Training Module s Hazard Identification and Risk Assessment (HIRA) Date: Safety Contact 2 2 What is HIRA a process whereby hazards present in a workplace are identified, evaluated and corrective action(s) is prioritized in order to eliminate or reduce risks to acceptable levels… 3 Objectives The objective of this training is to explain: • What are the Hazards and Risks? • What is Risk Assessment? • Introduce methodology for conducting Hazard Identification and Risk Assessment. 4 Scope It covers all activities controlled by Renew Power and carried out by employees, associates or contractors. 5 How is HIRA different from JSA HIRA 6 JSA HIRA is to analyze the business risks that are associated with certain activity and suggests measure to make the activity intrinsically safe. JSA is conducted to carry out activity with minimum risk. HIRA is carried out at the beginning of a process and project or major change in the process or defined timelines. JSA is carried out every time the task is performed on ground. HIR is carried out by Subject Matter Expert. JSA is carried out by executing team. HIRA is a quantitative analysis. JSA is a qualitative analysis. Output of HIRA process is risk register for the organization/ business department. For JSA risk register is an input to decide where JSA should b carried out. When to carry out HIRA? • When New job, task, chemical, and/or machine has been introduced • Existing task has been changed significantly • Significant Changes in technology • Existing procedures are not adequate/ non existing • Before start-up of work after a major incident or injury has occurred • Change in specific Regulatory or Renew HSE Standards • Any unforeseen external risks as perceived • Latest two years after the last review 7 Benefits of HIRA • Eliminate most serious hazards • Involves teams from all levels in organization • Improve awareness of hazards and/or identify new ones. • Ensure that the correct “control measures” are in place and reflected in proper job procedures • Continuously improve Safety Management systems and conditions of work • Reduce Safety incidents 8 Benefits of HIRA • Eliminate most serious hazards • Involves teams from all levels in organization • Improve awareness of hazards and/or identify new ones. • Ensure that the correct “control measures” are in place and reflected in proper job procedures • Continuously improve Safety Management systems and conditions of work • Reduce Safety incidents 9 Responsibilities Employee/Work Team 10 Site Incharge/ Project Lead Functional Business /Cluster Head or Manager HSE / Process Experts (e.g. Electrical Safety Task and Sub-Task Description R A I I Identification of people exposed R A I I Identification of hazards R A I C Assessment of actual risk C A/R I C Assigning priorities to the control measures Description of control measures I A/R I C R A C C/R Assessment of the residual risk C A/R I C/R R- Responsible A- Accountable; C- Consulted I- Informed: HIRA’s Methodology Fine-Kinney Method • The "Mathematical Evaluations for Controlling Hazards" method developed by W. T. Fine has been revised by Kinney and Wiruth in 1976 and updated with the name "Practical Risk Analysis for Safety Management". This method is now known and applied as the Fine-Kinney method. • The Fine–Kinney method is a comprehensive method for quantitative evaluations to aid in controlling hazards. • In this risk assessment method, the risk value is calculated by considering the parameters of the exposure or frequency of occurrence of a hazard event that could lead to an incident (E), the consequence of an incident (S) and the probability of a hazardous event (P). Risk Score = Exposure X Severity X Probability 11 Sequential Steps to Conduct HIRA The HIRA is based on the following 7 steps: Step 1: description of tasks and subtasks Step 2: identification of people exposed Step 3: identification of hazards Step 4: assessment of the actual risk (Kinney & Fine method) Step 5: assigning priorities and responsibilities to the control measures Step 6: description of the control measures Step 7: assessment of the residual risk (Kinney & Fine method) 12 Flow Chart to Conduct HIRA Description of tasks and subtasks Identify task and sub-tasks Identification of people exposed Identification of Hazards Assess and calculate Actual risk Assigning priorities and responsibilities to the control measures Define control measure(s) to mitigate risk No Calculate Residual Risk Acceptable? Document and file risk analysis 13 Note: Include standard and additional measures. Always take preventive hierarchy into account Step 1: Task and Sub-Task Description Description of tasks and subtasks Identify task and subtasks Identification of people exposed Identification of Hazards Assess and calculate Actual risk Assigning priorities and responsibilities to the control measures Define control measure(s) to mitigate risk N o Calculate Residual Risk Acceptabl e? Document and file risk analysis 14 The Main activity and the sub-activities associated with the main activity are listed for which risk is required to be Assessed. Step 2: Identification of People Exposed Description of tasks and subtasks Identify task and subtasks Identification of people exposed Identification of Hazards Assess and calculate Actual risk Assigning priorities and responsibilities to the control measures Define control measure(s) to mitigate risk N o Calculate Residual Risk Acceptabl e? Document and file risk analysis 15 This information is required to identify if the exposure of hazards is limited to point of activity or other contractual employees/people working nearby or community is also affected. Walkthrough • In our standard we have consolidated Step 1 and Step 2 of HIRA process and named it as Walkthrough Format. • This has be done for our convenience to document the information in one format “Walkthrough” in Annexure – 1). 16 (See sheet named Walkthrough Format Business Name Sub-tasks – duration (per day) Frequency Location Safety procedure – Standard operating procedure Used equipment – tools: Materials – objects that are being used (mass, shape, distances): Used processes (air, electricity, water, nitrogen…) Used substances, chemicals (MSDS) XYZ standard or national legislation Checks Emergency measures Identification of people exposed Person executing the task Other people involved Persons who run a higher risk (Handicap – age – pregnant/young mother – space without or with inadequate ventilation – maintenance personnel – bad health – medication) Competency of the person executing the task (Training – experience) 17 Step 3 – Identification of Hazards Description of tasks and subtasks Identify task and subtasks Identify Hazards in the task with respect to Identification of people exposed Identification of Hazards Assess and calculate Actual risk Assigning priorities and responsibilities to the control measures Define control measure(s) to mitigate risk N o Calculate Residual Risk Acceptabl e? Document and file risk analysis 18 See Annexure – 2 for List of Hazards Physical Hazards Electrical, Radiation, Sound, vibration, Mechanical/machines, Falling (objects & people) Fire 19 Chemical Hazards Liquids, Gasses, Solids Enter the body by means of : Swallowing (mouth) Absorbtion (skin) Inhaling (nose) 20 Chemical Hazards 21 Explosive Irritation Oxidation Sensitivity Flammable Cancer causing Poisonous Mutation Chemical burning Reproductive Ergonomic Hazard Back injury Hand, wrist, arm, neck stress as a result of computer use Uncomfortable positions which cause stress to the muscles Injury due to over exersion Muscle tearing 22 Biological Hazards Hepatitis, Hiv-infected Iegionnaires disease This is a highly specialized area, where health care professionals should be consulted 23 Environmental Hazards - Emissions - Spills - Products that pollute the earth - Ground water - Wastes 24 Step 3 – Identification of Hazards List of Hazards 1 PHYSICAL HAZARDS 2 CHEMICAL HAZARDS: dust, gasses, vapors, solids, liquid 1.1 electrical: tools, machines, cables 2.1 explosive 1.2 radiation: 2.2 oxidative – flammable 1.3 vibrations: hand, arm or body 2.3 toxic vibrations 1.4 mechanical: bumping, squeezing, cutting, pricking, chafing 2.4 corrosive – caustic 1.5 Slip / Trip 2.5 irritating 1.6 falling down from a scaffold, platform or ladder / fall of 2.6 carcinogenic material 25 1.7 temperature: contact with extremely warm or cold objects 2.7 mutagenic (effecting the genetic material) 1.8 pinch point /sharp edge 2.8 nitrogen 3 ERGONOMIC HAZARDS 4 BIOLOGICAL HAZARDS 5 ENVIRONMENTAL HAZARDS 5.1 work → environment. : 3.1 lifting (> 25 kg), carrying (> 15 4.1 direct contact with bodily fluids Emissions: fumes, dust, vapors kg) or pushing/pulling heavy loads (blood, defecation, …) and gasses 3.2 posture during working: 4.2 presence of water drops – bending forward or backward, water vapor (sprinklers, air5.2 spill twisted trunk – standing upright for conditioning systems, higha long period of time pressure cleaners) 3.3 movements with arms above 4.3 working in sewers, stagnant 5.3 discharging waste water and one’s head or arms stretched waters, brooks (presence of rats) contaminating groundwater 3.4 extremely stretched or bended wrist – high pinching force with 5.4 dumping waste hands – grabbing or holding with the fingertips 3.5 insufficient room to move or 5.5 noise pollution objects difficult to reach 5.6 thunder storm sand storm, rain 3.6 repetitive work with arms or , lighting , high wind velocity, high legs – operating a pedal temperature, land slide, flood and flash flood 3.7 control buttons, switches and 5.6 environment. → Work: ice labels are installed logically and or snow on roads or footpaths are clearly visible 5.7 poor visibility 5.8 instability, due to wind, of cranes, platforms, scaffolds or rotor blades 5.9 insufficient lighting 5.10 reflections or blinding Step 4 – Assess and calculate Actual Risk Description of tasks and subtasks Identify task and subtasks Identification of people exposed Identification of Hazards Assess and calculate Actual risk Assigning priorities and responsibilities to the control measures Define control measure(s) to mitigate risk N o Calculate Residual Risk Assess the actual risk using Kinney & Fine method, considering no control measures in place (Annexure - 1). This assessment would indicate the actual level of risk, that we want to manage via all our procedures, rules or other controls … Results of identification and assessment of risks would indicate risk score: Risk Score = Exposure X Severity X Probability R=EXSXP Acceptabl e? Document and file risk analysis 26 26 Step 4 – Assess and calculate Actual Risk HAZARD = Exposure x Severity RISK = Exposure x Severity x Probability 27 Step 4 – Assess and calculate Actual Risk Example of Hazards & Risks Task = changing rotary cutter Hazard = sharp edges of cutter blades Risk = cut by the blades Task = MCC switching Hazard = arch flash Risk = burn by arc flash 28 Step 4 – Assess and calculate Actual Risk Hazard A condition or a set of circumstances that are present and have a potential to cause harm Risk Risk is the likelihood that a person may be harmed or suffers adverse health effects if exposed to a hazard. Example: Unsafe Act and Unsafe Condition 29 29 Step 4 – Assess and calculate Actual Risk Risk Score = Exposure X Severity X Probability Exposure The frequency of exposure indicates how often a dangerous situation can arise. It could be an exposure to a toxic chemical or working and handling of a dangerous machine. EXPOSURE Very Rarely (less than one per year) Rarely (few times per year) Sometimes (1-2 times per month) FACTOR 0.5 1 2 Now and then (one per week) 3 Frequently (daily) 6 Continuous (more than two times per day) 10 For example, lifting a load of more than 25 kg might not be very risky if done once, but multiply this activity by numerous people making several lifts per day and you get a different perspective on risk. 30 Step 4 – Assess and calculate Actual Risk Risk Score = Exposure X Severity X Probability Severity The apparent effect indicates the seriousness of the arising situation. SEVERITY (*) FACTO R Low: Minor Injury 1 Minor: Injury which requires medical attention / 1-3 day loss 4 time Medium: Potentially life threatening Injury causing temporary 7 disability Major: Life threatening injury or causing permanent disability 15 Critical: Fatality or multiple fatalities, or multiple life 40 threatening injuries causing permanent disabilities 31 Step 4 – Assess and calculate Actual Risk Risk Score = Exposure X Severity X Probability Probability The probability indicates how big the chances are that the effect might indeed occur. This is a subjective judgment, the most difficult assessment to make. PROBABILITY(1) FACTOR(2) Virtually impossible (>20y, once in a life time, only 0.2 theoretical case) Conceivable but improbable (once in a career (1/20y) 0.5 Improbable/borderline case, (1/10y) 1 Unusual (one can think of a (unusual) scenario (1/3y) 3 Possible (once every 6 months) 6 To be expected (once per week) 10 32 1. (1) For the actual Risk, don’t take the effect of PPE, SOPs and technical precautions (engineering control) into account. For the Actual – Risk, take the effect of PPE, SOPs and technical precautions into account. 2. (2) As a guideline, if you can think of a scenario, were the considered effect will occur once in 3 years, the probability factor typically equals 3. Step 5 – Assigning Priorities and Responsibilities to the Control Measures Description of tasks and subtasks Identify task and subtasks Identification of people exposed • Having identified the risk score, the priority of measures to be taken is established as well. Identification of Hazards Assess and calculate Actual risk Assigning priorities and responsibilities to the control measures Define control measure(s) to mitigate risk N o Calculate Residual Risk Acceptabl e? Document and file risk analysis 33 • Priority means work must be stopped and immediate action is required. • The risk assessment needs to be documented and should be kept readily available for employees which are affected by the analyzed task. Step 5 – Assigning Priorities and Responsibilities to the Control Measures Risk Score Interpretation- Classify into Risk Category By calculating the hazard score it is then possible to classify it into the correct risk score category and thereby determining which possible urgent plan of action is to be taken. Risk Score = Exposure X Severity X Probability Risk Score Interpretation(1) (R) <20 Very limited risk acceptable 20-70 Measures required (in 6 months) 70-200 Immediate measures required >200 Stop work until measures are taken 34 Priority for the measures to be taken 4 3 2 1 Step 6 – Define of the measure(s) to mitigate risk Description of tasks and subtasks Identify task and subtasks Identification of people exposed Identification of Hazards Assess and calculate Actual risk Assigning priorities and responsibilities to the control measures Define control measure(s) to mitigate risk N o Calculate Residual Risk Acceptabl e? Document and file risk analysis 35 To eliminate or minimize the risk, measures are proposed that should be implemented in an action-plan or job-plan. Both routine and none-routine measures need to be listed. When defining these measures, the prevention hierarchy needs to be taken into account. First try to eliminate the risk. Highest priority is given to elimination. 1. 2. 3. 4. 5. Elimination: Eliminate Risk Substitution: Reduce Risk at source or remove source Engineering Control: Take corrective actions Administrative Control: Training + procedures + instructions PPE: Make people wear PPE Step 6 – Define of the measure(s) to mitigate risk Hierarchy of Control is to be used as a measure to mitigate risk 36 Step 6 – Define of the measure(s) to mitigate risk Elimination Substitution 37 Step 6 – Define of the measure(s) to mitigate risk Engineering control Administration Controls 38 Step 6 – Define of the measure(s) to mitigate risk PPE 39 Step 6 – Define of the measure(s) to mitigate risk Some Examples of Existing Control Measures • • • • • • 40 Safety Interlocks Machine guarding Special tools and equipment Wearing PPE Permit-to-work Job instruction Step 7 – Calculate Residual Risk Description of tasks and subtasks Identify task and subtasks Identification of people exposed Identification of Hazards Assess and calculate Actual risk Assigning priorities and responsibilities to the control measures Define control measure(s) to mitigate risk N o Calculate Residual Risk Acceptabl e? Document and file risk analysis 41 • Assessment of the residual risk is carried out by using Kinney & Fine method (See sheet named “HIRA” in Annexure – 1). • The outcome of the risk assessment determines the measures to be implemented. • Additional measures to be implemented in case where residual risk is not in the zone of acceptable even after implementation of actual measures Step 7 – Calculate Residual Risk “HIRA Format” Name of the Main Activity: Rotor Dismantling Instruction Names of people performing HIRA : XYZ, ABC Business : Wind Asset Management Site Name: XXXX Exposure Very Rarely (less than one per year) Rarely (few times per year) Factor Severity(*) 0.5 Factor Low: Minor Injury 1 Minor: Injury which requires medical attention / 1-3 day loss time 4 Medium: P otentially life threatening Injury causing temporary 7 1 Sometimes (1-2 times per month) 2 Now and then (one per week) 3 Frequently (daily) 6 Continuous (more than two times per day) 10 Factor Conceivable but improbable (once in a career (1/20y) 0.5 <20 Improbable/borderline case, (1/10y) 1 Unusual (one can think of a (unusual) scenario (1/3y) 3 Critical: Fatality or multiple fatalities, or multiple life threatening 40 To be expected (once per week) 10 Mitigating Control Measures S P 40 6 Actual Risk (E*S*P) Priority 240 1 Elimination Substitution Engineering Administrat ive 1.Applying Rotor Lock 2.Close the hatch of nacelle door. 1.Working under extream weather condition is not allowed. 2.Acess to the roof is not allowed without proper fall arrest equipment By Whom Priority f or the measures Very limited risk - acceptable 4 20-70 Measures required (in 6m) 3 70-200 Immediate measures required 2 >200 Stop work until measures are 1 Responsibility PPE Interpretation (1) Risk Score (R) 0.2 6 E (2) Virtually impossible (>20y, once in a life time, only theoretical P ossible (once every 6 months) People at Risk Working on the Risk of falling to the Contract Employee 1 nacelle roof and the ground, while (Maintenance hub. working on the Engineer) nacelle roof and hub Probability 15 Actual Risk Evaluation Hazards / Risk Reviewed By: XXX Approved By: XXX Approved On: XXX Major: Life threatening injury or causing permanent disability) Sub Activity 42 Site / Project Head : XXX State Name : XXX Date : XXXX By When 1. Always Site In-chargeImmediately wear personal fall protection equipment with two lanyards and at least one of the lanyards to be attached with approved anchorage point. Residual Risk Factor After Mitigation E S P Residual Risk Score 1 15 1 15 Remarks Recording of Initial and Actual Risk Activity/Task: Cutting of wrapped fiber from the roller of draw machine in PSF plant. Sub-activities/tasks: 1) Observation of fiber wrap on the roller 2) Approaching the roller to cut and remove the fiber wrap. 3) Cutting of fiber wrap using the sharp knife 4) Removal of cut portion of fiber from roller and putting it into waste box. 43 Exercise 44 Exercise : fix the tires of your bike fixing of tires remove tire 45 look for leak fix leak replace tire refill tire with air EXAMPLE OF TASK BREAKDOWN INTO STEPS -planting a tree (a) An appropriate level of detail 1. Select the site. 2. Bring tools, equipment, and the tree to the site. 3. Dig the hole. 4. Prepare the hole. 5. Put the tree into the hole. 6. Back fill, tamp, and water. 7. Brace the tree. 8. Clean up and return the equipment. (b) A breakdown that is too detailed 1. Pick up the shovel 2. Position the shovel so that it points down. 3. Place the right foot on the top edge of the shovel blade. 4. Press the shovel into the ground with the right foot. 5. Tilt the shovel handle backward and down to pick up the soil. and so on, and on, and on. (c) A breakdown that is too general 1. Dig the hole. 2. Plant the tree. 46 Example 1: Electrical cabinet Evaluate need for control measures for electrical work in an MCC. The Risk is “ burn by electrical arc”. Initial Risk E=1 S = 15 P=3 R = 45 Measures full PPE electrical work permit Actual Risk 1 E=1 S=7 P=3 R = 21 Additional Measures (since R>20) Trained standby-man AND update current limiting fuse. Actual Risk 2 E=1 S=4 P=3 R = 12 (acceptable situation) 47 47 Example 2: Cutting straps on bags Try to evaluate the risk of hand injury when cutting sharps on bags. The Knives 48 48 Example 2: Cutting straps on bags Risk is to cut fingers/hand/body parts Evaluation: If one uses the knife with wooden handle and leather gloves, what is the risk to cut yourself and how would you improve the situation 49 Example 2: Cutting straps on bags Initial Risk Initial Risk E = 10 S=7 P=6 R = 420 Measures 1 Kevlar® gloves Safety knife with spring loaded retractable blade Procedure: Cut away from body 50 Example 2: Cutting straps on bags Actual Situation Actual Risk 1 E = 10 S=1 P=3 R = 30 Measures 2 Kevlar® gloves Side Cutter 51 Example 2: Cutting straps on bags End Result Actual Risk 2 E = 10 S=1 P=1 R = 10 R < 20 AND S < 4 ……… This is an acceptable situation 52 Pit-falls Kinney and Fine method is to try to evaluate whether there is a risk, or no risk Always do it in group. – Group results are more stable than results of individuals. Even if R<20, we can still decide whether to take measures based on common sense. Conducting a risk assessment to try to justify a decision that already has been taken. Conducting a quantified risk assessment without considering available relevant good practices Fail to identify all hazards associated with the activities Fail to fully & truly consider all potential outcomes Do not link hazards to risk controls. Not familiar with the situation in the field 53 54 THANK YOU 55