Total grading for the project is approximately 29,148 cubic yards (CY), of which 28,341 CY will be remedial. Net 807 non remediated A very basic calc on the Tramonto slide - it measures ~180,000 SF on Zimas. With a median depth of 30’-40’, which is typical for our area, this will result in approximately 250,000 CY of earth mass, weighing roughly that much in tonnes. Even with the approximation, this is no joke. If improperly disturbed, a massive landslide could be triggered with perilous consequences. Proposals to build several homes under these conditions cannot and should not be a subject to a MND only. If building on top of 250K of moving earth does not warrant a full EIR, one should seriously question the reliability of the City institutions, licensing such.