Fire Alarm System Programming Method Statement

advertisement
LOGO
METHOD STATEMENT
PROGRAMMING OF FIRE ALARM SYSTEM FOR INTERFACING
MODULE OF AHU UNIT AND NEED TO CHECK AND
TROUBLESHOOT EXACT FAULT OF ANNOUNCIATOR
MSS:
Rev.: 00
Date:
1. Purpose
This Method Statement document explains the method for Reprogramming of fire alarm system (FAS) for interfacing
module of AHU Unit and needs to check the exact fault of Annunciator-2 at (Project/Facility Name) and Annunciator.
2. Scope
The scope of works detailed within this MS document applies to method for Reprogramming for a fire alarm system
(FAS) for Interfacing module of AHU and require to examine the exact defects of Annunciator-2 whereby upon
satisfactory accomplishment, inspection of works, the below mentioned Project requirement and effective &
efficient system is handed Over to the Client.
3. Reference



NFPA 101Life Safety Code
NFPA 72 Fire alarm system
NFPA 70 (2014 Edition)- Electrical
4. Procedure
Sr
Activity
Responsible Person
Controlling Document
Preventive maintenance:
1. Authorized PTW SHALL be Issued by the client before the start of works Worksite Engineer
2. Personnel conducting works SHALL wear appropriate PPE
3. Safety warning signs SHALL be provided and the area cleared of non4.
5.
6.
7.
8.
essential personnel
The programmer will connect the software with the fire alarm panel in
MODE-1.
The Programmer already added the existing interfacing module as per the
fire alarm panel Node and they will provide cause and effect (During fire
alarm activation AHU module will be activated after 180 seconds time
latency) for the Existing Module (EM).
The programmer will do the changing of caution and effect as per the site
standard to activate the Existing module.
After completing programming and updating the fire system. We require
to do the Fire Alarm Testing (FAT) to check the cause and effect of the
Exiting module.
The programmer will connect the software with fire alarm master panel
in (specified Room) and he will check and troubleshoot exact fault of
annunciator -2 Trouble.
Date:
Worksite Engineer
Worksite Engineer
Signatures:
Contractor:
Issued for Approval:
Reviewed by:
Approved by:
MOS/Programming of Fire Alarm System for Interfacing Module