Alsina Formwork South East Asia Corporation Unit 901, The Infinity Tower - 26th Street, Bonifacio Global City Taguig City, 1634 (Philippines) - Tel.: (+632) 834 7553 / 54 MF HORIZONTAL CHECKLIST Date: ________________________________ Time:________________________________ Project Name:_________________________ Client Name:__________________________ Alsina Site Supervisor on Duty:___________ A.) SLABS ITEMS Primary Beams (2UPN) are properly placed onto U-heads of the shoring Secondary Beams (HT20) follows correct spacing as per design Secondary Beams (HT20) are connected properly onto 2UPN through Mf Connectors HT20 overlaps are placed properly without extensive cantiléver. Phenolic used is of good quality. Phenolic properly nailed on mix joists OK NOT OK □ □ □ □ □ □ □ □ □ □ □ □ COMMENTS Alsina Formwork South East Asia Corporation Unit 901, The Infinity Tower - 26th Street, Bonifacio Global City Taguig City, 1634 (Philippines) - Tel.: (+632) 834 7553 / 54 No wide phenolic gaps on the decking Guardrails are fixed properly onto HT20 or 2UPN with the right connectors Brace tubes, Wood or other materials serving as guadrail are secured and properly placed. B.) OTHERS □ □ □ □ □ □ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ __________________ Alsina Site Supervisor __________________ Date