Document Number Revision No Effective Date Prepared by : SHE REP : STAN-CMP-C029 :1 : 02-12-2021 CONTRACTOR MANAGEMENT PROCEDURE Reviewed by: SHE OFFICER Sign: Approved by: CHIEF OPERATIONS OFFICER Sign: Sign: Contents 1.0 PURPOSE .............................................................................................................................. 2 2.0 SCOPE................................................................................................................................... 2 3.0 ROLES AND RESPONSIBILITIES......................................................................................... 2 4.0 TERMS AND DEFINITIONS ................................................................................................. 2 5.0 ACTIVITY DESCRIPTION .................................................................................................... 2 5.1. Services requiring a contractor ............................................................................................ 2 5.2 Contractor Evaluation .......................................................................................................... 3 5.3 Contractor OH&S Induction................................................................................................. 4 5.4 Supervision of Contractors ................................................................................................... 4 5.5 Contractor OH&S non-conformance ..................................................................................... 4 5.6 Consultation and Communication ......................................................................................... 4 5.7 Incident Reporting............................................................................................................... 4 6.0 RECORDS GENERATED ...................................................................................................... 5 7.0 REVISION HISTORY ............................................................................................................ 6 8.0 REFERENCES ....................................................................................................................... 6 R1 “SAFETY OUR PRIORITY” PAGE 1 OF 6 Document Number Revision No Effective Date Prepared by : SHE REP : STAN-CMP-C029 :1 : 02-12-2021 CONTRACTOR MANAGEMENT PROCEDURE Reviewed by: SHE OFFICER Sign: Approved by: CHIEF OPERATIONS OFFICER Sign: Sign: 1.0 PURPOSE The purpose of this procedure is to outline the OH&S requirements as well as other requirements in the selection, management and monitoring of contractors. 2.0 SCOPE This procedure applies to all contacting activities at SGS. 3.0 ROLES AND RESPONSIBILITIES The Head of Operations, R&D officer , Admin/HR HOD and the SHE Officer are responsible for the development, implementation and maintenance of this procedure. 4.0 TERMS AND DEFINITIONS SGS – Stanserv Genuine services HODs – Head of Department ISO – International Standards Organisation OH&S – Occupational Health and Safety R&D – Research and Development 5.0 ACTIVITY DESCRIPTION 5.1. Services requiring a contractor Where works or services are identified that cannot be completed by SGS, a contractor may be engaged. Examples include: • Solid waste disposal • Hazardous waste disposal • Fire Extinguisher servicing R1 “SAFETY OUR PRIORITY” PAGE 2 OF 6 Document Number Revision No Effective Date Prepared by : SHE REP : STAN-CMP-C029 :1 : 02-12-2021 CONTRACTOR MANAGEMENT PROCEDURE Reviewed by: SHE OFFICER Sign: Approved by: CHIEF OPERATIONS OFFICER • Vehicle maintenance • CCTV maintenance • Security • IT • Plumbing • Fabrication • Electrical installations and maintenance • Water tanks and pipeline installation and maintenance • Meter maintenance • Building, Excavation and Trenching • Paving Sign: Sign: 5.2 Contractor Evaluation The HODs in the respective departments are responsible for selection, evaluation and approval of contractors. The Finance Manager maintains a record of the Contractors in the Contractor’s Register reference STAN-CR-D050. Contractors will be selected and evaluated on the basis of, but not limited to: • Qualification (which enables the ability to identify hazards) • Competence and training (e.g., first aid, firefighting etc.) • Health and safety performance • Direct contract requirements • ISO Certification • Track record Contractors that were engaged before the ISO 45001 OHSMS was developed and implemented at the Organisation will be evaluated using a designed checklist STAN-CSE-D114 and if they do not meet the set requirements, they shall be requested to fulfill that particular requirement(s) in an agreed period of time between the contractor and the Organisation. In the meantime, an interim contractor who meets the requirements set by the Organisation will be engaged. Contractor selection and evaluation STAN-CSE-D114 will be done for contractors currently working with the Organisation or those the Organisation is planning to work with. R1 “SAFETY OUR PRIORITY” PAGE 3 OF 6 Document Number Revision No Effective Date Prepared by : SHE REP : STAN-CMP-C029 :1 : 02-12-2021 CONTRACTOR MANAGEMENT PROCEDURE Reviewed by: SHE OFFICER Sign: Approved by: CHIEF OPERATIONS OFFICER Sign: Sign: 5.3 Contractor OH&S Induction The SHE Officer and SHE rep are responsible for the OH&S induction of the Contractors using the Contractor OH&S Induction checklist reference STAN-COC-D051. The contractors will be required to follow all the safe work procedures as required by SGS’s OH&S management system before commencing work, during work and after completing work 5.4 Supervision of Contractors The relevant HOD is to retain a general supervisory power over general work undertaken by a Contractor under his/her department. The Contractor will be required to obtain a work permit and perform a risk assessment before commencing work and the records should be displayed at all times at their work stations. 5.5 Contractor OH&S non-conformance The SHE Officer can cease works and cancel the work permit issued to the contractor if a department engaged contractor fails to comply with OH&S requirements and/or is working in an unsafe manner (major non conformity). In this instance, the SHE Officer is to contact the relevant department, who will work to rectify the non-conformance with the contractor. In the case of a major non-conformance, if it is not rectified, the contactor will cease operations and no payment will be made. For minor non-conformities, the SHE officer will engage the contractor to rectify the non-conformity in an agreed period of time. 5.6 Consultation and Communication The SHE Officer/SHE Rep are to inform other employees, clients and visitors about any risks, or any special arrangements that are put in place, during works. 5.7 Incident Reporting The SHE Officer is to ensure all incidents involving contractors are reported and investigated as outlined in the Hazard and Incident Reporting and Investigation Procedure. R1 “SAFETY OUR PRIORITY” PAGE 4 OF 6 Document Number Revision No Effective Date Prepared by : SHE REP : STAN-CMP-C029 :1 : 02-12-2021 CONTRACTOR MANAGEMENT PROCEDURE Reviewed by: SHE OFFICER Sign: Approved by: CHIEF OPERATIONS OFFICER Sign: Sign: 6.0 RECORDS GENERATED Record Title Contractor’s Identification STAN-PTW-D091 General Work Location SHE Means of Retention Disposal Period SHREDDING 5 YEARS SHREDDING 5 YEARS SHREDDING 5 YEARS OFFICE Permit Hot Work Permit STAN-HWP-D073 SHE OFFICE Work at Height STAN-WHP-D072 Permit Contractor SHE OFFICE STAN-CSE-D114 HODs SHREDDING 3 YEARS STAN-CSP-D070 SHE SHREDDING 5 YE Selection and Evaluation form Confined Space Entry Work Permit Contractor’s OFFICE STAN-CR-D050 ARS FINANCE DELETING 5 YEARS Contractor OH&S SHE SHREDDING 5 YEARS induction checklist OFFICE Incident, Non SHE SHREDDING 5 YEARS Register STAN-COC-D051 Conformity and STAN-INC-C032 OFFICE Corrective action Procedure R1 “SAFETY OUR PRIORITY” PAGE 5 OF 6 Document Number Revision No Effective Date Prepared by : SHE REP : STAN-CMP-C029 :1 : 02-12-2021 CONTRACTOR MANAGEMENT PROCEDURE Reviewed by: SHE OFFICER Sign: Approved by: CHIEF OPERATIONS OFFICER Sign: Sign: 7.0 REVISION HISTORY Revision number Comments Authorised by: Effective date 1 Included part of contractors C.O.O 02-12-2021 engaged before the management system was developed and implemented 8.0 REFERENCES • ISO 45001:2018 , Clause 8.1.4.2 R1 “SAFETY OUR PRIORITY” PAGE 6 OF 6