuance / renewal of a work permit in greenery (fossils) for sites within the boundaries of the departments of parks and recreational parks. Please follow the following steps: Workflow Documents Fees Special Conditions 1- Submission of the application. 2- Providing the bank guarantee in case of demand. 3- Receipt of the permit Document Special Conditions Approved plans for the site of the Town Planning and survey Sector on the floppy disk format. Jpg copy Message from the project owner to take responsibility for any damage original The formal request of the contractor original Pledged by the contractor original Nil - The necessity to present the identity card in all transactions of Al Ain Municipality. The limits of the specialized sector. In case that there are watering lines through the workcourses, a permit will be issued to change the watering line 800555 Access Working Hours Revision No.: 1 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: page 170 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 171 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Community Service Department Revision No.: 1 page 172 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-CMS-SC-01 Gardens and Parks Reservation Customers Description All Business Citizens This service aims to reserve parks and gardens which enables customers to Al Ain Municipality of the use of these parks and coordinate their own booking process. Please follow the following steps: Workflow 1- Documents Nil Fees Nil Access for booking site in the city of Al Ain Municipality - The necessity to present the identity card in all transactions of Al Ain Municipality - Not to use the facilities for commercial purposes - To maintain the cleanliness of the site Special Conditions - Bearing damage caused by misuse - Inform the municipality for any caused damages during the period of reservation the site - Commitment to the sites that have been identified only - Maintain the customs and traditions and in case of making the concerts - Maintain a quiet location and not disturb the residents and people in the site Access 800555 info@am.ae 0097126715550 general help hours: Working Hours Revision No.: 1 Sunday - Thursday: 8:00 am 3:00 pm call center hours: page 173 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link 24/7 Revision No.: 1 page 174 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-CMS-SC-02 Non Muslims Cremation Permit Customers Description All Business Citizens This service aims to permit the use of the Holocaust for non-Muslims to burn the body of non-Muslims deceased in Al Fauaa Holocaust. Please follow the following steps: Workflow 1- The customer review universal service employee with the required documents. 2- Receive a copy of the permit. Document Documents Fees Special Conditions Revision No.: 1 Special Conditions Death certificate Original Message from the police statement burning Original A letter from the Embassy of the State of the deceased with the clarification of the person authorized to deliver the parent body Original Deceased passport copy The establishment of the deceased or a visit visa image provided that they are issued by the Emirate of Abu Dhabi copy identifiable Documents of the person authorized to hand over the corpse copy Emirates Identity card Original Nil - The necessity to present the identity card in all transactions of Al Ain Municipality. - Submitting the documents of the authorized person according to the embassy letter. page 175 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 - The deceased residence or visa should be issued from the Emirate of Abu Dhabi - Make sure the police letter of clarifying the cremation 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 176 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-CMS-SC-03 Sports Facilities Reservation Customers Description All Business Citizens This service aims to reserve sports stadiums in residential neighborhoods, which enables customers of Al Ain city to use them. Please follow the following steps: Workflow Documents Fees 1- Access the booking site in Al Ain Municipality official website 2- Select reservation form 3- choose the desired playground to be booked 4- Choose the desired day and hour during the month 5- Enter person's identity and attach a copy of it with the application Document Special Conditions Identity Card Original Nil - The necessity to present the identity card in all transactions of Al Ain Municipality - The presence of the applicant to the stadium in person and bring the identity card Special Conditions - Maintaining public properties - Customer can reserve two days a week for an hour a day during the entire month Example: If the playground was booked Sunday and Tuesday from 5-6 pm, it will be booked for a month - If the identity number does not match the identity number on the application, the booking form will be canceled Access Revision No.: 1 800555 info@am.ae page 177 Revision Date : 5/5/2014 0097126715550 Document Code.:AACM-CS-GL01 Link general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 178 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-CMS-SC-04 Public Works Permit Customers Description All Business Citizens This service aims to permit the use of special equipment for filling settlement and transfer of sand in the city of Al Ain. Please follow the following steps: Workflow Documents Fees Special Conditions Access Revision No.: 1 1- Provide all the required documents and record demand in the customer service center. 2- Will be scheduled to visit the site with the client 3- Receiving authorization 4- To provide clearance for the recovery of the bank guarantee (in the case of companies) 5- Receiving clearance Document Special Conditions Identity Card copy Proof of ownership or registration (if country estate, farms and residences) original Official agency in the event of failure to attend the relationship original Ownership of the equipment (in the case of companies, equipment must be the king of them) copy The company's trade license copy A contract between the company and the government agency (in the case of companies) copy Nil - The necessity to present the identity card in all transactions of Al Ain Municipality. The applicant should come or his representative. In case of companiesm a bank guarantee should be provided. 800555 info@am.ae page 179 Revision Date : 5/5/2014 0097126715550 Document Code.:AACM-CS-GL01 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 180 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-CMS-SC-05 Wedding Halls Reservation Customers Description All Business Citizens This service aims to provide available days in all the wedding halls under the supervision of Al Ain Municipality (All wedding halls, with the exception of Hall Khabaisi) and that it is possible that the client seized. Please follow the following steps: Workflow Documents Fees Special Conditions 1- Submission of the application. 2- Select the day you want to book. 3- Signing of the contract and take a copy Document Special Conditions Nil - The necessity to present the identity card in all transactions of Al Ain Municipality. The applicant should come or his legal representative. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 181 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Link Western Sector Department parks and recreational parks Revision No.: 1 page 183 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-P&R-SC-01 Fighting Homes Palm Diseases Customers Description All Business Citizens This service aims to control pests palm houses. And accessories. Please follow the following steps: Workflow 1- Documents Nil Fees Nil Special Conditions Client connection Pest Control Department at the following numbers (037020240 - 037020241) and provide the required data in terms of identifying the region, street, house number, phone number, and specify the type of injury, if possible - Palm blights are pest control only in homes Access 800555 info@am.ae 0097126715550 general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 184 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-P&R-SC-02 Site free Certificate of Irrigation Networks Customers Description All Business Citizens This service aims to issue a certificate of absence of irrigation systems and accessories. Please follow the following steps: Workflow Documents Fees Special Conditions 1- Submission of the application 2- Receive the certificate Document Special Conditions Approved plans for the site of the Town Planning & survey Sector on the floppy disk format. Jpg copy Message from the owner of the project copy Nil - The necessity to present the identity card in all transactions of Al Ain Municipality. In case that there are watering lines through the workcourses, a permit will be issued to change the watering line. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 185 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-P&R-SC-03 Greenery Work Permit Customers Description All Business Citizens This service aims to issuance / renewal of a work permit in greenery (fossils) for sites within the boundaries of the departments of parks and recreational parks. Please follow the following steps: Workflow Documents Fees Special Conditions 1- Submission of the application. 2- Providing the bank guarantee in case of demand. 3- Receipt of the permit Document Special Conditions Approved plans for the site of the Town Planning and survey Sector on the floppy disk format. Jpg copy Message from the project owner to take responsibility for any damage original The formal request of the contractor original Pledged by the contractor original Nil - The necessity to present the identity card in all transactions of Al Ain Municipality. The limits of the specialized sector. In case that there are watering lines through the workcourses, a permit will be issued to change the watering line 800555 Access Working Hours Revision No.: 1 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: page 186 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 187 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Support and Assistance sector Revision No.: 1 page 188 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Tenders and Contracts Department Revision No.: 1 page 189 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-T&C-SC-01 Commodities Purchase Customers Description All Business Citizens This service aims to exchange food according to the material available in the Department of Materials Please follow the following steps: Workflow Documents Fees Special Conditions 1- Submission of the application 2- Provide the required documents 3- Payment of fees Document Special Conditions Food release card original Identity card original Nil - The necessity to present the identity card in all transactions of Al Ain Municipality - In case that there is a bill to reserve food and the food is not delivered during the 48 hours, communicate with the client to determine the cause 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector Link Western Sector general help hours: Working Hours Revision No.: 1 Sunday Thursday: 7:00 am - 12:00 pm (food distribution center - Industrial) Sunday Thursday: 7:30 am - 2:30 pm (municipal offices) page 190 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 call center hours: 24/7 Revision No.: 1 page 191 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-T&C-SC-02 Forage Card Issuance Customers Description All Business Citizens Extract feed card for citizens who hold cards Animal Census of Abu Dhabi Food Control Authority. Please follow the following steps: Workflow 1- Submission of the application. 2- Mobilization of fodder card information (in the absence of the empty boxes in the current card will be issued a new card). 3- Receipt of the card feed. Document Documents Fees Special Conditions Valid Animal surevy Card Copy Valid Animal surevy Card from Counting & Registering Animals Section Copy Customer's Photo(men only) Copy Emirates Identity Card Copy Nil - The necessity to present the Emirates identity card in all transactions of Al Ain Municipality. Special Conditions Access Revision No.: 1 - Use the special cards approved by the Department of materials in the management of tenders and contracts. - In case of temporary farms and the client provides a book from Abu Dhabi Food Control Authority to provide Rhodes, a temporary delivery certificate of feed must be provided at the same period mentioned in the book of the Department of Agriculture. 800555 info@am.ae page 192 Revision Date : 5/5/2014 0097126715550 Document Code.:AACM-CS-GL01 City Center (Main Building) Northern Sector Eastern Sector Southern Sector Western Sector general help hours: Sunday Thursday: 7:00 am - 12:00 pm (food distribution center - Industrial) Working Hours Sunday Thursday: 7:30 am - 2:30 pm (municipal offices) call center hours: 24/7 Revision No.: 1 page 193 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-T&C-SC-03 Food Distribution Card Customers Description All Business Citizens This service aims to issuance / renewal / Replacement / Damaged food distribution card for citizens Please follow the following steps: Workflow 1- Submission of the application 2- Provide the required documents Document Special Conditions Passport original Family book original Emirates Identity card original photograph (for men only). ( Ownership of a property in Abu Dhabi or a valid lease certifie Documents : copy Certificate from the work of the husband or wife copy Certificate of study continuity of the sons certified by the school district in the Emirate of Abu Dhabi) copy - ) y : Original birth certificate for children copy and support for the children certificate issued by the court y y : Support certificate issued by the court Fees Special Revision No.: 1 copy Nil - The necessity to present the identity card in all transactions of Al Ain page 194 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Conditions Municipality 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector Western Sector general help hours: Sunday Thursday: 7:00 am - 12:00 pm (food distribution center - Industrial) Working Hours Sunday Thursday: 7:30 am - 2:30 pm (municipal offices) call center hours: 24/7 Revision No.: 1 page 195 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Accounts Department Revision No.: 1 page 196 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-AC-SC-01 Properties Contracts Renewal Customers Description All Business Citizens This service aims to renew the contracts of rental premises owned by the municipalitypremises allocated to citizens and that by titling premiums, as well as for the premises owned by the citizens and that ended payments ownership within the social responsibility of the municipality of the city of the property Ain. Please follow the following steps: Workflow 1- Submission of the application. 2- Provide the required documents. 3- Pay the rental value. 4- Signed copies of the contract client . Document Documents Tenant identity card copy Agency in the case of the agent (individuals or companies) copy The signature copy The Emirates identity card of the person authorized signatory copy Seal the institution / company original valid trade license copy Fees Fees Special Conditions Revision No.: 1 Special Conditions Rental Value Cost It is specified upon the contract's length - The necessity to present the Emirates identity card in all transactions of Al Ain Municipality. - It's required personal presence of the tenant mentioned in the contract. page 197 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 - All documents submitted by the tenant should be updated. 800555 Access info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours Sunday - Thursday: 8:00 am 3:00 pm call center hours: 24/7 Revision No.: 1 page 198 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector AACM-AC-SC-02 To Whom it May Concern Properties Certificate Customers Description All Business Citizens This service aims to issue a certificate Whom It May Concern for the owner to clarify the data the property-owned at the request of others, namely, (Ministry of Social Affairs, the Abu Dhabi Food Control Authority, Farmers' Services) as a certificate is issued to the tenant to Al Ain Distribution Company only. Please follow the following steps: Workflow 1- Submission of the application. 2- Provide the required documents. 3- Receive the certificate. Document Documents Fees Special Conditions Special Conditions Emirates Identity card (for the owner and the tenant) copy Lease or trade license (for the tenant only) copy Nil - The necessity to present the Emirates identity card in all transactions of Al Ain Municipality. - All documents submitted by the landlord should be updated. - The certificate is provided to the tenant of Al Ain Distribution Company only. 800555 Access Revision No.: 1 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector page 199 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector general help hours: Working Hours دحألا- سيمخلا: 8:00 احابص15:00 رهظلا دعب call center hours: 24/7 Revision No.: 1 page 200 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Grneral Manager office Revision No.: 1 page 201 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Investment Office Revision No.: 1 page 202 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 AACM-IO-SC-01 Signs and Advertisements Permits Customers Description All Business Citizens This service permits (outdoor advertising on public roads) to government bodies, institutions and private companies for the purpose of advertising Please follow the following steps: 1- Provide an electronic copy of the service requirements 2- In the case of non-objection from the planning point of view, is issuing a letter to the client to get a no-objection certificates from the authorities listed below 3- Provide the required NOC from third parties to departments of the municipal offices 4- Payment of fees 5- Receipt of the statement " Workflow Documents Fees Special Conditions Document Special Conditions Letter from the applicant original land plan for the applicant copy A copy of the trade license copy The form and content of the ad sizes copy The proposed site (Google) copy Identity card original Nil - The necessity to present the identity card in all transactions of Al Ain Municipality - Advertising Fees Act in force in Al Ain Municipality (administrative decision of the Department of Abu Dhabi Municipality and Town Planning No. 38 of 2004). Access Revision No.: 1 page 203 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 800555 info@am.ae 0097126715550 City Center (Main Building) Northern Sector Eastern Sector Southern Sector general help hours: Working Hours call center hours: 24/7 Revision No.: 1 page 204 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Western Sector Advertisement Type Fees Advertising the Trade Name of the facility within the range of the leased area (collected only once at the time of issuing the license) Up to one square meter 100 Over one square meter Addition of 25 Dhs for every extra meter Trade Name Poster on the part sides of the shop (owned by the shop/ not owned) Up to one square meter 50 Dhs/ yearly Over one square meter Addition of 25 Dhs for every extra meter Electronic Billboard (top of the building – on the roads) Board size (40 square meter or less) 20000 Dhs/ per year Over 40 square meter 500 Dhs/ per year (for every m2) Advertisements Ads Associated with the Commercial Boards For every square meter 100 Dhs/ per year Vending Machines Advertisements For every vending machine per location 1000 Dhs/ per year Flags Advertisements (Banners) For each flag 250 Dhs/ per year Temporary Ads for Sales & Promotional Campaigns For every request regardless whether accepted or rejected Revision No.: 1 page 205 Revision Date : 5/5/2014 200 Dhs Document Code.:AACM-CS-GL01 For every panel containing sales information during the sales period as long as the panel does not exceed 4 m2 500 Dhs For every promotional campaign panel within the period as long as it does not exceed 4m2 1500 Dhs Display Advertising Prizes (cars/ motorcycles/ …etc.) For every advertisement (fees to be collected once the cars been displayed even without the ad) 1500 Dhs/ per month Air fields & Stadiums fields Advertisements Air field Ad per day 2000 Dhs Stadium field Ad per week 2000 Dhs Paper Ad (Flayers/ leaflets) Per ad 250 Dhs per month Per leaflet (regardless to the number of pages & quality) 500 Dhs Umbrella Ad Per her umbrella brand 500 Announcements fixed / rooftops For every 4 m2 or less 5000 Dhs per year For every additional m2 100 Dhs per year Per 4 meters or less 10000 / Yearly Revision No.: 1 page 206 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Per one square meter of additional 200 / year Signage (Direction panels to companies location, facilities, warehouse…etc.) Balloons & Aircraft Ads 500 Dhs daily For every square meter or less 250 Dhs per year Every additional square meter 50 Dhs per year Cars Ads Saloon Cars body Ads 500 Dhs yearly per car Cars Body Ads (mini bus, pickup and similar) 1000 Dhs per year Bus Body Ads 1500 Dhs per year Animated Ads on the car body 3000 Dhs per year ATM Machines Ads (Banks Automatic Teller Machines on the public places) For each machine (except the ones located on the mean building and the banks) 1000 Dhs per year All Types of Auto Payment Vending Machines (Telephone Auto-payment services or any other payment machines) Each Machine 1000 Dhs per year Hot Drinks Vending Machines (Tea, coffee…etc.) 500 Dhs per year Other Machines Candies Vending Machines Vending Machines (candies, chips, 500 Dhs per year Gums Vending Machines 200 Dhs per year Revision No.: 1 page 207 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01 Ice Vending Machines 500 Dhs per year Toys Vending Machines 500 Dhs per year Revision No.: 1 page 208 Revision Date : 5/5/2014 Document Code.:AACM-CS-GL01