TECHNICAL REPORT
Power report; Installation of
batteries at Lungi and
replacement of solar panel at
Kambia.
PURPOSE
Telecommunication network devices must be provided with stable power supply to
ensure quality of service and adhere to service level agreements between the
clients and network carriers or service providers.
However, the Leonecom site at Lungi has been faced with enormous power
challenges concerning uninterruptible power supply when there is a power outage
on the primary source and backup generator.
Therefore, the Leonecom management contracted Real power to install 4 X
12V200AH/20HR batteries at the Lungi site and retrieve the 24 batteries from
Lungi, and install them at Kambia. This task was conducted by Real power and
supervised by the Leonecom power team, observations and constraints were
observed and captured in this report
Installation of batteries and replacement of
faulty panel.
No
Site Name Activity
Comments
1
Masiaka
Retrieval of one solar panel
A test was conducted to meet the 32V threshold.
2.
Lungi
The installation of four batteries
was completed successfully.
Several tests were conducted on and off power
supply.
3
Kambia
The 24 batteries retrieved from
Lungi were mounted and aligned
successfully on the rack at
Kambia.
Completed successfully.
01
Pictures of installed batteries at Lungi and
Kambia
Newly installed
batteries
Lunsar
at Lungi
epleted batteries at
Lungi
Specification of DC
batteries
02
Replacement of faulty solar panel at Kambia
Makeni - EBK
MASINGBI
Faulty panel
ood solar
panel
G
MILE-91
Good panel
voltage recorded
03
Observations
No DC to switch
power extractor
fans
Gravitational flow at
Masiaka
04
Lunsar
Network devices
disaapting high heat
RISKS & HIGHLIGHTS
● Gravitational flow has been established for the external tank at Masiaka. To
minimize the supply of fuel, plumbing work must be carried out to reduce the
frequent supply of fuel.
● It was observed that the extractor fans at Rogbere are not working, therefore, a
standing fan would be required to reduce the high temperature dissipated in the
equipment room.
● At Kambia it was observed that grasses are growing on top of the solar panels.