ACTIVITY:
S. N.
1
LIFTING OPERATIONS
HAZARD
HARM
Untrained Operator / Banksman
Serious
injury,
Fatality,
RISK
LXS
2x5
Material
2
Defective Lifting Equipment and
Lifting Tackles
· Pre-start inspection must be done prior to start.
Tackles.
3x5
Material
Fatality,
3x5
Material
Damage.
Serious
injury,
Fatality,
3x5
Material
Damage.
Serious
injury,
any lifting equipment / gear.
rd
· Load chart and 3 party test certificates to be
3x5
Damage.
Serious
injury,
6
Incorrect Signals / Communication Fatality,
System.
Material
visually inspected for any kind of defects prior to
use.
· After use all lifting gear and tackles to be stored
as per manufactures instruction.
· Certified and Experienced banks man and
Riggers.
· Suitable and safe lifting gears / tackles to be
used.
· Do not shorten the length of slings by making
knots.
· Do not attach any substandard components to
lifting gears.
· Certified and experienced Operator, banks man
and Riggers to be appointed.
· Safe lifting procedure to be addressed to the
lifting team and to be followed.
· Load to be lifted by attaching the slings to
designated lifting point.
· Ensure centre of gravity of the load prior to
advance the lifting operation.
· Do not exceed the Safe Working Load (SWL) of
Material
5
· All lifting gears, tackles and lifting hooks to be
· Ascertain the load prior to lift.
Fatality,
Over Loading of Cranes/Lifting
Equipments/gears.
valid 3rd party certificate to be appointed.
Fatality,
Improper Use of Lifting Gear.
Incorrect Slinging and Lifting
Methods
· Competent Operator and Banksman having
· Certified Cranes, Equipments and Lifting
Serious
injury,
4
CONTROL MEASURES
Damage.
Serious
injury,
Damage.
3
L M H
3x5
displayed in the operator cabin.
· All cranes over one tone capacity must be fitted
with an automatic safe load indicator with a visual
warning to the operator and an audible warning to
those in the vicinity.
· Do not carry out the lifting operation in heavy
wind condition.
· Do not allow shock loading and horizontal
pulling of load.
· Certified and experienced signal man to be
appointed.
· Ensure wireless radio is working properly and
battery pack is fully charged prior to start lifting
operation.
· Lifting operation must be stopped if any
problem occurred in the communication.
Damage.
Minor /
Serious
injury,
· Ensure enough space is available in the work
area to handle the load safely.
· Centre of gravity of the load to be ensured to
Fatality.
7
Fall of Persons.
3x5
prevent uncontrolled movement of load.
· Do not stand on the top of a load while
hoisting.
· Ensure slings are not snatched on any work
platform or persons standing in the area while
hoisting.
· Use Safety Harness where fall hazard exist.
Serious
injury,
· Certified Cranes, Equipments and Lifting
Fatality,
8
Fall of Materials.
3x5
Material
Damage.
· Crane must be thoroughly inspected and
Serious
injury,
9
Collapse of Cranes.
Fatality,
certified by DM approved 3rd party after erection,
jack-up and major repair or after every 12 months.
3x5
Property
Damage.
Serious
injury,
10
Uncontrolled movement of load.
Fatality,
3x5
Material
Damage.
Serious
injury,
11
Adverse Weather
Fatality,
Material
13
Working under pressure.
Bad health of Operatives.
Fatality,
Material
Damage.
Serious
injury,
Fatality,
Material
Damage.
· Experienced and certified operator to be
appointed to operate the crane.
· Do not exceed the SWL.
· Do not carry out any lifting operation in adverse
weather condition. (Heavy wind).
· Centre of gravity of the load to be ensured prior
to lift.
· Do not carry out any lifting operation in heavy
wind condition.
· Tag line to be used to direct the load into
position and prevent it spinning.
· Slew the load smoothly.
· Wind speed to be monitored frequently.
3X5
Damage.
Serious
injury,
12
Tackles.
· All lifting gears, tackles and lifting hooks to be
visually inspected for any kind of defects prior to
use.
· Secure all loose materials properly and safely
prior to lift.
· Do not allow anybody to stand / pass through
under suspended load.
· Do not carry out any lifting operation in adverse
weather condition (Heavy wind, poor visibility
etc).
· If anybody asking for a lift which is not safe,
2X5
never do it. Do not work under pressure.
· Always follow the approved / correct lifting
procedure and instructions of lifting Supervisor /
Foreman / person responsible for the crane /
Operators & Banksman.
· Do not work when the health condition is not
3X5
allowing to perform the duties properly. (Sick,
tension, under pressure etc).
CONTROLLED BY
WHOM
RESIDUAL
RISK
Supervisor /
Foreman.
L
Supervisor /
Foreman.
L
Supervisor /
Foreman.
L
Supervisor /
Foreman.
L
Supervisor /
Foreman.
L
Supervisor /
Foreman.
L
Review Date
Supervisor /
Foreman.
L
Supervisor /
Foreman.
L
Supervisor /
Foreman.
L
Supervisor /
Foreman.
L
Supervisor /
Foreman.
L
Supervisor /
Foreman.
L
Supervisor /
Foreman.
L