Alsina Formwork South East Asia Corporation Unit 901, The Infinity Tower - 26th Street, Bonifacio Global City Taguig City, 1634 (Philippines) - Tel.: (+632) 834 7553 / 54 CL40 CHECKLIST Date: ________________________________ Time:________________________________ Project Name:_________________________ Client Name:__________________________ Alsina Site Supervisor on Duty:___________ A.) TOWERS ITEMS Verticality of CL Verticals Properly placed and locked diagonal bracings Base (concrete or compacted soil) is flat and levelled Base wood sleepers or steel plates placed properly if needed Base Jack extensión does not exceed 35cm If base Jack is hyperextended, proper tube bracing placed Verticals follow correct combination with Open-ended verticals at the bottom OK NOT OK □ □ □ □ □ □ □ □ □ □ □ □ □ □ COMMENTS Alsina Formwork South East Asia Corporation Unit 901, The Infinity Tower - 26th Street, Bonifacio Global City Taguig City, 1634 (Philippines) - Tel.: (+632) 834 7553 / 54 Verticals are placed in the correct upright position U-head properly placed and stable Towers properly braced on permanent structures if necessary □ □ □ □ □ □ OK NOT OK □ □ □ □ □ □ □ □ □ □ □ □ B.) CANTILEVER BRACKETS ITEMS Double-diagonal proper placed. Horizontal ledgers and diagonals properly secured onto main tower Transverse ledgers and diagonals properly placed Base Collar or verticals holding u-heads are properly placed Double diagonals are properly braced with bracing tubes and couplers Cantilever brackets provided extra bracing tubes as needed to prevent swaying COMMENTS Alsina Formwork South East Asia Corporation Unit 901, The Infinity Tower - 26th Street, Bonifacio Global City Taguig City, 1634 (Philippines) - Tel.: (+632) 834 7553 / 54 C.) UNBALANCED TOP VERTICALS ITEMS Double-diagonal proper placed to support the higher side of the verticals. Horizontal ledgers and diagonals properly secured Transverse ledgers and diagonals properly placed for the higher side Double diagonals are properly braced with bracing tubes and couplers as necessary OK NOT OK □ □ □ □ □ □ □ □ COMMENTS Alsina Formwork South East Asia Corporation Unit 901, The Infinity Tower - 26th Street, Bonifacio Global City Taguig City, 1634 (Philippines) - Tel.: (+632) 834 7553 / 54 D.) SCAFFOLDING AND ACCESS STAIRS ITEMS Verticality of CL Verticals Properly placed and locked diagonal bracings Base (concrete or compacted soil) is flat and levelled Base wood sleepers or steel plates placed properly if needed Base Jack extensión does not exceed 35cm If base Jack is hyperextended, proper tube bracing placed Verticals follow correct combination with Open-ended verticals at the bottom Verticals are placed in the correct upright position U-head properly placed and stable Towers properly braced on permanent structures if necessary Handrail Adapter properly placed Stair Landing, Stairs and handrail properly placed Toe Boards, if applicable, are placed around the area of the scaffold or access stairs OK NOT OK □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ COMMENTS Alsina Formwork South East Asia Corporation Unit 901, The Infinity Tower - 26th Street, Bonifacio Global City Taguig City, 1634 (Philippines) - Tel.: (+632) 834 7553 / 54 Platforms boards are placed and hooked properly onto U-ledgers Platforms are clear from obstructions and no stock pile of materials Castor Wheels are properly placed and locked when in use □ □ □ □ □ □ E.) OTHERS _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ __________________ Alsina Site Supervisor __________________ Date