Height Work Permit Project: Form No :001 PMC Permit No : Contractor Date of issue : PERMIT MUST BE TAKEN BEFORE STARTING THE WORK. Permit Valid up to : PERMIT MUST BE DISPLAYED AT SITE. ATTACH TOOL BOX TALK COPY WITH PERMIT. Dept. Note: Contractor Safety officer : Contractor execution engineer : Contact (Extn) No : Contact (Extn) No : Area of work : Please mark the location of work Job description: System(s) used during the works Elevated work platform (i.e. scissor lift) Roof and/or ladder anchor points Ropes and harness Step ladder Scaffold platform Edge protection Mobile scaffold Safety net Other (please specify): Equipment Used : CONTRACTOR’S COMPLIANCE STATEMENT We hereby confirm that the following HSEQ requirements shall be complied with: Yes Remark /No ( Give reason for No /NA option) Statement Description SN 1 Only medically fit personnel engaged in work and list is available. 2 Job Hazards is explained to all concern thru tool box talk meeting. 3 Ladder(s) inspected prior to use 4 Ladder properly supported and levelled (For access purpose only) and tied top and bottom 5 Distance between the ladder support and the ladder base is at least ¼ the total length of the ladder. Ladder been provided with skid resistant feet 6 Scaffolds/platforms inspected for good stability and proper construction (secured flooring and guardrails) Floor openings covered / Guarded. 7 Has scaffold/boom lift/scissor lift working platform is loaded within safe working load. 8 Work area cordon off and warning signs in place. Proper Housekeeping is done. 9 Personnel assigned to warn of floor opening or other hazardous exposure. 10 Tools and other equipment stored in safe manner 11 Area cleared below prior to start work 12 Proper equipment provided 13 Safety Harness and Lanyard anchored to independent rigid object 14 Lifeline with rope grab shock absorber/fall arrestor 15 Full Body harness is used by all workmen engaged at height work. 16 Safety net is provided but not less than 5 M from the work area. 17 Electrical cable/ welding hose / compressed air hose properly secured and lay down without obstruction. 18 Full Body harness and other PPE's are used by all workmen engaged at height work Any Safety Remarks: Night Work Precautions 19 General area & task Illumination is provided and secured properly 20 Emergency vehicle and driver available at standby 21 Non-compliance observed at work place to be closed prior commence of night work 22 Continues on job supervision to be available for the night works * Contractor Supervisor to be in the workplace throughout the completion of the work. Note: * To close the permit, concerned supervisor to check the workplace for any abnormalities after completion of the work. * A separate permit to be filled for hot work if performed at height. Permit requesting by Contractor Name, Sign. & Time: (Site Engineer) Name, Sign. & Time: (Safety Engineer) Permit approved by PMC/CLIENT Name, Sign. & Time: (Site Engineer) Name, Sign. & Time: (Safety Engineer) Permit Closed by Name, Sign. & Time: (Contr. Site Engg.) Name, Sign. & Time: (Contr. Safety Engg.) Name, Sign. & Time: (PMC Safety Engg.)