Uploaded by alexanderbaluyot1522

ANSI NETA MST 2011

advertisement
ANSI/NETA MTS-2011
AMERICAN NATIONAL STANDARD
STANDARD FOR
MAINTENANCE TESTING SPECIFICATIONS for
Electrical Power Equipment
and Systems
Secretariat
NETA (InterNational Electrical Testing Association)
Approved by
American National Standards Institute
– This page intentionally left blank –
American
National
Standard
Approval of an American National Standard requires verification by
ANSI that the requirements for due process, consensus, and other
criteria for approval have been met by the standards developer.
Consensus is established when, in the judgment of the ANSI Board of
Standards Review, substantial agreement has been reached by directly
and materially affected interests. Substantial agreement means much
more than a simple majority, but not necessarily unanimity. Consensus
requires that all views and objections be considered, and that a concerted
effort be made toward their resolution.
The use of American National Standards is completely voluntary; their
existence does not in any respect preclude anyone, whether he has
approved the standards or not, from manufacturing, marketing,
purchasing, or using products, processes, or procedures not conforming
to the standards.
The American National Standards Institute does not develop standards
and will in no circumstances give an interpretation of any American
National Standard in the name of the American National Standards
Institute. Requests for interpretations should be addressed to the
secretariat or sponsor whose name appears on the title page of this
standard.
Caution Notice: This American National Standard may be revised or
withdrawn at any time. The procedures of the American National
Standards Institute require that action be taken periodically to reaffirm,
revise, or withdraw this standard. Purchasers of American National
Standards may receive current information on all standards by calling or
writing the American National Standards Institute.
Published by
InterNational Electrical Testing Association
3050 Old Centre Ave., Suite 102
Portage, MI 49024
269.488.6382· FAX 269.488.6383
www.netaworld.org
neta@netaworld.org
Jayne Tanz - Executive Director
Copyright© 2011
InterNational Electrical Testing Association
All rights reserved
Printed in the United States of America
No part of this publication may be reproduced in any form, in an
electronic retrieval system or otherwise, without the prior written
permission of the publisher.
ANSI/NETA MTS-2011
Copyright Information and
Alteration of Content
2011 ANSI/NETA Standard for Maintenance Testing Specifications is protected under the
copyright laws of the United States, and all rights are reserved. Further, the Standard may
not be copied, modified, sold, or used except in accordance with such laws and as follows:
Purchasers may reproduce and use all or a portion of the Standard provided ANSI/NETA
Standard for Maintenance Testing Specifications is clearly identified in writing as the source
of all such uses or reproductions.
Section 7 of the ANSI/NETA Standard for Maintenance Testing Specifications may be
reproduced and used on a “cut and paste” basis for the particular type of equipment to be
tested.
The following sections of the ANSI/NETA Standard for Maintenance Testing Specifications
must be incorporated by reference as part of any subsection:
3.
4.
5.
Qualifications of Testing Organization and Personnel
3.1
Testing Organization
3.2
Testing Personnel
Division of Responsibility
4.1
The Owner’s Representative
4.2
The Testing Organization
General
5.1
Safety and Precaution
5.2
Suitability of Test Equipment
5.3
Test Instrument Calibration
5.4
Test Report
The purchaser is required to include the above sections with any section(s) of 7.
© Copyright 2011
InterNational Electrical Testing Association
3050 Old Centre Ave., Suite 102
Portage, MI 49024
Voice: 888.300.6382 Facsimile: 269.488.6383
E-mail: neta@netaworld.org • Web: www.netaworld.org
ANSI/NETA MTS-2011
Standards Review Council
The following persons were members of the NETA Standards Review Council which approved this
document.
Charles K. Blizard, Sr.
Timothy J. Cotter
Diane W. Hageman
Roderic L. Hageman
Dave Huffman
Ralph Patterson
Alan D. Peterson
Jayne Tanz
Ron Widup
Maintenance Testing Specifications Section Panel Members
The following persons were members of the Section Panel which balloted on this document for submission
to the NETA Standards Review Council.
Mark Baldwin
Ken Bassett
Tom Bishop
Scott Blizard
Michael Bowers
Alan Bump
John Cadick
Michel Canstonguay
Ernie Creech
Tim Crnko
Don Genutis
Kerry Heid
Stuart Jackson
Scott Kinney
Andrew Kobler
Korey Kruse
Benjamin Lanz
Mark Lautenschlager
Joe Nims
Bruce Olson
ANSI/NETA MTS-2011
Jerry Parnell
Raj Patel
Tony Perry
M. Lee Perry, Jr.
Mose Ramieh, Sr.
Vince Saporita
Richard Sobhraj
ChrisWerstiuk
John White
J.P. Wolff
NETA Accredited Companies
The following persons were voting members of the InterNational Electrical Testing Association
when this document was approved on May 16, 2011.
A&F Electrical Testing., Inc.
Kevin Chilton
Advanced Testing Systems
Patrick MacCarthy
American Electrical Testing Co., Inc.
Scott Blizard
Apparatus Testing and Engineering
James Lawler
Applied Engineering Concepts
Michel Castonguay
Burlington Electrical Testing Company, Inc.
C.E. Testing., Inc.
Walter Cleary
Mark Chapman
CE Power Solutions of Wisconsin, LLC
James VanHandel
DYMAX Holdings, Inc.
Gene Philipp
Eastern High Voltage
Joseph Wilson
ELECT, P.C.
Barry W. Tyndall
Electric Power Systems, Inc.
Steve Reed
Electrical and Electronic Controls
Michael Hughes
Electrical Energy Experts, Inc.
William Styer
Electrical Equipment Upgrading, Inc.
Kevin Miller
Electrical Maintenance & Testing, Inc.
Brian Borst
Electrical Reliability Services
Lee Bigham
Electrical Testing, Inc.
Steve Dodd
Elemco Services, Inc.
Robert J. White
Hampton Tedder Technical Services
Matt Tedder
Harford Electrical Testing Co., Inc.
Vincent Biondino
High Energy Electrical Testing, Inc.
James P. Ratshin
High Voltage Maintenance Corp.
Eric Nation
HMT, Inc.
John Pertgen
Industrial Electric Testing, Inc.
Gary Benzenberg
Industrial Electronics Group
Butch E. Teal
Industrial Tests, Inc.
Greg Poole
Infra-Red Building and Power Service
Thomas McDonald
ANSI/NETA MTS-2011
NETA Accredited Companies
M&L Power Systems Maintenance, Inc.
Darshan Arora
Magna Electric Corporation
Kerry Heid
Magna IV Engineering – Edmonton
Jereme Wentzell
Magna IV Engineering (BC), Ltd.
Cameron Hite
MET Electrical Testing, LLC
William McKenzie
National Field Services
Eric Beckman
Nationwide Electrical Testing, Inc.
Shashikant B. Bagle
North Central Electric, Inc.
Robert Messina
Northern Electrical Testing, Inc.
Lyle Detterman
Orbis Engineering Field Services
Lorne Gara
Pacific Power Testing, Inc.
Steve Emmert
Phasor Engineering
Rafael Castro
Potomac Testing, Inc.
Ken Bassett
Power & Generation Testing, Inc.
Mose Ramieh
Power Engineering Services, Inc.
Miles R. Engelke
POWER PLUS Engineering, Inc.
Salvatore Mancuso
Power Products & Solutions, Inc.
Ralph Patterson
Power Services, LLC
Gerald Bydash
Power Systems Testing Co.
David Huffman
Power Test, Inc.
Richard Walker
POWER Testing and Energization, Inc.
Chris Zavadlov
Powertech Services, Inc.
Jean A. Brown
Precision Testing Group
Glenn Stuckey
PRIT Service, Inc.
Roderic Hageman
Reuter & Hanney, Inc.
Michael Reuter
REV Engineering, LTD
Roland Davidson
Scott Testing, Inc.
Russ Sorbello
Shermco Industries
Ron Widup
Sigma Six Solutions, Inc.
John White
Southern New England Electrical Testing
David Asplund, Sr.
ANSI/NETA MTS-2011
NETA Accredited Companies
Southwest Energy Systems, LLC
Robert Sheppard
Taurus Power and Controls, Inc.
Rob Bulfinch
Three-C Electrical Co., Inc.
James Cialdea
Tidal Power Services, LLC
Monty Janak
Tony Demaria Electric, Inc.
Anthony Demaria
Trace Electrical Services & Testing, LLC
Joseph Vasta
Utilities Instrumentation Service, Inc.
Gary Walls
Utility Service Corporation
Alan Peterson
Western Electrical Services
Dan Hook
ANSI/NETA MTS-2011
NOTICE
In no event shall the InterNational Electrical Testing Association be liable to anyone for special, collateral,
incidental, or consequential damages in connection with or arising out of the use of these materials.
This document is subject to periodic review, and users are cautioned to obtain the latest edition. Comments
and suggestions are invited from all users for consideration by the Association in connection with such
review. Any such suggestions will be fully reviewed by the Association after giving the commenter, upon
request, a reasonable opportunity to be heard.
This document should not be confused with federal, state, or municipal specifications or regulations,
insurance requirements, or national safety codes. While the Association recommends reference to or use of
this document by government agencies and others, use of this document is purely voluntary and not binding.
InterNational Electrical Testing Association
3050 Old Centre Ave., Suite 102 • Portage, MI 49024
Voice: 888.300.6382 Facsimile: 269.488.6383
Email: neta@netaworld.org • Web: www.netaworld.org
Jayne Tanz, CMP - Executive Director
ANSI/NETA MTS-2011
– This page intentionally left blank –
ANSI/NETA MTS-2011
FOREWORD
(This Foreword is not part of American National Standard ANSI/NETA MTS-2011)
The InterNational Electrical Testing Association (NETA) was formed in 1972 to establish uniform testing
procedures for electrical equipment and apparatus. NETA has been an Accredited Standards Developer for
the American National Standards Institute since 1996. NETA’s scope of standards activity is different from
that of IEEE, NECA, NEMA, and UL. In matters of testing electrical equipment and systems NETA
continues to reference other standards developers’ documents where applicable. NETA’s review and
updating of presently published standards takes into account both national and international standards.
NETA’s standards may be used internationally as well as in the United States. NETA firmly endorses a
global standardization. IEC standards as well as American consensus standards are taken into consideration
by NETA’s ballot pools and reviewing committees.
The first NETA Maintenance Testing Specifications for Electrical Power Equipment and Systems was
published in 1975. Since 1989, revised editions of the Maintenance Testing Specifications have been
published in 1993, 1997, and 2001.
In 2005, this document was approved for the first time as an American National Standard. The 2011
Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems is the most
current revision of this document.
The ANSI/NETA Standard for Maintenance Testing Specifications for Electrical Power Equipment and
Systems was developed for use by those responsible for the continued operation of existing electrical
systems and equipment to guide them in specifying and performing the necessary tests to ensure that these
systems and apparatus perform satisfactorily, minimizing downtime and maximizing life expectancy. This
document aids in ensuring safe, reliable operation of existing electrical power systems and equipment.
Maintenance testing can identify potential problem areas before they become major problems requiring
expensive and time-consuming solutions.
Suggestions for improvement of this standard are welcome. They should be sent to the InterNational
Electrical Testing Association, 3050 Old Centre Avenue, Suite 102, Portage, MI 49024.
ANSI/NETA MTS-2011
PREFACE
It is recognized by the Association that the needs for maintenance testing of commercial, industrial,
governmental, and other electrical power systems vary widely. Many criteria are used in determining what
equipment is to be tested and to what extent.
To help the user better understand and navigate more efficiently through this document, we offer the
following information:
The Document Structure
The document is divided into twelve separate and defined sections:
Section
Section 1
Section 2
Section 3
Section 4
Section 5
Section 6
Section 7
Section 8
Section 9
Section 10
Tables
Appendices
Description
General Scope
Applicable References
Qualifications of Testing Organization and Personnel
Division of Responsibility
General
Power System Studies
Inspection and Test Procedures
System Function Test
Thermographic Survey
Electromagnetic Field Testing
Reference Tables
Various Informational Documents
Section 7 Structure
Section 7 is the main body of the document with specific information on what to do relative to the
inspection and maintenance testing of electrical power distribution equipment and systems. It is not intended
that this document explain how to test specific pieces of equipment or systems.
Expected Test Results
Section 7 consists of sections specific to each particular type of equipment. Within those sections there are,
typically, three main bodies of information:
1. Visual and Mechanical Inspection
2. Electrical Tests
3. Test Values
ANSI/NETA MTS-2011
PREFACE (continued)
Results of Visual and Mechanical Inspections
Some, but not all, visual and mechanical inspections have an associated test value or result. Those items
with an expected result are referenced under Section 3.1 Test Values – Visual and Mechanical. For
example, Section 7.1 Switchgear and Switchboard Assemblies, item 7.1.1.7.2 calls for verifying tightness of
connections using a calibrated torque wrench method. Under the Test Values – Visual and Mechanical
Section 7.1.3. 1.2, the expected results for that particular task are listed within Section 3.1, with reference
back to the original task description on item 7.1.1.7.2.
ANSI/NETA MTS-2011
PREFACE (continued)
Results of Electrical Tests
Each electrical test has a corresponding expected result, and the test and the result have identical numbers. If
the electrical test is item four, the expected result under the Test Values section is also item four. For
example, under Section 7.15.1 Rotating Machinery, AC Induction Motors and Generators, item 7.15.1.2.2
(item 2 within the Electrical Tests section) calls for performing an insulation-resistance test in accordance
with IEEE Standard 43. Under the Test Values – Electrical section, the expected results for that particular
task are listed in the Test Values section under item 2.
ANSI/NETA MTS-2011
PREFACE (continued)
Optional Tests
The purpose of these specifications is to assure that all tested electrical equipment and systems supplied by
either contractor or owner are operational and within applicable standards and manufacturer’s published
tolerances and that equipment and systems are installed in accordance with design specifications.
Certain tests are assigned an optional classification. The following considerations are used in determining
the use of the optional classification:
1.
2.
3.
Does another listed test provide similar information?
How does the cost of the test compare to the cost of other tests
providing similar information?
How commonplace is the test procedure? Is it new technology?
Manufacturer’s Instruction Manuals
It is important to follow the recommendations contained in the manufacturer’s published data. Many of the
details of a complete and effective testing procedure can be obtained from this source.
Summary
The guidance of an experienced testing professional should be sought when making decisions concerning
the extent of testing. It is necessary to make an informed judgment for each particular system regarding how
extensive a procedure is justified. The approach taken in these specifications is to present a comprehensive
series of tests applicable to most industrial and larger commercial systems. In smaller systems, some of the
tests can be deleted. In other cases, a number of the tests indicated as optional should be performed.
Likewise, guidance of an experienced testing professional should also be sought when making decisions
concerning the results of test data and their significance to the overall analysis of the device or system under
test. Careful consideration of all aspects of test data, including manufacturer’s published data and
recommendations, must be included in the overall assessment of the device or system under test.
The Association encourages comment from users of this document. Please contact the NETA office or your
local NETA Accredited Company.
Standards Review Council
InterNational Electrical Testing Association
Charles K. Blizard, Sr.
Timothy J. Cotter
Diane W. Hageman
Roderic L. Hageman
Dave Huffman
Ralph Patterson
Alan D. Peterson
Jayne Tanz
Ron Widup
ANSI/NETA MTS-2011
– This page intentionally left blank –
ANSI/NETA MTS-2011
CONTENTS
1.
2.
3.
4.
5.
6.
7.
GENERAL SCOPE ..................................................................................................................
APPLICABLE REFERENCES ................................................................................................
QUALIFICATIONS OF TESTING PERSONNEL .................................................................
DIVISION OF RESPONSIBILITY ..........................................................................................
GENERAL ................................................................................................................................
5.1
Safety and Precautions ............................................................................................
5.2
Suitability of Test Equipment .................................................................................
5.3
Test Instrument Calibration ....................................................................................
5.4
Test Report ..............................................................................................................
POWER SYSTEM STUDIES ..................................................................................................
6.1
Short-Circuit Studies...............................................................................................
6.2
Coordination Studies...............................................................................................
6.3
Arc-Flash Hazard Analysis .....................................................................................
6.4
Load-Flow Studies ..................................................................................................
6.5
Stability Studies ......................................................................................................
6.6
Harmonic-Analysis Studies ....................................................................................
INSPECTION AND TEST PROCEDURES ............................................................................
7.1
Switchgear and Switchboard Assemblies ...............................................................
7.2.1.1
Transformers, Dry-Type, Air-Cooled, Low-Voltage, Small ..................................
7.2.1.2
Transformers, Dry-Type, Air-Cooled, Large ..........................................................
7.2.2
Transformers, Liquid-Filled....................................................................................
7.3.1
Cables, Low-Voltage, Low-Energy – Reserved .....................................................
7.3.2
Cables, Low-Voltage, 600 Volt Maximum.............................................................
7.3.3
Cables, Medium- and High-Voltage .......................................................................
7.4
Metal-Enclosed Busways ........................................................................................
7.5.1.1
Switches, Air, Low-Voltage ...................................................................................
7.5.1.2
Switches, Air, Medium-Voltage, Metal-Enclosed ..................................................
7.5.1.3
Switches, Air, Medium- and High-Voltage, Open .................................................
7.5.2
Switches, Oil, Medium-Voltage .............................................................................
7.5.3
Switches, Vacuum, Medium-Voltage .....................................................................
7.5.4
Switches, SF6, Medium-Voltage .............................................................................
7.5.5
Switches, Cutouts....................................................................................................
7.6.1.1
Circuit Breakers, Air, Insulated-Case/Molded-Case ..............................................
7.6.1.2
Circuit Breakers, Air, Low-Voltage Power ............................................................
7.6.1.3
Circuit Breakers, Air, Medium-Voltage .................................................................
7.6.2
Circuit Breakers, Oil, Medium- and High-Voltage ................................................
7.6.3
Circuit Breakers, Vacuum, Medium-Voltage .........................................................
7.6.4
Circuit Breakers, SF6 ..............................................................................................
7.7
Circuit Switchers .....................................................................................................
ANSI/NETA MTS-2011
1
2
11
12
13
13
13
14
15
16
16
17
19
21
22
23
24
24
28
30
34
38
39
41
44
46
49
52
55
58
61
64
66
69
73
77
82
86
90
CONTENTS (continued)
7.8
7.9.1
7.9.2
7.10
7.11.1
7.11.2
7.12.1.1
7.12.1.2
7.12.2
7.12.3
7.13
7.14
7.15.1
7.15.2
7.15.3
7.16.1.1
7.16.1.2
7.16.2.1
7.16.2.2
7.17
7.18.1.1
7.18.1.2
7.18.1.3
7.18.2
7.18.3
7.19.1
7.19.2
7.20.1
7.20.2
7.20.3.1
7.20.3.2
7.21
7.22.1
7.22.2
7.22.3
7.23
7.24.1
8.
9.
10.
11.
Network Protectors, 600-Volt Class .......................................................................
Protective Relays, Electromechanical and Solid-State ...........................................
Protective Relays, Microprocessor-Based ..............................................................
Instrument Transformers .........................................................................................
Metering Devices, Electromechanical and Solid-State ...........................................
Metering Devices, Microprocessor-Based ..............................................................
Regulating Apparatus, Voltage, Step-Voltage Regulators .....................................
Regulating Apparatus, Voltage, Induction Regulators ...........................................
Regulating Apparatus, Current – Reserved ............................................................
Regulating Apparatus, Load Tap-Changers ............................................................
Grounding Systems .................................................................................................
Ground-Fault Protection Systems, Low-Voltage ....................................................
Rotating Machinery, AC Induction Motors and Generators ...................................
Rotating Machinery, Synchronous Motors and Generators ....................................
Rotating Machinery, DC Motors and Generators ...................................................
Motor Control, Motor Starters, Low-Voltage .........................................................
Motor Control, Motor Starters, Medium-Voltage...................................................
Motor Control, Motor Control Centers, Low-Voltage............................................
Motor Control, Motor Control Centers, Medium-Voltage .....................................
Adjustable-Speed Drive Systems ............................................................................
Direct-Current Systems, Batteries, Flooded Lead-Acid .........................................
Direct-Current Systems, Batteries, Vented Nickel-Cadmium ................................
Direct Current Systems, Batteries, Valve-Regulated Lead-Acid............................
Direct-Current Systems, Chargers ..........................................................................
Direct-Current Systems, Rectifiers – Reserved ......................................................
Surge Arresters, Low-Voltage Surge Protection Devices.......................................
Surge Arresters, Medium- and High-Voltage Surge Protection Devices ...............
Capacitors and Reactors, Capacitors.......................................................................
Capacitors and Reactors, Capacitor Control Devices – Reserved ..........................
Capacitors and Reactors, Reactors (Shunt and Current-Limiting), Dry-Type........
Capacitors and Reactors, Reactors (Shunt and Current-Limiting), Liquid-Filled ..
Outdoor Bus Structures ...........................................................................................
Emergency Systems, Engine Generator ..................................................................
Emergency Systems, Uninterruptible Power Systems ............................................
Emergency Systems, Automatic Transfer Switches ...............................................
Communications – Reserved ..................................................................................
Automatic Circuit Reclosers and Line Sectionalizers,
Automatic Circuit Reclosers, Oil/Vacuum .......................................................
7.24.2
Automatic Circuit Reclosers and Line Sectionalizers
Automatic Line Sectionalizers, Oil ...................................................................
7.25
Fiber-Optic Cables ..................................................................................................
SYSTEM FUNCTION TESTS .................................................................................................
THERMOGRAPHIC SURVEY ...............................................................................................
ELECTROMAGNETIC FIELD TESTING .............................................................................
CORONA STUDIES – RESERVED........................................................................................
ANSI/NETA MTS-2011
93
97
104
106
112
114
116
121
125
126
130
132
135
139
145
148
151
155
155
156
159
162
165
167
169
170
172
174
176
177
179
183
185
187
190
193
194
198
201
202
203
204
205
CONTENTS (continued)
TABLES
100.1
Insulation Resistance Test Values, Electrical Apparatus and Systems..................................
100.2
Switchgear Withstand Test Voltages .....................................................................................
100.3
Dissipation Factor/Power Factor at 20° C; Liquid-Filled Transformers,
Regulators and Reactors, Maintenance Test Values ..............................................................
100.4
Insulating Fluid Limits
100.4.1 Suggested Limits for Class I Insulating Oil, Mineral Oil .......................................
100.4.2 Suggested Limits for Less-Flammable Hydrocarbon Insulating Liquid.................
100.4.3 Suggested Limits for Service-Aged Silicone Insulating Liquid .............................
100.4.4 Suggested Limits for Service-Aged Tetrachloroethylene Insulating Fluid ............
100.5
Transformer Insulation Resistance, Maintenance Testing .....................................................
100.6
Cables, Maintenance Test Values
100.6.1 Medium-Voltage Cables, Maintenance Test Values, DC Test Voltages ................
100.6.2 Field Test Voltages for Laminated Dielectric, Shielded Power Cable Systems
Rated 5,000 Volts and Above with High DC Voltage ............................................
100.6.3 Very Low Frequency Testing Levels for Medium-Voltage Cable
0.1 Hz Test Voltage (rms) .......................................................................................
100.7
Molded-Case Circuit Breakers, Inverse Time Trip Test ........................................................
100.8
Instantaneous Trip Tolerances for Field Testing of Circuit Breakers....................................
100.9
Instrument Transformer Dielectric Tests, Field Maintenance ...............................................
100.10 Maximum Allowable Vibration Amplitude ...........................................................................
100.11 Withdrawn ...........................................................................................................................
100.12 Bolt-Torque Values for Electrical Connections, US Standard Fasteners
100.12.1 Heat-Treated Steel – Cadmium or Zinc Plated .......................................................
100.12.2 Silicon Bronze Fasteners, Torque (Pound-Feet) .....................................................
100.12.3 Aluminum Alloy Fasteners, Torque (Pound-Feet) .................................................
100.12.4 Stainless Steel Fasteners, Torque (Pound-Feet)......................................................
100.13 SF6 Gas Tests .........................................................................................................................
100.14 Insulation Resistance Conversion Factors
100.14.1 Insulation Resistance Conversion Factors (20° C) .................................................
100.14.2 Insulation Resistance Conversion Factors (40° C) .................................................
100.15 High-Potential Test Voltage for Automatic Circuit Reclosers ..............................................
100.16 High-Potential Test Voltage for Periodic Test of Line Sectionalizers ..................................
100.17 Metal-Enclosed Bus Dielectric Withstand Test Voltages ......................................................
100.18 Thermographic Survey, Suggested Actions Based on Temperature Rise .............................
100.19 Dielectric Withstand Test Voltages for Electrical Apparatus
Other than Inductive Equipment ............................................................................................
100.20 Rated Control Voltages and Their Ranges for Circuit Breakers
100.20.1 Rated Control Voltages and Their Ranges for Circuit Breakers.............................
100.20.2 Rated Control Voltages and Their Ranges for Circuit Breakers,
Soleniod-Operated Devices ....................................................................................
100.21 Accuracy of IEC Class TP Current Transformers, Error Limit .............................................
100.22 Minimum Radii for Power Cable ...........................................................................................
208
209
210
211
212
213
213
214
215
216
217
218
219
220
221
222
223
223
224
224
225
226
227
228
229
230
231
232
233
235
236
237
APPENDICES
Appendix A – Definitions ..................................................................................................................... 241
Appendix B – Frequency of Maintenance Tests ................................................................................... 243
ANSI/NETA MTS-2011
CONTENTS (continued)
Appendix C – About the InterNational Electrical Testing Association ................................................ 247
Appendix D – Form for Comments ...................................................................................................... 249
Appendix E – Form for Proposals ........................................................................................................ 250
ANSI/NETA MTS-2011
– This page intentionally left blank –
ANSI/NETA MTS-2011
1.
GENERAL SCOPE
1.1 Maintenance Testing Specifications
1.
These specifications cover the suggested field tests and inspections that are available to assess
the suitability for continued service and reliability of electrical power distribution equipment
and systems.
2.
The purpose of these specifications is to assure that tested electrical equipment and systems are
operational, are within applicable standards and manufacturer’s tolerances, and are suitable for
continued service.
3.
The work specified in these specifications may involve hazardous voltages, materials,
operations, and equipment. These specifications do not purport to address all of the safety
problems associated with their use. It is the responsibility of the user to review all applicable
regulatory limitations prior to the use of these specifications.
Page 1
ANSI/NETA MTS-2011
2.
APPLICABLE REFERENCES
2.1 Codes, Standards, and Specifications
All inspections and field tests shall be in accordance with the latest edition of the following codes,
standards, and specifications except as provided otherwise herein.
1.
American National Standards Institute – ANSI
2.
ASTM International – ASTM
ASTM D 92
Standard Test Method for Flash and Fire Points by Cleveland Open Cup
Tester
ASTM D 445
Standard Test Method for Kinematic Viscosity of Transparent and
Opaque Liquids (the Calculation of Dynamic Viscosity)
ASTM D 664
Standard Test Method for Acid Number of Petroleum Products by
Potentiometric Titration
ASTM D 877
Standard Test Method for Dielectric Breakdown Voltage of Insulating
Liquids using Disk Electrodes
ASTM D 923
Standard Practices for Sampling Electrical Insulating Liquids
ASTM D 924
Standard Test Method for Dissipation Factor (or Power Factor) and
Relative Permittivity (Dielectric Constant) of Electrical Insulating
Liquids
ASTM D 971
Standard Test Method for Interfacial Tension of Oil against Water by
the Ring Method
ASTM D 974
Standard Test Method for Acid and Base Number by Color-Indicator
Titration
ASTM D 1298
Standard Test Method for Density, Relative Density (Specific Gravity),
or API Gravity of Crude Petroleum and Liquid Petroleum Products by
Hydrometer Method
ASTM D 1500
Standard Test Method for ASTM Color of Petroleum Products (ASTM
Color Scale)
ASTM D 1524
Standard Test Method for Visual Examination of Used Electrical
Insulating Oils of Petroleum Origin in the Field
Page 2
ANSI/NETA MTS-2011
2.
APPLICABLE REFERENCES
2.1 Codes, Standards, and Specifications (continued)
ASTM D 1533
Standard Test Methods for Water in Insulating Liquids by Coulometric
Karl Fischer Titration
ASTM D 1816
Standard Test Method for Dielectric Breakdown Voltage of Insulating
Oils of Petroleum Origin Using VDE Electrodes
ASTM D 2029
Standard Test Methods for Water Vapor Content of Electrical Insulating
Gases by Measurement of Dew Point
ASTM D 2129
Standard Test Method for Color of Clear Electrical Insulating Liquids
(Platinum-Cobalt Scale)
ASTM D 2284
Standard Test Method of Acidity of Sulfur Hexafluoride
ASTM D 2285
Standard Test Method for Interfacial Tension of Electrical Insulating
Oils of Petroleum Origin against Water by the Drop-Weight Method
ASTM D 2477
Standard Test Method for Dielectric Breakdown Voltage and Dielectric
Strength of Insulating Gases at Commercial Power Frequencies
ASTM D 2685
Standard Test Method for Air and Carbon Tetrafluoride in Sulfur
Hexafluoride by Gas Chromatography
ASTM D 2759
Standard Practice for Sampling Gas from a Transformer under Positive
Pressure
ASTM D 3284
Standard Test Method for Combustible Gases in the Gas Space of
Electrical Apparatus Using Portable Meters
ASTM D 3612
Standard Test Method for Analysis of Gases Dissolved in Electrical
Insulating Oil by Gas Chromatography
ASTM D 3613
Standard Practice for Sampling Electrical Insulating Oils for Gas
Analysis and Determination of Water Content
3.
Association of Edison Illuminating Companies – AEIC
4.
Canadian Standards Association – CSA
Page 3
ANSI/NETA MTS-2011
2.
APPLICABLE REFERENCES
2.1 Codes, Standards, and Specifications (continued)
5.
Electrical Apparatus Service Association – EASA
ANSI/EASA AR100
6.
Recommended Practice for the Repair of Rotating Electrical Apparatus
Institute of Electrical and Electronic Engineers – IEEE
ANSI/IEEE C2
National Electrical Safety Code
ANSI/IEEE C37
Compilation
Guides and Standards for Circuit Breakers, Switchgear, Relays,
Substations, and Fuses
ANSI/IEEE C57
Compilation
Distribution, Power, and Regulating Transformers
ANSI/IEEE C62
Compilation
Surge Protection
ANSI/IEEE 43
IEEE Recommended Practice for Testing Insulation Resistance of
Rotating Machinery
ANSI/IEEE 48
IEEE Standard Test Procedures and Requirements for AlternatingCurrent Cable Terminations 2.5 kV through 765 kV
IEEE 81
IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and
Earth Surface Potentials of a Ground System Part I: Normal
Measurements
ANSI/IEEE 81.2
IEEE Guide for Measurement of Impedance and Safety Characteristics of
Large, Extended or Interconnected Grounding Systems
ANSI/IEEE 95
IEEE Recommended Practice for Insulation Testing of Large AC
Rotating Machinery with High Direct Voltage
IEEE 100
The Authoritative Dictionary of IEEE Standards Terms
IEEE 141
IEEE Recommended Practice for Electrical Power Distribution for
Industrial Plants (Red Book)
ANSI/IEEE 142
IEEE Recommended Practice for Grounding of Industrial and
Commercial Power Systems (Green Book)
ANSI/IEEE 241
IEEE Recommended Practice for Electric Power Systems in Commercial
Buildings (Gray Book)
ANSI/IEEE 242
IEEE Recommended Practice for Protection and Coordination of
Industrial and Commercial Power Systems (Buff Book)
Page 4
ANSI/NETA MTS-2011
2.
APPLICABLE REFERENCES
2.1 Codes, Standards, and Specifications (continued)
IEEE 386
IEEE Standard for Separable Insulated Connectors System for Power
Distribution Systems above 600 V
ANSI/IEEE 399
IEEE Recommended Practice for Power Systems Analysis (Brown Book)
IEEE 400
IEEE Guide for Field Testing and Evaluation of the Insulation of
Shielded Power Cable Systems
ANSI/IEEE 421.3
IEEE Standard for High-Potential-Test Requirements for Excitation
Systems for Synchronous Machines
ANSI/IEEE 446
IEEE Recommended Practice for Emergency and Standby Power Systems
for Industrial and Commercial Applications (Orange Book)
ANSI/IEEE 450
IEEE Recommended Practice for Maintenance, Testing, and Replacement
of Vented Lead-Acid Batteries for Stationary Applications
ANSI/IEEE 493
IEEE Recommended Practice for the Design of Reliable Industrial and
Commercial Power Systems (Gold Book)
ANSI/IEEE 519
IEEE Recommended Practices and Requirements for Harmonic Control
in Electrical Power Systems
ANSI/IEEE 602
IEEE Recommended Practice for Electric Systems in Health Care
Facilities (White Book)
ANSI/IEEE 637
IEEE Guide for the Reclamation of Insulating Oil and Criteria for Its Use
IEEE 644
Procedures for Measurement of Power Frequency Electric and Magnetic
Fields from AC Power Lines
ANSI/IEEE 739
IEEE Recommended Practice for Energy Management in Commercial
and Industrial Facilities (Bronze Book)
ANSI/IEEE 902
IEEE Guide for Maintenance, Operation and Safety of Industrial and
Commercial Power Systems (Yellow Book)
IEEE 1015
IEEE Recommended Practice for Applying Low-Voltage Circuit Breakers
Used in Industrial and Commercial Power Systems (Blue Book)
IEEE 1100
IEEE Recommended Practice for Powering and Grounding Sensitive
Electronic Equipment (Emerald Book)
ANSI/IEEE 1106
IEEE Recommended Practice for Maintenance, Testing, and Replacement
of Nickel-Cadmium Batteries for Stationary Applications
Page 5
ANSI/NETA MTS-2011
2.
APPLICABLE REFERENCES
2.1 Codes, Standards, and Specifications (continued)
7.
8.
ANSI/IEEE 1159
IEEE Recommended Practice on Monitoring Electrical Power Quality
ANSI/IEEE 1188
IEEE Recommended Practice for Maintenance, Testing, and Replacement
of Valve-Regulated Lead-Acid (VRLA) Batteries for Stationary
Applications
IEEE 1584
IEEE Guide for Performing Arc-Flash Hazard Calculations
IEEE 1584a
IEEE Guide for Performing Arc-Flash Hazard Calculations –
Amendment 1
Insulated Cable Engineers Association – ICEA
ANSI/ICEA
S-93-639/NEMA
WC 74
5-46 kV Shielded Power Cable for Use in the Transmission and
Distribution of Electric Energy
ANSI/ICEA
S-94-649
Standard for Concentric Neutral Cables Rated 5,000 – 46,000 Volts
ANSI/ICEA
S-97-682
Standard for Utility Shielded Power Cables Rated 5,000 – 46,000 Volts
InterNational Electrical Testing Association – NETA
ANSI/NETA ETT
Standard for Certification of Electrical Testing Technicians
ANSI/NETA ATS
Acceptance Testing Specifications for Electrical Power Equipment and
Systems
Page 6
ANSI/NETA MTS-2011
2.
APPLICABLE REFERENCES
2.1 Codes, Standards, and Specifications (continued)
9.
National Electrical Manufacturers Association – NEMA
NEMA AB4
Guidelines for Inspection and Preventive Maintenance of Molded-Case
Circuit Breakers Used in Commercial and Industrial Applications
ANSI/NEMA C84.1 Electrical Power Systems and Equipment Voltage Ratings (60 Hz)
NEMA MG1
10.
Motors and Generators
National Fire Protection Association – NFPA
ANSI/NFPA 70
National Electrical Code
ANSI/NFPA 70B
Recommended Practice for Electrical Equipment Maintenance
ANSI/NFPA 70E
Standard for Electrical Safety in the Workplace
ANSI/NFPA 99
Standard for Healthcare Facilities
ANSI/NFPA 101
Life Safety Code
ANSI/NFPA 110
Emergency and Standby Power Systems
ANSI/NFPA 780
Installation of Lightning Protection Systems
11.
Occupational Safety and Health Administration – OSHA
12.
State and local codes and ordinances
13.
Underwriters Laboratories, Inc. – UL
Page 7
ANSI/NETA MTS-2011
2.
APPLICABLE REFERENCES
2.2 Other Publications
Manufacturer’s instruction manuals for the equipment to be tested.
A Stitch in Time…The Complete Guide to Electrical Insulation Testing, Megger.
Electrical Power Equipment Maintenance and Testing, Paul Gill, New York: Taylor & Francis Books.
Electrical Safety Handbook, John C. Cadick, New York: McGraw Hill.
The Electrical Safety Program Book, Kenneth G. Mastrullo, Ray A. Jones, Jane G. Jones, National Fire
Protection Association.
Instruction Book PC – 2000 for Wecosol™ Fluid-Filled Primary and Secondary Unit Substation
Transformer, ABB Power T&D.
2.3 Contact Information
ABB Power T&D
Small Transformer Division
PO Box 920
South Boston, VA 24592
(434) 572-5695
www.abb.com
American National Standards Institute – ANSI
25 West 43rd Street 4th Fl.
New York, NY 10036
(212) 642-4900
www.ansi.org
ASTM International – ASTM
100 Barr Harbor Drive
W. Conshohocken, PA 19428
(610) 832-9585
www.astm.org
Association of Edison Illuminating Companies – AEIC
600 N. 18th Street; PO Box 2641
Birmingham, AL 35291
(205) 257-2530
www.aeic.org
Canadian Standards Association – CSA
178 Rexdale Boulevard
Toronto, ON M9W 1R3
(416) 747-4000
www.csa.ca
Page 8
ANSI/NETA MTS-2011
2.
APPLICABLE REFERENCES
2.3 Contact Information (continued)
Electrical Apparatus Service Association – EASA
1331 Baur Boulevard
St. Louis, MO 63132
(314) 993-2220
www.easa.com
Institute of Electrical and Electronic Engineers – IEEE
PO Box 1331
Piscataway, NJ 08855
(732) 981-0060
www.ieee.org
Insulated Cable Engineers Association – ICEA
c/o Global Document Engineers
15 Inverness Way East
Englewood, CO 80112
(303) 397-7956
www.icea.net
International Electrotechnical Commission – IEC
Contact through American National Standards Institute
InterNational Electrical Testing Association – NETA
3050 Old Centre Ave. Suite 102
Portage, MI 49024
(269)488-6382 or (888) 300-NETA (6382)
www.netaworld.org
The McGraw-Hill Companies
P.O. Box 182604
Columbus, OH 43272
(877) 833-5524
www.mcgraw-hill.com
Megger
4271 Bronze Way
Dallas, TX 75237
(214) 723-2861
www.megger.com
National Electrical Manufacturers Association– NEMA
1300 N. 17th St. Suite 1847
Rosslyn, VA 22209
(703) 841-3200
www.nema.org
Page 9
ANSI/NETA MTS-2011
2.
APPLICABLE REFERENCES
2.3 Contact Information (continued)
National Institute of Standards and Technology
100 Bureau Drive
Gaithersburg, SD 20899
(301) 975-6478
www.nist.gov
National Fire Prevention Association – NFPA
1 Battery March Park
PO Box 901
Quincy, MA 02269-9101
(617) 984-7247
www.nfpa.org
Occupational Safety and Health Administration – OSHA
U.S. Department of Labor
Occupational Safety and Health Administration
Office of Public Affairs – Room N3647
200 Constitution Avenue
Washington, D.C. 20210
(202) 693-1999
www.osha.gov
Square D Company, Anderson Product Division
P.O. Box 455
Leeds, AL 35094
205-699-2411
www.squared.com
Taylor and Francis Books, Inc. – CRC Press
2000 NW Corporate Blvd.
Boca Raton, FL 33431
(561) 361-6000
www.crcpress.com
Underwriters Laboratories, Inc. – UL
333 Pfingsten Road
Northbrook, IL 60062
(847) 272-8800
www.ul.com
Page 10
ANSI/NETA MTS-2011
3.
QUALIFICATIONS OF TESTING PERSONNEL
1.
The subjective assessment required by this NETA maintenance standard is unique compared
to other American National Standards in that it deals with the evaluation of service-aged
equipment. While technicians performing tests and inspections on new equipment deal with
finite test values, those working with service-aged equipment must form recommendations
based on judgment.
2.
Technicians performing these electrical tests and inspections shall be trained and experienced
concerning the apparatus and systems being evaluated. These individuals shall be capable of
conducting the tests in a safe manner and with complete knowledge of the hazards involved.
They must be able to evaluate the test data and make a judgment on the continued
serviceability or nonserviceability of the specific equipment.
3.
Test technicians shall have knowledge of and experience with the specific device under test.
Additional personnel qualifications are as follows:
1.
Testing organizations: Owners utilizing testing companies shall require that each onsite crew leader shall hold a current certification, Level III or higher, in electrical
testing. This certification shall be in accordance with ANSI/NETA ETT-2010,
Standard for Certification of Electrical Testing Personnel.
2.
Manufacturers’ Service Personnel: Field service personnel of the manufacturer of the
equipment being evaluated shall be certified by the manufacturer to perform these
electrical tests and inspections. The manufacturer shall provide sufficient
documentation to satisfy the owner that its service personnel are trained and qualified
to perform these electrical tests and inspections.
3.
In-House Testing Personnel: Owners having in-house testing personnel shall utilize
an independent, outside certification organization or have some system of
qualification which provides an equivalent level of assurance that their personnel are
qualified to perform electrical testing. Owners are encouraged to utilize ANSI/NETA
ETT-2010 as a means of determining that their electrical testing personnel possess the
training, experience, and proof (examination) requirements now being promulgated
by various governmental agencies.
Page 11
ANSI/NETA MTS-2011
4.
DIVISION OF RESPONSIBILITY
4.1 The User
The user shall be responsible for all power switching of equipment and for providing equipment in a
ready-to-test condition. The user shall provide the testing organization with the following:
1.
A short-circuit analysis, a coordination study, an arc-flash hazard analysis, and a protective
device setting sheet as described in Section 6, if applicable.
2.
The most current set of electrical drawings and instruction manuals applicable to the scope of
work relative to the equipment under test.
3.
An itemized description of equipment to be inspected and tested.
4.
A determination of who shall provide a suitable and stable source of electrical power to each
test site.
5.
Notification of when equipment becomes available for maintenance tests. Work shall be
coordinated to expedite project scheduling.
6.
Site-specific hazard notification and safety training.
4.2 The Testing Organization
The testing organization shall provide the following:
1.
All field technical services, tooling, equipment, instrumentation, and technical supervision to
perform such tests and inspections.
2.
Specific power requirements for test equipment.
3.
Notification to the owner’s representative prior to commencement of any testing.
4.
A timely notification of any system, material, or workmanship which is found deficient on the
basis of maintenance tests.
5.
A record of all tests and a final report.
Page 12
ANSI/NETA MTS-2011
5.
GENERAL
5.1 Safety and Precautions
All parties involved must be cognizant of industry-standard safety procedures. This document does
not include any procedures, including specific safety procedures. It is recognized that an
overwhelming majority of the tests and inspections recommended in these specifications are
potentially hazardous. Individuals performing these tests shall be capable of conducting the tests in a
safe manner and with complete knowledge of the hazards involved.
1.
Safety practices shall include, but are not limited to, the following requirements:
1.
All applicable provisions of the Occupational Safety and Health Act, particularly OSHA
29CFR 1910.
2.
ANSI/NFPA 70E, Standard for Electrical Safety in the Workplace
3.
The Electrical Safety Program Book, Kenneth G. Mastrullo, Ray A. Jones, Jane G.
Jones, NFPA.
4.
Applicable state and local safety operating procedures.
5.
Owner’s safety practices.
2.
A safety lead person shall be identified prior to commencement of work.
3.
A safety briefing shall be conducted prior to the commencement of work.
4.
All tests shall be performed with the apparatus de-energized and grounded except where
otherwise specifically required to be ungrounded or energized for certain tests.
5.
The testing organization shall have a designated safety representative on the project to
supervise operations with respect to safety. This individual may be the same person described
in 5.1.2.
5.2 Suitability of Test Equipment
1.
All test equipment shall meet the requirements in Section 5.3 and be in good mechanical and
electrical condition.
2.
Field test metering used to check power system meter calibration must be more accurate than
the instrument being tested.
3.
Accuracy of metering in test equipment shall be appropriate for the test being performed.
4.
Waveshape and frequency of test equipment output waveforms shall be appropriate for the test
and the tested equipment.
Page 13
ANSI/NETA MTS-2011
5.
GENERAL
5.3 Test Instrument Calibration
1.
The testing organization shall have a calibration program which assures that all applicable test
instruments are maintained within rated accuracy for each test instrument calibrated.
2.
The firm providing calibration service shall maintain up-to-date instrument calibration
instructions and procedures for each test instrument calibrated.
3.
The accuracy shall be directly traceable to the National Institute of Standards and Technology
(NIST).
4.
Instruments shall be calibrated in accordance with the following frequency schedule:
1.
Field instruments: Analog and digital, 12 months maximum.
2.
Laboratory instruments: 12 months maximum.
3.
Leased specialty equipment: 12 months maximum.
5.
Dated calibration labels shall be visible on all test equipment.
6.
Records, which show date and results of instruments calibrated or tested, must be kept up-todate.
7.
Calibrating standard shall be of higher accuracy than that of the instrument tested.
Page 14
ANSI/NETA MTS-2011
5.
GENERAL
5.4 Test Report
1.
2.
3.
The test report shall include the following:
1.
Summary of project.
2.
Description of equipment tested.
3.
Description of tests.
4.
Test data.
5.
Analysis and recommendations.
Test data records shall include the following minimum requirements:
1.
Identification of the testing organization.
2.
Equipment identification.
3.
Humidity, temperature, and other conditions that may affect the results of the
tests/calibrations.
4.
Date of inspections, tests, maintenance, and/or calibrations.
5.
Identification of the testing technician.
6.
Indication of inspections, tests, maintenance, and/or calibrations to be performed and
recorded.
7.
Indication of expected results when calibrations are to be performed.
8.
Indication of “as-found” and “as-left” results, as applicable.
9.
Sufficient spaces to allow all results and comments to be indicated.
The testing organization shall furnish a copy or copies of the complete report as specified in the
maintenance testing contract.
Page 15
ANSI/NETA MTS-2011
6.
POWER SYSTEM STUDIES
6.1 Short-Circuit Studies
1.
Scope of Study
Determine the short-circuit current available at each component of the electrical system and the
ability of the component to withstand and/or interrupt the current. Provide an analysis of all
possible operating scenarios which will be or have been influenced by the proposed or
completed additions or changes to the subject system.
2.
Procedure
The short-circuit study shall be performed in accordance with the recommended practices and
procedures set forth in ANSI/IEEE standard 399 and the step-by-step procedures outlined in the
short-circuit calculation chapters of IEEE standard 141 and ANSI/IEEE standard 242.
3.
Study Report
Results of the short-circuit study shall be summarized in a final report containing the following
items:
1.
Basis, description, purpose, and scope of the study.
2.
Tabulations of the data used to model the system components and a corresponding oneline diagram.
3.
Descriptions of the scenarios evaluated and identification of the scenario used to
evaluate equipment short-circuit ratings.
4.
Tabulations of equipment short-circuit ratings versus available fault duties. The
tabulation shall identify percentage of rated short circuit and clearly note equipment with
insufficient ratings.
5.
Conclusions and recommendations.
Page 16
ANSI/NETA MTS-2011
6.
POWER SYSTEM STUDIES
6.2 Coordination Studies
1.
Scope of Study
1.
2.
2.
Determine the extent of overcurrent protective device coordination for the scope:
1.
Selective coordination: determine the protective device types, characteristics,
settings, or ampere ratings which provide selective coordination, equipment
protection, and correct interrupting ratings for the full range of available shortcircuit currents at points of application for each overcurrent protective device.
2.
Compromised coordination: determine protective device types, characteristics,
settings, or ampere ratings which permit ranges of non-coordination of
overcurrent protective devices. In this case, overcurrent protective device
coordination may be compromised due to the overcurrent protective devices
selected or already installed or in order to achieve protection of equipment
that is selected or already installed. Objective is to maximize coordination of
overcurrent protective devices to extent possible based on the type of devices
Determine protective device characteristics, settings, or sizes which provide a
balance between equipment protection and selective device operation that is
optimum for the electrical system.
Provide an analysis of all possible operating scenarios which will be or have been
influenced by the proposed or completed additions or changes to the subject system.
Procedure
The coordination study shall be performed in accordance with the recommended practices and
procedures set forth in ANSI/IEEE standard 399 and ANSI/IEEE standard 242. Protective
device selection and settings shall comply with requirements of the National Electrical Code.
3.
Study Report
Results of the coordination study shall be summarized in a final report containing the following
items:
1.
Basis, description, purpose, and scope of the study and a corresponding one-line
diagram.
2.
Time-current curves, selective coordination ratios of fuses, or selective coordination
tables of circuit breakers demonstrating the coordination of overcurrent protective
devices to the scope.
3.
Tabulations of protective devices identifying circuit location, manufacturer, type, range
of adjustment, IEEE device number, current transformer ratios, recommended settings or
device size, and referenced time-current curve.
Page 17
ANSI/NETA MTS-2011
6.
POWER SYSTEM STUDIES
6.2 Coordination Studies (continued)
4.
4.
Conclusions and recommendations.
Implementation
The owner shall engage an independent testing firm for the purpose of inspecting, setting,
testing, and calibrating the protective relays, circuit breakers, fuses, and other applicable
devices as outlined in this specification.
Page 18
ANSI/NETA MTS-2011
6.
POWER SYSTEM STUDIES
6.3 Arc-Flash Hazard Analysis
1.
Scope of Study
Determine arc-flash incident energy levels and flash protection boundary distances based on the
results of the short-circuit and coordination studies. Perform the analysis under worst-case arcflash conditions for all modes of operation. Provide an analysis of all possible operating
scenarios which will be or have been influenced by the proposed or completed additions to the
subject system.
2.
Procedure
Identify all locations and equipment to be included in the arc-flash hazard analysis.
3.
1.
Prepare a one-line diagram of the power system.
2.
Perform a short-circuit study in accordance with Section 6.1.
3.
Perform a coordination study in accordance with Section 6.2.
4.
Identify the possible system operating modes, including tie-breaker positions, parallel
generation, etc.
5.
Calculate the arcing fault current flowing through each branch for each fault location
using empirical formula in accordance with NFPA, IEEE, or other standards.
6.
Determine the time required to clear the arcing fault current using the protective device
settings and associated trip curves.
7.
Select the working distances based on system voltage and equipment class.
8.
Calculate the incident energy at each fault location at the prescribed working distance.
9.
Determine the hazard/risk category (HRC) for the estimated incident energy level.
10.
Calculate the flash protection boundary at each fault location.
11.
Document the assessment in reports and one-line diagrams.
12.
Place appropriate labels on the equipment.
Study Report
Results of the arc-flash study shall be summarized in a final report containing the following
items:
1.
Basis, method of hazard assessment, description, purpose, scope, and date of the study.
Page 19
ANSI/NETA MTS-2011
6.
POWER SYSTEM STUDIES
6.3 Arc-Flash Hazard Analysis (continued)
2.
Tabulations of the data used to model the system components and a corresponding oneline diagram.
3.
Descriptions of the scenarios evaluated and identification of the scenario used to
evaluate equipment ratings.
4.
Tabulations of equipment incident energies, hazard risk categories, and flash protection
boundaries. The tabulation shall identify and clearly note equipment that exceeds
allowable incident energy ratings.
5.
Required arc-flash labeling and placement of labels.
6.
Conclusions and recommendations.
Page 20
ANSI/NETA MTS-2011
6.
POWER SYSTEM STUDIES
6.4 Load-Flow Studies
1.
Scope of Study
Determine active and reactive power, voltage, current, and power factor throughout the
electrical system. Provide an analysis of all possible operating scenarios which will be or have
been influenced by the proposed or completed additions or changes to the subject system.
2.
Procedure
The load-flow study shall be performed in accordance with the recommended practices and
procedures set forth in ANSI/IEEE standard 399.
3.
Study Report
Results of the load-flow study shall be summarized in a final report containing the following
items:
1.
Basis, description, purpose, and scope of the study.
2.
Tabulations of the data used to model the system components and a corresponding oneline diagram.
3.
Descriptions of the scenarios evaluated and the basis for each.
4.
Tabulations of power and current flow versus equipment ratings. The tabulation shall
identify percentage of rated load and the scenario for which the percentage is based.
Overloaded equipment shall be clearly noted.
5.
Tabulations of system voltages versus equipment ratings. The tabulation shall identify
percentage of rated voltage and the scenario for which the percentage is based. Voltage
levels outside the ranges recommended by equipment manufacturers, ANSI C84.1, or
other appropriate standards shall be clearly noted.
6.
Tabulations of system real and reactive power losses with areas of concern clearly noted.
7.
Conclusions and recommendations.
Page 21
ANSI/NETA MTS-2011
6.
POWER SYSTEM STUDIES
6.5 Stability Studies
1.
Scope of Study
Determine the ability of the electrical system’s synchronous machines to remain in step with
one another following a disturbance. Provide an analysis of disturbances for all possible
operating scenarios which will be or have been influenced by the proposed or completed
additions or changes to the subject system.
2.
Procedure
The stability study shall be performed in accordance with the recommended practices and
procedures set forth in ANSI/IEEE standard 399.
3.
Study Report
Results of the stability study shall be summarized in a final report containing the following
items:
1.
Basis, description, purpose, and scope of the study.
2.
Tabulations of the data used to model the system components and a corresponding oneline diagram.
3.
Descriptions of the scenarios evaluated and tabulations or graphs showing the
calculation results.
4.
Conclusions and recommendations.
Page 22
ANSI/NETA MTS-2011
6.
POWER SYSTEM STUDIES
6.6 Harmonic-Analysis Studies
1.
Scope of Study
Determine the impact of nonlinear loads and their associated harmonic contributions on the
voltage and currents throughout the electrical system. Provide an analysis of all possible
operating scenarios which will be or have been influenced by the proposed or completed
additions or changes to the subject system.
2.
Procedure
The harmonic-analysis study shall be performed in accordance with the recommended practices
and procedures set forth in ANSI/IEEE standard 399.
3.
Study Report
Results of the harmonic-analysis study shall be summarized in a final report containing the
following items:
1.
Basis, description, purpose, and scope of the study.
2.
Tabulations of the data used to model the system components and a corresponding oneline diagram.
3.
Descriptions of the scenarios evaluated and the basis for each.
4.
Tabulations of rms voltages, peak voltages, rms currents, and total capacitor bank
loading versus associated equipment ratings. Equipment with insufficient ratings shall
be clearly identified for each of the scenarios evaluated.
5.
Tabulations of calculated voltage distortion factors, current distortion factors, and
individual harmonics versus the limits specified by IEEE standard 519. Calculated
values exceeding the limits specified in the standard shall be clearly noted.
6.
Plots of impedance versus frequency showing resonant frequencies to be avoided.
7.
Tabulations of the system transformer capabilities based on the calculated nonsinusoidal
load current and the procedures set forth in ANSI/IEEE C57.110. Overloaded
transformers shall be clearly noted.
8.
Conclusions and recommendations.
Page 23
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.1 Switchgear and Switchboard Assemblies
1.
Visual and Mechanical Inspection
1.
Inspect physical, electrical, and mechanical condition including evidence of moisture or corona.
2.
Inspect anchorage, alignment, grounding, and required area clearances.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
5.
Verify that fuse and/or circuit breaker sizes and types correspond to drawings and coordination
study as well as to the circuit breaker’s address for microprocessor-communication packages.
6.
Verify that current and voltage transformer ratios correspond to drawings.
7.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
8.
9.
1.
Use of a low-resistance ohmmeter in accordance with Section 7.1.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Confirm correct operation and sequencing of electrical and mechanical interlock systems.
1.
Attempt closure on locked-open devices. Attempt to open locked-closed devices.
2.
Make key exchange with all devices included in the interlock scheme as applicable.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
10.
Verify correct barrier and shutter installation and operation.
11.
Exercise all active components.
12.
Inspect mechanical indicating devices for correct operation.
13.
Verify that filters are in place and/or vents are clear.
14.
Perform visual and mechanical inspection of instrument transformers in accordance with
Section 7.10.
* Optional
Page 24
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.1 Switchgear and Switchboard Assemblies (continued)
15.
16.
2.
Inspect control power transformers.
1.
Inspect for physical damage, cracked insulation, broken leads, tightness of connections,
defective wiring, and overall general condition.
2.
Verify that primary and secondary fuse ratings or circuit breakers match drawings.
3.
Verify correct functioning of drawout disconnecting and grounding contacts and
interlocks.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted electrical connections with a low-resistance
ohmmeter in accordance with Section 7.1.1, if applicable.
2.
Perform insulation–resistance tests for one minute on each bus section, phase-to-phase and
phase-to-ground. Apply voltage in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1.
*3.
Perform a dielectric withstand voltage test on each bus section, each phase-to-ground with
phases not under test grounded, in accordance with manufacturer’s published data. If
manufacturer has no recommendation for this test, it shall be in accordance with Table 100.2.
The test voltage shall be applied for one minute. Refer to Section 7.1.3 before performing test.
*4.
Perform insulation-resistance tests on control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components or control
devices that cannot tolerate the applied voltage, follow manufacturer’s recommendation.
5.
Perform electrical tests on instrument transformers in accordance with Section 7.10.
6.
Perform ground–resistance tests in accordance with Section 7.13.
7.
Determine accuracy of all meters and calibrate watthour meters in accordance with Section
7.11.
8.
Control Power Transformers
1.
Perform insulation-resistance tests. Perform measurements from winding-to-winding
and each winding-to-ground. Test voltages shall be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.1.
* Optional
Page 25
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.1 Switchgear and Switchboard Assemblies (continued)
2.
9.
10.
Verify correct function of control transfer relays located in switchgear with multiple
power sources.
Verify operation of switchgear/switchboard heaters and their controller, if applicable.
Perform system function tests in accordance with Section 8.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.1.1.7.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.1.1.7.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.1.1.7.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values of bus insulation should be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.1. Values of
insulation resistance less than this table or manufacturer’s recommendations should be
investigated. Dielectric withstand voltage tests should not proceed until insulation-resistance
levels are raised above minimum values.
3.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the test, the test dielectric withstand voltage specimen is considered to have
passed the test.
4.
Minimum insulation-resistance values of control wiring should be comparable to previously
obtained results but not less than two megohms.
5.
Results of electrical tests on instrument transformers should be in accordance with Section 7.10.
6.
Results of ground resistance tests should be in accordance with Section 7.13.
7.
Accuracy of meters should be in accordance with Section 7.11.
* Optional
Page 26
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.1 Switchgear and Switchboard Assemblies (continued)
8.
9.
10.
Control Power Transformers
1.
Insulation-resistance values of control power transformers should be in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use
Table 100.5. Values of insulation resistance less than this table or manufacturer’s
recommendations should be investigated.
2.
Control transfer relays should perform as designed.
Heaters should be operational.
Results of system function tests shall be in accordance with Section 8.
* Optional
Page 27
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.2.1.1 Transformers, Dry Type, Air-Cooled, Low-Voltage, Small
NOTE: This category consists of power transformers with windings rated 600 volts or less and sizes
equal to or less than 167 kVA single-phase or 500 kVA three-phase.
1.
2.
Visual and Mechanical Inspection.
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
5.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use a of low-resistance ohmmeter in accordance with Section 7.2.1.1.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
6.
Perform as-left tests.
7.
Verify that as-left tap connections are as specified.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.2.1.1.1.
2.
Perform insulation-resistance tests winding-to-winding and each winding-to-ground. Apply
voltage in accordance with manufacturer’s published data. In the absence of manufacturer’s
published data, use Table 100.5. Calculate the dielectric absorption ratio or polarization index.
*3.
Perform turns-ratio tests at the designated tap position.
* Optional
Page 28
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.2.1.1 Transformers, Dry Type, Air-Cooled, Low-Voltage, Small (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.2.1.1.1.5.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.2.1.1.1.5.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.2.1.1.1.5.3)
4.
Tap connections are left as found unless otherwise specified. (7.2.1.1.7)
Test Values – Electrical
1.
Compare bolted electrical connection resistances to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Minimum insulation-resistance values of transformer insulation should be in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use
Table 100.5. Values of insulation resistance less than this table or manufacturer’s
recommendations should be investigated. The dielectric absorption ratio or polarization index
shall be compared to previously obtained results and should not be less than 1.0.
3.
Turns-ratio test results should not deviate more than one-half percent from either the adjacent
coils or the calculated ratio.
* Optional
Page 29
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.2.1.2 Transformers, Dry Type, Air-Cooled, Large
NOTE: This category consists of power transformers with windings rated higher than 600 volts and
low-voltage transformers larger than 167 kVA single-phase or 500 kVA three-phase.
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition including evidence of moisture and corona.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
*5.
Verify that control and alarm settings on temperature indicators are as specified.
6.
Verify that cooling fans operate correctly.
7.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.2.1.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
8.
Perform specific inspections and mechanical tests as recommended by the manufacturer.
9.
Perform as-left tests.
10.
Verify that as-left tap connections are as specified.
11.
Verify the presence of surge arresters.
* Optional
Page 30
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.2.1.2 Transformers, Dry Type, Air-Cooled, Large (continued)
2.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.2.1.2.1.
2.
Perform insulation-resistance tests winding-to-winding and each winding-to-ground. Apply
voltage in accordance with manufacturer’s published data. In the absence of manufacturer’s
published data, use Table 100.5. Calculate polarization index.
3.
Perform insulation power-factor or dissipation-factor tests on all windings in accordance with
the test equipment manufacturer’s published data.
*4.
Perform a power-factor or dissipation-factor tip-up test on windings rated greater than 2.5 kV.
5.
Perform turns-ratio tests at the designated tap position.
6.
Perform an excitation-current test on each phase.
*7.
8.
Measure the resistance of each winding at the designated tap position.
Measure core insulation resistance at 500 volts dc if the core is insulated and if the core ground
strap is removable.
*9.
Perform an applied voltage test on all high- and low-voltage windings-to-ground. See
ANSI/IEEE C57.12.91, Sections 10.2 and 10.9.
10.
Verify correct secondary voltage phase-to-phase and phase-to-neutral after energization and
prior to loading.
11.
Test surge arresters in accordance with Section 7.19.
* Optional
Page 31
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.2.1.2 Transformers, Dry Type, Air-Cooled, Large (continued)
3.1
3.2
Test Values – Visual and Mechanical
1.
Control and alarm settings on temperature indicators should operate within manufacturer’s
recommendations for specified settings. (7.2.1.2.1.5)
2.
Cooling fans should operate. (7.2.1.2.1.6)
3.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.2.1.2.1.7.1)
4.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.2.1.2.1.7.2)
5.
Results of the thermographic survey shall be in accordance with Section 9. (7.2.1.2.1.7.3)
6.
Tap connections shall be left as found unless otherwise specified. (7.2.1.2.1.10)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Minimum insulation-resistance values of transformer insulation should be in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.5. Values of insulation resistance less than this table or manufacturer’s recommendations
should be investigated. The polarization index shall be compared to previously obtained results
and should not be less than 1.0.
3.
CH and CL power-factor or dissipation-factor values will vary due to support insulators and bus
work utilized on dry transformers. The following should be expected on CHL power factors:
Power transformers: 2.0 percent or less
Distribution transformers: 5.0 percent or less
Consult transformer manufacturer’s or test equipment manufacturer’s data for additional
information.
4.
Power-factor or dissipation-factor tip-up exceeding 1.0 percent should be investigated.
5.
Turns-ratio test results should not deviate more than one-half percent from either the adjacent
coils or the calculated ratio.
6.
The typical excitation current test data pattern for a three-legged core transformer is two similar
current readings and one lower current reading.
* Optional
Page 32
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.2.1.2 Transformers, Dry Type, Air-Cooled, Large (continued)
7.
Temperature-corrected winding-resistance values should compare within one percent of
previously-obtained results.
8.
Core insulation-resistance values should be comparable to previously-obtained results but not
less than one megohm at 500 volts dc.
9.
AC dielectric withstand test voltage shall not exceed 65 percent of factory test voltage for one
minute duration. DC dielectric withstand test voltage shall not exceed 100 percent of the ac
rms test voltage specified in ANSI C57.12.91, Section 10.2 for one minute duration. If no
evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
10.
Phase-to-phase and phase-to-neutral secondary voltages should be in agreement with nameplate
data.
11.
Test results for surge arresters shall be in accordance with Section 7.19.
* Optional
Page 33
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.2.2 Transformers, Liquid-Filled
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Verify the presence of PCB labeling, if applicable.
4.
Prior to cleaning the unit, perform as-found tests, if required.
5.
Clean bushings and control cabinets.
*6.
7.
Verify that cooling fans and/or pumps operate correctly.
8.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
9.
2.
Verify operation of alarm, control, and trip circuits from temperature and level indicators,
pressure relief device, and fault pressure relay, if applicable.
1.
Use of a low-resistance ohmmeter in accordance with Section 7.2.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Verify correct liquid level in tanks and bushings.
10.
Verify that positive pressure is maintained on gas-blanketed transformers.
11.
Perform inspections and mechanical tests as recommended by the manufacturer.
12.
Test load tap-changer in accordance with Section 7.12, if applicable.
13.
Verify the presence of transformer surge arresters.
14.
Perform as-left tests.
15.
Verify de-energized tap-changer position is left as specified.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.2.2.1.
* Optional
Page 34
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.2.2 Transformers, Liquid-Filled (continued)
2.
Perform insulation-resistance tests, winding-to-winding and each winding-to-ground. Apply
voltage in accordance with manufacturer’s published data. In the absence of manufacturer’s
published data, use Table 100.5. Calculate polarization index.
3.
Perform turns-ratio tests at the designated tap position.
4.
Perform insulation power-factor or dissipation-factor tests on all windings in accordance with
test equipment manufacturer’s published data.
5.
Perform power-factor or dissipation-factor tests on each bushing.
6.
Perform excitation-current tests in accordance with the test equipment manufacturer’s
published data.
7.
Measure the resistance of each winding at the designated tap position.
*8.
If the core ground strap is accessible, remove and measure the core insulation resistance at 500
volts dc.
*9.
Measure the percentage of oxygen in the gas blanket, if applicable.
10.
Remove a sample of insulating liquid in accordance with ASTM D 923. The sample shall be
tested for the following.
1.
Dielectric breakdown voltage: ASTM D 877 and/or ASTM D 1816
2.
Acid neutralization number: ANSI/ASTM D 974
*3.
Specific gravity: ANSI/ASTM D 1298
4.
Interfacial tension: ANSI/ASTM D 971 or ANSI/ASTM D 2285
5.
Color: ANSI/ASTM D 1500
6.
Visual Condition: ASTM D 1524
*7.
Water in insulating liquids: ASTM D 1533. (Required on 25 kV or higher voltages and
on all silicone-filled units.)
*8.
Measure power factor or dissipation factor in accordance with ASTM D 924.
11.
Remove a sample of insulating liquid in accordance with ASTM D 3613 and perform
dissolved-gas analysis (DGA) in accordance with ANSI/IEEE C57.104 or ASTM D3612.
12.
Test the instrument transformers in accordance with Section 7.10.
* Optional
Page 35
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.2.2 Transformers, Liquid-Filled (continued)
13.
Test the surge arresters in accordance with Section 7.19.
14.
Test the transformer neutral grounding impedance devices, if applicable.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Alarm, control, and trip circuits from temperature and level indicators as well as pressure relief
device and fault pressure relay should operate within manufacturer’s recommendations for their
specified settings. (7.2.2.1.6)
2.
Cooling fans and/or pumps should operate. (7.2.2.1.7)
3.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.2.2.1.8.1)
4.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.2.2.1.8.2)
5.
Results of the thermographic survey shall be in accordance with Section 9. (7.2.2.1.8.3)
6.
Liquid levels in the transformer tanks and bushings should be within indicated tolerances.
(7.2.2.1.9)
7.
Positive pressure should be indicated on pressure gauge for gas-blanketed transformers.
(7.2.2.1.10)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Minimum insulation-resistance values of transformer insulation should be in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.5. Values of insulation resistance less than this table or manufacturer’s recommendations
should be investigated. The polarization index shall be compared to previously obtained results
and should not be less than 1.0.
3.
Turns-ratio test results should not deviate by more than one-half percent from either the
adjacent coils or the calculated ratio.
* Optional
Page 36
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.2.2 Transformers, Liquid-Filled (continued)
4.
Maximum power-factor/dissipation-factor values of liquid-filled transformers corrected to
20° C should be in accordance with the transformer manufacturer’s published data.
Representative values are indicated in Table 100.3.
5.
Investigate bushing power-factor and capacitance values that vary from nameplate values by
more than ten percent. Hot-collar tests are evaluated on a milliampere/milliwatt loss basis, and
the results should be compared to values of similar bushings.
6.
Typical excitation-current test data pattern for a three-legged core transformer is two similar
current readings and one lower current reading.
7.
Temperature corrected winding-resistance values should compare within one percent of
previously obtained results.
8.
Core insulation values should be comparable to previously obtained results but not less than one
megohm at 500 volts dc.
9.
Investigate the presence of oxygen in the nitrogen gas blanket.
10.
Insulating liquid values should be in accordance with Table 100.4.
11.
Evaluate results of dissolved-gas analysis in accordance with ANSI/IEEE Standard C57.104.
12.
Results of electrical tests on instrument transformers shall be in accordance with Section 7.10.
13.
Results of surge arrester tests shall be in accordance with Section 7.19.
14.
Compare grounding impedance device values to previously obtained results. In the absence of
previously obtained values, compare obtained values to manufacturer’s published data.
* Optional
Page 37
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.3.1 Cables, Low-Voltage, Low-Energy
– RESERVED –
* Optional
Page 38
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.3.2 Cables, Low-Voltage, 600-Volt Maximum
1.
Visual and Mechanical Inspection
1.
Inspect exposed sections of cables for physical damage and evidence of overheating.
2.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
3.
2.
1.
Use of a low-resistance ohmmeter in accordance with Section 7.3.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Inspect compression-applied connectors for correct cable match and indentation.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.3.2.1.
2.
Perform an insulation-resistance test on each conductor with respect to ground and adjacent
conductors. The applied potential shall be 500 volts dc for 300-volt rated cable and 1000 volts
dc for 600-volt rated cable. The test duration shall be one minute.
3.
Verify uniform resistance of parallel conductors.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.3.2.1.2.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.3.2.1.2.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.3.2.1.2.3)
* Optional
Page 39
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.3.2 Cables, Low-Voltage, 600-Volt Maximum (continued)
3.2
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be comparable to previously obtained results and similar
circuits but not less than two megohms.
3.
Deviations in resistance between parallel conductors shall be investigated.
* Optional
Page 40
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.3.3 Cables, Medium- and High-Voltage
1.
Visual and Mechanical Inspection
1.
Inspect exposed sections of cables for physical damage and evidence of overheating and
corona.
2.
Inspect terminations and splices for physical damage, evidence of overheating, and corona.
3.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
Use of a low-resistance ohmmeter in accordance with Section 7.3.3.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
4.
Inspect compression-applied connectors for correct cable match and indentation.
5.
Inspect shield grounding and cable support.
6.
Verify that visible cable bends meet or exceed ICEA and/or manufacturer’s minimum
allowable bending radius.
*7.
8.
2.
1.
Inspect fireproofing in common cable areas.
If cables are terminated through window-type current transformers, inspect to verify that neutral
and ground conductors are correctly placed and that shields are correctly terminated for
operation of protective devices.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.3.3.1.
2.
Perform an insulation-resistance test individually on each conductor with all other conductors
and shields grounded. Apply voltage in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1.
3.
Perform a shield-continuity test on each power cable by ohmmeter method.
* Optional
Page 41
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.3.3 Cables, Medium- and High-Voltage (continued)
Due to the various cable testing methods commercially available, the following section does not denote
“optional” or “required” tests. It is only after careful analysis of all circuit parameters between the
testing entity and the cable owner that a preferred testing method should be selected.
4.
In accordance with ICEA, IEC, IEEE and other power cable consensus standards, testing can be
performed by means of direct current, power frequency alternating current, or very low
frequency alternating current. These sources may be used to perform insulation withstand tests,
and diagnostic tests such as partial discharge analysis, and power factor or dissipation factor.
The selection can only be made after an evaluation of the available test methods and a review of
the installed cable system.
4.1
4.2
Dielectric Withstand
1.
Direct current (DC) dielectric withstand voltage
2.
Very low frequency (VLF) dielectric withstand voltage
3.
Power frequency (50/60 Hz) dielectric withstand voltage
Diagnostic Tests
1.
Power factor/dissipation factor (tan delta)
1. Power frequency (50/60 Hz)
2. Very low frequency (VLF)
2.
DC insulation resistance
3.
Partial discharge
1. On line (50/60 Hz)
2. Off line
1. Power frequency (50/60 Hz)
2. Very low frequency (VLF)
* Optional
Page 42
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.3.3 Cables, Medium- and High-Voltage (continued)
3
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.3.3.1.3.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.3.3.1.3.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.3.3.1.3.3)
4.
The minimum bend radius to which insulated cables may be bent for permanent training shall
be in accordance with Table 100.22. (7.3.3.1.6)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1.Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated.
3.
Shielding shall exhibit continuity. Investigate resistance values in excess of ten ohms per 1000
feet of cable.
4.1
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the test, the test specimen is considered to have passed the test.
4.2
Based on the test methodology chosen, refer to applicable standards or manufacturer’s literature
for acceptable values.
* Optional
Page 43
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.4 Metal-Enclosed Busways
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.4.2.
2.
Verify tightness of accessible bolted electrical connections and bus joints by calibrated
torque-wrench method in accordance with manufacturer’s published data or Table
100.12.
3.
Perform a thermographic survey in accordance with Section 9.
4.
Confirm physical orientation in accordance with manufacturer’s labels to insure adequate
cooling.
5.
Examine outdoor busway for removal of “weep-hole” plugs, if applicable, and for the correct
installation of joint shield.
6.
Inspect and clean ventilating openings.
Electrical Tests
1.
Perform resistance measurements through bolted connections and bus joints with a lowresistance ohmmeter, if applicable, in accordance with Section 7.4.1.
2.
Perform insulation resistance tests on each busway for one minute, phase-to-phase and phaseto-ground. Apply voltage in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.1.
3.
Perform a dielectric withstand voltage test on each busway, phase-to-ground with phases not
under test grounded, in accordance with manufacturer’s published data. If manufacturer has no
recommendation for this test, it shall be in accordance with Table 100.17. Where no dc test
value is shown in Table 100.17, ac value shall be used. The test voltage shall be applied for one
minute.
*4.
Perform a contact-resistance test on each connection point of uninsulated busway. On insulated
busway, measure resistance of assembled busway sections and compare values with the
adjacent phases.
5.
Verify operation of busway space heaters.
* Optional
Page 44
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.4 Metal-Enclosed Busways (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.4.1.3.1)
2
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.4.1.3.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.4.1.3.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance test voltages and resistance values shall be in accordance with
manufacturer’s specifications or Table 100.1. Minimum resistance values are for a nominal
1000-foot busway run. Use the following formula to convert the measured resistance value to
the 1000-foot nominal value:
R1000 ft = Measured Resistance x
Length of Run
1000
Converted values of insulation resistance less than those in Table 100.1 or manufacturer’s
minimum should be investigated. Dielectric withstand voltage tests shall not proceed until
insulation-resistance levels are raised above minimum values.
3.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
4.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values which deviate from those of similar bus connections and sections by more
than 50 percent of the lowest value.
5.
Heaters should be operational.
* Optional
Page 45
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.1.1 Switches, Air, Low-Voltage
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, grounding, and required clearances.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
5.
Verify correct blade alignment, blade penetration, travel stops, and mechanical operation.
6.
Verify that fuse sizes and types are in accordance with drawings, short-circuit study, and
coordination study.
7.
Verify that each fuse has adequate mechanical support and contact integrity.
8.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
9.
1.
Use of a low-resistance ohmmeter in accordance with Section 7.5.1.1.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Verify operation and sequencing of interlocking systems.
10.
Verify phase-barrier mounting is intact.
11.
Verify correct operation of indicating and control devices.
12.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
13.
Perform as-left tests.
* Optional
Page 46
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.1.1 Switches, Air, Low-Voltage (continued)
2.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.5.1.1.1.
2.
Measure contact resistance across each switchblade and fuseholder.
3.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with switch closed and across each open pole. Apply voltage in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
4.
Measure fuse resistance.
5.
Verify cubicle space heater operation.
6.
Perform a ground-fault test in accordance with Section 7.14, if applicable.
7.
Perform tests on other protective devices in accordance with Section 7.9, if applicable.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.5.1.1.1.8.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.1.1.1.8.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.1.1.1.8.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar switches by more than 50 percent
of the lowest value.
* Optional
Page 47
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.1.1 Switches, Air, Low-Voltage (continued)
3.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated.
4.
Investigate fuse-resistance values that deviate from each other by more than 15 percent.
5.
Heaters should be operational.
6.
Ground fault tests should be in accordance with Section 7.14.
7.
Results of protective device tests should be in accordance with Section 7.9.
* Optional
Page 48
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.1.2 Switches, Air, Medium-Voltage, Metal-Enclosed
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, grounding, and required clearances.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
5.
Verify correct blade alignment, blade penetration, travel stops, arc interrupter operation, and
mechanical operation.
6.
Verify that fuse sizes and types are in accordance with drawings, short-circuit studies, and
coordination study.
7.
Verify that expulsion-limiting devices are in place on all fuses having expulsion-type elements.
8.
Verify that each fuseholder has adequate mechanical support and contact integrity.
9.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.5.1.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
10.
Verify operation and sequencing of interlocking systems.
11.
Verify that phase-barrier mounting is intact.
12.
Verify correct operation of all indicating and control devices.
13.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
14.
Perform as-left tests.
* Optional
Page 49
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.1.2 Switches, Air, Medium-Voltage, Metal-Enclosed (continued)
2.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.5.1.2.1.
2.
Measure contact resistance across each switchblade assembly and fuseholder.
3.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with switch closed and across each open pole. Apply voltage in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
4.
Perform a dielectric withstand voltage test on each pole with switch closed. Test each pole-toground with all other poles grounded. Test voltage shall be in accordance with manufacturer’s
published data or Table 100.2.
5.
Measure fuse resistance.
6.
Verify cubicle space heater operation.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.5.1.2.1.9.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.5.1.2.1.9.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.5.1.2.1.9.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar switches by more than 50 percent
of the lowest value.
* Optional
Page 50
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.1.2 Switches, Air, Medium-Voltage, Metal-Enclosed (continued)
3.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated. Dielectric withstand
voltage tests shall not proceed until insulation-resistance levels are raised above minimum
values.
4.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
5.
Investigate fuse resistance values that deviate from each other by more than 15 percent.
6.
Heaters should be operational.
* Optional
Page 51
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.1.3 Switches, Air, Medium- and High-Voltage, Open
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, grounding, and required clearances.
3.
Prior to cleaning insulators, perform as-found tests, if required.
4.
Clean the insulators.
5.
Verify correct blade alignment, blade penetration, travel stops, arc interrupter operation, and
mechanical operation.
6.
Verify that fuse sizes and types are in accordance with drawings, short-circuit studies, and
coordination study.
7.
Verify that each fuseholder has adequate mechanical support and contact integrity.
8.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
9.
1.
Use of a low-resistance ohmmeter in accordance with Section 7.5.1.3.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Verify operation and sequencing of interlocking systems.
10.
Perform mechanical operator tests in accordance with manufacturer’s published data, if
applicable.
11.
Verify correct operation and adjustment of motor operator limit switches and mechanical
interlocks, if applicable.
12.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
13.
Perform as-left tests.
14.
Record as-found and as-left operation counter readings.
* Optional
Page 52
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.1.3 Switches, Air, Medium- and High-Voltage, Open (continued)
2.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.5.1.3.1.
2.
Perform a contact-resistance test across each switchblade and fuseholder.
3.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with switch closed and across each open pole. Apply voltage in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
*4.
5.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components or control
devices that cannot tolerate the applied voltage, follow manufacturer’s recommendation.
Perform a dielectric withstand voltage test on each pole with switch closed. Test each pole-toground with all other poles grounded. Test voltage shall be in accordance with manufacturer’s
published data or Table 100.19.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.5.1.3.1.8.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.5.1.3.1.8.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.5.1.3.1.8.3)
4.
Operation counter should advance one digit per close-open cycle. (7.5.1.3.1.14)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
* Optional
Page 53
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.1.3 Switches, Air, Medium- and High-Voltage, Open (continued)
investigate values that deviate from adjacent poles or similar switches by more than 50 percent
of the lowest value.
3.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated. Dielectric withstand
voltage tests should not proceed until insulation-resistance levels are raised above minimum
values.
4.
Minimum insulation-resistance values of control wiring should be comparable to previously
obtained results but not less than two megohms.
5.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
* Optional
Page 54
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.2 Switches, Oil, Medium-Voltage
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, grounding, and required clearances.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
5.
Perform mechanical operator tests in accordance with manufacturer’s published data, if
applicable.
6.
Verify correct operation and adjustment of motor operator limit switches and mechanical
interlocks, if applicable.
*7.
Verify correct blade alignment, blade penetration, travel stops, arc interrupter operation, and
mechanical operation.
8.
Verify that each fuseholder has adequate mechanical support and contact integrity, if
applicable.
9.
Verify that fuse sizes and types are in accordance with drawings, short circuit studies, and
coordination study.
10.
Test all electrical and mechanical interlock systems for correct operation and sequencing.
11.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.5.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
12.
Verify that insulating oil level is correct.
13.
Inspect and/or replace gaskets as recommended by the manufacturer.
14.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
* Optional
Page 55
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.2 Switches, Oil, Medium-Voltage (continued)
2.
15.
Perform as-left tests.
16.
Record as-found and as-left operation counter readings, if applicable.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.5.2.1.
2.
Perform a contact/pole-resistance test.
3.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with the switch closed, and across each open pole. Apply voltage in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
*4.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components or control
devices that cannot tolerate the applied voltage, follow manufacturer’s recommendation.
*5.
Perform a dielectric withstand voltage test on each pole with switch closed. Test each pole-toground with all other poles grounded. Test voltage shall be in accordance with manufacturer’s
published data or Table 100.19.
*6
Remove a sample of insulating liquid in accordance with ASTM D 923. Sample shall be tested
in accordance with the referenced standard.
1.
Dielectric breakdown voltage: ASTM D 877
2.
Color: ANSI/ASTM D 1500
3.
Visual condition: ASTM D 1524
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.5.2.1.11.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.5.2.1.11.2)
* Optional
Page 56
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.2 Switches, Oil, Medium-Voltage (continued)
3.2
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.5.2.1.11.3)
4.
Operations counter should advance one digit per close-open cycle. (7.5.2.1.16)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar switches by more than 50 percent
of the lowest value.
3.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated. Dielectric withstand
voltage tests should not proceed until insulation-resistance levels are raised above minimum
values.
4.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
5.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
6.
Insulating liquid test results should be in accordance with Table 100.4.
* Optional
Page 57
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.3 Switches, Vacuum, Medium-Voltage
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, grounding, and required clearances.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
5.
Perform mechanical operator tests in accordance with manufacturer’s published data, if
applicable.
6.
Verify correct operation and adjustment of motor operator limit switches and mechanical
interlocks, if applicable.
7.
Measure critical distances on operating mechanism as recommended by the manufacturer.
8.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
9.
1.
Use of a low-resistance ohmmeter. See Section 7.5.3.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Inspect insulating assemblies for evidence of physical damage or contaminated surfaces.
10.
Verify that each fuseholder has adequate support and contact integrity.
11.
Verify that fuse sizes and types are in accordance with drawings, short-circuit studies, and
coordination study.
12.
Test all electrical and mechanical interlock systems for correct operation and sequencing.
13.
Verify that insulating oil level is correct, if applicable.
14.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
15.
Perform as-left tests.
16.
Record as-found and as-left operation counter readings, if applicable.
* Optional
Page 58
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.3 Switches, Vacuum, Medium-Voltage (continued)
2.
Electrical Tests
1.
Perform resistance measurements through bolted electrical connections with a low-resistance
ohmmeter, if applicable. See Section 7.5.3.1.
2.
Perform a contact/pole-resistance test.
3.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with switch closed, and across each open pole. Apply voltage in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
4.
Perform a vacuum bottle integrity (dielectric withstand voltage) test across each vacuum bottle
with the switch in the open position in strict accordance with manufacturer’s published data.
5.
Remove a sample of insulating liquid, if applicable, in accordance with ASTM D 923. The
sample shall be tested in accordance with the referenced standard.
1.
Dielectric breakdown voltage: ASTM D 877
2.
Color: ASTM D 1500
3.
Visual condition: ASTM D 1524
*6.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components, follow the
manufacturer’s recommendation.
*7.
Perform a dielectric withstand voltage test in accordance with manufacturer’s published data.
8.
Verify open and close operation from control devices, if applicable.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Critical distances of operating mechanism should be in accordance with manufacturer’s
published data. (7.5.3.1.7)
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.5.3.1.8.1)
* Optional
Page 59
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.3 Switches, Vacuum, Medium-Voltage (continued)
3.2
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.5.3.1.8.2)
4.
Results of the thermographic survey shall be in accordance with Section 9. (7.5.3.1.8.3)
5.
Operation counter should advance one digit per close-open cycle. (7.5.3.1.16)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar switches by more than 50 percent
of the lowest value.
3.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated. Dielectric withstand
voltage tests should not proceed until insulation-resistance levels are raised above minimum
values.
4.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the vacuum bottle integrity test, the test specimen is considered to have
passed the test.
5.
Insulating liquid test results should be in accordance with Table 100.4.
6.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
7.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
8.
Results of open and close operation from control devices should be in accordance with system
design.
* Optional
Page 60
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.4 Switches, SF6, Medium-Voltage
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, grounding, and required clearances.
3.
Prior to cleaning the unit, perform as-found tests, if applicable.
4.
Clean the unit.
5.
Inspect and service mechanical operator and SF6 gas insulated system in accordance with the
manufacturer’s published data.
6.
Verify correct operation of SF6 gas pressure alarms and limit switches, if applicable, as
recommended by the manufacturer.
7.
Measure critical distances as recommended by the manufacturer.
8.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
9.
1.
Use of a low-resistance ohmmeter in accordance with Section 7.5.4.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Verify that fuse sizes and types are in accordance with drawings, short-circuit studies, and
coordination study.
10.
Verify that each fuseholder has adequate mechanical support and contact integrity.
11.
Verify operation and sequencing of interlocking systems.
12.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
13.
Test for SF6 gas leaks in accordance with manufacturer’s published data.
14.
Perform as-left tests.
15.
Record as-found and as-left operation counter readings, if applicable.
* Optional
Page 61
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.4 Switches, SF6, Medium-Voltage (continued)
2.
Electrical Tests
1.
Perform resistance measurements through accessible bolted electrical connections with a lowresistance ohmmeter, if applicable. See Section 7.5.4.1.
2.
Perform a contact-resistance test.
3.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with switch closed, and across each open pole. Apply voltage in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
*4.
Remove a sample of SF6 gas and test in accordance with Table 100.13.
5.
Perform a dielectric withstand voltage test across each gas bottle with the switch in the open
position in accordance with manufacturer’s published data.
*6.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components, follow
manufacturer’s recommendation.
*7.
Perform a dielectric withstand voltage test in accordance with manufacturer’s published data.
8.
Verify open and close operation from control devices, if applicable.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Critical distances of operating mechanism should be in accordance with manufacturer’s
published data. (7.5.4.1.7)
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.5.4.1.8.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.5.4.1.8.2)
4.
Results of the thermographic survey shall be in accordance with Section 9. (7.5.4.1.8.3)
5.
Operations counter should advance one digit per close-open cycle. (7.5.4.1.15)
* Optional
Page 62
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.4 Switches, SF6, Medium-Voltage (continued)
3.2
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar switches by more than 50 percent
of the lowest value.
3.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated. Dielectric withstand
voltage tests should not proceed until insulation-resistance levels are raised above minimum
values.
4.
Results of SF6 gas tests should be in accordance with Table 100.13.
5.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
6.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
7.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
8.
Results of open and close operation from control devices should be in accordance with system
design.
* Optional
Page 63
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.5 Switches, Cutouts
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding, if applicable.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.5.5.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
6.
Verify correct blade alignment, blade penetration, travel stops, latching mechanism, and
mechanical operation.
7.
Verify that fuse size and types are in accordance with drawings, short-circuit study, and
coordination study.
8.
Verify that each fuseholder has adequate mechanical support and contact integrity.
9.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.5.5.1.
2.
Measure contact resistance across each cutout.
3.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with switch closed and across each open pole. Apply voltage in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
4.
Perform a dielectric withstand voltage test on each pole, phase to ground with cutout closed.
Ground adjacent cutouts, if applicable. Test voltage shall be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.1.
* Optional
Page 64
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.5.5 Switches, Cutouts (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.5.5.1.5.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.5.5.1.5.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.5.5.1.5.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values which deviate from adjacent poles or similar switches by more than 50
percent of the lowest value.
3.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated. Dielectric withstand
voltage tests should not proceed until insulation-resistance levels are raised above minimum
values.
4.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
* Optional
Page 65
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.1.1 Circuit Breakers, Air, Insulated-Case/Molded-Case
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage and alignment.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
5.
Operate the circuit breaker to insure smooth operation.
6.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.6.1.1.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
7.
Inspect operating mechanism, contacts, and arc chutes in unsealed units.
8.
Perform adjustments for final protective device settings in accordance with coordination study
provided by end user.
9.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.6.1.1.1.
2.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with the circuit breaker closed, and across each open pole. Apply voltage in accordance
with manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
3.
Perform a contact/pole-resistance test.
* Optional
Page 66
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.1.1 Circuit Breakers, Air, Insulated-Case/Molded-Case (continued)
*4.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components, follow
manufacturer’s recommendation.
5.
Determine long-time pickup and delay by primary current injection.
6.
Determine short-time pickup and delay by primary current injection.
7.
Determine ground-fault pickup delay by primary current injection.
8.
Determine instantaneous pickup current by primary injection.
*9.
Test functions of the trip unit by means of secondary injection.
10.
Perform minimum pickup voltage test on shunt trip and close coils in accordance with Table
100.20.
11.
Verify correct operation of auxiliary features such as trip and pickup indicators, zone
interlocking, electrical close and trip operation, trip-free, antipump function, and trip unit
battery condition.
12.
Reset all trip logs and indicators.
13.
Verify operation of charging mechanism.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.6.1.1.1.6.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.6.1.1.1.6.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.6.1.1.1.6.3)
4.
Settings shall comply with coordination study recommendations. (7.6.1.1.1.8)
* Optional
Page 67
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.1.1 Circuit Breakers, Air, Insulated-Case/Molded-Case (continued)
3.2
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated.
3.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar breakers by more than 50 percent
of the lowest value.
4.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
5.
Long-time pickup values should be as specified, and the trip characteristic should not exceed
manufacturer’s published time-current characteristic tolerance band, including adjustment
factors. If manufacturer’s curves are not available, trip times should not exceed the value shown
in Table 100.7.
6.
Short-time pickup values should be as specified, and the trip characteristic should not exceed
manufacturer’s published time-current tolerance band.
7.
Ground fault pickup values should be as specified, and the trip characteristic should not exceed
manufacturer’s published time-current tolerance band.
8.
Instantaneous pickup values of molded-case circuit breakers should fall within manufacturer’s
published tolerances and/or Table 100.8.
9.
Pickup values and trip characteristics should be within manufacturer’s published tolerances.
10.
Minimum pickup voltage on shunt trip and close coils should be in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, refer to Table
100.20.
11.
Breaker open, close, trip, trip-free, antipump, and auxiliary features should function as
designed.
12.
Trip logs and indicators are reset.
13.
The charging mechanism should operate in accordance with manufacturer’s published data.
* Optional
Page 68
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.1.2 Circuit Breakers, Air, Low-Voltage Power
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Verify that all maintenance devices are available for servicing and operating the breaker.
4.
Prior to cleaning the unit, perform as-found tests, if required.
5.
Clean the unit.
6.
Inspect arc chutes.
7.
Inspect moving and stationary contacts for condition, wear, and alignment.
8.
Verify that primary and secondary contact wipe and other dimensions vital to satisfactory
operation of the breaker are correct.
9.
Perform all mechanical operator and contact alignment tests on both the breaker and its
operating mechanism in accordance with manufacturer’s published data.
10.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.6.1.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
11.
Verify cell fit and element alignment.
12.
Verify racking mechanism operation.
13.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
14.
Perform adjustments for final protective device settings in accordance with coordination study
provided by end user.
15.
Perform as-left tests.
16.
Record as-found and as-left operation counter readings, if applicable.
* Optional
Page 69
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.1.2 Circuit Breakers, Air, Low-Voltage Power (continued)
2.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.6.1.2.1.
2.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with the circuit breaker closed, and across each open pole. Apply voltage in accordance
with manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
3.
Perform a contact/pole-resistance test.
*4.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components or control
devices that cannot tolerate the applied voltage, follow manufacturer’s recommendation.
5.
Determine long-time pickup and delay by primary current injection.
6.
Determine short-time pickup and delay by primary current injection.
7.
Determine ground-fault pickup and delay by primary current injection.
8.
Determine instantaneous pickup current by primary current injection.
*9.
Test functions of the trip unit by means of secondary injection.
10.
Perform minimum pickup voltage test on shunt trip and close coils in accordance with Table
100.20.
11.
Verify correct operation of auxiliary features such as trip and pickup indicators, zone
interlocking, electrical close and trip operation, trip-free, antipump function, and trip unit
battery condition.
12.
Reset all trip logs and indicators.
13.
Verify operation of charging mechanism.
* Optional
Page 70
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.1.2 Circuit Breakers, Air, Low-Voltage Power (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.6.1.2.1.10.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.6.1.2.1.10.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.6.1.2.1.10.3)
4.
Settings shall comply with coordination study recommendations. (7.6.1.2.1.15)
5.
Operations counter should advance one digit per close-open cycle. (7.6.1.2.1.16)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values of breakers should be in accordance with manufacturer’s published
data. In the absence of manufacturer’s published data, use Table 100.1. Values of insulation
resistance less than this table or manufacturer’s recommendations should be investigated.
3.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar breakers by more than 50 percent
of the lowest value.
4.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
5.
Long-time pickup values should be as specified, and the trip characteristic shall not exceed
manufacturer’s published time-current characteristic tolerance band.
6.
Short-time pickup values should be as specified, and the trip characteristic should not exceed
manufacturer’s published time-current tolerance band.
7.
Ground fault pickup values should be as specified, and the trip characteristic should not exceed
manufacturer’s published time-current tolerance band.
8.
Instantaneous pickup values should be within the tolerances of manufacturer’s published data.
* Optional
Page 71
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.1.2 Circuit Breakers, Air, Low-Voltage Power (continued)
9.
Pickup values and trip characteristic should be as specified and within manufacturer’s
published tolerances.
10.
Minimum pickup voltage on shunt trip and close coils should be in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, refer to
Table 100.20.
11.
Auxiliary features should operate in accordance with manufacturer’s published data.
12.
Trip logs and indicators are reset.
13.
The charging mechanism should operate in accordance with manufacturer’s published data.
* Optional
Page 72
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.1.3 Circuit Breakers, Air, Medium-Voltage
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Verify that all maintenance devices are available for servicing and operating the breaker.
*4.
Perform operator analysis (first-trip) test.
5.
Prior to cleaning the unit, perform as-found tests, if required.
6.
Clean the unit.
7.
Inspect arc chutes.
8.
Inspect moving and stationary contacts for condition, wear, and alignment.
9.
If recommended by manufacturer, slow close/open breaker and check for binding, friction,
contact alignment, contact sequence, and penetration. Verify that contact sequence is in
accordance with manufacturer’s published data. In the absence of manufacturer’s published
data, refer to ANSI/IEEE C37.04.
10.
Perform all mechanical operation tests on the operating mechanism in accordance with
manufacturer’s published data.
11.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.6.1.3.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
12.
Verify cell fit and element alignment.
13.
Verify racking mechanism operation.
14.
Inspect puffer operation.
15.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
* Optional
Page 73
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.1.3 Circuit Breakers, Air, Medium-Voltage (continued)
*16.
2.
Perform time-travel analysis.
17.
Perform as-left tests.
18.
Record as-found and as-left operation-counter readings.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable. See Section 7.6.1.3.1.
2.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with the circuit breaker closed, and across each open pole. Apply voltage in accordance
with manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
*3.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components or control
devices that cannot tolerate the applied voltage, follow manufacturer’s recommendation.
4.
Perform a contact/pole-resistance test.
5.
With the breaker in a test position, perform the following tests:
1.
Trip and close breaker with the control switch.
2.
Trip breaker by operating each of its protective relays.
3.
Verify mechanism charge, trip-free, and antipump functions.
*6.
Perform minimum pickup voltage tests on trip and close coils in accordance with Table 100.20.
*7.
Perform power-factor or dissipation-factor tests with breaker in both the open and closed
positions.
*8.
Perform power-factor or dissipation-factor tests on each bushing equipped with a power-factor/
capacitance tap. In the absence of a power-factor/ capacitance tap, perform hot-collar tests.
These tests shall be in accordance with the test equipment manufacturer’s published data.
*9.
Perform a dielectric withstand voltage test on each phase with the circuit breaker closed and the
poles not under test grounded. Test voltage should be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.19.
* Optional
Page 74
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.1.3 Circuit Breakers, Air, Medium-Voltage (continued)
10.
Verify blowout coil circuit continuity.
11.
Verify operation of cubicle space heaters, if applicable.
*12.
Test instrument transformers in accordance with Section 7.10.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare first-trip operation time and trip-coil current waveform to manufacturer’s published
data. In the absence of manufacturer's published data, compare first-trip operation time and tripcoil current waveform to previously obtained results. (7.6.1.3.1.4)
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.6.1.3.1.11.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.6.1.3.1.11.2)
4.
Results of the thermographic survey shall be in accordance with Section 9. (7.6.1.3.1.11.3)
5.
Compare travel and velocity values to manufacturer’s published data and previous test data.
(7.6.1.3.1.16)
6.
Operations counter should advance one digit per close-open cycle. (7.6.1.2.1.18)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values of circuit breakers should be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.1. Values of
insulation resistance less than this table or manufacturer’s recommendations should be
investigated.
3.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
4.
Microhm or dc millivolt drop values shall not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
* Optional
Page 75
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.1.3 Circuit Breakers, Air, Medium-Voltage (continued)
investigate values that deviate from adjacent poles or similar breakers by more than 50 percent
of the lowest value.
5.
Breaker mechanism charge, close, open, trip, trip-free, and antipump features shall function as
designed.
6.
Minimum pickup for trip and close coils shall be in accordance with manufacturer’s published
data. In the absence of manufacturer’s data, refer to Table 100.20.
7.
Power-factor or dissipation-factor values shall be compared with previous test results of similar
breakers or manufacturer’s published data.
8.
Power-factor or dissipation-factor and capacitance values should be within ten percent of
nameplate rating for bushings. Hot collar tests are evaluated on a milliampere/milliwatt loss
basis, and the results should be compared to values of similar bushings.
9.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the circuit breaker is considered to have
passed the test.
10.
The blowout coil circuit should exhibit continuity.
11.
Cubicle space heaters should be operational.
12.
The results of instrument transformer tests shall be in accordance with Section 7.10.
* Optional
Page 76
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.2 Circuit Breakers, Oil, Medium- and High-Voltage
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Verify that maintenance devices are available for servicing and operating the breaker.
*4.
Perform operator analysis (first-trip) test.
5.
Verify correct oil level in tanks and bushings.
6.
Verify that breather vents are clear.
7.
Prior to cleaning the unit, perform as-found tests.
8.
Clean the unit.
9.
Inspect and service hydraulic or pneumatic system and/or air compressor in accordance with
manufacturer’s published data.
10.
Test alarms, pressure switches, and limit switches for pneumatic and/or hydraulic operators as
recommended by the manufacturer.
11.
Perform all mechanical operation tests on the operating mechanism in accordance with
manufacturer’s published data.
*12.
If performing internal inspection:
1.
Remove oil. Lower tanks or remove manhole covers as necessary. Inspect bottom of
tank for broken parts and debris and clean carbon residue from tank.
2.
Inspect lift rod and toggle assemblies, contacts, interrupters, bumpers, dashpots, bushing
current transformers, tank liners, and gaskets.
3.
If recommended by manufacturer, slow close/open breaker and check for binding,
friction, contact alignment, and penetration. Verify that contact sequence is in
accordance with manufacturer’s published data. In the absence of manufacturer’s
published data, refer to ANSI C37.04.
4.
Refill tank(s) with filtered oil to correct levels.
* Optional
Page 77
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.2 Circuit Breakers, Oil, Medium- and High-Voltage (continued)
13.
2.
Inspect all bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.6.2.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
14.
Verify cell fit and element alignment, if applicable.
15.
Verify racking mechanism operation, if applicable.
16.
Perform time-travel analysis.
17.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
18.
Perform as-left tests.
19.
Record as-found and as-left operation counter readings.
Electrical Tests
1.
Perform resistance measurements through all bolted connections with a low-resistance
ohmmeter, if applicable, in accordance with Section 7.6.2.1.12.1.
2.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with circuit breaker closed, and across each open pole. Apply voltage in accordance
with manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
3.
Perform a contact/pole-resistance test.
*4.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components or for control
devices that cannot tolerate the voltage, follow manufacturer’s recommendation.
* Optional
Page 78
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.2 Circuit Breakers, Oil, Medium- and High-Voltage (continued)
5.
6.
Remove a sample of insulating liquid in accordance with ASTM D 923. The sample shall be
tested in accordance with the referenced standard.
1.
Dielectric breakdown voltage: ASTM D 877
2.
Color: ANSI/ASTM D 1500
*3.
Power factor: ASTM D 924
*4.
Interfacial tension: ANSI/ASTM D 971 or ANSI/ASTM D 2285
*5.
Visual condition: ASTM D 1524
With breaker in a test position, make the following tests:
1.
Trip and close breaker with the control switch.
2.
Trip breaker by operating each of its protective relays.
3.
Verify trip-free and antipump functions.
*4.
Perform minimum pickup voltage tests on trip and close coils in accordance with Table
100.20.
7.
Perform power-factor or dissipation-factor tests on each pole with the breaker open and each
phase with the breaker closed. Determine tank loss index.
8.
Perform power-factor or dissipation-factor tests on each bushing equipped with a power-factor/
capacitance tap. In the absence of a power-factor/ capacitance tap, perform hot-collar tests.
These tests shall be in accordance with the test equipment manufacturer’s published data.
*9.
Perform a dielectric withstand voltage test on each phase with the circuit breaker closed and the
poles not under test grounded. Test voltage should be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.19.
10.
Verify operation of heaters.
*11.
Test instrument transformers in accordance Section 7.10.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Compare first-trip operation time and trip-coil current waveform to manufacturer’s published
data. In the absence of manufacturer's published data, compare first-trip operation time and tripcoil current waveform to previously obtained results. (7.6.2.1.4)
* Optional
Page 79
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.2 Circuit Breakers, Oil, Medium- and High-Voltage (continued)
3.2
2.
Settings for alarm, pressure, and limit switches should be in accordance with manufacturer’s
published data. (7.6.2.1.10)
3.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.6.2.1.13.1)
4.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.6.2.1.13.2)
5.
Results of the thermographic survey shall be in accordance with Section 9. (7.6.2.1.13.3)
6.
Compare travel and velocity values to manufacturer’s published data and previous test data.
(7.6.2.1.16)
7.
Operations counter should advance one digit per close-open cycle. (7.6.2.1.19)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values of circuit breakers should be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.1. Values of
insulation resistance less than this table or manufacturer’s recommendations should be
investigated.
3.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar breakers by more than 50 percent
of the lowest value.
4.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
5.
Insulating liquid test results should be in accordance with Table 100.4.
6.
Open, close, trip-free, and antipump features should function in accordance with
manufacturer’s design. Minimum pickup for trip and close coils should conform to
manufacturer’s published data. In the absence of manufacturer’s published data, refer to Table
100.20.
* Optional
Page 80
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.2 Circuit Breakers, Oil, Medium- and High-Voltage (continued)
7.
Power-factor or dissipation-factor values and tank loss index shall be compared to
manufacturer’s published data. In the absence of manufacturer’s published data, the comparison
shall be made to test data from similar breakers or data from test equipment manufacturers.
8.
Power-factor or dissipation-factor and capacitance values should be within ten percent of
nameplate rating for bushings. Hot collar tests are evaluated on a milliampere/milliwatt loss
basis, and the results should be compared to values of similar bushings.
9.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
10.
Heaters should be operational.
11.
Results of electrical tests on instrument transformers should be in accordance with Section 7.10.
* Optional
Page 81
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.3 Circuit Breakers, Vacuum, Medium-Voltage
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Verify that all maintenance devices are available for servicing and operating the breaker.
*4.
Perform operator analysis (first-trip) test.
5.
Prior to cleaning the unit, perform as-found tests, if required.
6.
Clean the unit.
7.
Inspect vacuum bottle assemblies.
8.
Measure critical distances such as contact gap as recommended by the manufacturer.
9.
If recommended by the manufacturer, slow close/open the breaker and check for binding,
friction, contact alignment, contact sequence, and penetration.
10.
Perform all mechanical operation tests on the operating mechanism in accordance with
manufacturer’s published data.
11.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.6.3.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
12.
Verify cell fit and element alignment.
13.
Verify racking mechanism operation.
14.
Inspect vacuum bellows operation.
15.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
* Optional
Page 82
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.3 Circuit Breakers, Vacuum, Medium-Voltage (continued)
*16.
2.
Perform time-travel analysis.
17.
Perform as-left tests.
18.
Record as-found and as-left operation counter readings.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.6.3.1.10.
2.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with circuit breaker closed and across each pole with the breaker open. Apply voltage in
accordance with manufacturer’s published data. In the absence of manufacturer’s published
data, use Table 100.1.
*3.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components or control
devices that cannot tolerate the applied voltage, follow manufacturer’s recommendation.
4.
Perform a contact/pole-resistance test.
5.
With breaker in a test position, perform the following tests:
1.
Trip and close breaker with the control switch.
2.
Trip breaker by operating each of its protective relays.
3.
Verify mechanism charge, trip-free, and antipump functions.
*6.
Perform minimum pickup voltage tests on trip and close coils in accordance with Table 100.20.
*7.
Perform power-factor or dissipation-factor tests on each pole with the breaker open and each
phase with the breaker closed.
*8.
Perform power-factor or dissipation-factor tests on each bushing equipped with a power-factor/
capacitance tap. In the absence of a power-factor/ capacitance tap, perform hot-collar tests.
These tests shall be in accordance with the test equipment manufacturer’s published data.
9.
Perform a vacuum bottle integrity (dielectric withstand voltage) test across each vacuum bottle
with the breaker in the open position in strict accordance with manufacturer’s published data.
* Optional
Page 83
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.3 Circuit Breakers, Vacuum, Medium-Voltage (continued)
*10.
Perform a dielectric withstand voltage test on each phase with the circuit breaker closed and the
poles not under test grounded. Test voltage should be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.19.
11.
Verify operation of heaters, if applicable.
12.
Test instrument transformers in accordance with Section 7.10.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare first-trip operation time and trip-coil current waveform to manufacturer’s published
data. In the absence of manufacturer's published data, compare first-trip operation time and tripcoil current waveform to previously obtained results. (7.6.3.1.4)
2.
Mechanical operation and contact alignment should be in accordance with manufacturer’s
published data. (7.6.3.1.9)
3.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.6.3.1.11.1)
4.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.6.3.1.11.2)
5.
Results of the thermographic survey shall be in accordance with Section 9. (7.6.3.1.11.3)
6.
Compare travel and velocity values to manufacturer’s published data and previous test data.
(7.6.3.1.16)
7.
Operation counter should advance one digit per close-open cycle. (7.6.3.1.18)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values of circuit breakers should be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.1. Values of
insulation resistance less than this table or manufacturer’s recommendations should be
investigated.
* Optional
Page 84
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.3 Circuit Breakers, Vacuum, Medium-Voltage (continued)
3.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
4.
Microhm or dc millivolt drop values shall not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar breakers by more than 50 percent
of the lowest value.
5.
Breaker mechanism charge, close, open, trip, trip-free, and antipump features shall function as
designed.
6.
Minimum pickup for trip and close coils shall be in accordance with manufacturer’s published
data. In the absence of manufacturer’s data, refer to Table 100.20.
7.
Power-factor or dissipation-factor values shall be compared to manufacturer’s published data.
In the absence of manufacturer’s published data the comparison shall be made to similar
breakers.
8.
Power-factor or dissipation-factor and capacitance values should be within ten percent of
nameplate rating for bushings. Hot collar tests are evaluated on a milliampere/milliwatt loss
basis, and the results should be compared to values of similar bushings.
9.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the vacuum bottle integrity test, the test specimen is considered to have
passed the test.
10.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
11.
Heaters should be operational.
12.
Results of instrument transformer tests shall be in accordance with Section 7.10.
* Optional
Page 85
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.4 Circuit Breakers, SF6
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Verify that all maintenance devices are available for servicing and operating the breaker.
*4.
Perform operator analysis (first-trip) test.
5.
Prior to cleaning the unit, perform as-found tests, if required.
6.
Clean the unit.
*7.
When provisions are made for sampling, remove a sample of SF6 gas and test in accordance
with Table 100.13. Do not break seal or distort sealed-for-life interrupters.
8.
Inspect and service operating mechanism and/or hydraulic or pneumatic system and SF6 gasinsulated system in accordance with manufacturer’s published data.
9.
Test for SF6 gas leaks in accordance with manufacturer’s published data.
10.
Test alarms, pressure switches, and limit switches for pneumatic and/or hydraulic operators and
SF6 gas pressure in accordance with manufacturer’s published data.
11.
If recommended by manufacturer, slow close/open breaker and check for binding, friction,
contact alignment, and penetration. Verify that contact sequence is in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, refer to
ANSI/IEEE C37.04.
12.
Perform all mechanical operation tests on the operating mechanism in accordance with
manufacturer’s published data.
13.
Inspect all bolted electrical connections for high resistance using one or more of the following
methods:
14.
1.
Use of a low-resistance ohmmeter in accordance with Section 7.6.4.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Verify cell fit and element alignment.
* Optional
Page 86
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.4 Circuit Breakers, SF6 (continued)
2.
15.
Verify racking mechanism operation.
16.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
17.
Perform time-travel analysis.
18.
Perform as-left tests.
19.
Record as-found and as-left operation counter readings.
Electrical Tests
1.
Perform resistance measurements through all bolted connections with a low-resistance
ohmmeter, if applicable, in accordance with Section 7.6.4.1.
2.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with breaker closed, and across each open pole. For single-tank breakers, perform
insulation resistance tests from pole-to-pole. Apply voltage in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.1.
3.
Perform a contact/pole-resistance test.
*4.
5.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components or for control
devices that cannot tolerate the voltage, follow manufacturer’s recommendation.
With breaker in a test position, perform the following tests:
1.
Trip and close breaker with the control switch.
2.
Trip breaker by operating each of its protective relays.
3.
Verify trip-free and antipump functions.
*4.
Perform minimum pickup voltage tests on trip and close coils in accordance with Table
100.20.
6.
Perform power-factor or dissipation-factor tests on each pole with the breaker open and on each
phase with breaker closed.
7.
Perform power-factor or dissipation-factor tests on each bushing equipped with a power-factor/
capacitance tap. In the absence of a power-factor/ capacitance tap, perform hot-collar tests.
These tests shall be in accordance with the test equipment manufacturer’s published data.
* Optional
Page 87
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.4 Circuit Breakers, SF6 (continued)
*8.
9.
*10.
Perform a dielectric withstand voltage test in accordance with manufacturer’s published data.
Verify operation of heaters.
Test instrument transformers in accordance with Section 7.10.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare first-trip operation time and trip-coil current waveform to manufacturer’s published
data. In the absence of manufacturer's published data, compare first-trip operation time and tripcoil current waveform to previously obtained results. (7.6.4.1.4) .
2.
SF6 gas should have values in accordance with Table 100.13. (7.6.4.1.7)
3.
Results of the SF6 gas leak test should confirm that no SF6 gas leak exists. (7.6.4.1.9)
4.
Settings for alarm, pressure, and limit switches should be in accordance with manufacturer’s
published data. (7.6.4.1.10)
5.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.6.4.1.13.1)
6.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.6.4.1.13.2)
7.
Results of the thermographic survey shall be in accordance with Section 9. (7.6.4.1.13.3)
8.
Compare circuit breaker travel and velocity values with manufacturer’s published data and
previous test data. (7.6.4.1.17)
9.
Operations counter should advance one digit per close-open cycle. (7.6.4.1.19)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values of circuit breakers should be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.1.Values of
insulation resistance less than this table or manufacturer’s recommendations should be
investigated.
* Optional
Page 88
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.6.4 Circuit Breakers, SF6 (continued)
3.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar breakers by more than 50 percent
of the lowest value.
4.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
5.
Open, close, trip-free, and antipump features should function in accordance with the
manufacturer’s design. Minimum pickup for trip and close coils should conform to
manufacturer’s published data. In the absence of manufacturer’s published data, refer to Table
100.20.
6.
Power-factor or dissipation-factor values shall be compared to manufacturer’s published data.
In the absence of manufacturer’s published data, the comparison shall be made to test data from
similar breakers or data from test equipment manufacturers.
7.
Power-factor or dissipation-factor and capacitance test values should be within ten percent of
nameplate rating for bushings. Hot collar tests are evaluated on a milliampere/milliwatt loss
basis, and the results should be compared to values of similar bushings.
8.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
9.
Heaters should be operational.
10.
Results of electrical tests on instrument transformers should be in accordance with Section 7.10.
* Optional
Page 89
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.7 Circuit Switchers
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
5.
Perform all mechanical operational tests on both the circuit switcher and its operating
mechanism.
6.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.7.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
7.
Verify operation of SF6 interrupters is in accordance with manufacturer’s published data.
8.
Verify SF6 pressure is in accordance with manufacturer’s published data.
9.
Verify operation of isolating switch is in accordance with manufacturer’s published data.
10.
Test all interlocking systems for correct operation and sequencing.
11.
Verify all indicating and control devices for correct separation.
12.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
13.
Perform as-left tests.
14.
Record as-found and as-left operation counter readings.
* Optional
Page 90
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.7 Circuit Switchers (continued)
2.
Electrical Tests
1.
Perform resistance measurements through all connections with a low-resistance ohmmeter, if
applicable, in accordance with Section 7.7.1.
2.
Perform contact-resistance tests of interrupters and isolating switches.
3.
Perform insulation-resistance tests on each pole, phase-to-ground. Apply voltage in accordance
with manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
*4.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components, follow
manufacturer’s recommendation.
5.
Perform minimum pickup voltage tests on trip and close coils in accordance with Table 100.20.
6.
Verify correct operation of auxiliary features such as electrical close and trip operation, tripfree, and antipump function. Reset all trip logs and indicators.
7.
Trip circuit switcher by operation of each protective device.
8.
Verify correct operation of electrical trip of interrupters.
9.
Perform a dielectric withstand voltage test in accordance with manufacturer’s published data.
10.
Verify operation of heaters.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.7.1.6.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.7.1.6.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.7.1.6.3)
4.
SF6 interrupters should operate in accordance with manufacturer’s published data. (7.7.1.7)
5.
SF6 pressure should be in accordance with manufacturer’s published data. (7.7.1.8)
* Optional
Page 91
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.7 Circuit Switchers (continued)
3.2
6.
Isolating switch should operate in accordance with manufacturer’s design. (7.7.1.9)
7.
Interlocking systems should operate per system lockout design. (7.7.1.10)
8.
Results of open and close operation from control devices should be in accordance with system
design. (7.7.1.11)
9.
Operation counter should advance one digit per close-open cycle. (7.7.1.14)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar breakers by more than 50 percent
of the lowest value.
3.
Insulation-resistance values of circuit switchers should be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.1.Values of
insulation resistance less than this table or manufacturer’s recommendations should be
investigated.
4.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
5.
Minimum pickup for trip and close coils should conform to manufacturer’s published data. In
the absence of manufacturer’s published data, refer to Table 100.20.
6.
Switcher mechanism charge, close, open, trip, trip-free, and antipump features shall function as
designed.
7.
Electrical trip interrupters shall function as designed.
8.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the circuit switcher is considered to
have passed the test.
9.
Heaters should be operational.
* Optional
Page 92
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.8. Network Protectors, 600-Volt Class
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
5.
Inspect arc chutes.
6.
Inspect moving and stationary contacts for condition, wear, and alignment.
7.
Verify that maintenance devices are available for servicing and operating the protector.
8.
Verify that primary and secondary contact wipe and other dimensions vital to satisfactory
operation of the breaker are correct.
9.
Perform mechanical operator and contact alignment tests on both the protector and its operating
mechanism.
10.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.8.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
11.
Verify cell fit and element alignment.
12.
Verify racking mechanism operation.
13.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
14.
Perform as-left tests.
* Optional
Page 93
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.8. Network Protectors, 600-Volt Class (continued)
2.
15.
Record the as-found and as-left operations counter readings.
16.
Perform a leak test, if applicable, on submersible enclosure in accordance with manufacturer’s
published data.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.8.1.
2.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with protector closed, and across each open pole. Apply voltage in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
3.
Perform a contact/pole-resistance test.
*4.
Perform insulation-resistance test on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components or for control
devices that cannot tolerate the voltage, follow manufacturer’s recommendation.
*5.
Verify current transformer ratios in accordance with Section 7.10.
6.
Measure the resistance of each protector power fuse.
7.
Measure minimum pickup voltage of the motor control relay.
*8.
Verify that the motor can charge the closing mechanism at the minimum voltage specified by
the manufacturer.
9.
Measure minimum pickup voltage of the trip actuator. Verify that the actuator resets correctly.
10.
Calibrate the network protector relays in accordance with Section 7.9.
11.
Perform operational tests.
1.
Verify correct operation of all mechanical and electrical interlocks.
2.
Verify trip-free operation.
3.
Verify correct operation of the auto-open-close control handle.
4.
Verify the protector will close with voltage on the transformer side only.
5.
Verify the protector will open when the source feeder breaker is opened.
* Optional
Page 94
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.8. Network Protectors, 600-Volt Class (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.8.1.10.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.8.1.10.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.8.1.10.3)
4.
Operations counter should advance one digit per close-open cycle. (7.8.1.15)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation resistance of the network protector should be in accordance with manufacturer’s
published data. In the absence of manufacturer’s published data, use Table 100.1. Values of
insulation resistance less than this table or manufacturer’s recommendations should be
investigated. Dielectric withstand voltage tests should not proceed until insulation-resistance
levels are raised above minimum values.
3.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar protectors by more than 50
percent of the lowest value.
4.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
5.
Results of current transformer ratios shall be in accordance with Section 7.10.
6.
Investigate fuse resistance values that deviate from each other by more than 15 percent.
7.
Minimum pickup voltage of the motor control relay should be in accordance with
manufacturer’s published data, but not more than 75 percent of rated control circuit voltage.
8.
Minimum acceptable motor closing voltage should not exceed 75 percent of rated control
circuit voltage.
* Optional
Page 95
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.8. Network Protectors, 600-Volt Class (continued)
9.
Calibration should not exceed 7.5 percent of rated control circuit voltage.
10.
Results of network protector relays should be in accordance with Section 7.9.
11.
Network protector operation should be in accordance with design requirements.
* Optional
Page 96
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.9.1 Protective Relays, Electromechanical and Solid-State
1.
Visual and Mechanical Inspection
1.
Inspect relays and cases for physical damage.
2.
Prior to cleaning the unit, perform as-found tests, if required.
3.
Clean the unit.
4.
Relay Case
5.
2.
1.
Tighten case connections.
2.
Inspect cover for correct gasket seal.
3.
Clean cover glass. Inspect shorting hardware, connection paddles, and/or knife switches.
4.
Remove any foreign material from the case.
5.
Verify target reset
Relay
1.
Inspect relay for foreign material, particularly in disk slots of the damping and
electromagnets.
2.
Verify disk clearance. Verify contact clearance and spring bias.
3.
Inspect spiral spring convolutions. Inspect disk and contacts for freedom of movement
and correct travel. Verify tightness of mounting hardware and connections. Burnish
contacts. Inspect bearings and/or pivots.
6.
Verify that all settings are in accordance with coordination study or setting sheet supplied by
owner.
7.
Perform as-left tests.
Electrical Tests
1.
Perform insulation-resistance test on each circuit-to-frame. Procedures for performing
insulation-resistance tests on solid-state relays should be determined from the relay
manufacturer’s published data.
* Optional
Page 97
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.9.1 Protective Relays, Electromechanical and Solid-State (continued)
2.
3.
Inspect targets and indicators.
1.
Determine pickup and dropout of electromechanical targets.
2.
Verify operation of all light-emitting diode indicators.
3.
Set contrast for liquid-crystal display readouts.
Functional Operation
1.
2.
2/62 Timing Relay
1.
Determine time delay.
2.
Verify operation of instantaneous contacts.
21 Distance Relay
1.
Determine maximum reach.
2.
Determine maximum torque angle.
3.
Determine offset.
*4.
3.
4.
Plot impedance circle.
24 Volts/Hertz Relay
1.
Determine pickup frequency at rated voltage.
2.
Determine pickup frequency at a second voltage level.
3.
Determine time delay.
25 Sync Check Relay
1.
Determine closing zone at rated voltage.
2.
Determine maximum voltage differential that permits closing at zero degrees.
3.
Determine live line, live bus, dead line, and dead bus set points.
4.
Determine time delay.
5.
Verify dead bus/live line, dead line/live bus and dead bus/dead line control functions.
* Optional
Page 98
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.9.1 Protective Relays, Electromechanical and Solid-State (continued)
5.
6.
27 Undervoltage Relay
1.
Determine dropout voltage.
2.
Determine time delay.
3.
Determine the time delay at a second point on the timing curve for inverse time relays.
32 Directional Power Relay
1.
Determine minimum pickup at maximum torque angle.
2.
Determine closing zone.
3.
Determine maximum torque angle.
4.
Determine time delay.
5.
Verify the time delay at a second point on the timing curve for inverse time relays.
*6.
7.
40 Loss of Field (Impedance) Relay
1.
Determine maximum reach.
2.
Determine maximum torque angle.
3.
Determine offset.
*4.
8.
9.
Plot the operating characteristic.
Plot impedance circle.
46 Current Balance Relay
1.
Determine pickup of each unit.
2.
Determine percent slope.
3.
Determine time delay.
46N Negative Sequence Current Relay
1.
Determine negative sequence alarm level.
2.
Determine negative sequence minimum trip level.
* Optional
Page 99
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.9.1 Protective Relays, Electromechanical and Solid-State (continued)
10.
11.
3.
Determine maximum time delay.
4.
Verify two points on the (I2)2t curve.
47 Phase Sequence or Phase Balance Voltage Relay
1.
Determine positive sequence voltage to close the normally open contact.
2.
Determine positive sequence voltage to open the normally closed contact (undervoltage
trip).
3.
Verify negative sequence trip.
4.
Determine time delay to close the normally open contact with sudden application of 120
percent of pickup.
5.
Determine time delay to close the normally closed contact upon removal of voltage
when previously set to rated system voltage.
49R Thermal Replica Relay
1.
Determine time delay at 300 percent of setting.
2.
Determine a second point on the operating curve.
*3.
12.
13.
49T Temperature (RTD) Relay
1.
Determine trip resistance.
2.
Determine reset resistance.
50 Instantaneous Overcurrent Relay
1.
Determine pickup.
2.
Determine dropout.
*3.
14.
Determine pickup.
Determine time delay.
51 Time Overcurrent
1.
Determine minimum pickup.
2.
Determine time delay at two points on the time current curve.
* Optional
Page 100
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.9.1 Protective Relays, Electromechanical and Solid-State (continued)
15.
16.
17.
55 Power Factor Relay
1.
Determine tripping angle.
2.
Determine time delay.
59 Overvoltage Relay
1.
Determine overvoltage pickup.
2.
Determine time delay to close the contact with sudden application of 120 percent of
pickup.
60 Voltage Balance Relay
1.
*2.
18.
19.
Determine voltage difference to close the contacts with one source at rated voltage.
Plot the operating curve for the relay.
63 Transformer Sudden Pressure Relay
1.
Determine rate-of-rise or the pickup level of suddenly applied pressure in accordance
with manufacturer’s published data.
2.
Verify operation of the 63 FPX seal-in circuit.
3.
Verify trip circuit to remote operating device.
64 Ground Detector Relay
Determine maximum impedance to ground causing relay pickup.
20.
67 Directional Overcurrent Relay
1.
Determine directional unit minimum pickup at maximum torque angle.
2.
Determine closing zone.
*3.
Determine maximum torque angle.
*4.
Plot operating characteristics.
5.
Determine overcurrent unit pickup.
6.
Determine overcurrent unit time delay at two points on the time current curve.
* Optional
Page 101
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.9.1 Protective Relays, Electromechanical and Solid-State (continued)
21.
79 Reclosing Relay
1.
Determine time delay for each programmed reclosing interval.
2.
Verify lockout for unsuccessful reclosing.
3.
Determine reset time.
*4.
5.
22.
23.
24.
Determine close pulse duration.
Verify instantaneous overcurrent lockout.
81 Frequency Relay
1.
Verify frequency set points.
2.
Determine time delay.
3.
Determine undervoltage cutoff.
85 Pilot Wire Monitor
1.
Determine overcurrent pickup.
2.
Determine undercurrent pickup.
3.
Determine pilot wire ground pickup level.
87 Differential
1.
Determine operating unit pickup.
2.
Determine the operation of each restraint unit.
3.
Determine slope.
4.
Determine harmonic restraint.
5.
Determine instantaneous pickup.
*6.
Plot operating characteristics for each restraint.
* Optional
Page 102
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.9.1 Protective Relays, Electromechanical and Solid-State (continued)
4.
Control Verification
Verify that each of the relay contacts performs its intended function in the control scheme including
breaker trip tests, close inhibit tests, 86 lockout tests, and alarm functions.
5.
Test Values
1.
When not otherwise specified, use manufacturer’s recommended tolerances.
2.
When critical test points are specified, the relay should be calibrated to those specified points
even though other test points may be out of tolerance.
* Optional
Page 103
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.9.2 Protective Relays, Microprocessor-Based
1.
2.
Visual and Mechanical Inspection
1.
Record model number, style number, serial number, firmware revision, software revision, and
rated control voltage.
2.
Download all events from the event recorder in filtered and unfiltered mode before performing
any tests on the relay. Download the sequence-of-events recorder prior to testing the relay.
3.
Verify operation of light-emitting diodes, display, and targets.
4.
Record passwords for all access levels.
5.
Clean the front panel and remove foreign material from the case.
6.
Check tightness of connections.
7.
Verify that the frame is grounded in accordance with manufacturer’s instructions.
8.
Download settings from the relay. Print a copy of the settings for the report and compare the
settings to those specified in the coordination study.
Electrical Tests
1.
Perform insulation-resistance tests from each circuit to the grounded frame in accordance with
manufacturer’s published data.
2.
Apply voltage or current to all analog inputs and verify correct registration of the relay meter
functions.
*3.
Functional Operation
Check functional operation of each element used in the protection scheme as described for
electromechanical and solid-state relays in 7.9.1.3.
4.
Control Verification
1.
Check operation of all active digital inputs.
2.
Check all output contacts or SCRs, preferably by operating the controlled device such as
circuit breaker, auxiliary relay, or alarm.
*3.
4.
Check all internal logic functions used in the protection scheme.
For pilot schemes, perform a loop-back test to check the receive and transmit
communication circuits.
* Optional
Page 104
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.9.2 Protective Relays, Microprocessor-Based (continued)
*5.
For pilot schemes, perform satellite synchronized (GPS) end-to-end tests.
6.
For pilot schemes with direct transfer trip (DTT), perform transmit and received DTT at
each terminal.
7.
Upon completion of testing reset all min/max recorders, fault counters, sequence of
events recorder, and all event records.
* Optional
Page 105
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.10 Instrument Transformers
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Prior to cleaning the unit, perform as-found tests, if required.
3.
Clean the unit.
4.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.10.2 and 7.10.3.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
5.
Verify that all required grounding and shorting connections provide contact.
6.
Verify correct operation of transformer withdrawal mechanism and grounding operation, if
applicable.
7.
Verify correct primary and secondary fuse sizes for voltage transformers.
8.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
9.
Perform as-left tests.
2.
Electrical Tests
2.1
Electrical Tests – Current Transformers
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.10.1.
2.
Perform insulation-resistance test of each current transformer and wiring-to-ground at 1000
volts dc for one minute. For units with solid-state components that cannot tolerate the applied
voltage, follow manufacturer’s recommendations.
* Optional
Page 106
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.10 Instrument Transformers (continued)
2.2
*3.
Perform a polarity test of each current transformer in accordance with ANSI/IEEE C57.13.1.
*4.
Perform a ratio-verification test using the voltage or current method in accordance with
ANSI/IEEE C57.13.1.
*5.
Perform an excitation test on transformers used for relaying applications in accordance with
ANSI/IEEE C57.13.1.
*6.
Measure current circuit burdens at transformer terminals.
7.
When applicable, perform insulation-resistance tests on the primary winding with the secondary
grounded. Test voltages shall be in accordance with Table 100.5.
8.
When applicable, perform dielectric withstand voltage tests on the primary winding with the
secondary grounded. Test voltages shall be in accordance with Table100.9 respectively.
*9.
Measure insulation power factor or dissipation factor in accordance with test equipment
manufacturer’s published data.
10.
Verify that current circuits are grounded and have only one grounding point in accordance with
ANSI/IEEE C57.13.3. (IEEE Guide for the Grounding of Instrument Transformer Secondary
Circuits and Cases).
Electrical Tests – Voltage Transformers
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.10.1.
2.
Perform insulation-resistance tests for one minute winding-to-winding and each winding-toground. Test voltages shall be applied in accordance with Table 100.5. For units with solidstate components that cannot tolerate the applied voltage, follow manufacturer’s
recommendations.
*3.
4.
Perform a polarity test on each transformer, as applicable, to verify the polarity marks or H1-X1
relationship.
Perform a turns-ratio test on all tap positions, if applicable.
*5.
Measure voltage circuit burdens at transformer terminals.
*6.
Perform a dielectric withstand voltage test on the primary windings with the secondary
windings connected to ground. The dielectric voltage shall be in accordance with Table 100.9.
The test voltage shall be applied for one minute.
* Optional
Page 107
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.10 Instrument Transformers (continued)
*7.
8.
2.3
Measure insulation power factor or dissipation factor in accordance with test equipment
manufacturer’s published data.
Verify that potential circuits are grounded and have only one grounding point in accordance
with ANSI/IEEE C57.13.3.
Electrical Tests – Coupling-Capacitor Voltage Transformers
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.10.1.
2.
Perform insulation-resistance tests for one minute, winding-to-winding and each winding-toground. Test voltages shall be applied in accordance with Table 100.5. For units with solidstate components that cannot tolerate the applied voltage, follow manufacturer’s
recommendations.
*3.
4.
Perform a polarity test on each transformer, as applicable, to verify the polarity marks or H1-X1
relationship. See ANSI/IEEE C93.1 for standard polarity marking.
Perform a turns ratio test on the as-found tap position, if applicable.
*5.
Measure voltage circuit burdens at transformer terminals.
*6.
Perform a dielectric withstand voltage test on the primary windings with the secondary
windings connected to ground. The dielectric withstand voltage shall be in accordance with
Table 100.9. The test voltage shall be applied for one minute.
7.
Measure capacitance of capacitor sections.
8.
Measure insulation power factor or dissipation factor in accordance with test equipment
manufacturer’s published data
9.
Verify that potential circuits are grounded and have only one grounding point in accordance
with ANSI/IEEE C57.13.3.
* Optional
Page 108
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.10 Instrument Transformers (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.10.1.4.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.10.1.4.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.10.1.4.3)
3.2.1 Test Values – Current Transformers – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values of instrument transformers should not be less than values shown in
Table 100.5.
3.
Polarity results should agree with transformer markings.
4.
Ratio errors should not be greater than values shown in Table 100.21.
5.
Excitation results should match the curve supplied by the manufacturer or be in accordance
with ANSI C57.13.1.
6.
Compare measured burdens to instrument transformer ratings.
7.
Insulation-resistance values of instrument transformers should not be less than values shown in
Table 100.5.
8.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the primary winding is considered to
have passed the test.
9.
Power-factor or dissipation-factor values shall be in accordance with manufacturer’s published
data. In the absence of manufacturer’s published data, use test equipment manufacturer’s
published data.
10.
Test results should indicate that the circuits have only one grounding point.
* Optional
Page 109
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.10 Instrument Transformers (continued)
3.2.2 Test Values –Voltage Transformers – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values of instrument transformers should not be less than values shown in
Table 100.5.
3.
Polarity results should agree with transformer markings.
4.
In accordance with IEEE C57.13; 8.1.1 the ratio error should be as follows:
1.
Revenue metering applications: equal to or less than ±0.1 percent for ratio and ±0.9
mrad (three minutes) for phase angle.
2.
Other applications: equal to or less than +1.2 percent for ratio and ±17.5 mrad (one
degree) for phase angle.
5.
Compare measured burdens to instrument transformer ratings.
6.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the primary windings are considered to
have passed the test.
7.
Power-factor or dissipation-factor values shall be in accordance with manufacturer’s published
data. In the absence of manufacturer’s published data, use test equipment manufacturer’s
published data.
8.
Test results should indicate that the circuits have only one grounding point.
3.2.3 Test Values – Coupling Capacitor Voltage Transformers
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values of instrument transformers should not be less than values shown in
Table 100.5.
3.
Polarity results should agree with transformer markings.
* Optional
Page 110
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.10 Instrument Transformers (continued)
4.
In accordance with IEEE C57.13; 8.1.1 the ratio error should be as follows:
1.
Revenue metering applications: equal to or less than ±0.1 percent for ratio and ±0.9
mrad (three minutes) for phase angle.
2.
Other applications: equal to or less than +1.2 percent for ratio and ±17.5 mrad (one
degree) for phase angle.
5.
Compare measured burdens to instrument transformer ratings.
6.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
7.
Capacitance of capacitor sections of coupling-capacitance voltage transformers should be in
accordance with manufacturer’s published data.
8.
Power-factor or dissipation-factor values shall be in accordance with manufacturer’s published
data. In the absence of manufacturer’s published data, use test equipment manufacturer’s
published data.
9.
Test results should indicate that the circuits have only one grounding point.
* Optional
Page 111
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.11.1 Metering Devices, Electromechanical and Solid-State
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.11.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
3.
Inspect cover gasket, cover glass, condition of spiral spring, disk clearance, contacts, and caseshorting contacts, as applicable.
4.
Prior to cleaning the unit, perform as-found tests, if required.
5.
Clean the unit.
6.
Verify freedom of movement, end play, and alignment of rotating disk(s).
7.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.11.1.
2.
Verify accuracy of meters at all cardinal points.
3.
Calibrate meters in accordance with manufacturer’s published data.
*4.
Verify all instrument multipliers.
* Optional
Page 112
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.11.1 Metering Devices, Electromechanical and Solid-State (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.11.1.2.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.11.1.2.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.11.1.2.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Meter accuracy should be in accordance with manufacturer’s published data.
3.
Calibration results should be within manufacturer’s specified tolerances.
4.
Instrument multipliers should be in accordance with specified system design.
* Optional
Page 113
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.11.2 Metering Devices, Microprocessor-Based
1.
2.
Visual and Mechanical Inspection
1.
Inspect meters and cases for physical damage.
2.
Clean front panel .
3.
Check tightness of electrical connections.
4.
Record model number, serial number, firmware revision, software revision, and rated control
voltage.
5.
Verify operation of display and indicating devices.
6.
Record passwords.
7.
Verify unit is grounded in accordance with manufacturer’s instructions.
8.
Verify unit is connected in accordance with manufacturer’s instructions and project drawings.
9.
Download settings from the meter, print a copy of the settings for the report, and compare the
settings to those specified.
Electrical Tests
1.
Apply voltage or current as appropriate to each analog input and verify correct measurement
and indication.
2.
Confirm correct operation and setting of each auxiliary input/output feature in use, including
mechanical relay, digital, and analog.
3.
Confirm measurements and indications are consistent with loads present.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Tightness of electrical connections shall assure a low resistance connection. (7.11.2.1.3)
2.
Display and indicating devices shall operate per manufacturer’s published data. (7.11.2.1.5)
3.2
1.
Test Values – Electrical
Measurement and indication of applied values of voltage and current should be within
manufacturer’s published tolerances for accuracy.
* Optional
Page 114
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.11.2 Metering Devices, Microprocessor-Based (continued)
2.
All auxiliary input/output features should operate per settings and manufacturer’s published
data
3.
Measurements and indications should be consistent with energized system loads.
* Optional
Page 115
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.1.1 Regulating Apparatus, Voltage, Step-Voltage Regulators
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Record position indicator as-found, maximum, and minimum values.
4.
Prior to cleaning the unit, perform as-found tests, if required.
5.
Clean the unit.
6.
Verify auxiliary device operation.
7.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.12.1.1.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
8.
Verify correct operation of motor and drive train and automatic motor cutoff at maximum lower
and maximum raise positions.
9.
Verify correct liquid level in all tanks and bushings.
10.
*11.
Perform specific inspections and mechanical tests as recommended by the manufacturer.
Perform an internal inspection:
1.
Remove oil.
2.
Clean carbon residue and debris from compartment.
3.
Inspect contacts for wear and alignment.
4.
Inspect all electrical and mechanical connections for tightness using calibrated torque
wrench method in accordance with manufacturer’s published data or Table 100.12.
5.
Inspect tap-changer compartment terminal board, contact support boards, and insulating
operating components for evidence of moisture, cracks, excessive wear, breakage,
and/or signs of electrical tracking.
* Optional
Page 116
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.1.1 Regulating Apparatus, Voltage, Step Voltage Regulators (continued)
2.
6.
Electrically operate tap-changer through full range of taps.
7.
Replace gaskets and seal compartment.
8.
Fill with filtered oil.
12.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
13.
Perform as-left tests.
14.
Record as-found and as-left operation counter readings.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.12.1.1.1.
2.
Perform insulation-resistance tests on each winding-to-ground in any off-neutral position.
Apply voltage in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.5. Calculate polarization index.
3.
Perform insulation power-factor or dissipation-factor tests on windings in accordance with test
equipment manufacturer’s published data.
4.
Perform power-factor or dissipation-factor tests on each bushing equipped with a power-factor/
capacitance tap. In the absence of a power-factor/ capacitance tap, perform hot-collar tests.
These tests shall be in accordance with the test equipment manufacturer’s published data.
5.
Measure winding resistance of source windings in the neutral position. Measure the resistance
of all taps on load windings.
6.
Perform special tests and adjustments as recommended by manufacturer.
*7.
If the regulator has a separate tap-changer compartment, measure the percentage of oxygen of
the nitrogen gas blanket in the main tank.
8.
Perform turns-ratio test on each voltage step position. Verify that the tap position indicator
correctly identifies all tap positions.
9.
Verify accurate operation of voltage range limiter.
10.
Verify operation and accuracy of bandwidth, time delay, voltage, and line-drop compensation
adjustments of tap-changer control device
* Optional
Page 117
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.1.1 Regulating Apparatus, Voltage, Step Voltage Regulators (continued)
*11.
If regulator has a separate tap-changer compartment, sample insulating liquid in the main tank
in accordance with ASTM D 3613 and perform dissolved-gas analysis in accordance with
ANSI/IEEE C57.104 or ASTM D 3612.
12.
Remove a sample of insulating liquid from the main tank or common tank in accordance with
ASTM D 923. Sample shall be tested in accordance with the referenced standard.
13.
*14.
15.
1.
Dielectric breakdown voltage: ASTM D 877 and/or ASTM D 1816
2.
Acid neutralization number: ANSI/ASTM D 974
3.
Specific gravity: ANSI/ASTM D 1298
4.
Interfacial tension: ANSI/ASTM D 971 or ASTM D 2285
5.
Color: ANSI/ASTM D 1500
6.
Visual condition: ASTM D 1524
*7.
Power factor: ASTM D 924
Required when the regulator voltage is 46 kV or higher.
*8.
PPM water: ASTM D 1533
Required when the regulator voltage is 25 kV or higher and on all silicone-filled units.
Remove a sample of insulating liquid from the tap-changer tank in accordance with
ASTM D 923. Sample shall be tested in accordance with the referenced standard.
1.
Dielectric breakdown voltage: ASTM D 877
2.
Color: ANSI/ASTM D 1500
3.
Visual condition: ASTM D 1524
Remove a sample of insulating liquid from the tap-changer compartment or common tank in
accordance with ASTM D 3613 and perform dissolved-gas analysis (DGA) in accordance with
ANSI/IEEE C57.104 or ASTM D 3612.
Verify operation of heaters.
* Optional
Page 118
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.1.1 Regulating Apparatus, Voltage, Step Voltage Regulators (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Auxiliary devices should operate in accordance with system design. (7.12.1.1.1.6)
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.12.1.1.1.7.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.12.1.1.1.7.2)
4.
Results of the thermographic survey shall be in accordance with Section 9. (7.12.1.1.1.7.3)
5.
Motor, drive train, and automatic cutoff should operate in accordance with manufacturer’s
design. (7.12.1.1.1.8)
6.
Liquid level in tanks and bushings should be within indicated tolerances. (7.12.1.1.1.9)
7.
On internal inspection, contact alignment and wear should be within manufacturer’s
recommendations for continued service. (7.12.1.1.1.11.3)
8.
Bolt torque levels should be in accordance with Table 100.12 unless otherwise specified by the
manufacturer. (7.12.1.1.1.11.4)
9.
Terminal board, contact support boards, and insulating operating components should not show
signs of moisture, cracking, excessive wear, breakage, or electrical cracking. (7.12.1.1.1.11.5)
10.
The tap-changer should operate electrically through the full range of taps. (7.12.1.1.1.11.6)
11.
The operation counter should move incrementally for each operation performed. (7.12.1.1.1.14)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.5. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated. Resistance values
shall be temperature corrected in accordance with Table 100.14. The polarization index shall be
compared to previously obtained results.
* Optional
Page 119
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.1.1 Regulating Apparatus, Voltage, Step Voltage Regulators (continued)
3.
Maximum power-factor or dissipation-factor values of liquid-filled regulators should be in
accordance with manufacturer’s published data. In the absence of manufacturer’s data, compare
to test equipment manufacturer’s published data. Representative values are indicated in Table
100.3.
4.
Power-factor or dissipation-factor and capacitance values should be within ten percent of
nameplate rating for bushings. Hot collar tests are evaluated on a milliampere/milliwatt loss
basis, and the results should be compared to values of similar bushings.
5.
Consult manufacturer if winding-resistance values vary by more than one percent from test
results of adjacent windings.
6.
Special tests and adjustments should meet manufacturer’s published requirements.
7.
Investigate presence of oxygen in nitrogen gas blanket.
8.
Turns-ratio test results should maintain a normal deviation between each voltage step and
should not deviate more than one-half percent from the calculated voltage ratio.
9.
Voltage range limiter should operate within manufacturer’s recommendations.
10.
Accuracy of bandwidth, time-delay, voltage, and live drop compensation adjustments should be
as specified.
11.
Results of dissolved-gas analysis of insulating liquid on the main tank of regulators having a
separate tap-changer compartment shall be evaluated in accordance with ANSI/IEEE C57.104
or ASTM D 3612.
12.
Results of insulating liquid tests on the main tank or common tank of single tank voltage
regulators should be in accordance with Table 100.4.
13.
Results of insulating liquid tests on the tap-changer tank of regulators having a separate tapchanger compartment should be in accordance with Table 100.4.
14.
Compare results of dissolved gas analysis to previous test results.
15.
Heaters should be operational.
* Optional
Page 120
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.1.2 Regulating Apparatus, Voltage, Induction Regulators
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Record position indicator as-found, maximum, and minimum values.
4.
Prior to cleaning the unit, perform as-found tests, if required.
5.
Clean the unit.
6.
Verify correct auxiliary device operation.
7.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.12.1.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
8.
Check motor and drive train for correct operation and automatic motor cutoff at maximum
lower and maximum raise.
9.
Verify appropriate liquid level in all tanks and bushings, if applicable.
10.
Perform specific inspections and mechanical tests as recommended by the manufacturer.
11.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
12.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.12.1.2.1.
2.
Perform insulation-resistance tests winding-to-winding and each winding-to-ground. Apply
voltage in accordance with manufacturer’s published data. In the absence of manufacturer’s
published data, use Table 100.5. Calculate polarization index.
* Optional
Page 121
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.1.2 Regulating Apparatus, Voltage, Induction Regulators (continued)
3.
Perform power-factor or dissipation-factor tests on winding insulation in accordance with test
equipment manufacturer’s published data.
4.
Perform power-factor or dissipation-factor tests on each bushing equipped with a power-factor/
capacitance tap. In the absence of a power-factor/ capacitance tap, perform hot-collar tests.
These tests shall be in accordance with the test equipment manufacturer’s published data.
5.
Verify voltage regulation.
6.
Verify that the indicator correctly identifies neutral position.
7.
Perform winding resistance tests on each winding.
8.
Sample insulating liquid, if applicable, in accordance with ASTM D 923. Sample shall be
tested in accordance with the referenced standard.
1.
Dielectric breakdown voltage: ASTM D 877 and/or ASTM D 1816
2.
Acid neutralization number: ANSI/ASTM D 974
*3.
*9.
*10.
11.
Specific gravity: ANSI/ASTM D 1298
4.
Interfacial tension: ANSI/ASTM D 971 or ASTM D 2285
5.
Color: ANSI/ASTM D 1500
6.
Visual condition: ASTM D 1524
*7.
Power factor: ASTM D 924
Required when the regulator voltage is 46 kV or higher.
*8.
Water content: ASTM D 1533
Required when the regulator voltage is 25 kV or higher.
Remove a sample of insulating liquid, if applicable, in accordance with ASTM D 3613 and
perform dissolved-gas analysis (DGA) in accordance with ASTM D 3612 or ANSI.IEEE
C57.104.
Test for the presence of oxygen in the gas blanket of liquid-filled regulators.
Verify operation of control cabinet space heater.
* Optional
Page 122
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.1.2 Regulating Apparatus, Voltage, Induction Regulators (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Auxiliary devices should operate in accordance with system design. (7.12.1.2.1.6)
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.12.1.2.1.7.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.12.1.2.1.7.2)
4.
Results of the thermographic survey shall be in accordance with Section 9. (7.12.1.2.1.7.3)
5.
Motor, drive train, and automatic cutoff should operate in accordance with manufacturer’s
design intent and automatic motor cutoff should operate at maximum lower and maximum raise
positions. (7.12.1.2.1.8)
6.
Liquid level in tanks and bushings should be within indicated tolerances. (7.12.1.2.1.9)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.5. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated. The polarization
index shall be compared to previously obtained results.
3.
Maximum power-factor or dissipation-factor values of liquid-filled regulators should be in
accordance with manufacturer’s published data. In the absence of manufacturer’s data, compare
to test equipment manufacturer’s published data. Representative values are indicated in Table
100.3.
4.
Power-factor or dissipation-factor and capacitance values should be within ten percent of
nameplate rating for bushings. Hot collar tests are evaluated on a milliampere/milliwatt loss
basis, and the results should be compared to values of similar bushings.
5.
The regulation should be a linear ratio throughout the range between the maximum raise and
the maximum lower positions.
6.
Indicator should indicate neutral position correctly.
* Optional
Page 123
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.1.2 Regulating Apparatus, Voltage, Induction Regulators (continued)
7.
Consult the manufacturer if winding-resistance values vary by more than one percent from
measurements of adjacent windings.
8.
Results of insulating liquid tests should be in accordance with Table 100.4.
9.
Evaluate results of dissolved-gas analysis in accordance with ANSI/IEEE C57.104.
10.
Investigate presence of oxygen in nitrogen gas blanket.
11.
Heaters should be operational.
* Optional
Page 124
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.2 Regulating Apparatus, Current
– RESERVED –
* Optional
Page 125
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.3 Regulating Apparatus, Load Tap-Changers
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Record position indicator as-found, maximum, and minimum values.
4.
Prior to cleaning the unit, perform as-found tests.
5.
Clean the unit.
6.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.12.3.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
7.
Verify correct auxiliary device operation.
8.
Verify motor and drive train for correct operation and automatic motor cutoff at maximum
lower and maximum raise.
9.
Verify correct liquid level in all tanks.
10.
Perform specific inspections and mechanical tests as recommended by the manufacturer.
11.
Visually inspect wear/erosion indicators on vacuum bottles, if applicable.
*12.
Perform an internal inspection:
1.
Remove oil.
2.
Clean carbon residue and debris from compartment.
3.
Inspect contacts for wear and alignment.
* Optional
Page 126
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.3 Regulating Apparatus, Load Tap-Changers (continued)
2.
4.
Inspect all electrical and mechanical connections for tightness using calibrated torquewrench method in accordance with manufacturer’s published data or Table 100.12.
5.
Inspect tap-changer compartment terminal board, contact support boards, and insulated
operating components for evidence of moisture, cracks, excessive wear, breakage,
and/or signs of electrical tracking.
6.
Electrically operate tap-changer through full range of taps.
7.
Replace gaskets and seal compartment.
8.
Fill with filtered oil.
13.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
14.
Perform as-left tests.
15.
Record as-found and as-left operation counter readings.
Electrical Tests
1.
Perform resistance measurements through bolted connections with low-resistance ohmmeter, if
applicable, in accordance with Section 7.12.3.1.
2.
Perform insulation-resistance tests in any off-neutral position in accordance with Section 7.2.2.
3.
Perform insulation power-factor or dissipation-factor tests in off-neutral position in accordance
with Section 7.2.2.
*4.
Perform winding-resistance test.
5.
Perform special tests and adjustments as recommended by the manufacturer.
6.
Perform turns-ratio test at all tap positions.
7.
Remove a sample of insulating liquid in accordance with ASTM D 923. The sample shall be
tested for the following in accordance with the referenced standard.
1.
Dielectric breakdown voltage: ASTM D 877 and/or ASTM D 1816
2.
Color: ANSI/ASTM D 1500
3.
Visual condition: ASTM D 1524
* Optional
Page 127
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.3 Regulating Apparatus, Load Tap-Changers (continued)
8.
Remove a sample of insulating liquid in accordance with ASTM D 3613 and perform dissolved
gas analysis (DGA) in accordance with ANSI/IEEE C57.104 or ASTM D 3612.
9.
Perform vacuum bottle integrity tests (dielectric withstand voltage) across each vacuum bottle
with the contacts in the open position in strict accordance with manufacturer’s published data.
10.
Verify operation of heaters.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.12.3.1.6.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.12.3.1.6.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.12.3.1.6.3)
4.
Auxiliary device operation should be in accordance with design intent. (7.12.3.1.7)
5.
Motor, drive train, and automatic cutoff should operate in accordance with manufacturer’s
design intent and automatic motor cutoff should operate at maximum lower and maximum raise
positions.
6.
Liquid level in tanks should be within indicated tolerances. (7.12.3.1.9)
7.
Vacuum bottle wear/erosion indicators should be within manufacturer’s recommended
tolerances. (7.12.3.1.11)
8.
Contact wear and alignment should be within manufacturer’s recommended tolerances.
(7.12.3.1.12.3)
9.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.12.3.1.12.4)
10.
No evidence of moisture, cracks, excessive wear, breakage, or electrical tracking should be
found. (7.12.3.1.12.5)
11.
The tap-changer should operate through the full range of taps. (7.12.3.1.12.6)
12.
Operations counter should have had an incremental change in accordance with tap-changer
operation. (7.12.3.1.15)
* Optional
Page 128
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.12.3 Regulating Apparatus, Load Tap-Changers (continued)
3.2
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.5. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated.
3.
Maximum winding insulation power-factor or dissipation-factor values of liquid-filled
transformers should be in accordance with manufacturer’s specifications. Representative values
are indicated in Table 100.3. Also, compare with test equipment manufacturer’s published data.
4.
Consult the manufacturer if winding-resistance values vary by more than one percent from
measurements of adjacent windings.
5.
Special tests and adjustments should conform to manufacturer’s specifications.
6.
Turns-ratio test results should maintain a normal deviation between each voltage step and
should not deviate more than one-half percent from the calculated voltage ratio.
7.
Results of insulating liquid tests should be in accordance with Table 100.4.
8.
Evaluate results of dissolved-gas analysis in accordance with ANSI/IEEE C57.104.
9.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
10.
Heaters should be operational.
* Optional
Page 129
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.13 Grounding Systems
1.
Visual and Mechanical Inspection
1.
Verify ground system is in compliance with ANSI/NFPA 70, National Electrical Code,
Article 250.
2.
Inspect physical and mechanical condition.
3.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
4.
2.
1.
Use of low-resistance ohmmeter in accordance with Section 7.13.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
Inspect anchorage.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with section 7.13.1.
2.
Perform fall-of-potential or alternative test in accordance with IEEE Standard 81 on the main
grounding electrode or system.
3.
Perform point-to-point tests to determine the resistance between the main grounding system and
all major electrical equipment frames, system neutral, and/or derived neutral points.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Grounding system electrical and mechanical connections should be free of corrosion. (7.13.1.2)
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.13.1.3.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.13.1.3.2)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
* Optional
Page 130
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.13 Grounding Systems (continued)
2.
The resistance between the main grounding electrode and ground should be no greater than five
ohms for large commercial or industrial systems and 1.0 ohm or less for generating or
transmission station grounds unless otherwise specified by the owner. (Reference ANSI/IEEE
Standard 142)
3.
Investigate point-to-point resistance values which exceed 0.5 ohm.
* Optional
Page 131
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.14 Ground-Fault Protection Systems, Low-Voltage
1.
Visual and Mechanical Inspection
1.
2.
Inspect the components for damage and errors in polarity or conductor routing.
1.
Verify that the ground connection is made on the source side of the neutral disconnect
link and also on the source side of any ground fault sensor.
2.
Verify that the neutral sensors are connected with correct polarity on both primary and
secondary.
3.
Verify that all phase conductors and the neutral pass through the sensor in the same
direction for zero sequence systems.
4.
Verify that grounding conductors do not pass through zero sequence sensors.
5.
Verify that the grounded conductor is solidly grounded.
2.
Prior to cleaning the unit, perform as-found tests.
3.
Clean the unit.
4.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.14.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
5.
Verify correct operation of all functions of the self-test panel, if applicable.
6.
Verify pickup and time-delay settings in accordance with the settings provided in the owner’s
specifications. Record appropriate operation and test sequences as required by ANSI/NFPA 70
National Electrical Code, Article 230.95.
7.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.14.1.
2.
Measure the system neutral-to-ground insulation resistance with the neutral disconnect link
temporarily removed. Replace neutral disconnect link after testing.
* Optional
Page 132
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.14 Ground-Fault Protection Systems, Low-Voltage (continued)
*3.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components or control
devices that cannot tolerate the applied voltage, follow manufacturer’s recommendation.
4.
Perform ground fault protective device pickup tests using primary current injection.
5.
For summation type systems utilizing phase and neutral current transformers, verify correct
polarities by applying current to each phase-neutral current transformer pair. This test also
applies to molded-case breakers utilizing an external neutral current transformer.
6.
Measure time delay of the ground fault protective device at a value equal to or greater than 150
percent of the pickup value.
7.
Verify that reduced control voltage tripping capability is 55 percent for ac systems and 80
percent for dc systems.
8.
Verify blocking capability of zone interlock systems.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.14.1.4.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.14.1.4.2)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
System neutral-to-ground insulation resistance should be a minimum of one megohm.
3.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
4.
Results of pickup test should be greater than 90 percent of the ground fault protection device
pickup setting and less than 1200 amperes or 125 percent of the pickup setting, whichever is
smaller.
* Optional
Page 133
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.14 Ground-Fault Protection Systems, Low-Voltage (continued)
5.
The ground fault protective device should operate when current direction is the same relative to
polarity marks in the two current transformers. The ground fault protective device should not
operate when current direction is opposite relative to polarity marks in the two current
transformers.
6.
Relay timing should be in accordance with manufacturer’s specifications but must be no longer
than one second at 3000 amperes in accordance with ANSI/NFPA 70, National Electrical
Code, Article 230.95.
7.
The circuit interrupting device should operate when control voltage is 55 percent of nominal
voltage for ac circuits and 80 percent of nominal voltage for dc circuits.
8.
Results of zone-blocking tests should be in accordance with manufacturer’s published data
and/or design specifications.
* Optional
Page 134
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.1 Rotating Machinery, AC Induction Motors and Generators
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Inspect air baffles, filter media, cooling fans, slip rings, brushes, and brush rigging.
4.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of low-resistance ohmmeter in accordance with Section 7.15.1.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform thermographic survey in accordance with Section 9.
5.
Perform special tests such as air-gap spacing and machine alignment, if applicable.
6.
Verify the application of appropriate lubrication and lubrication systems.
7.
Verify the absence of unusual mechanical or electrical noise or signs of overheating.
8.
Verify that resistance temperature detector (RTD) circuits conform to drawings.
Electrical Tests – AC Induction
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.15.1.1.
2.
Perform insulation-resistance tests in accordance with ANSI/IEEE Standard 43.
1.
Machines larger than 200 horsepower (150 kilowatts):
Test duration shall be for ten minutes. Calculate polarization index.
2.
Machines 200 horsepower (150 kilowatts) and less:
Test duration shall be for one minute. Calculate the dielectric-absorption ratio.
3.
Perform dc dielectric withstand voltage tests on machines rated at 2300 volts and greater in
accordance with ANSI/IEEE Standard 95.
4.
Perform phase-to-phase stator resistance test on machines 2300 volts and greater.
*5.
Perform insulation power-factor or dissipation-factor tests.
* Optional
Page 135
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.1 Rotating Machinery, AC Induction Motors and Generators (continued)
*6.
Perform power-factor tip-up tests.
*7.
Perform surge comparison tests.
8.
Perform insulation-resistance test on insulated bearings in accordance with manufacturer’s
published data, if applicable.
9.
Test surge protection devices in accordance with Section 7.19 and Section 7.20.
10.
Test motor starter in accordance with Section 7.16.
11.
Perform resistance tests on resistance temperature detector (RTD) circuits.
12.
Verify operation of machine space heater, if applicable.
*13.
Perform vibration test.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Inspection (7.15.1.1.3)
1.
Air baffles should be clean.
2.
Filter media should be clean.
3.
Cooling fans should operate.
4.
Slip ring wear should be within manufacturer’s tolerances for continued use.
5.
Brushes should be within manufacturer’s tolerances for continued use.
6.
Brush rigging should be intact.
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.15.1.1.4.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.15.1.1.4.2)
4.
Results of the thermographic survey shall be in accordance with Section 9. (7.15.1.1.4.3)
* Optional
Page 136
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.1 Rotating Machinery, AC Induction Motors and Generators (continued)
3.2
Test Values – Electrical Tests
1.
Compare bolted connection resistance values to values of similar connections. Investigate any
values that deviate from similar bolted connections by more than 50 percent of the lowest
value.
2.
The dielectric absorption ratio or polarization shall be compared to previously obtained results
and should not be less than 1.0. The recommended minimum insulation resistance (IR 1 min) test
results in megohms should be corrected to 40° C and read as follows:
1.
IR 1 min = kV + 1 for most windings made before 1970, all field windings, and others not
described in 2.2 and 2.3.
(kV is the rated machine terminal-to-terminal voltage in rms kV)
2.
IR 1 min = 100 megohms for most dc armature and ac windings built after 1970 (formwound coils).
3.
IR 1 min = 5 megohms for most machines and random-wound stator coils and formwound coils rated below 1 kV.
NOTE: Dielectric withstand voltage and surge comparison tests shall not be performed
on machines having values lower than those indicated above.
3.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
4.
Investigate phase-to-phase stator resistance values that deviate by more than five percent.
5.
Power-factor or dissipation-factor values shall be compared with previous values of similar
machines.
6.
Tip-up values should indicate no significant increase in power factor.
7.
If no evidence of distress, insulation failure, or lack of waveform nesting is observed by the
end of the total time of voltage application during the surge comparison test, the test specimen
is considered to have passed the test.
8.
Bearing insulation-resistance measurements should be within manufacturer’s published
tolerances. In the absence of manufacturer’s published tolerances, the comparison shall be
made to similar machines.
9.
Test results of surge protection devices shall be in accordance with Section 7.19 and Section
7.20.
* Optional
Page 137
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.1 Rotating Machinery, AC Induction Motors and Generators (continued)
10.
Test results of motor starter equipment shall be in accordance with Section 7.16.
11.
RTD circuits should conform to design intent and/or machine protection device manufacturer’s
specifications.
12.
Heaters should be operational.
13.
Vibration amplitudes of the uncoupled and unloaded machine should not exceed values shown
in Table 100.10. If values exceed those in Table 100.10, perform complete vibration analysis.
* Optional
Page 138
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.2 Rotating Machinery, Synchronous Motors and Generators
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Inspect air baffles, filter media, cooling fans, slip rings, brushes, and brush rigging.
4.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of low-resistance ohmmeter in accordance with Section 7.15.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform thermographic survey in accordance with Section 9.
5.
Perform special tests such as air-gap spacing and machine alignment, if applicable.
6.
Verify the application of appropriate lubrication and lubrication systems.
7.
Verify the absence of unusual mechanical or electrical noise or signs of overheating.
8.
Verify that resistance temperature detector (RTD) circuits conform to drawings.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.15.2.1.
2.
Perform insulation-resistance tests in accordance with ANSI/IEEE Standard 43.
1.
Machines larger than 200 horsepower (150 kilowatts):
Test duration shall be for ten minutes. Calculate polarization index.
2.
Machines 200 horsepower (150 kilowatts) and less:
Test duration shall be for one minute. Calculate the dielectric-absorption ratio.
3.
Perform dc dielectric withstand voltage tests on machines rated at 2300 volts and greater in
accordance with ANSI/IEEE Standard 95.
4.
Perform phase-to-phase stator resistance test on machines 2300 volts and greater.
*5.
Perform insulation power-factor or dissipation-factor tests.
* Optional
Page 139
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.2 Rotating Machinery, Synchronous Motors and Generators (continued)
*6.
Perform power-factor tip-up tests.
*7.
Perform surge comparison tests.
8.
Perform insulation-resistance test on insulated bearings in accordance with manufacturer’s
published data, if applicable.
9.
Test surge protection devices in accordance with Section 7.19 and Section 7.20.
10.
Test motor starter in accordance with Section 7.16.
11.
Perform resistance tests on resistance temperature detector (RTD) circuits.
12.
Verify operation of machine space heater, if applicable.
*13.
14.
Perform vibration test.
Perform insulation-resistance tests on the main rotating field winding, the exciter-field winding,
and the exciter-armature winding in accordance with ANSI/IEEE Standard 43.
*15.
Perform an ac voltage-drop test on all rotating field poles.
*16.
Perform a high-potential test on the excitation system in accordance with ANSI/IEEE Standard
421.3.
17.
*18.
Measure resistance of machine-field winding, exciter-stator winding, exciter-rotor windings,
and field discharge resistors.
Perform front-to-back resistance tests on diodes and gating tests of silicon-controlled rectifiers
for field application semiconductors.
19.
Prior to re-energizing, apply voltage to the exciter supply and adjust exciter-field current to
nameplate value.
20.
Verify that the field application timer and the enable timer for the power-factor relay have been
tested and set to the motor drive manufacturer’s recommended values.
*21.
Record stator current, stator voltage, and field current for the complete acceleration period
including stabilization time for a normally loaded starting condition. From the recording
determine the following information:
1.
Bus voltage prior to start.
2.
Voltage drop at start.
3.
Bus voltage at machine full-load.
* Optional
Page 140
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.2 Rotating Machinery, Synchronous Motors and Generators (continued)
4.
Locked-rotor current.
5.
Current after synchronization but before loading.
6.
Current at maximum loading.
7.
Acceleration time to near synchronous speed.
8.
RPM just prior to synchronization.
9.
Field application time.
10.
Time to reach stable synchronous operation.
*22.
Plot a V-curve of stator current versus excitation current at approximately 50 percent load to
check correct exciter operation.
*23.
If the range of exciter adjustment and machine loading permit, reduce excitation to cause power
factor to fall below the trip value of the power-factor relay. Verify relay operation.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Inspection (7.15.2.1.3)
1.
Air baffles should be clean.
2.
Filter media should be clean.
3.
Cooling fans should operate.
4.
Slip ring wear should be within manufacturer’s tolerances for continued use.
5.
Brushes should be within manufacturer’s tolerances for continued use.
6.
Brush rigging should be intact.
2.
Compare bolted connection resistance values to values of similar connections. Investigate any
values that deviate from similar bolted connections by more than 50 percent of the lowest
value. (7.15.2.1.4.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.15.2.1.4.2)
4.
Results of thermographic survey shall be in accordance with Section 9. (7.15.2.1.4.3)
* Optional
Page 141
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.2 Rotating Machinery, Synchronous Motors and Generators (continued)
3.2
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate any
values that deviate from similar bolted connections by more than 50 percent of the lowest
value.
2.
The dielectric absorption ratio or polarization index shall be compared to previously obtained
results and should not be less than 1.0. The recommended minimum insulation resistance
(IR 1 min) test results in megohms should be corrected to 40° C and read as follows:
1.
IR 1 min = kV + 1 for most windings made before 1970, all field windings and others not
described in 2.2 and 2.3.
(kV is the rated machine terminal-to-terminal voltage in rms kV)
2.
IR 1 min = 100 megohms for most dc armature and ac windings built after 1970 (formwound coils).
3.
IR 1 min = 5 megohms for most machines and random-wound stator coils and formwound coils rated below 1 kV.
NOTE: Dielectric withstand voltage, high-potential, and surge comparison tests shall not
be performed on machines having values lower than those indicated above.
3.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
4.
Investigate phase-to-phase stator resistance values that deviate by more than five percent.
5.
Power-factor or dissipation-factor values shall be compared with previous values of similar
machines.
6.
Tip-up values should indicate no significant increase in power factor.
7.
If no evidence of distress, insulation failure, or lack of waveform nesting is observed by the end
of the total time of voltage application during the surge comparison test, the test specimen is
considered to have passed the test.
8.
Insulation resistance of bearings should be within manufacturer’s published tolerances. In the
absence of manufacturer’s published tolerances, the comparison shall be made to similar
machines.
9.
Test results of surge protection devices shall be in accordance with Section 7.19 and Section
7.20.
* Optional
Page 142
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.2 Rotating Machinery, Synchronous Motors and Generators (continued)
10.
Test results of motor starter equipment shall be in accordance with Section 7.16.
11.
RTD circuits should conform to design intent and/or machine protection device manufacturer’s
specifications.
12.
Heaters should be operational.
13.
Vibration amplitudes of the uncoupled and unloaded machine should not exceed values shown
in Table 100.10. If values exceed those in Table 100.10, perform complete vibration analysis.
14.
The recommended minimum insulation resistance (IR1 min) test results in megohms should be
corrected to 40° C and read as follows:
1.
IR 1 min = kV + 1 for most windings made before 1970, all field windings, and others not
described in 2.2 and 2.3.
(kV is the rated machine terminal-to-terminal voltage in rms kV)
2.
IR 1 min = 100 megohms for most dc armature and ac windings built after 1970 (formwound coils).
3.
IR 1 min = 5 megohms for most machines and random-wound stator coils and formwound coils rated below 1 kV.
NOTE: Dielectric withstand voltage, high-potential, and surge comparison tests shall
not be performed on machines having values lower than those indicated above.
15.
The pole-to-pole ac voltage drop shall not exceed 10 percent variance between poles.
16.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage, test, the winding is considered to have
passed the test.
17.
The measured resistance values of motor-field windings, exciter-stator windings, exciter-rotor
windings, and field-discharge resistors shall be compared to manufacturer’s recommended
values.
18.
Resistance test results of diodes and gating tests of silicon-controlled rectifiers should be in
accordance with industry standards and system design requirements.
19.
Exciter power supply should allow exciter-field current to be adjusted to nameplate value.
20.
Application timer and enable timer for power factor relay test results should comply with
manufacturer’s recommended values.
* Optional
Page 143
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.2 Rotating Machinery, Synchronous Motors and Generators (continued)
21.
Recorded values should be in accordance with system design requirements.
22.
Plotted V-curve should indicate correct exciter operation.
23.
When reduced excitation falls below trip value for the power-factor relay, the relay should
operate.
* Optional
Page 144
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.3 Rotating Machinery, DC Motors and Generators
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Inspect air baffles, field media, cooling fans, brushes, and brush rigging.
4.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of low-resistance ohmmeter in accordance with Section 7.15.3.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform thermographic survey in accordance with Section 9.
5.
Inspect commutator and tachometer generator.
6.
Perform special tests such as air-gap spacing and machine alignment, if applicable.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.15.3.1.
2.
Perform insulation-resistance tests on all windings in accordance with ANSI/IEEE Standard 43.
3.
*4.
5.
*6.
7.
1.
Machines larger than 200 horsepower (150 kilowatts):
Test duration shall be for ten minutes. Calculate polarization index.
2.
Machines 200 horsepower (150 kilowatts) and less:
Test duration shall be for one minute. Calculate the dielectric absorption ratio.
Perform high-potential test in accordance with NEMA MG 1, paragraph 3.01.
Perform an ac voltage-drop test on all field poles.
Measure armature running current and field current or voltage. Compare to nameplate.
Perform vibration tests.
Verify that all protective devices are in accordance with Section 7.16.
* Optional
Page 145
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.3 Rotating Machinery, DC Motors and Generators (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
3.2
Inspection (7.15.3.1.3)
1.
Air baffles should be clean
2.
Filter media should be clean.
3.
Cooling fans should operate.
4.
Brushes should be within manufacturer’s tolerances for continued use.
5.
Brush rigging should be intact.
2.
Compare bolted connection resistance values to values of similar connections. Investigate any
values that deviate from similar bolted connections by more than 50 percent of the lowest
value. (7.15.3.1.4.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.15.3.1.4.2)
4.
Results of thermographic survey shall be in accordance with Section 9. (7.15.3.1.4.3)
5.
Commutator and tachometer generator should be in accordance with manufacturer’s published
data and/or system design. (7.15.3.1.5)
6.
Air-gap spacing and machine alignment should be within manufacturer’s recommendations.
(7.15.3.1.6)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate any
values that deviate from similar bolted connections by more than 50 percent of the lowest
value.
2.
The dielectric absorption ratio or polarization index shall be compared to previously obtained
results and should not be less than 1.0. The recommended minimum insulation resistance
(IR1 min) test results in megohms should be corrected to 40° C and read as follows:
1.
IR 1 min = kV + 1 for most windings made before 1970, all field windings, and others not
described in 2.2 and 2.3.
(kV is the rated machine terminal-to-terminal voltage, in rms kV)
* Optional
Page 146
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.15.3 Rotating Machinery, DC Motors and Generators (continued)
2.
IR 1 min = 100 megohms for most dc armature and ac windings built after 1970 (formwound coils).
3.
IR 1 min = 5 megohms for most machines and random-wound stator coils and formwound coils rated below 1 kV.
NOTE: Dielectric withstand voltage, high-potential, and surge comparison tests shall not
be performed on machines having values lower than those indicated above.
3.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand test, the winding is considered to have passed the
test.
4.
The pole-to-pole voltage drop shall not exceed five percent variance between poles.
5.
Measured running current and field current or voltage should be comparable to nameplate data.
6.
Vibration amplitudes of the uncoupled and unloaded machine should not exceed values shown
in Table 100.10. If values exceed those in Table 100.10, perform complete vibration analysis.
7.
Test results of motor starter equipment shall be in accordance with Section 7.16.
* Optional
Page 147
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.16.1.1 Motor Control, Motor Starters, Low-Voltage
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
5.
Inspect contactors.
*6.
7.
1.
Verify mechanical operation.
2.
Inspect and adjust contact gap, wipe, alignment, and pressure in accordance with
manufacturer’s published data.
Motor-Running Protection
1.
Compare overload element rating with motor full-load current rating to verify correct
sizing.
2.
If motor-running protection is provided by fuses, verify correct fuse rating considering
motor characteristics and power-factor correction capacitors.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.16.1.1.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
8.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
9.
Perform as-left tests.
* Optional
Page 148
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.16.1.1 Motor Control, Motor Starters, Low-Voltage (continued)
2.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.16.1.1.1.
2.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with starter closed, and across each open pole. Test voltage shall be in accordance with
manufacturer’s published data or Table 100.1.
*3.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components, follow
manufacturer’s recommendation.
4.
Test motor protection devices in accordance with manufacturer’s published data. In the absence
of manufacturer’s data, use Section 7.19.
5.
Test circuit breakers in accordance with Section 7.6.1.1.
6.
Perform operational tests by initiating control devices.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.16.1.1.1.7.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.16.1.1.1.7.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.16.1.1.1.7.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.5. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated.
* Optional
Page 149
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.16.1.1 Motor Control, Motor Starters, Low-Voltage (continued)
3.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
4.
Motor protection parameters shall be in accordance with manufacturer’s published data or
Section 7.9.
5.
Circuit breaker test results shall be in accordance with Section 7.6.1.1.
6.
Control devices should perform in accordance with system design and/or requirements.
* Optional
Page 150
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.16.1.2 Motor Control, Motor Starters, Medium-Voltage
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition including evidence of moisture and corona.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests, if required.
4.
Clean the unit.
5.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.16.1.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
6.
Test electrical and mechanical interlock systems for correct operation and sequencing.
7.
Verify correct barrier and shutter installation and operation.
8.
Exercise active components and confirm correct operation of indicating devices.
9.
Inspect contactors.
1.
Verify mechanical operation.
2.
Inspect and adjust contact gap, wipe, alignment, and pressure in accordance with
manufacturer’s published data.
10.
Compare overload protection rating with motor nameplate to verify correct size. Set adjustable
or programmable devices according to the protective device coordination study.
11.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
12.
Perform as-left tests.
* Optional
Page 151
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.16.1.2 Motor Control, Motor Starters, Medium-Voltage (continued)
2.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.16.1.2.1.
2.
Perform insulation-resistance tests on contactor(s) for one minute, phase-to-ground and phaseto-phase with the contactor closed, and across each open contact. Test voltage shall be in
accordance with manufacturer’s published data or Table 100.1.
*3.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components, follow
manufacturer’s recommendation.
*4.
Perform a dielectric withstand voltage test in accordance with manufacturer’s published data. In
the absence of manufacturer’s published data, use Table 100.19.
5.
Perform vacuum bottle integrity test (dielectric withstand voltage), if applicable, across each
vacuum bottle with the contacts in the open position in strict accordance with manufacturer’s
published data. Do not exceed maximum voltage stipulated for this test.
6.
Perform contact resistance tests.
7.
Measure blowout coil circuit resistance, if applicable.
8.
Measure resistance of power fuses.
9.
Energize contactor using an auxiliary source. Adjust armature to minimize operating vibration
where applicable.
10.
Test control power transformers in accordance with Section 7.1.2.8.
11.
Test starting transformers, if applicable, in accordance with Section 7.2.1.
12.
Test starting reactors, if applicable, in accordance with Section 7.20.3.
13.
Test motor protection devices in accordance with manufacturer’s published data. In the absence
of manufacturer’s data, test in accordance with Section 7.9.
*14.
15.
Perform system function test in accordance with Section 8.
Verify operation of cubicle space heater.
* Optional
Page 152
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.16.1.2 Motor Control, Motor Starters, Medium-Voltage (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.16.1.2.1.5.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.16.1.2.1.5.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.16.1.2.1.5.3)
4.
Electrical and mechanical interlocks should operate in accordance with system design.
(7.16.1.2.1.6)
5.
Barrier and shutter installation and operation should be in accordance with manufacturer’s
design. (7.16.1.2.1.7)
6.
Indicating devices should operate in accordance with system design. (7.16.1.2.1.8)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.5. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated.
3.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
4.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
5.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the vacuum bottle integrity test, the vacuum bottle is considered to have
passed the test.
6.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
* Optional
Page 153
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.16.1.2 Motor Control, Motor Starters, Medium-Voltage (continued)
investigate values which deviate from those of similar connections by more than 50 percent of
the lowest value.
7.
Resistance values of blowout coils should be in accordance with manufacturer’s published data.
8.
Resistance values should not deviate by more than 15 percent between identical fuses.
9.
Contactor coil should operate with minimal vibration and noise.
10.
Control power transformer test results shall be in accordance with Section 7.1.2.8.
11.
Starting transformer test results shall be in accordance with Section 7.2.1.
12.
Starting reactor test results shall be in accordance with Section 7.20.3.
13.
Motor protection parameters shall be in accordance with manufacturer’s published data.
14.
System function test results should be in accordance with manufacturer’s published data and/or
system design.
15.
Heaters should be operational.
* Optional
Page 154
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.16.2.1 Motor Control, Motor Control Centers, Low-Voltage
1.
Refer to Section 7.1 for appropriate inspections and tests of the motor control center bus.
2.
Refer to Section 7.5.1.1 for appropriate inspections and tests of the motor control center
switches.
3.
Refer to Section 7.6 for appropriate inspections and tests of the motor control center circuit
breakers.
4.
Refer to Section 7.16.1.1 for appropriate inspections and tests of the motor control center
starters.
7.16.2.2 Motor Control, Motor Control Centers, Medium-Voltage
1.
Refer to Section 7.1 for appropriate inspections and tests of the motor control center bus.
2.
Refer to Section 7.5.1.2 for appropriate inspections and tests of the motor control center
switches.
3.
Refer to Section 7.6 for appropriate inspections and tests of the motor control center circuit
breakers.
4.
Refer to Section 7.16.1.2 for appropriate inspections and tests of the motor control center
starters.
* Optional
Page 155
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.17 Adjustable-Speed Drive Systems
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Ensure vent path openings are free from debris and that heat transfer surfaces are not
contaminated by oil, dust, or dirt.
6.
Verify correct connections of circuit boards, wiring, disconnects, and ribbon cables.
7.
Motor running protection
8.
9.
10.
1.
Compare drive overcurrent set points with motor full-load current rating to verify correct
settings.
2.
If drive is used to operate multiple motors, compare individual overload element ratings
with motor full-load current ratings.
3.
Apply minimum and maximum speed set points. Confirm set points are within
limitations of the load coupled to the motor.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.17.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Verify correct fuse sizing in accordance with manufacturer’s published data.
Perform as-left tests.
* Optional
Page 156
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.17 Adjustable-Speed Drive Systems (continued)
2.
Electrical Tests
1.
Perform resistance measurements through bolted connections with low-resistance ohmmeter, if
applicable, in accordance with Section 7.17.1.
2.
Test the motor overload relay elements by injecting primary current through the overload
circuit and monitoring trip time of the overload element.
3.
Test input circuit breaker by primary injection in accordance with Section 7.6.
*4.
Perform insulation resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components, follow
manufacturer’s recommendation.
5.
Test for the following parameters in accordance with relay calibration procedures outlined in
Section 7.9 or as recommended by the manufacturer:
1.
Input phase loss protection
2.
Input overvoltage protection
3.
Output phase rotation
4.
Overtemperature protection
5.
DC overvoltage protection
6.
Overfrequency protection
7.
Drive overload protection
8.
Fault alarm outputs
6.
Perform continuity tests on bonding conductors in accordance with Section 7.13.
7.
Perform operational tests by initiating control devices.
1.
Slowly vary drive speed between minimum and maximum. Observe motor and load for
unusual noise or vibration.
2.
Verify operation of drive from remote start/stop and speed control signals.
* Optional
Page 157
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.17 Adjustable-Speed Drive Systems (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.17.1.8.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.17.1.8.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.17.1.8.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Overload test trip times at 300 percent of overload element rating should be in accordance with
manufacturer’s published time-current curve.
3.
Input circuit breaker test results shall be in accordance with Section 7.6.
4.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
5.
Relay calibration test results shall be in accordance with Section 7.9.
6.
Continuity of bonding conductors shall be in accordance with Section 7.13.
7.
Control devices should perform in accordance with system requirements.
* Optional
Page 158
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.18.1.1 Direct-Current Systems, Batteries, Flooded Lead-Acid
1.
Visual and Mechanical Inspection
1.
Verify the battery area ventilation system is operable.
2.
Verify existence of suitable eyewash equipment.
3.
Inspect physical and mechanical condition.
4.
Inspect battery support racks, mounting, battery spill containment system, anchorage,
clearances, alignment, and grounding.
5.
Prior to cleaning or adding electrolyte, perform as-found tests, if applicable.
6.
Verify electrolyte level. Measure electrolyte specific gravity and temperature levels.
7.
Verify presence of flame arresters.
8.
Neutralize acid on exterior surfaces and rinse with water.
9.
Clean corroded/oxidized terminals and apply an oxide inhibitor.
10.
11.
2.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.18.1.1.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey under load in accordance with Section 9.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through all bolted connections with a low-resistance
ohmmeter, if applicable, in accordance with Section 7.18.1.1.1.
2.
Measure charger float and equalizing voltage levels. Adjust to battery manufacturer’s
recommended settings.
3.
Verify all charger functions and alarms.
4.
Measure each cell voltage and total battery voltage with charger energized and in float mode of
operation.
* Optional
Page 159
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.18.1.1 Direct-Current Systems, Batteries, Flooded Lead-Acid (continued)
5.
Measure intercell connection resistances.
6.
Perform internal ohmic measurement tests.
*7.
Perform a load test in accordance with manufacturer’s specifications or ANSI/IEEE 450,
Recommended Practice for Maintenance, Testing and Replacement of Large Lead Storage
Batteries for Generating Stations and Substations.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Electrolyte level and specific gravity should be within normal limits. (7.18.1.1.1.6)
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.18.1.1.1.10.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.18.1.1.1.10.2)
4.
Results of the thermographic survey shall be in accordance with Section 9. (7.18.1.1.1.10.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Charger float and equalize voltage levels should be in accordance with battery manufacturer’s
published data.
3.
The results of charger functions and alarms should be in accordance with manufacturer’s
published data.
4.
Cell voltages should be within 0.05 volt of each other or in accordance with manufacturer’s
published data.
5.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
6.
Cell internal ohmic values (resistance, impedance or conductance) values should not vary by
more than 25 percent between identical cells that are in a fully charged state.
* Optional
Page 160
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.18.1.1 Direct-Current Systems, Batteries, Flooded Lead-Acid (continued)
7.
Results of load tests should be in accordance with manufacturer’s published data or ANSI/IEEE
450.
* Optional
Page 161
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.18.1.2 Direct-Current Systems, Batteries, Vented Nickel-Cadmium
1.
Visual and Mechanical Inspection
1.
Verify that battery area ventilation system is operable.
2.
Verify existence of suitable eyewash equipment.
3.
Inspect physical and mechanical condition.
4.
Verify adequacy of battery support racks or cabinets, mounting, battery spill containment
system, anchorage, alignment, grounding, and clearances.
5.
Prior to cleaning or adding electrolyte, perform as-found tests.
6.
Verify electrolyte level and measure pilot-cell electrolyte temperature.
7.
Verify the units are clean.
8.
Verify application of an oxide inhibitor on battery terminal connections.
9.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.18.1.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform thermographic survey in accordance with Section 9.
10. Perform as-left tests.
2.
Electrical Tests
1.
Perform resistance measurements through all bolted connections with a low-resistance
ohmmeter, if applicable, in accordance with Section 7.18.1.2.1.
2.
Measure charger float and equalizing voltage levels. Adjust to battery manufacturer’s
recommended settings.
3.
Verify all charger functions and alarms.
4.
Measure each cell voltage and total battery voltage with charger energized and in float mode of
operation.
5.
Measure intercell connection resistances.
* Optional
Page 162
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.18.1.2 Direct-Current Systems, Batteries, Vented Nickel-Cadmium (continued)
6.
*7.
8.
Perform internal ohmic measurement tests.
Perform a load test in accordance with manufacturer’s published data or ANSI/IEEE 1106.
Measure the battery system voltage from positive-to-ground and negative-to-ground.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Electrolyte level shall be within normal limits. (7.18.1.2.1.7)
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.18.1.2.1.10.1)
3.
Bolt-torque levels shall be in accordance with manufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12. (7.18.1.2.1.10.2)
4.
Results of the thermographic survey shall be in accordance with Section 9. (7.18.1.2.1.10.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Charger float and equalize voltage levels should be in accordance with battery manufacturer’s
published data.
3.
The results of charger functions and alarms should be in accordance with manufacturer’s
published data.
4.
Cell voltages should be within 0.05 volt of each other or in accordance with manufacturer’s
published data.
5.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
6.
Cell internal ohmic values (resistance, impedance, or conductance) should not vary by more
than 25 percent between identical cells that are in a fully charged state, or should be in
accordance with manufacturer’s published data.
* Optional
Page 163
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.18.1.2 Direct-Current Systems, Batteries, Vented Nickel-Cadmium (continued)
7.
Results of load tests should be in accordance with manufacturer’s published data or ANSI/IEEE
1106.
8.
Voltage measured from positive-to-ground should be equal in magnitude to the voltage
measured from negative-to-ground.
* Optional
Page 164
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.18.1.3 Direct-Current Systems, Batteries, Valve-Regulated Lead-Acid
1.
Visual and Mechanical Inspection
1.
Verify the battery ventilation system is operable.
2.
Verify the existence of suitable eyewash equipment.
3.
Inspect physical and mechanical condition.
4.
Inspect battery support racks or cabinets, mounting, anchorage, clearances, alignment, and
grounding.
5.
Prior to cleaning, perform as-found tests.
6.
Neutralize acid on exterior surfaces and rinse with water.
7.
Clean corroded/oxidized terminals and apply an oxide inhibitor.
8.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
9.
2.
1.
Use of a low-resistance ohmmeter in accordance with Section 7.18.1.3.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey under load in accordance with Section 9.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through all bolted connections with a low-resistance
ohmmeter, if applicable, in accordance with Section 7.18.1.3.1.
2.
Measure negative post temperature.
3.
Measure charger float and equalizing voltage levels.
4.
Verify all charger functions and alarms.
5.
Measure each monoblock/cell voltage and total battery voltage with charger energized and in
float mode of operation.
6.
Measure intercell connection resistances.
7.
Perform internal ohmic measurement tests.
* Optional
Page 165
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.18.1.3 Direct-Current Systems, Batteries, Valve-Regulated Lead-Acid (continued)
8.
Perform an annual load test in accordance with manufacturer’s specifications or IEEE 1188,
Recommended Practice for Maintenance, Testing and Replacement of Valve-Regulated LeadAcid (VRLA) Batteries for Stationary Applications.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.18.1.3.9.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.18.1.3.9.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.18.1.3.9.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values that deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Negative post temperature should be within manufacturer’s published data or IEEE 1188.
3.
Charger float and equalize voltage levels should be in accordance with the battery
manufacturer’s published data.
4.
Results of charger functions and alarms should be in accordance with manufacturer’s published
data.
5.
Monoblock/cell voltages should be in accordance with manufacturer’s published data.
6.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
7.
Monoblock/cell internal ohmic values (resistance, impedance, or conductance) should not vary
by more than 25 percent between identical monoblocks/cells that are in a fully charged state.
8.
Results of load tests should be in accordance with manufacturer’s published data or IEEE
1188.
* Optional
Page 166
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.18.2 Direct-Current Systems, Chargers
1.
2.
Visual and Mechanical Inspection
1.
Inspect for physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Inspect all bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.18.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey under load in accordance with Section 9.
6.
Inspect filter and tank capacitors.
7.
Verify operation of cooling fans. Clean filters if provided.
8.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through all bolted connections with a low-resistance
ohmmeter, if applicable, in accordance with Section 7.18.2.1.
2.
Verify float voltage, equalize voltage, and high-voltage shutdown settings.
3.
Verify current limit.
4.
Verify correct load sharing (parallel chargers).
5.
Verify calibration of meters in accordance with Section 7.11.
6.
Verify operation of alarms.
7.
Measure and record input and output voltage and current.
8.
Measure and record ac ripple current and/or voltage imposed on battery.
*9.
Perform full load testing of charger.
* Optional
Page 167
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.18.2 Direct-Current Systems, Chargers (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.18.2.1.5.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.18.2.1.5.1)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.18.2.1.5.1)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values that deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Float and equalize voltage settings should be in accordance with the battery manufacturer’s
published data.
3.
Current limit should be within manufacturer’s recommended maximum.
4.
Results of load sharing between parallel chargers should be in accordance with system design
specifications.
5.
Results of meter calibration should be in accordance with Section 7.11.
6.
Results of alarm operation should be in accordance with manufacturer’s published data and
system design.
7.
Input and output voltage should be in accordance with manufacturer’s published data.
8.
AC ripple current and/or voltage imposed on the battery should be in accordance with
manufacturer’s published data.
9.
Charger should be capable of manufacturer’s specified full load.
* Optional
Page 168
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.18.3 Direct-Current Systems, Rectifiers
– RESERVED –
* Optional
Page 169
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.19.1 Surge Arresters, Low-Voltage Surge Protection Devices
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.19.1.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
6.
Verify that the ground lead on each device is individually attached to a ground bus or ground
electrode.
7.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.19.1.1.
2.
Perform insulation-resistance test on each arrester, from the phase terminal to ground. Apply
voltage in accordance with manufacturer’s published data. In the absence of manufacturer’s
published data, use Table 100.1.
3.
Test grounding connection in accordance with Section 7.13.
* Optional
Page 170
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.19.1 Surge Arresters, Low-Voltage Surge Protection Devices (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.19.1.1.5.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.19.1.1.5.2)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated.
3.
Resistance between the arrester ground terminal and the ground system should be less than 0.5
ohm and in accordance with Section 7.13.
* Optional
Page 171
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.19.2 Surge Arresters, Medium- and High-Voltage Surge Protection Devices
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.19.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
6.
Verify that the ground lead on each device is individually attached to a ground bus or ground
electrode.
7.
Verify that stroke counter, if present, is correctly mounted and electrically connected.
8.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.19.2.1.
2.
Perform insulation-resistance tests from phase terminals(s) to case for one minute. Test voltage
and minimum resistance shall be in accordance with manufacturer's published data. In the
absence of manufacturer's published data, refer to Table 100.1.
3.
Test the grounding connection in accordance with Section 7.13.
*4.
Perform a watts-loss test in accordance with test equipment manufacturer’s published data.
* Optional
Page 172
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.19.2 Surge Arresters, Medium- and High-Voltage Surge Protection Devices
(continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.19.2.1.5.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.19.2.1.5.2)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated
3.
Resistance between the arrester ground terminal and the ground system should be less than 0.5
ohm and in accordance with Section 7.13.
4.
Watts loss values are evaluated on a comparison basis with similar units and test equipment
manufacturer’s published data.
* Optional
Page 173
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.20.1 Capacitors and Reactors, Capacitors
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, grounding, and required clearances.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Verify that capacitors are electrically connected in their specified configuration.
6.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
7.
2.
1.
Use of a low-resistance ohmmeter in accordance with Section 7.20.1.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable. See Section 7.20.1.1.
2.
Perform insulation-resistance tests from phase terminal(s) to case for one minute. Test voltage
and minimum resistance shall be in accordance with manufacturer's published data. In the
absence of manufacturer's published data, refer to Table 100.1.
3.
Measure the capacitance of all terminal combinations.
4.
Measure resistance of internal discharge resistors.
* Optional
Page 174
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.20.1 Capacitors and Reactors, Capacitors (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.20.1.1.6.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.20.1.1.6.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.20.1.1.6.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated
3.
Investigate capacitance values differing from manufacturer’s published data.
4.
Investigate discharge resistor values differing from manufacturer’s published data. In
accordance with ANSI/NFPA 70 National Electrical Code, Article 460, residual voltage of a
capacitor shall be reduced to 50 volts in the following time intervals after being disconnected
from the source of supply:
Rated Voltage
600 volts
> 600 volts
Discharge Time
1 minute
5 minutes
* Optional
Page 175
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.20.2 Capacitors and Reactors, Capacitor Control Devices
– RESERVED –
* Optional
Page 176
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.20.3.1 Capacitors and Reactors, Reactors (Shunt and Current-Limiting), Dry Type
1.
2.
Visual and Mechanical Inspections
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.20.3.1.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
6.
Verify that tap connections are as specified, if applicable.
7.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with low-resistance ohmmeter, if
applicable, in accordance with Section 7.20.3.1.1.
2.
Perform winding-to-ground insulation-resistance tests. Apply voltage in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
3.
Measure winding resistance.
*4.
Perform dielectric withstand voltage tests on each winding-to-ground.
* Optional
Page 177
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.20.3.1 Capacitors and Reactors, Reactors (Shunt and Current-Limiting),
Dry Type (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.20.3.1.1.5.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.20.3.1.1.5.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.20.3.1.1.5.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated.
3.
If winding-resistance test results vary by more than one percent from factory tests, consult the
manufacturer.
4.
AC dielectric withstand test voltage shall not exceed 75 percent of factory test voltage for one
minute duration. DC dielectric withstand test voltage shall not exceed 100 percent of the factory
rms test voltage for one minute duration. If no evidence of distress or insulation failure is
observed by the end of the total time of voltage application during the dielectric withstand
voltage test, the test specimen is considered to have passed the test.
* Optional
Page 178
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.20.3.2 Capacitors and Reactors, Reactors (Shunt and Current-Limiting),
Liquid-Filled
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Verify settings and operation of all temperature devices, if applicable.
6.
Verify that cooling fans and pumps operate correctly and that fan and pump motors have
correct overcurrent protection, if applicable.
7.
Verify operation of all alarm, control, and trip circuits from temperature and level indicators,
pressure relief device, and fault pressure relay, if applicable.
8.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
9.
1.
Use of a low-resistance ohmmeter in accordance with Section 7.20.3.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Perform as-left tests.
10.
Verify correct liquid level in all tanks and bushings.
11.
Verify that positive pressure is maintained on nitrogen-blanketed reactors.
12.
Perform specific inspections and mechanical tests as recommended by the manufacturer.
13.
Verify that tap connections are as specified, if applicable.
* Optional
Page 179
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.20.3.2 Capacitors and Reactors, Reactors (Shunt and Current-Limiting),
Liquid-Filled (continued)
2.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.20.3.2.1.
2.
Perform winding-to-ground insulation-resistance tests. Apply voltage in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1. Calculate polarization index.
3.
Perform insulation power-factor or dissipation-factor tests on windings in accordance with the
test equipment manufacturer’s published data.
4.
Perform power-factor or dissipation-factor tests on each bushing equipped with a power-factor/
capacitance tap. In the absence of a power-factor/ capacitance tap, perform hot-collar tests.
These tests shall be in accordance with the test equipment manufacturer’s published data.
5.
Measure winding resistance.
6.
Measure the percentage of oxygen in the nitrogen gas blanket, if applicable.
7.
Remove a sample of insulating liquid in accordance with ASTM D-923. Sample shall be tested
for the following:
1.
Dielectric breakdown voltage: ASTM D-877
2.
Acid neutralization number: ASTM D-974
3.
Specific gravity: ASTM D-1298
4.
Interfacial tension: ASTM D-971 or ASTM D-2285
5.
Color: ASTM D-1500
6.
Visual Condition: ASTM D-1524
7.
Water in insulating liquids: ASTM D-1533 (Required on 25 kV or higher voltages and
on all silicone-filled units)
*8.
8.
Measure power factor or dissipation factor in accordance with ASTM D-924
Remove a sample of insulating liquid in accordance with ASTM D-3613 and perform
dissolved-gas-analysis (DGA) in accordance with ANSI/IEEE C57.104 or ASTM D-3612.
* Optional
Page 180
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.20.3.2 Capacitors and Reactors, Reactors (Shunt and Current-Limiting),
Liquid-Filled (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Operation of temperature devices should be in accordance with system requirements.
(7.20.3.2.1.5)
2.
Operation of pumps and fans should be in accordance with manufacturer’s recommendations
and system design. (7.20.3.2.1.6)
3.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.20.3.2.1.8.1)
4.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.20.3.2.1.8.2)
5.
Results of the thermographic survey shall be in accordance with Section 9. (7.20.3.2.1.8.3)
6.
Liquid levels should be in accordance with manufacturer’s indicated tolerances. (7.20.3.2.1.10)
7.
Positive pressure should be indicated on the pressure gauge for gas-blanketed reactors.
(7.20.3.2.1.11)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated. The polarization
index should be greater than 1.0 and should be compared to previous data.
3.
Maximum power-factor or dissipation-factor values of liquid-filled reactors should be in
accordance with manufacturer’s published data. In the absence of manufacturer’s data, compare
to test equipment manufacturer’s published data. Representative values are indicated in Table
100.3.
4.
Power-factor or dissipation-factor and capacitance values should be within ten percent of
nameplate rating for bushings. Hot collar tests are evaluated on a milliampere/milliwatt loss
basis, and the results should be compared to values of similar bushings.
* Optional
Page 181
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.20.3.2 Capacitors and Reactors, Reactors (Shunt and Current-Limiting),
Liquid-Filled (continued)
5.
Consult the manufacturer if winding-resistance values vary more than one percent from factory
tests.
6.
Investigate presence of oxygen in the nitrogen gas blanket.
7.
Insulating liquid values should be in accordance with Table 100.4.
8.
Evaluate results of dissolved-gas analysis in accordance with IEEE Standard C57.104. Compare
results to previous test data.
* Optional
Page 182
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.21 Outdoor Bus Structures
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.21.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
6.
Clean the insulators.
7.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.21.1.
*2.
Measure insulation resistance of each bus, phase-to-ground with other phases grounded. Apply
voltage in accordance with manufacturer’s published data. In the absence of manufacturer’s
published data, use Table 100.1.
3.
Perform dielectric withstand voltage test on each bus phase, phase-to-ground with other phases
grounded in accordance with manufacturer’s published data. In the absence of manufacturer’s
data use Table 100.19. Test duration shall be for one minute.
* Optional
Page 183
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.21 Outdoor Bus Structures (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.21.1.5.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.21.1.5.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.21.1.5.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data or
Table 100.1.
3.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
* Optional
Page 184
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.22.1 Emergency Systems, Engine Generator
NOTE: The prime mover is not addressed in these specifications.
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Perform as-left tests.
Electrical and Mechanical Tests
1.
Perform an insulation-resistance test on the generator winding-to-ground in accordance with
ANSI/IEEE Standard 43. Calculate the polarization index.
2.
Test protective relay devices in accordance with Section 7.9.
3.
Functionally test engine shutdown for low oil pressure, overtemperature, overspeed, and other
protection features as applicable.
*4.
Perform vibration test for each main bearing cap.
5.
Conduct performance test in accordance with ANSI/NFPA Standard 110.
6.
Verify correct functioning of governor and regulator.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Anchorage, alignment, and grounding should be in accordance with manufacturer’s published
data and system design.
* Optional
Page 185
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.22.1 Emergency Systems, Engine Generator (continued)
3.2
Test Values – Electrical
1.
Insulation resistance values should be in accordance with ANSI/IEEE Standard 43.
2.
The dielectric absorption ratio or polarization shall be compared to previously obtained results
and should not be less than 1.0. The recommended minimum insulation resistance (IR 1 min) test
results in megohms should be corrected to 40° C and read as follows:
1.
IR 1 min = kV + 1 for most windings made before 1970, all field windings, and others not
described in 2.2 and 2.3.
(kV is the rated machine terminal-to-terminal voltage, in rms kV)
2.
IR 1 min = 100 megohms for most dc armature and ac windings built after 1970 (formwound coils).
3.
IR 1 min = 5 megohms for most machines and random-wound stator coils and formwound coils rated below 1 kV.
NOTE: Dielectric withstand voltage high-potential, and surge comparison tests shall not
be performed on machines having values lower than those indicated above.
3.
Protective relay device test results shall be in accordance with Section 7.9.
4.
Low oil pressure, overtemperature, overspeed, and other protection features should operate in
accordance with manufacturer’s and system design requirements.
5.
Vibration levels should be in accordance with manufacturer’s published data and shall be
compared to baseline data.
6.
Performance tests should conform to manufacturer’s published data and ANSI/NFPA Standard
110.
7.
Governor and regulator should operate in accordance with manufacturer’s and system design
requirements.
* Optional
Page 186
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.22.2 Emergency Systems, Uninterruptible Power Systems
NOTE: There are many configurations of uninterruptible power supply installations. Some are as
simple as a static switch selecting between two highly reliable sources, while others are complex
systems using a combination of rectifiers, batteries, inverters, motor/generators, static switches and
bypass switches. It is the intent of these specifications to list possible tests and maintenance of the
major components of the system and more specifically the system as a whole. It is important that
the manufacturer’s recommended maintenance be performed.
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Check for anchorage, alignment, grounding, and required clearances.
3.
Verify that fuse sizes and types correspond to drawings.
4.
Prior to cleaning the unit, perform as-found tests, if required.
5.
Clean the unit.
6.
Test all electrical and mechanical interlock systems for correct operation and sequencing.
7.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.22.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
8.
Perform as-left tests.
9.
Check operation of forced ventilation.
10.
Verify that filters are in place and/or vents are clear.
* Optional
Page 187
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.22.2 Emergency Systems, Uninterruptible Power Systems (continued)
2.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.22.2.1.
2.
Test static transfer from inverter to bypass and back. Use normal load, if possible.
3.
Set free running frequency of oscillator.
4.
Test dc undervoltage trip level on inverter input breaker. Set according to manufacturer’s
published data.
5.
Test alarm circuits.
6.
Verify sync indicators for static switch and bypass switches.
7.
Perform electrical tests for UPS system breakers in accordance with Section 7.6.1.
8.
Perform electrical tests for UPS system automatic transfer switches in accordance with
Section 7.22.3.
9.
Perform electrical tests for UPS system batteries in accordance with Section 7.18.
10.
Perform electrical tests for UPS rotating machinery in accordance with Section 7.15.
3.
Test Values
3.1
Test Values – Visual and Mechanical
1.
Electrical and mechanical interlock systems should operate in accordance with system design
requirements. (7.22.2.1.6)
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.22.2.1.7.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.22.2.1.7.2)
4.
Results of the thermographic survey shall be in accordance with Section 9. (7.22.2.1.7.3)
* Optional
Page 188
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.22.2 Emergency Systems, Uninterruptible Power Systems (continued)
3.2
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Static transfer should function in accordance with manufacturer’s published data.
3.
Oscillator free running frequency should be within manufacturer’s recommended tolerances.
4.
DC undervoltage should trip inverter input breaker.
5.
Alarm circuits should operate in accordance with design requirements.
6.
Sync indicators should operate in accordance with design requirements.
7.
Breaker performance shall be in accordance with Section 7.6.1
8.
Automatic transfer switch performance shall be in accordance with Section 7.22.3.
9.
Battery test results shall be in accordance with Section 7.18.
10.
Rotating machinery performance shall be in accordance with Section 7.15.
* Optional
Page 189
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.22.3 Emergency Systems, Automatic Transfer Switches
1.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, grounding, and required clearances.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding
surfaces.
6.
Verify that manual transfer warnings are attached and visible.
7.
Verify tightness of all control connections.
8.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
9.
1.
Use of a low-resistance ohmmeter in accordance with Section 7.22.3.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
Perform manual transfer operation.
10.
Verify positive mechanical interlocking between normal and alternate sources.
11.
Perform as-left tests.
* Optional
Page 190
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.22.3 Emergency Systems, Automatic Transfer Switches (continued)
2.
Electrical Tests
1.
*2.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.22.3.1.
Perform insulation resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components or for control
devices that cannot tolerate the applied voltage, follow manufacturer’s recommendation.
3.
Perform a contact/pole-resistance test.
4.
Verify settings and operation of control devices.
5.
Calibrate and set all relays and timers in accordance with Section 7.9.
6.
Perform automatic transfer tests:
7.
1.
Simulate loss of normal power.
2.
Return to normal power.
3.
Simulate loss of emergency power.
4.
Simulate all forms of single-phase conditions.
Verify correct operation and timing of the following functions:
1.
Normal source voltage-sensing and frequency sensing relays.
2.
Engine start sequence.
3.
Time delay upon transfer.
4.
Alternate source voltage-sensing and frequency sensing relays.
5.
Automatic transfer operation.
6.
Interlocks and limit switch function.
7.
Time delay and retransfer upon normal power restoration.
8.
Engine cool down and shutdown feature.
* Optional
Page 191
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.22.3 Emergency Systems, Automatic Transfer Switches (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.22.3.1.8.1)
2.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.22.3.1.8.2)
3.
Results of the thermographic survey shall be in accordance with Section 9. (7.22.3.1.8.3)
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two meghoms.
3.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar switches by more than 50 percent
of the lowest value.
4.
Control devices should operate in accordance with manufacturer’s published data.
5.
Relay test results shall be in accordance with Section 7.9.
6.
Automatic transfers should operate in accordance with manufacturer’s design.
7.
Operation and timing should be in accordance with manufacturer’s and/or system design
requirements.
* Optional
Page 192
ANSI/NETA MTS-2011
7.
7.23
INSPECTION AND TEST PROCEDURES
Communications
– RESERVED –
* Optional
Page 193
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.24.1 Automatic Circuit Reclosers and Line Sectionalizers,
Automatic Circuit Reclosers, Oil/Vacuum
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Perform all mechanical operation and contact alignment tests on both the recloser and its
operating mechanism in accordance with manufacturer’s published data.
6.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.24.1.2.1.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
7.
Inspect for correct insulating liquid level, if applicable.
8.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.24.1.1.
2.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with recloser closed and across each pole with the recloser open. Apply voltage in
accordance with manufacturer’s published data. In the absence of manufacturer’s published
data, use Table 100.1.
3.
Perform a contact/pole-resistance test.
*4.
Perform insulation-resistance tests on all control wiring with respect to ground. The applied
potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated
cable. Test duration shall be one minute. For units with solid-state components, follow
manufacturer’s recommendation.
* Optional
Page 194
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.24.1 Automatic Circuit Reclosers and Line Sectionalizers,
Automatic Circuit Reclosers, Oil/Vacuum (continued)
5.
Remove a sample of insulating liquid, if applicable, in accordance with ASTM D 923. Sample
shall be tested in accordance with the referenced standard.
1.
Dielectric breakdown voltage: ASTM D 877 and/or ASTM D 1816
2.
Color: ANSI/ASTM D 1500
3.
Visual condition: ASTM D 1524
*6.
Perform minimum pickup voltage tests on trip and close coils in accordance with Table 100.20.
*7.
Perform power-factor or dissipation-factor tests on each pole with the recloser open and each
phase with the recloser closed.
*8.
Perform power-factor or dissipation-factor tests on each bushing equipped with a power-factor/
capacitance tap. In the absence of a power-factor/ capacitance tap, perform hot-collar tests.
These tests should be in accordance with the test equipment manufacturer’s published data.
9.
Perform vacuum bottle integrity test (dielectric withstand voltage), if applicable, across each
vacuum bottle with the recloser in the open position in strict accordance with manufacturer’s
published data.
10.
Perform dielectric withstand voltage test on each phase with the recloser closed and the poles
not under test grounded. Test voltage should be in accordance with manufacturer’s published
data. In the absence of manufacturer’s published data, use Table 100.19.
11.
Verify operation of heaters, if applicable.
12.
Test all protective functions in accordance with Section 7.9.
13.
Test all metering and instrumentation in accordance with Section 7.11.
14.
Test instrument transformers in accordance with Section 7.10.
* Optional
Page 195
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.24.1 Automatic Circuit Reclosers and Line Sectionalizers,
Automatic Circuit Reclosers, Oil/Vacuum (continued)
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Mechanical operation and contact alignment should be in accordance with manufacturer’s
published data. (7.24.1.1.5)
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.24.1.1.6.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.24.1.1.6.2)
4.
Results of the thermographic survey shall be in accordance with Section 9. (7.24.1.1.6.3)
5.
Insulating liquid level should be in accordance with manufacturer’s recommended tolerances.
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated.
3.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar reclosers by more than 50 percent
of the lowest value.
4.
Insulation-resistance values of control wiring should be comparable to previously obtained
results but not less than two megohms.
5.
Insulating liquid test results should be in accordance with Table 100.4.
6.
Minimum pickup for trip and close coils should conform with manufacturer’s published data. In
the absence of manufacturer’s published data refer to Table 100.20.
* Optional
Page 196
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.24.1 Automatic Circuit Reclosers and Line Sectionalizers,
Automatic Circuit Reclosers, Oil/Vacuum (continued)
7.
Power-factor or dissipation-factor values and tank loss index shall be compared to
manufacturer’s published data. In the absence of manufacturer’s published data, the comparison
shall be made to test data from similar circuit reclosers or sectionalizers or data from test
equipment manufacturers.
8.
Power-factor or dissipation-factor and capacitance values should be within ten percent of
nameplate rating for bushings. Hot collar tests are evaluated on a milliampere/milliwatt loss
basis, and the results should be compared to values of similar bushings.
9.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the vacuum bottle integrity test, the test specimen is considered to have
passed the test
10.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
11.
Heaters should be operational.
12.
Protective device function test results shall be in accordance with Section 7.9.
13.
Metering and instrumentation test results shall be in accordance with Section 7.11.
14.
Instrument transformer test results shall be in accordance with Section 7.10.
* Optional
Page 197
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.24.2 Automatic Circuit Reclosers and Line Sectionalizers,
Automatic Line Sectionalizers, Oil
1.
2.
Visual and Mechanical Inspection
1.
Inspect physical and mechanical condition.
2.
Inspect anchorage, alignment, and grounding.
3.
Prior to cleaning the unit, perform as-found tests.
4.
Clean the unit.
5.
Perform all mechanical operation and contact alignment tests on both the sectionalizer and its
operating mechanism in accordance with manufacturer’s published data.
6.
Inspect bolted electrical connections for high resistance using one or more of the following
methods:
1.
Use of a low-resistance ohmmeter in accordance with Section 7.24.2.2.
2.
Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method in accordance with manufacturer’s published data or Table 100.12.
3.
Perform a thermographic survey in accordance with Section 9.
7.
Inspect for correct insulating liquid level.
8.
Perform as-left tests.
Electrical Tests
1.
Perform resistance measurements through bolted connections with a low-resistance ohmmeter,
if applicable, in accordance with Section 7.24.2.1.
2.
Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-toground with sectionalizer closed and across each open pole. Apply voltage in accordance with
manufacturer’s published data. In the absence of manufacturer’s published data, use Table
100.1.
3.
Perform a contact/pole-resistance test.
4.
Remove a sample insulating liquid in accordance with ASTM D 923. Sample shall be tested in
accordance with the referenced standard.
1.
Dielectric breakdown voltage: ASTM D 877
2.
Color: ANSI/ASTM D 1500
* Optional
Page 198
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.24.2 Automatic Circuit Reclosers and Line Sectionalizers,
Automatic Line Sectionalizers, Oil (continued)
3.
Visual condition: ASTM D 1524
5.
Perform dielectric withstand voltage tests on each pole-to-ground and pole-to-pole.
6.
Test sectionalizer counting function by application of simulated fault current (greater than 160
percent of continuous current rating).
7.
Test sectionalizer lockout function for all counting positions.
8.
Test for reset timing on trip actuator.
*9.
* 10.
Perform power-factor or dissipation-factor tests on each pole with the recloser open and each
phase with the recloser closed.
Perform power-factor or dissipation-factor tests on each bushing equipped with a power-factor/
capacitance tap. In the absence of a power-factor/ capacitance tap, perform hot-collar tests.
These tests should be in accordance with the test equipment manufacturer’s published data.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Mechanical operation and contact alignment should be in accordance with manufacturer’s
published data. (7.24.2.1.5)
2.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value. (7.24.2.1.6.1)
3.
Bolt-torque levels should be in accordance with manufacturer’s published data. In the absence
of manufacturer’s published data, use Table 100.12. (7.24.2.1.6.2)
4.
Results of the thermographic survey shall be in accordance with Section 9. (7.24.2.1.6.3)
5.
Insulating liquid level should be in accordance with manufacturer’s recommended tolerances.
Test Values – Electrical
1.
Compare bolted connection resistance values to values of similar connections. Investigate
values which deviate from those of similar bolted connections by more than 50 percent of the
lowest value.
* Optional
Page 199
ANSI/NETA MTS-2011
7.
INSPECTION AND TEST PROCEDURES
7.24.2 Automatic Circuit Reclosers and Line Sectionalizers,
Automatic Line Sectionalizers, Oil (continued)
2.
Insulation-resistance values should be in accordance with manufacturer’s published data. In the
absence of manufacturer’s published data, use Table 100.1. Values of insulation resistance less
than this table or manufacturer’s recommendations should be investigated.
3.
Microhm or dc millivolt drop values should not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available,
investigate values that deviate from adjacent poles or similar switches by more than 50 percent
of the lowest value.
4.
Insulating liquid test results should be in accordance with Table 100.4.
5.
If no evidence of distress or insulation failure is observed by the end of the total time of voltage
application during the dielectric withstand voltage test, the test specimen is considered to have
passed the test.
6.
Operations counter should advance one digit per close-open cycle.
7.
Lockout function should operate in accordance with manufacturer’s published data.
8.
Reset timing of trip actuator should operate in accordance with manufacturer’s published data.
9.
Power-factor or dissipation-factor values and tank loss index shall be compared to
manufacturer’s published data. In the absence of manufacturer’s published data, the comparison
shall be made to test data from similar circuit reclosers or sectionalizers or data from test
equipment manufacturers.
10.
Power-factor or dissipation-factor and capacitance values should be within ten percent of
nameplate rating for bushings. Hot collar tests are evaluated on a milliampere/milliwatt loss
basis, and the results should be compared to values of similar bushings.
* Optional
Page 200
ANSI/NETA MTS-2011
7.
7.25
1.
2.
INSPECTION AND TEST PROCEDURES
Fiber-Optic Cables
Visual and Mechanical Inspection
1.
Inspect cable and connections for physical and mechanical damage.
2.
Verify that all connectors and splices are correctly installed.
Optical Tests
1.
Perform cable length measurement, fiber fracture inspection, and construction defect inspection
using an optical time domain reflectometer.
2.
Perform connector and splice integrity test using an optical time domain reflectometer.
3.
Perform cable attenuation loss measurement with an optical power loss test set.
4.
Perform connector and splice attenuation loss measurement from both ends of the optical cable
with an optical power loss test set.
3.
Test Values
3.1
Test Values – Visual and Mechanical
3.2
1.
Cable and connections should not have been subjected to physical or mechanical damage.
(7.25.1.1)
2.
Connectors and splices should be installed in accordance with industry standards. (7.25.1.2)
Test Values – Optical
1.
The optical time domain reflectometer signal should be analyzed for excessive connection,
splice, or cable backscatter by viewing the reflected power/distance graph.
2.
The optical time domain reflectometer signal should be analyzed for excessive connection,
splice, or cable backscatter by viewing the reflected power/distance graph.
3.
Attenuation loss measurement shall be expressed in dB/km. Losses should be within the
manufacturer’s recommendations when no local site specifications are available.
4.
Attenuation loss measurement shall be expressed in dB/km. Losses should be within the
manufacturer’s recommendations when no local site specifications are available.
* Optional
Page 201
ANSI/NETA MTS-2011
8.
SYSTEM FUNCTION TESTS
It is the purpose of system function tests to prove the correct interaction of all sensing,
processing, and action devices.
Perform system function tests upon completion of the maintenance tests defined, as system
conditions allow.
1.
Develop test parameters and perform tests for the purpose of evaluating performance of all
integral components and their functioning as a complete unit within design requirements and
manufacturer’s published data.
2.
Verify the correct operation of all interlock safety devices for fail-safe functions in addition to
design function.
3.
Verify the correct operation of all sensing devices, alarms, and indicating devices.
Page 202
ANSI/NETA MTS-2011
9.
THERMOGRAPHIC SURVEY
1.
Visual and Mechanical Inspection
2.
1.
Inspect physical and mechanical condition.
2.
Remove panel covers or view the equipment through viewing ports designed to transmit
applicable signals being measured.
Thermographic Survey Report
Provide a report which includes the following:
3.
4.
1.
Description of equipment to be tested.
2.
Discrepancies.
3.
Temperature difference between the area of concern and the reference area.
4.
Probable cause of temperature difference.
5.
Areas inspected. Identify inaccessible and/or unobservable areas and/or equipment.
6.
Identify load conditions at time of inspection.
7.
Provide photographs and/or thermograms of the deficient area.
8.
Provide recommended action for repair.
Test Parameters
1.
Inspect distribution systems with imaging equipment capable of detecting a minimum
temperature difference of 1° C at 30° C.
2.
Equipment shall detect emitted radiation and convert detected radiation to visual signal.
3.
Thermographic surveys should be performed during periods of maximum possible loading.
Refer to ANSI/NFPA 70B 2006 edition, Section 21.17
Test Results
Suggested actions based on temperature rise can be found in Table 100.18.
Page 203
ANSI/NETA MTS-2011
10. ELECTROMAGNETIC FIELD SURVEY
1.
Procedure
1.
1.
Take detailed measurements of the magnetic flux density, vector direction, and temporal
variations at the locations or over the area, as necessary.
1.
Perform spot measurements of the magnetic fields (40 to 800 hertz) at grid intervals one
meter above the floor throughout the office. Record x, y, z, and resultant magnetic flux
density values for each measurement point.
2.
Take additional detailed spot measurements directly at floor level, at two meters above
the floor, at grid point locations, and directly on the wall surface separating the
measured area from suspected magnetic field source.
3.
If measured magnetic flux densities at any perimeter wall appear to be above 3.0 mG,
take additional spot measurements of the adjoining space utilizing the same
measurement grid spacing at a height of one meter above floor.
4.
Take a baseline magnetic flux density reading at a specific point in the immediate area
of the suspected magnetic field source.
5.
Determine magnetic field temporal variations as required by positioning the Gaussmeter
at or near the location of highest magnetic flux density for 24 to 48 hours.
2.
Obtain and record electrical system information including current measurements.
3.
The magnetic field evaluation shall be performed in accordance with the recommended
practices and procedures in accordance with IEEE 644.
Survey Report
Provide a report which includes the following:
1.
Basis, description, purpose, and scope of the survey.
2.
Tabulations and or attached graphical representations of the magnetic flux density
measurements corresponding to the time and area or space where the measurements were taken.
3.
Descriptions of each of the operating conditions evaluated and identification of the condition
that resulted in the highest magnetic flux density.
4.
Descriptions of equipment performance issues that could be related to measured magnetic flux
density.
5.
Description of magnetic field test equipment.
6.
Conclusions and recommendations.
Page 204
ANSI/NETA MTS-2011
11.0
CORONA STUDIES
– RESERVED –
Page 205
ANSI/NETA MTS-2011
– This page intentionally left blank –
Page 206
ANSI/NETA MTS-2011
Tables
Standard for
Maintenance Testing Specifications
for
Electrical Power
Equipment and Systems
TABLE 100.1
Insulation Resistance Test Values
Electrical Apparatus and Systems
Nominal Rating
of Equipment (Volts)
Recommended
Minimum
Minimum Test Voltage Insulation Resistance
(DC)
(Megohms)
250
500
25
600
1,000
100
1,000
1,000
100
2,500
1,000
500
5,000
2,500
1,000
8,000
2,500
2,000
15,000
2,500
5,000
25,000
5,000
20,000
34,500 and above
15,000
100,000
In the absence of consensus standards dealing with insulation-resistance tests, the NETA Standards Review Council
suggests the above representative values.
See Table 100.14 for temperature correction factors.
Test results are dependent on the temperature of the insulating material and the humidity of the surrounding environment
at the time of the test.
Insulation-resistance test data may be used to establish a trending pattern. Deviations from the baseline information
permit evaluation of the insulation.
Page 208
ANSI/NETA MTS-2011
TABLE 100.2
Switchgear Withstand Test Voltages
Type of Switchgear
Low-Voltage Power
Circuit Breaker
Switchgear
Metal-Clad Switchgear
Station-Type Cubicle
Switchgear
Metal-Enclosed
Interrupter
Switchgear
Rated Maximum
Voltage
(kV) (rms)
Maximum Test Voltage (kV)
AC
DC
1.6
2.3
.254/.508/.635
4.76
14
20
8.25
27
37
15.0
27
37
27.0
45
a
38.0
60
a
15.5
37
a
38.0
60
a
72.5
120
a
4.76
14
20
8.25
19
27
15.0
27
37
27
45
a
38.0
60
a
Derived from ANSI/IEEE C37.20.1-1993 Standard for Metal-Enclosed Low-Voltage Power Circuit-Breaker Switchgear,
Paragraph 5; ANSI/IEEE C37.20.2-1999, Standard for Metal-Clad Switchgear, Paragraph 6.5; and ANSI/IEEE C37.20.32001 Standard for Metal-Enclosed Interrupter Switchgear, Paragraph 6.5. This table includes 0.75 multiplier with fraction
rounded down.
The column headed “DC” is given as a reference only for those using dc tests to verify the integrity of connected cable
installations without disconnecting the cables from the switchgear. It represents values believed to be appropriate and
approximately equivalent to the corresponding power frequency withstand test values specified for voltage rating of
switchgear. The presence of this column in no way implies any requirement for a dc withstand test on ac equipment or that a
dc withstand test represents an acceptable alternative to the low-frequency withstand tests specified in these specifications,
either for design tests, production tests, conformance tests, or field tests. When making dc tests, the voltage should be raised
to the test value in discrete steps and held for a period of one minute.
a.
Because of the variable voltage distribution encountered when making dc withstand tests, the manufacturer should be
contacted for recommendations before applying dc withstand tests to the switchgear. Voltage transformers above
34.5 kV should be disconnected when testing with dc. Refer to ANSI/IEEE C57.13-1993 (IEEE Standard Requirements
for Instrument Transformers) paragraph 8.8.2.
Page 209
ANSI/NETA MTS-2011
TABLE 100.3
Maintenance Test Values
Recommended Dissipation Factor/Power Factor at 20 C
Liquid-Filled Transformers, Regulators, and Reactors
Oil
Maximum
Silicone
Maximum
Tetrachloroethylene
Maximum
High Fire Point
Hydrocarbon
Maximum
Power
Transformers
1.0%
0.5%
3.0%
2.0%
Distribution
Transformers
2.0%
0.5%
3.0%
3.0%
In the absence of consensus standards dealing with transformer dissipation/power factor values, the NETA Standards
Review Council suggests the above representative values. Maximum values for oil are based on data from Doble
Engineering Company.
Page 210
ANSI/NETA MTS-2011
TABLE 100.4.1
Suggested Limits for Class I Insulating Oil
Mineral Oil a
Test
ASTM
Method
69 kV and
Below
Acceptable Values
Above 69 kV 230 kV and
Below 230 kV
Above
Dielectric breakdown,
kV minimum b
D 877
26
26
26
Dielectric breakdown, kV
minimum @ 1 mm (0.04
inch) gap
D 1816
23
28
30
Dielectric breakdown,
kV minimum @ 2 mm (0.08
inch) gap
D 1816
40
47
50
Interfacial tension
mN/m minimum
D 971 or
D 2285
25
30
32
Neutralization number,
mg KOH/g maximum
D 974
0.20
0.15
0.10
Water content,
ppm maximum @ 60º C c
D 1533
35
25
20
Power factor at 25° C, %
D 924
0.5
0.5
0.5
Power factor at 100° C, %
D 924
5.0
5.0
5.0
D 1500
3.5
3.5
3.5
Visual Condition
D 1524
Bright, clear and
free of particles
Specific Gravity (Relative
Density)
@ 15º C Maximum e
D 1298
0.91
Color
a.
b.
c.
d.
e.
d
Bright, clear and
free of particles
0.91
Bright, clear and
free of particles
0.91
ANSI/IEEE C57.106-2002 Guide for Acceptance and Maintenance of Insulating Oil in Equipment, Table 7.
IEEE STD 637-1985 Guide for Reclamation of Insulating Oil and Criteria for Its Use, Table 1.
ANSI/IEEE C57.106-2002 Guide for Acceptance and Maintenance of Insulating Oil in Equipment, Table 5.
In the absence of consensus standards, NETA’s Standard Review Council suggests these values.
ANSI/IEEE C57.106 Guide for Acceptance and Maintenance of Insulating Oil in Equipment, Table 1.
Page 211
ANSI/NETA MTS-2011
TABLE 100.4.2
Suggested Limits
for Less-Flammable Hydrocarbon Insulating Liquid
Test
ASTM Method
Acceptable Values
Dielectric breakdown voltage,
kV minimum
D 877
24
Dielectric breakdown voltage
for 1 mm (0.04 inch) gap, kV
minimum
D 1816
34
Dielectric breakdown voltage
for 2 mm (0.08 inch) gap, kV
minimum
D 1816
24
Water content, ppm maximum
D 1533 B
35
Dissipation/power factor, 60
hertz, % max. @ 25° C
D 924
1.0
Fire point, ° C, minimum
D 92
300
Interfacial tension, mN/m,
25° C
D 971
24
Neutralization number, mg
KOH/g
D 664
0.20
ANSI/IEEE C57.121-1998 Guide for Acceptance and Maintenance of Less-Flammable Hydrocarbon Fluid in
Transformers, Table 4.
The values in this table are considered typical for acceptable service-aged LFH fluids as a general class. If actual
test analysis approaches the values shown, consult the fluid manufacturer for specific recommendations.
If the purpose of the HMWH installation is to comply with the NFPA 70 National Electrical Code, this value is the
minimum for compliance with NEC Article 450.23.
Page 212
ANSI/NETA MTS-2011
TABLE 100.4.3
Suggested Limits
for Service-Aged Silicone Insulating Liquid
Test
ASTM Method
Acceptable Values
Dielectric breakdown, kV
minimum
D 877
25
Visual
D 2129
Colorless, clear, free of particles
Water content, ppm maximum
D 1533
100
Dissipation/power factor, 60 hertz,
maximum @ 25° C
D 924
0.2
Viscosity, cSt @ 25° C
D 445
47.5 – 52.5
Fire point, ° C, minimum
D 92
340
Neutralization number,
mg KOH/g max.
D 974
0.2
ANSI/IEEE C57.111-1989 (R1995) Guide for Acceptance of Silicone Insulating Fluid and Its Maintenance in
Transformers, Table 3.
TABLE 100.4.4
Suggested Limits for Service-Aged Tetrachloroethylene Insulating
Fluid
Test
ASTM Method
Acceptable Values
Dielectric breakdown, kV
minimum
D 877
26
Visual
D 2129
Clear with purple iridescence
Water content, ppm maximum
D 1533
35
Dissipation/power factor,
% maximum @ 25° C
D 924
12.0
Viscosity, cSt @ 25° C
D 445
0
Fire point, ° C, minimum
D 92
-
Neutralization number,
mg KOH/g maximum
D 974
0.25
Neutralization number,
mg KOH/g maximum
D 664
-
Interfacial tension,
mN/m minimum @ 25º C
D 971
-
Instruction Book PC-2000 for WecosolTM Fluid-Filled Primary and Secondary Unit Substation Transformers,
ABB Power T&D.
Page 213
ANSI/NETA MTS-2011
TABLE 100.5
Transformer Insulation Resistance
Maintenance Testing
Recommended Minimum
Insulation Resistance (Megohms)
Transformer Coil
Rating Type
(Volts)
Minimum DC Test
Voltage
Liquid Filled
Dry
0 – 600
1000
100
500
601 – 5000
2500
1000
5000
Greater than 5000
5000
5000
25000
In the absence of consensus standards, the NETA Standards Review Council suggests the above representative
values.
See Table 100.14 for temperature correction factors.
NOTE: Since insulation resistance depends on insulation rating (kV) and winding capacity (kVA), values obtained
should be compared to manufacturer’s published data.
Page 214
ANSI/NETA MTS-2011
TABLE 100.6.1
Medium-Voltage Cables
Maintenance Test Values
DC Test Voltages
Rated
Voltage
Phase-toPhase
(kV)
Conductor Size
AWG or kcmil (mm)
Nominal
Insulation Thickness
mils (mm)
100%
133%
Insulation Insulation
Level
Level
Maximum DC Field
Test Voltages (kV)
First 5 Years After
Installation
100%
133%
Insulation Insulation
Level
Level
5
8-1000 (8.4-507)
Above 1000 (507)
90 (2.29)
140 (3.56)
115 (2.92)
140 (3.56)
9
9
11
11
8
6-1000 (13.3-507)
Above 1000 (507)
115 (2.92)
175 (4.45)
140 (3.56)
175 (4.45)
11
11
14
14
15
2-1000 (33.6-507)
Above 1000 (507)
175 (4.45)
220 (5.59)
220 (5.59)
220 (5.59)
18
18
20
20
25
1-2000 (42.4-1013)
260 (6.60)
320 (8.13)
25
30
28
1-2000 (42.4-1013)
280 (7.11)
345 (8.76)
26
31
35
1/0-2000 (53.5-1013)
345 (8.76)
420 (10.7)
31
39
46
4/0-2000 (107.2-1013)
445 (11.3)
580 (14.7)
41
54
Reproduction of tables from ICEA S-94-649-2004 Standard for Concentric Neutral Cables Rated 5,000 – 46,000
Volts and ICEA S-97-682-2007 Utility Shielded Power Cables Rated 5,000 – 46,000 Volts.
Page 215
ANSI/NETA MTS-2011
TABLE 100.6.2
Field Test Voltages for Laminated Dielectric, Shielded Power
Cable Systems Rated 5,000 Volts and Above with High DC
Voltage
System voltage,
kV rms,
phase-to-phase
System BIL,
kV crest
Maintenance test,
kV dc,
phase-to-ground
5
8
15
25
28
35
46
69
115
115
138
161
230
345
345
500
500
500
75
95
110
150
170
200
250
350
450
550
650
750
1050
1175
1300
1425
1550
1675
23
29
46
61
68
75
95
130
170
205
245
280
395
440
488
535
580
629
NOTE 1 – Voltages higher than those listed, up to 80% of system BIL, may be considered, but the age and operating environment
of the system should be taken into account. The user is urged to consult the suppliers of the cable and any/all accessories before
applying the high voltage.
NOTE 2 – When older cables or other types/classes of cables or other equipment, such as transformers, switchgear, motors, etc.
are connected to the cable to be tested, voltages lower than those shown in this table may be necessary to comply with the
limitations imposed by such interconnected cables and equipment. See IEEE Std 95 TM [B5]7 and Table 1 of IEEE Std C37.20.2TM1999 [B7].
NOTE 3 – If the test voltage exceeds 50% of system BIL, surge protection against excessive overvoltages induced by flashovers
at the termination should be provided.
NOTE 4 – It is strongly recommended that the user consult with the manufacturer(s) of all components that will be subjected to
such testing before performing any tests on cables and cable accessories rated 115 kV and higher.
NOTE 5 – It should be noted that this table and the test procedures suggested in this guide do not necessarily agree with the
recommendations of other organizations, such as those of the Association of Edison Illuminating Companies [B1], [B2], [B3],
[B4]. Where there is concern, a user should consult the supplier of the cable and accessories to ascertain that the components will
withstand the test.
Reproduction of table from IEEE Std 400.1-2007 IEEE Guide for Field Testing of Laminated Dielectric, Shielded Power Cable
Systems Rated 5 kV and Above with High Direct Current Voltage.
Page 216
ANSI/NETA MTS-2011
TABLE 100.6.3
Very Low Frequency Testing Levels for Medium-Voltage Cable
0.1 Hz Test Voltage (rms)
Very Low Frequency Testing Levels
0.1 Hz Test Voltage (rms)
System Voltage
Maintenance
Phase-to-Phase
Phase-to-Ground
(kV) (rms)
(kV) (rms)
5
8
15
25
35
7
10
16
23
33
Adaptation of table from IEEE Std 400.2-2004 Guide for field testing of shielded power cable systems using very low frequency
(VLF).
Page 217
ANSI/NETA MTS-2011
TABLE 100.7
Molded-Case Circuit Breakers
Inverse Time Trip Test
(At 300% of Rated Continuous Current of Circuit Breaker)
Maximum Trip Time in Seconds
for Each Maximum Frame Rating a
Range of Rated Continuous
Current (Amperes)
< 250 V
251 – 600 V
0-30
50
70
31-50
80
100
51-100
140
160
101-150
200
250
151-225
230
275
226-400
300
350
401-600
-----
450
601-800
-----
500
801-1000
-----
600
1001 – 1200
-----
700
1201-1600
-----
775
1601-2000
-----
800
2001-2500
-----
850
2501-5000
-----
900
6000
-----
1000
Derived from Table 5-3, NEMA Standard AB 4-2000, Guidelines for Inspection and Preventative Maintenance of
Molded-Case Circuit Breaker Used in Commercial and Industrial Applications.
a.
Trip times may be substantially longer for integrally-fused circuit breakers if tested with the fuses replaced by solid
links (shorting bars).
Page 218
ANSI/NETA MTS-2011
TABLE 100.8
Instantaneous Trip Tolerances
for Field Testing of Circuit Breakers
Tolerances of Manufacturer’s
Published Trip Range
Breaker Type
Tolerance of Settings
High Side
Low Side
Electronic Trip
Units (1)
+30%
-----
-----
Adjustable (1)
+40%
-----
-----
+25%
-25%
-30%
Nonadjustable (2)
-----
NEMA AB4-2009 Guidelines for Inspection and Preventative Maintenance of Molded-Case Circuit Breaker Used in
Commercial and Industrial Applications, Table 4.
1.
Tolerances are based on variations from the nominal settings.
2.
Tolerances are based on variations from the manufacturer’s published trip band (i.e., -25% below the low side of the
band; +25% above the high side of the band.)
Page 219
ANSI/NETA MTS-2011
TABLE 100.9
Instrument Transformer Dielectric Tests
Field Maintenance
Nominal System
(kV)
BIL
(kV)
Periodic Dielectric Withstand Test
Field Test Voltage (kV)
AC
DC b
0.6
10
2.6
4
1.1
30
6.5
10
2.4
45
9.7
15
4.8
60
12.3
19
8.32
75
16.9
26
13.8
95
22.1
34
13.8
110
22.1
34
25
125
26.0
40
25
150
32.5
50
34.5
150
32.5
50
34.5
200
45.5
70
46
250
61.7
a
69
350
91.0
a
115
450
120.0
a
115
550
149.0
a
138
550
149.0
a
138
650
178.0
a
161
650
178.0
a
161
750
211.0
a
230
900
256.0
a
230
1050
299.0
a
Table is derived from Paragraph 8.8.2 and Tables 2 and 7 of ANSI/IEEE C57.13-1993, Standard Requirements for
Instrument Transformers.
a.
Periodic dc potential tests are not recommended for transformers rated higher than 34.5 kV.
b.
Under some conditions transformers may be subjected to periodic insulation test using direct voltage. In such cases
the test direct voltage should not exceed the original factory test rms alternating voltage. Periodic direct-voltage tests
should not be applied to (instrument) transformers of higher than 34.5 kV voltage rating.
Page 220
ANSI/NETA MTS-2011
TABLE 100.10
Maximum Allowable Vibration Amplitude
RPM
(at 60 Hz)
Velocity
(in/s peak)
Velocity
(mm/s)
RPM
(at 50 Hz)
Velocity
(in/s peak)
Velocity
(mm/s)
3600
0.15
3.8
3000
0.15
3.8
1800
0.15
3.8
1500
0.15
3.8
1200
0.15
3.8
1000
0.13
3.3
900
0.12
3.0
750
0.10
2.5
720
0.09
2.3
600
0.08
2.0
600
0.08
2.0
500
0.07
1.7
Derived from NEMA MG 1-7.08, Table 7-1.
Table is unfiltered vibration limits for resiliently mounted machines. For machines with rigid mounting multiply the limiting
values by 0.8.
Page 221
ANSI/NETA MTS-2011
TABLE 100.11
– WITHDRAWN –
Page 222
ANSI/NETA MTS-2011
TABLE 100.12.1
Bolt-Torque Values for Electrical Connections
US Standard Fasteners a
Heat-Treated Steel – Cadmium or Zinc Plated b
Grade
SAE 1&2
SAE 5
SAE 7
SAE 8
64K
105K
133K
150K
Head Marking
Minimum Tensile
(Strength)
(lbf/in2)
Bolt Diameter
(Inches)
a.
b.
Torque (Pound-Feet)
1/4
4
6
8
8
5/16
7
11
15
18
3/8
12
20
27
30
7/16
19
32
44
48
1/2
30
48
68
74
9/16
42
70
96
105
5/8
59
96
135
145
3/4
96
160
225
235
7/8
150
240
350
380
1.0
225
370
530
570
Consult manufacturer for equipment supplied with metric fasteners.
Table is based on national coarse thread pitch.
Table 100.12.2
US Standard Fasteners a
Silicon Bronze Fasteners b c
Torque (Pound-Feet)
Bolt Diameter (Inches)
5/16
3/8
1/2
5/8
3/4
a.
b.
c.
Nonlubricated
15
20
40
55
70
Lubricated
10
15
25
40
60
Consult manufacturer for equipment supplied with metric fasteners.
Table is based on national coarse thread pitch.
This table is based on bronze alloy bolts having a minimum tensile strength of 70,000 pounds per square inch.
Page 223
ANSI/NETA MTS-2011
TABLE 100.12.3
US Standard Fasteners a
Aluminum Alloy Fasteners b c
Torque (Pound-Feet)
a.
b.
c.
Bolt Diameter (Inches)
Lubricated
5/16
10
3/8
14
1/2
25
5/8
40
3/4
60
Consult manufacturer for equipment supplied with metric fasteners.
Table is based on national coarse thread pitch.
This table is based on aluminum alloy bolts having a minimum tensile strength of 55,000 pounds per
square inch.
TABLE 100.12.4
US Standard Fasteners a
Stainless Steel Fasteners b c
Torque (Pound-Feet)
a.
b.
c.
Bolt Diameter (Inches)
Uncoated
5/16
15
3/8
20
1/2
40
5/8
55
3/4
70
Consult manufacturer for equipment supplied with metric fasteners.
Table is based on national coarse thread pitch.
This table is to be used for the following hardware types:
Bolts, cap screws, nuts, flat washers, locknuts (18-8 alloy)
Belleville washers (302 alloy).
Tables in 100.12 are compiled from Penn-Union Catalogue and Square D Company, Anderson Products Division, General
Catalog: Class 3910 Distribution Technical Data, Class 3930 Reference Data Substation Connector Products.
Page 224
ANSI/NETA MTS-2011
TABLE 100.13
SF6 Gas Tests
Test
Method
Serviceability Limits a
Moisture
Hygrometer
SF6 decomposition byproducts
ASTM D 2685
500 ppm
Air
ASTM D 2685
5000 ppm c
Dielectric breakdown hemispherical
contacts
2.54 mm (0.10 inch) gap at atmospheric
pressure
a.
b.
c.
d.
Per manufacturer or
200 ppm b
11.5 – 13.5 kV d
In the absence of consensus standards dealing with SF6 circuit breaker gas tests, the NETA Standards Review Council
suggests the above representative values.
According to some manufacturers.
Dominelli, N. and Wylie, L., Analysis of SF6 Gas as a Diagnostic Technique for GIS, Electric Power Research Institute,
Substation Equipment Diagnostics Conference IV, February 1996.
Per Even, F.E., and Mani, G. Sulfur Fluorides, Kirk, Othmer Encyclopedia of Chemical Technology, 4th ed., 11,428,
1994.
Reference: IEC 61634 High-Voltage Switchgear and Controlgear – Use and Handling of Sulfur Hexafluoride (SF6) in
High-Voltage Switchgear and Controlgear.
Page 225
ANSI/NETA MTS-2011
TABLE 100.14.1
Insulation Resistance Conversion Factors (20° C)
Temperature
Multiplier
Apparatus Containing
Oil Immersed
Apparatus Containing
Insulation
Solid Insulation
°C
°F
-10
14
0.125
0.25
-5
23
0.180
0.32
0
32
0.25
0.40
5
41
0.36
0.50
10
50
0.50
0.63
15
59
0.75
0.81
20
68
1.00
1.00
25
77
1.40
1.25
30
86
1.98
1.58
35
95
2.80
2.00
40
104
3.95
2.50
45
113
5.60
3.15
50
122
7.85
3.98
55
131
11.20
5.00
60
140
15.85
6.30
65
149
22.40
7.90
70
158
31.75
10.00
75
167
44.70
12.60
80
176
63.50
15.80
85
185
89.789
20.00
90
194
127.00
25.20
95
203
180.00
31.60
100
212
254.00
40.00
105
221
359.15
50.40
110
230
509.00
63.20
Derived from Megger, Stitch in Time…The Complete Guide to Electrical Insulation Testing.
Formula:
Rc = Ra x K
Where: Rc
Ra
K
is resistance corrected to 20° C
is measured resistance at test
temperature
is applicable multiplier
Example: Resistance test on oil-immersion insulation at 104° F
Ra = 2 megohms @ 104° F
K = 3.95
Rc = Ra x K
Rc = 2.0 x 3.95
Rc = 7.90 megohms @ 20° C
Page 226
ANSI/NETA MTS-2011
TABLE 100.14.2
Insulation Resistance Conversion Factors (40° C)
Temperature
°C
°F
-10
-5
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
105
110
14
23
32
41
50
59
68
77
86
95
104
113
122
131
140
149
158
167
176
185
194
203
212
221
230
Multiplier
Apparatus Containing
Oil Immersed
Apparatus Containing
Insulation
Solid Insulation
0.03
0.04
0.06
0.09
0.13
0.18
0.25
0.35
0.50
0.71
1.00
1.41
2.00
2.83
4.00
5.66
8.00
11.31
16.00
22.63
32.00
45.25
64.00
90.51
128.00
0.10
0.13
0.16
0.20
0.25
0.31
0.40
0.50
0.63
0.79
1.00
1.26
1.59
2.00
2.52
3.17
4.00
5.04
6.35
8.00
10.08
12.70
16.00
20.16
25.40
Derived from Megger, Stitch in Time…The Complete Guide to Electrical Insulation Testing and ANSI/IEEE 43-2000 IEEE
Recommended Practice for Testing Insulation Resistance of Rotating Machinery .
Notes: The insulation resistance coefficient is based on the halving of the insulation resistance to the change in temperature.
Apparatus Containing Immersed Oil Insulation Table uses 10° C change with temperature halving.
Apparatus Containing Solid Insulation Table uses 15° C change with temperature halving.
Formula:
Rc = Ra x K
Where: Rc is resistance corrected to 40° C
Ra is measured resistance at test temperature
K is applicable multiplier
Example: Resistance test on oil-immersion insulation at
68° F/20° C
Ra = 2 megohms @ 68° F/20° C
K = 0.40
Rc = Ra x K
Rc = 2.0 x 0.40 = 0.8 megohms @ 40° C
Page 227
ANSI/NETA MTS-2011
TABLE 100.15
High-Potential Test Voltage
for Automatic Circuit Reclosers
Maintenance Testing
Nominal Voltage
Class (kV)
Maximum Voltage
(kV)
Rated Impulse
Withstand Voltage
(kV)
Maximum AC a Field
Test Voltage (kV)
14.4 (1ø and 3 ø)
15.0
95
26.2
14.4 (1 ø and 3 ø)
15.5
110
37.5
24.9 (1 ø and 3 ø)
27.0
150
45.0
34.5 (1 ø and 3 ø)
38.0
150
52.5
46.0 (3 ø)
48.3
250
78.7
69.0 (3 ø)
72.5
350
120.0
Derived from ANSI/IEEE C37.61-1973(R1992) Standard Guide for the Application, Operation, and Maintenance of
Automatic Circuit Reclosers and from ANSI/IEEE C37.60-1981(R1992) Standard Requirements for Overhead, PadMounted, Dry-Vault, and Submersible Automatic Circuit Reclosers and Fault Interrupters for AC Systems, Table 2,
Column 5.
a.
Derived from ANSI/IEEE C37.60-1981(R1992), Table 2, Column 5. In accordance with ANSI/IEEE C37.61,
Section 6.2.2 (Servicing), a .75 multiplier has been applied to the values.
Page 228
ANSI/NETA MTS-2011
TABLE 100.16
High-Potential Test Voltage
for Periodic Test of Line Sectionalizers
Nominal Voltage
Class (kV)
Maximum
Voltage (kV)
Rated Impulse
Withstand
Voltage (kV)
Maximum AC
Field Test
Voltage (kV)
15 Minute DC
Withstand (kV)
14.4 (1 ø)
15.0
95
26.2
39
14.4 (1 ø)
15.0
125
31.5
39
14.4 (3 ø)
15.5
110
37.5
39
24.9 (1 ø)
27.0
125
45.0
58
34.5 (3 ø)
38.0
150
52.5
77
Derived from ANSI/IEEE C37.63-1984(R1990) Standard Requirements for Overhead, Pad-Mounted, Dry-Vault, and
Submersible Automatic Line Sectionalizers of AC Systems, Table 2.
The table includes a 0.75 multiplier with fractions rounded down.
In the absence of consensus standards, the NETA Standards Review Council suggests the above representative values.
NOTE: Values of ac voltage given are dry test, one-minute, factory test values.
Page 229
ANSI/NETA MTS-2011
TABLE 100.17
Metal-Enclosed Bus Dielectric Withstand Test Voltages
Type of Bus
Isolated Phase for Generator Leads
Isolated Phase for Other than Generator
Leads
Rated kV
24.5
37.0
52.0
29.5
45.0
--
34.5
60.0
--
15.5
37.0
52.0
25.8
45.0
--
38.0
60.0
--
0.635
1.6
2.3
14.2
20.0
15.0
27.0
37.0
25.8
45.0
63.0
38.0
60.0
--
15.5
37.0
52.0
25.8
45.0
63.0
38.0
60.0
--
4.76
Nonsegregated Phase
Segregated Phase
DC Bus Duct
a
Maximum Test Voltage (kV)
AC
DC
0.3
1.6
2.3
0.8
2.7
3.9
1.2
3.4
4.8
1.6
4.0
5.7
3.2
6.6
9.3
Derived from ANSI-IEEE C37.23-1987 Standard for Metal-Enclosed Bus and Calculating Losses in Isolated-Phase Bus,
Tables 3A, 3B, 3C, 3D and paragraph 6.4.2. The table includes a 0.75 multiplier with fractions rounded down.
Note:
a.
The presence of the column headed “DC” does not imply any requirement for a dc withstand test on ac equipment.
This column is given as a reference only for those using dc tests and represents values believed to be appropriate and
approximately equivalent to the corresponding power frequency withstand test values specified for each class of bus.
Direct current withstand tests are recommended for flexible bus to avoid the loss of insulation life that may result
from the dielectric heating that occurs with rated frequency withstand testing.
Because of the variable voltage distribution encountered when making dc withstand tests and variances in leakage
currents associated with various insulation systems, the manufacturer should be consulted for recommendations
before applying dc withstand tests to this equipment.
Page 230
ANSI/NETA MTS-2011
TABLE 100.18
Thermographic Survey
Suggested Actions Based on Temperature Rise
Temperature difference ( T)
based on comparisons
between similar components
under similar loading
Temperature difference ( T)
based upon comparisons
between component and
ambient air temperatures
1º C – 3º C
1º C – 10º C
Possible deficiency; warrants
investigation
4º C – 15º C
11º C – 20º C
Indicates probable deficiency; repair as
time permits
------
21º C – 40º C
Monitor until corrective measures can be
accomplished
>15º C
>40º C
Recommended Action
Major discrepancy; repair immediately
Temperature specifications vary depending on the exact type of equipment. Even in the same class of equipment (i.e.,
cables) there are various temperature ratings. Heating is generally related to the square of the current; therefore, the load
current will have a major impact on T. In the absence of consensus standards for T, the values in this table will provide
reasonable guidelines.
An alternative method of evaluation is the standards-based temperature rating system as discussed in Section 8.9.2,
Conducting an IR Thermographic Inspection, Electrical Power Systems Maintenance and Testing by Paul Gill, PE, 1998.
It is a necessary and valid requirement that the person performing the electrical inspection be thoroughly trained and
experienced concerning the apparatus and systems being evaluated as well as knowledgeable of thermographic
methodology.
Page 231
ANSI/NETA MTS-2011
TABLE 100.19
Dielectric Withstand Test Voltages for Electrical Apparatus
Other than Inductive Equipment
Nominal
System (Line)
Voltage a (kV)
Insulation
Class (kV)
AC Factory
Test (kV)
Maximum
Field Applied
AC Test (kV)
Maximum
Field Applied
DC Test (kV)
1.2
1.2
10
6.0
8.5
2.4
2.5
15
9.0
12.7
4.8
5.0
19
11.4
16.1
8.3
8.7
26
15.6
22.1
14.4
15.0
34
20.4
28.8
18.0
18.0
40
24.0
33.9
25.0
25.0
50
30.0
42.4
34.5
35.0
70
42.0
59.4
46.0
46.0
95
57.0
80.6
69.0
69.0
140
84.0
118.8
In the absence of consensus standards, the NETA Standards Review Council suggests the above representative values.
a.
Intermediate voltage ratings are placed in the next higher insulation class.
Page 232
ANSI/NETA MTS-2011
TABLE 100.20.1
Rated Control Voltages and Their Ranges for Circuit Breakers
Operating mechanisms are designed for rated control voltages listed with operational capability throughout the indicated
voltage ranges to accommodate variations in source regulation, coupled with low charge levels, as well as high charge
levels maintained with floating charges. The maximum voltage is measured at the point of user connection to the circuit
breaker [see notes (12) and (13)] with no operating current flowing, and the minimum voltage is measured with maximum
operating current flowing.
Direct Current Voltage
Ranges
(1)(2)(3)(5) (8)(9)
(11)
Rated
Control
Voltage
Closing and Auxiliary
Functions
Indoor
Outdoor
Circuit
Circuit
Breakers
Breakers
Alternating Current
Voltage Ranges
(1)(2)(3)(4)(8)
Rated Control Closing, Tripping,
Voltage
and Auxiliary
(60 Hz)
Functions
Opening
Functions
All Types
Single Phase
Single Phase
24 (6)
--
--
14–28
120
104–127 (7)
48 (6)
38–56
36–56
28–56
240
208–254 (7)
125
100–140
90–140
70–140
250
200–280
180–280
140–280
---
---
---
---
Polyphase
208Y/120
240
Polyphase
180Y/104–220Y/127
208–254
Derived from Table 8, ANSI C37.06-2000, AC High-Voltage Circuit Breakers Rated on a Symmetrical Current
Basis – Preferred Ratings and Related Required Capabilities.
Page 233
ANSI/NETA MTS-2011
TABLE 100.20.1
Rated Control Voltages and Their Ranges for Circuit Breakers
Notes
(1) Electrically operated motors, contactors, solenoids, valves, and the like, need not carry a nameplate voltage rating that
corresponds to the control voltage rating shown in the table as long as these components perform the intended duty cycle
(usually intermittent) in the voltage range specified.
(2) Relays, motors, or other auxiliary equipment that function as a part of the control for a device shall be subject to the
voltage limits imposed by this standard, whether mounted at the device or at a remote location.
(3) Circuit breaker devices, in some applications, may be exposed to control voltages exceeding those specified here due to
abnormal conditions such as abrupt changes in line loading. Such applications require specific study, and the
manufacturer should be consulted. Also, application of switchgear devices containing solid-state control, exposed
continuously to control voltages approaching the upper limits of ranges specified herein, require specific attention and the
manufacturer should be consulted before application is made.
(4) Includes supply for pump or compressor motors. Note that rated voltages for motors and their operating ranges are
covered by ANSI/NEMA MG-1-1978.
(5) It is recommended that the coils of closing, auxiliary, and tripping devices that are connected continually to one dc
potential should be connected to the negative control bus so as to minimize electrolytic deterioration.
(6) 24-volt or 48-volt tripping, closing, and auxiliary functions are recommended only when the device is located near the
battery or where special effort is made to ensure the adequacy of conductors between battery and control terminals. 24volt closing is not recommended.
(7) Includes heater circuits
(8) Voltage ranges apply to all closing and auxiliary devices when cold. Breakers utilizing standard auxiliary relays for
control functions may not comply at lower extremes of voltage ranges when relay coils are hot, as after repeated or
continuous operation.
(8) Voltage ranges apply to all closing and auxiliary devices when cold. Breakers utilizing standard auxiliary relays for
control functions may not comply at lower extremes of voltage ranges when relay coils are hot, as after repeated or
continuous operation.
(9) Direct current control voltage sources, such as those derived from rectified alternating current, may contain sufficient
inherent ripple to modify the operation of control devices to the extent that they may not function over the entire specified
voltage ranges.
(10) This table also applies to circuit breakers in gas-insulated substation installations.
(11) In cases where other operational ratings are a function of the specific control voltage applied, tests in C37.09 may
refer to the “Rated Control Voltage.” In these cases, tests shall be performed at the levels in this column.
(12) For an outdoor circuit breaker, the point of user connection to the circuit breaker is the secondary terminal block point
at which the wires from the circuit breaker operating mechanism components are connected to the user’s control
circuit wiring.
(13) For an indoor circuit breaker, the point of user connection to the circuit breaker is either the secondary disconnecting
contact (where the control power is connected from the stationary housing to the removable circuit breaker) or the
terminal block point in the housing nearest to the secondary disconnecting contact.
Page 234
ANSI/NETA MTS-2011
TABLE 100.20.2
Rated Control Voltages and Their Ranges for Circuit Breakers
Solenoid-Operated Devices
Rated Voltage
Closing Voltage Ranges
for Power Supply
125 dc
90 – 115 or 105 – 130
250 dc
180 – 230 or 210 – 260
230 ac
190 – 230 or 210 – 260
Some solenoid operating mechanisms are not capable of satisfactory performance over the range of voltage specified in the
standard; moreover, two ranges of voltage may be required for such mechanisms to achieve an acceptable standard of
performance.
The preferred method of obtaining the double range of closing voltage is by use of tapped coils. Otherwise it will be
necessary to designate one of the two closing voltage ranges listed above as representing the condition existing at the
device location due to battery or lead voltage drop or control power transformer regulation. Also, caution should be
exercised to ensure that the maximum voltage of the range used is not exceeded.
Page 235
ANSI/NETA MTS-2011
TABLE 100.21
Accuracy of IEC Class TP Current Transformers
Error Limit
At Rated Current
Class
Ratio Error (%)
TPX
TPY
TPZ
At Accuracy Limit Condition
Phase Displacement
Minimum
± 0.5
± 1.0
± 1.0
Peak Instantaneous Error
(%)
± 30
± 60
180 ± 18
10
10
10 (see note)
NOTE – Alternating current component error.
There are four different TP classifications to meet different functional requirements as follows:
1.
2.
3.
4.
Class TPS low leakage flux design ct.
Class TPX closed core ct for specified transient duty cycle.
Class TPY gapped (low remanance) ct for specified transient duty cycle
Class TPZ linear ct (no remanence).
The error limit for TPS ct in terms of turn ratio error is ± .25% and the excitation voltage under limiting conditions should
not be less than the specified value; furthermore, this value is such that an increase of 10 percent in magnitude does not
result in an increase in the corresponding peak instantaneous exciting current exceeding 100 percent. In other words, the ct
should not be in saturated state at the specified maximum operating voltage.
The accuracy limit conditions are specified on the rating plate. The required rating plate information is shown in the table
below. (The obvious information such as rated primary and secondary currents is not shown.)
CT Class
TPS
TPX
TPY
Symmetrical short-circuit current factor
x
x
x
x
Rated resistive burden (Rb)
x
x
x
x
Secondary winding resistance ( C)
x
x
x
x
Rated Transient dimensioning factor
-
x
x
x
Steady-state error limit factor
x
-
-
-
Excitation limiting secondary voltage
x
-
-
-
Accuracy limiting secondary exciting current
x
-
-
-
Factor of construction*
-
x
x
x
Rated secondary loop time constant
-
-
x
-
Specified primary time constant (Tp)
-
x
x
x
Duty cycle
-
x
x
-
o
TPZ
x = applicable, – = not applicable
*The factor construction is determined from the following ratio:
Equivalent secondary accuracy limiting voltage (Vcal)
Equivalent secondary accuracy limiting e.m.f (Ecal)
where
Vcal is the rms value of sinusoidal voltage of rated frequency, with, if applied to the secondary winding of a ct, would result in an exciting
current corresponding to the maximum permissible error current appropriate to ct class
Ecal is the equivalent rms emf of rated frequency determined during test observed error current corresponds to the appropriate limit for the class
Derived from C37.110
Page 236
ANSI/NETA MTS-2011
TABLE 100.22
Minimum Radii for Power Cable
Single and Multiple Conductor Cables with Interlocked Armor,
Smooth or Corrugated Aluminum Sheath or Lead Sheath
Cable Type
Smooth Aluminum Sheath Single
Conductor Nonshielded, Multiple
Conductor or Multiplexed, with
Individually Shielded Conductors
Single Conductor Shielded
Multiple Conductor or Multiplexed,
with Overall Shield
Interlocked Armor or Corrugated
Aluminum Sheath Nonshielded
Multiple Conductor with Individually
Shielded Conductor
Multiple Conductor with Overall
Shield
Lead Sheath
Overall Diameter of Cable
mm
inches
mm
inches
190
0.76 to
191 to
1.51 and
and less
1.50
381
larger
Minimum Bending Radius as a Multiple of Cable Diameter
inches
0.75
and less
mm
382 and
larger
10
12
15
12
12
15
12
12
15
7
7
7
12/7 a
12/7 a
12/7 a
12
12
12
12
12
12
ANSI/ICEA S-93-639 2006, 5-46 kV Shielded Power Cable for Use in the Transmission and Distribution of Electric
Energy, Appendix I – Recommended Bending Radii for Cables and Table I1 – Minimum Radii for Power Cable.
1.
12 x individual shielded conductor diameter, or 7 x overall cable diameter, whichever is greater.
Page 237
ANSI/NETA MTS-2011
TABLE 100.22
Minimum Radii for Power Cable
Single and Multiple Conductor Cables with Interlocked Armor,
Smooth or Corrugated Aluminum Sheath or Lead Sheath
Notes
Specific references from Appendix I:
1.
Interlocked-Armor and Metallic-Sheathed Cables
1.1 The minimum bending radius for interlocked-armored cables, smooth or corrugated aluminum sheath or lead sheath,
shall be in accordance with Table 100.22.
2.
Flat-Tape Armored or Wire-Armored Cables
2.1 The minimum bending radius for all flat-tape armored and all wire-armored cables is twelve times the overall diameter
of cable.
3.
Tape-Shielded Cables
3.1 The minimum bending radius for tape-shielded cables given above applies to helically applied flat or corrugated tape
or longitudinally applied corrugated tape-shielded cables.
3.2 The minimum bending radius for a single-conductor cable is twelve times the overall diameter.
3.3 For multiple-conductor or multiplexed single-conductor cables having individually taped shielded conductors, the
minimum bending radius is twelve times the diameter of the individual conductors or seven times the overall diameter,
whichever is greater.
3.4 For multiple-conductor cables having an overall tape shield over the assembly, the minimum bending radius is twelve
times the overall diameter of the cable.
4.
Wire-Shielded Cables
4.1 The minimum bending radius for a single-conductor cable is eight times the overall diameter.
4.2 For multiple-conductor or multiplexed single-conductor cables having wire-shielded individual conductors, the
minimum bending radius is eight times the diameter of the individual conductors or five times the overall diameter,
whichever is greater.
4.3 For multiple-conductor cables having a wire shield over the assembly, the minimum bending radius is eight times the
overall diameter of the cable.
.
Page 238
ANSI/NETA MTS-2011
– This page intentionally left blank –
Page 239
ANSI/NETA MTS-2011
– This page intentionally left blank –
Page 240
ANSI/NETA MTS-2011
APPENDIX A
Definitions
NETA recognizes the IEEE 100, IEEE Dictionary, as its official source for electrical definitions. The
definitions in the list provided by NETA either are not included in the IEEE reference or are more specific
to electrical testing and to this document.
NETA defines equipment voltage ratings in accordance with ANSI/NEMA C37.84.1 American National
Standard for Electrical Power Systems and Equipment – Voltage Ratings (60 Hertz).
As-found
Condition of the equipment when taken out of service, prior to maintenance.
As-left
Condition of equipment at the completion of maintenance. As-left values refer to test values obtained after
all maintenance has been performed on the device under test.
Comment
Suggested revision, addition, or deletion in an existing section of the NETA specifications.
Electrical tests
Electrical tests involve application of electrical signals and observation of the response. It may be, for
instance, applying a potential across an insulation system and measuring the resultant leakage current
magnitude or power factor/dissipation factor. It may also involve application of voltage and/or current to
metering and relaying equipment to check for correct response.
Equipment condition
Suitability of the equipment for continued operation in the intended environment as determined by
evaluation of the results of inspections and tests.
Exercise
To operate equipment in such a manner that it performs all its intended functions to allow observation,
testing, measurement, and diagnosis of its operational condition.
Extra-high voltage
A class of nominal system voltages greater than 230,000 volts.
High voltage
A class of nominal system voltages equal to or greater than 100,000 volts and equal to or less than 230,000
volts.
Inspection
Examination or measurement to verify whether an item or activity conforms to specified requirements.
Interim amendment
An interim amendment is made by NETA’s Standards Review Council when a potential hazard is identified
with respect to the use of this document. The interim amendment is in force from the time of its issue until
the next revision of the document.
Page 241
ANSI/NETA MTS-2011
APPENDIX A
Definitions
Low voltage
A class of nominal system voltages 1000 volts or less.
Manufacturer’s published data
Data provided by the manufacturer concerning a specific piece of equipment.
Mechanical inspection
Observation of the mechanical operation of equipment not requiring electrical stimulation, such as manual
operation of circuit breaker trip and close functions. It may also include tightening of hardware, cleaning,
and lubricating.
Medium voltage
A class of nominal system voltages greater than 1000 volts and less than 100,000 volts.
Proposal
Draft of a section that is currently “reserved” in one of the NETA specifications.
Ready-to-test condition
Having the equipment which is to be tested isolated, source and load disconnected, the breaker grounded,
and control and operating sources identified.
Shall
Indicates a mandatory requirement and is used when the testing firm has control over the result.
Should
Indicates that a provision is not mandatory but is recommended as good practice. This term is also used
when a value is recommended and there is no practical capability of achieving that value.
System voltage
The root-mean-square (rms) phase-to-phase voltage of a portion of an alternating-current electric system.
Each system voltage pertains to a portion of the system that is bounded by transformers or utilization
equipment.
Verify
To investigate by observation or by test to determine that a particular condition exists.
Visual inspection
Qualitative observation of physical characteristics, including cleanliness, physical integrity, evidence of
overheating, lubrication, etc.
Page 242
ANSI/NETA MTS-2011
APPENDIX B
Frequency of Maintenance Tests
NETA recognizes that the ideal maintenance program is reliability-based, unique to each plant and to each
piece of equipment. In the absence of this information and in response to requests for a maintenance
timetable, NETA’s Standards Review Council presents the following time-based maintenance schedule and
matrix.
One should contact a NETA Accredited Testing Company for a reliability-based evaluation.
The following matrix is to be used in conjunction with Appendix B, Inspections and Tests. Application of
the matrix is recognized as a guide only.
Specific condition, criticality, and reliability must be determined to correctly apply the matrix. Application
of the matrix, along with the culmination of historical testing data and trending, should provide a quality
electrical preventive maintenance program.
MAINTENANCE FREQUENCY MATRIX
EQUIPMENT CONDITION
EQUIPMENT
RELIABILITY
REQUIREMENT
POOR
AVERAGE
GOOD
LOW
1.0
2.0
2.5
MEDIUM
0.50
1.0
1.5
HIGH
0.25
0.50
0.75
Page 243
ANSI/NETA MTS-2011
APPENDIX B
Frequency of Maintenance Tests (continued)
Inspections and Tests
Frequency in Months
(Multiply These Values by the Factor in the Maintenance Frequency Matrix)
Section
7.1
7.2
7.2.1.1
7.2.1.2
7.2.2
7.3
7.3.1
7.3.2
7.3.3
7.4
7.5
7.5.1.1
7.5.1.2
7.5.1.3
7.5.2
7.5.3
7.5.4
7.5.5
7.6
7.6.1.1
7.6.1.2
7.6.1.3
7.6.2
7.6.2
7.6.3
7.6.4
7.7
7.8
Description
Switchgear & Switchboard Assemblies
Transformers
Small Dry-Type Transformers
Large Dry-Type Transformers
Liquid-Filled Transformers
Sampling
Cables
Low-Voltage, Low-Energy
Low-Voltage, 600 Volt Maximum
Medium- and High-Voltage
Metal-Enclosed Busways
Infrared Only
Switches
Air, Low-Voltage
Air, Medium-Voltage, Metal-Enclosed
Air, Medium- and High-Voltage Open
Visual
12
Visual &
Mechanical
12
Visual &
Mechanical &
Electrical
24
2
1
1
–
12
12
12
–
36
24
24
12
–
2
2
2
–
–
12
12
12
–
–
36
36
24
12
2
–
1
12
12
12
36
24
24
1
1
1
12
12
12
12
24
24
24
24
24
1
1
1
1
–
1
–
1
1
1
12
12
12
12
12
–
12
–
12
12
12
12
36
36
36
36
12
12
12
24
12
12
24
Oil, Medium-Voltage
Vacuum, Medium-Voltage
Medium-Voltage, SF6
Cutouts
Circuit Breakers
Air, Insulated-Case/Molded-Case
Air, Low-Voltage Power
Air, Medium-Voltage
Oil, Medium-Voltage
Sampling
Oil, High-Voltage
Sampling
Vacuum, Medium-Voltage
SF6
Circuit Switchers
Network Protectors
Page 244
ANSI/NETA MTS-2011
APPENDIX B
Frequency of Maintenance Tests (continued)
Inspections and Tests
Frequency in Months
(Multiply These Values by the Factor in the Maintenance Frequency Matrix)
Section
7.9
7.9.1
7.9.2
7.10
7.11
7.11.1
7.11.2
7.12
7.12.1.1
7.12.1.2
7.12.2
7.12.3
7.13
7.14
7.15
7.15.1
7.15.2
7.15.3
7.16
7.16.1.1
7.16.1.2
7.16.2.1
7.16.2.2
7.17
7.18
7.18.1
7.18.2
7.18.3
7.19
7.19.1
7.19.2
Description
Protective Relays
Electromechanical and Solid State
Microprocessor-Based
Instrument Transformers
Metering Devices
Electromechanical and Solid-State
Microprocessor-Based
Regulating Apparatus
Step-Voltage Regulators
Sample Liquid
Induction Regulators
Current Regulators
Load Tap-changers
Sample Liquid
Grounding Systems
Ground-Fault Protection Systems
Rotating Machinery
AC Induction Motors and Generators
Synchronous Motors and Generators
DC Motors and Generators
Motor Control
Motor Starters, Low-Voltage
Motor Starters, Medium-Voltage
Motor Control Centers, Low-Voltage
Motor Control Centers, Medium-Voltage
Adjustable-Speed Drive Systems
Direct-Current Systems
Batteries
Battery Chargers
Rectifiers
Surge Arresters
Low-Voltage Surge Protection Devices
Medium- and High-Voltage Surge Protection
Devices
Visual
Visual &
Mechanical
Visual &
Mechanical &
Electrical
1
1
12
12
12
12
12
12
36
12
12
12
12
36
36
1
–
12
1
1
–
2
2
12
–
12
12
12
–
12
12
24
12
24
24
24
12
24
12
1
1
1
12
12
12
24
24
24
2
2
2
2
1
12
12
12
12
12
24
24
24
24
24
1
1
1
12
12
12
12
12
24
2
2
12
12
24
24
Page 245
ANSI/NETA MTS-2011
APPENDIX B
Frequency of Maintenance Tests (continued)
Inspections and Tests
Frequency in Months
(Multiply These Values by the Factor in the Maintenance Frequency Matrix)
Section
7.20
7.20.1
7.20.2
7.20.3.1
7.20.3.2
7.21
7.22
7.22.1
7.22.2
7.22.3
7.23
7.24
7.24.1
7.24.2
7.27
Description
Visual
Capacitors and Reactors
Capacitors
1
Capacitor Control Devices
1
Reactors, (Shunt and Current-Limiting) Dry2
Type
Reactors, (Shunt and Current-Limiting) Liquid1
Filled
Sampling
–
Outdoor Bus Structures
1
Emergency Systems
Engine Generator
1
Functional Testing
–
Uninterruptible Power Systems
1
Functional Testing
–
Automatic Transfer Switches
1
Functional Testing
–
Telemetry/Pilot Wire SCADA
1
Automatic Circuit Reclosers and Line Sectionalizers
Automatic Circuit Reclosers, Oil/Vacuum
1
Sample
–
Automatic Line Sectionalizers, Oil
1
Sample
–
EMF Testing
12
Page 246
ANSI/NETA MTS-2011
Visual &
Mechanical
Visual &
Mechanical &
Electrical
12
12
12
12
12
24
12
24
–
12
12
36
2
–
12
–
12
–
12
12
2
12
2
12
2
12
12
–
12
–
12
24
12
24
12
12
APPENDIX C
About the InterNational Electrical Testing Association
(This appendix is not part of American National Standard ANSI/NETA MTS-2011)
The InterNational Electrical Testing Association (NETA) is an accredited standards developer for the
American National Standards Institute (ANSI) and defines the standards by which electrical equipment is
deemed safe and reliable. NETA Certified Technicians conduct the tests that ensure this equipment meets
the Association’s stringent specifications. NETA is the leading source of specifications, procedures, testing,
and requirements, not only for commissioning new equipment but for testing the reliability and performance
of existing equipment.
CERTIFICATION
Certification of competency is particularly important in the electrical testing industry. Inherent in the
determination of the equipment’s serviceability is the prerequisite that individuals performing the tests be
capable of conducting the tests in a safe manner and with complete knowledge of the hazards involved.
They must also evaluate the test data and make an informed judgement on the continued serviceability,
deterioration, or nonserviceability of the specific equipment. NETA, a nationally-recognized certification
agency, provides recognition of four levels of competency within the electrical testing industry in
accordance with ANSI/NETA ETT-2010 Standard for Certification of Electrical Testing Technicians.
QUALIFICATIONS OF THE TESTING ORGANIZATION
An independent overview is the only method of determining the long-term usage of electrical apparatus and
its suitability for the intended purpose. NETA Accredited Companies best support the interest of the owner,
as the objectivity and competency of the testing firm is as important as the competency of the individual
technician. NETA Accredited Companies are part of an independent, third-party electrical testing
association dedicated to setting world standards in electrical maintenance and acceptance testing. Hiring a
NETA Accredited Company assures the customer that:
The NETA Technician has broad-based knowledge -- this person is trained to inspect, test, maintain, and
calibrate all types of electrical equipment in all types of industries.
NETA Technicians meet stringent educational and experience requirements in accordance with
ANSI/NETA ETT-2010 Standard for Certification of Electrical Testing Technicians.
A Registered Professional Engineer will review all engineering reports.
All tests will be performed objectively, according to NETA specifications, using calibrated instruments
traceable to the National Institute of Science and Technology (NIST).
The firm is a well-established, full-service electrical testing business.
Page 247
ANSI/NETA MTS-2011
APPENDIX C
About the InterNational Electrical Testing Association (continued)
(This appendix is not part of American National Standard ANSI/NETA MTS-2011)
SPECIFICATIONS AND PUBLICATIONS
As a part of its service to the industry, the InterNational Electrical Testing Association provides nationallyrecognized publications:
ANSI/NETA ETT-2010
ANSI/NETA MTS-2011
Standard for Certification of Electrical Testing Technicians
Standard for Maintenance Testing Specifications for Electrical
Power Equipment and Systems
ANSI/NETA ATS-2009
Standard for Acceptance Testing Specifications for Electrical
Power Equipment and Systems
The Association also produces a quarterly technical journal, NETA World, which features articles of interest
to electrical testing and maintenance companies, consultants, engineers, architects, and plant personnel
directly involved in electrical testing and maintenance.
EDUCATIONAL PROGRAMS
PowerTest, NETA's annual technical conference, draws hundreds of qualified industry professionals from
around the globe. This conference provides a forum for current industry advances, critical informational
updates, networking, and more. Regular attendees include technicians from electrical testing and
maintenance companies, consultants, engineers, architects, and plant personnel directly involved in
electrical testing and maintenance. Paper presentations from field-experienced industry experts share
practical knowledge and experience while in-depth seminars offer interactive training. At the Trade Show
attendees enjoy the highest-quality gathering of industry-specific suppliers displaying state-of-the-art
products and services directly related to the electrical testing industry. Attendance of PowerTest is the best
opportunity for interaction and input in a professional technical environment.
Page 248
ANSI/NETA MTS-2011
APPENDIX D
Form for Comments
(This appendix is not part of American National Standard ANSI/NETA MTS-2011)
Anyone may comment on this document using this form:
Type of Comment (Check one)  Technical  Editorial
Paragraph Number
Recommend (Check One)  *New Text  *Revised Text  *Deleted Text
This Comment is original material (Note: Original material is considered to be the submitter’s own idea based on
or as a result of his/her own experience, thought, or research and to the best of his/her knowledge is not copied from
another source.)
This Comment is not original material; its source (if known) is
Please Check One: User Producer General Interest Section Panel
Date
Name (please print)
Company
Address
City/State/Zip
Phone with area code
Fax
Email
Organization represented, if any
I hereby grant NETA the nonexclusive, royalty-free rights, including nonexclusive, royalty-free rights in copyright,
in this material; I understand that I acquire no rights in any publication of NETA in which this proposal in this or
another similar analogous form is used.
Signature (required)
*1.
*2.
*3.
All comments must be relevant to the proposed standard.
Suggested changes must include (1) proposed text, including the wording to be added, revised (and how
revised), or deleted, (2) a statement of the problem and substantiation for a technical change, and (3)
signature of submitter. (Note: State the problem that will be resolved by your recommendation; give the
specific reason for your comment, including copies of texts, research papers, testing experience, etc. If more
than 200 words, it may be abstracted for publication.)
Editorial comments are welcome, but they cannot serve as the sole basis for a suggested change.
A comment that does not include all required information may be rejected by the Standards Review Council for that
reason. Must use separate form for each comment. All comments must be typed or printed neatly. Illegible
comments will be interpreted to the best of the staff’s ability.
This form is available electronically on NETA’s website at www.netaworld.org under Standards Activities.
Send to:
Standards Review Council
3050 Old Centre Avenue, Suite 102, Portage, MI 49024
Phone: 888.300.6382 FAX: 269.488.6383 Email: neta@netaworld.org
Page 249
ANSI/NETA MTS-2011
APPENDIX E
Form for Proposals
(This appendix is not part of American National Standard ANSI/NETA MTS-2011)
Anyone may propose a new section for this document using the following form:
When drafting a proposed section:
Use the most recent edition of the specifications as a guideline for format and wording.
Remember that NETA specifications are “what to do” documents and do not include “how to do” information.
Include references.
When applicable, use the standard base format:
1. Visual and Mechanical Inspection
2. Electrical Tests
3. Test Values
Date
Name
Company
Address
Please indicate organization represented (if any)
NETA document title
Section/Number
Tel No.
Fax No.
E-Mail
Year
Note 1: Type or print legibly in black ink.
Note 2: If supplementary material (photographs, diagrams, reports, etc.) is included, you may be required to submit
sufficient copies for all Members and Alternates of the Section Panel.
I hereby grant NETA the nonexclusive, royalty-free rights, including nonexclusive, royalty-free rights in
copyright, in this proposal. I understand that I acquire no rights in any publication of NETA in which this
proposal in this or another similar analogous form is used.
Signature (required)
This form is available electronically on NETA’s website at www.netaworld.org under Standards Activities.
Send to:
Standards Review Council
3050 Old Centre Avenue, Suite 102
Portage, MI 49024
Phone: 888.300.6382 FAX: 269.488.6383
Email: neta@netaworld.org
Page 250
ANSI/NETA MTS-2011
Download