14th Aug, 2023. Author: Shaka Madda Butscher Submitted to: Thomas Koroma Word order; 41081 TECHNICAL REPORT Power report; Installation of batteries at Lungi and replacement of solar panel at Kambia. PURPOSE Telecommunication network devices must be provided with stable power supply to ensure quality of service and adhere to service level agreements between the clients and network carriers or service providers. However, the Leonecom site at Lungi has been faced with enormous power challenges concerning uninterruptible power supply when there is a power outage on the primary source and backup generator. Therefore, the Leonecom management contracted Real power to install 4 X 12V200AH/20HR batteries at the Lungi site and retrieve the 24 batteries from Lungi, and install them at Kambia. This task was conducted by Real power and supervised by the Leonecom power team, observations and constraints were observed and captured in this report Installation of batteries and replacement of faulty panel. No Site Name Activity Comments 1 Masiaka Retrieval of one solar panel A test was conducted to meet the 32V threshold. 2. Lungi The installation of four batteries was completed successfully. Several tests were conducted on and off power supply. 3 Kambia The 24 batteries retrieved from Lungi were mounted and aligned successfully on the rack at Kambia. Completed successfully. 01 Pictures of installed batteries at Lungi and Kambia Newly installed batteries Lunsar at Lungi epleted batteries at Lungi Specification of DC batteries 02 Replacement of faulty solar panel at Kambia Makeni - EBK MASINGBI Faulty panel ood solar panel G MILE-91 Good panel voltage recorded 03 Observations No DC to switch power extractor fans Gravitational flow at Masiaka 04 Lunsar Network devices disaapting high heat RISKS & HIGHLIGHTS ● Gravitational flow has been established for the external tank at Masiaka. To minimize the supply of fuel, plumbing work must be carried out to reduce the frequent supply of fuel. ● It was observed that the extractor fans at Rogbere are not working, therefore, a standing fan would be required to reduce the high temperature dissipated in the equipment room. ● At Kambia it was observed that grasses are growing on top of the solar panels. 05 THANK YOU