PROJECT PLAN I. II. Name:_____________________________________ Grade .& Sec.: _________________ Name of Project: ______________ Project No. ____________ Time: ___________________ Date: _________________________________________No. Of Hours Spent: _____________ PURPOSE: 1. 2. 3. PLANNING: A. Bill of Ingredients Qty. Unit Description Unit Cost Total Total Cost of Ingredients: _____________________ Cost of Finish Project : ______________________ Tools and Equipment Needed: _________________________________________________________ __________________________________________________________________________________ III. PROCEDURE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. IV. JUDGING OR EVALUATION 1. Quality of the finished product 2. Creativity in Food Plating 3. Use and care of Tools 4. Knowledge or related information 5. Attitude, Punctuality & Sanitation REMARKS Weight 20% 20% 20% 20% 20% 100% Student’s Rating Teacher’s Rating Name: Charmaigne P. Mendrez Name of Project: Shell Craft (Wall Decor) Block or Unit: IA 605 Date Begun: July 27,2017 Date Finished: July 27, 2017 V. VI. No. Of Hours Spent: 4 hours PURPOSE: 1. Utility 2. Operation: Home Decor 3. Related Information: PLANNING: B. Working drawing: Draw the pictorial drawing and orthographic projection of the project you wish to make. Use the back space or another sheet. C. Bill of Materials Qty. 1 2 1 1 1 18 1/4 1 Unit Description Unit Cost Sea shells 40.00 Glue stick 5.00 Background printed picture 12.00 Pearl beads 5.00 24inch twine 3.00 Popsicle sticks 0.3 cardboard 10.00 12”x24” plastic cover 3.00 Total Cost of Materials: ₱93.4 Cost of Finish Project : ₱137.1 Tools and Equipment Needed: Glue gun, pair of scissors, pruning shears VII. pack pcs sheet pack pc pcs pc pc PROCEDURE 1. Cut the curve tips of 2 popsicle sticks and bind them together.; make 9 pairs. 2. Fold in half the cardboard horizontally. Total 40.00 15.00 12.00 5.00 3.00 5.40 10.00 3.00 3. Make two hole on the folded part of the cardboard and securely tie the twine. 4. Join the cardboard using glue gun. 5. Attach the popsicle sticks on the sides of the cardboard. 6. Paste the printed picture on the cardboard. 7. Arrange the shells and pearl beads and secure it using glue gun. 8. Wrap it with plastic cover, secure with plastic tape and you’re done. VIII. JUDGING OR EVALUATION 6. 7. 8. 9. Quality of Work Speed and Accuracy Use and care of Tools Knowledge or related information 10. Attitude, Punctuality, Attendance REMARKS Weight 20% 20% 20% 20% Student’s Rating Teacher’s Rating 20% 100% EDDIE E. SABESAJE, Ph. D. Assoc. Prof. IV PROJECT PLAN IN Home Industries Name: Charmaigne P. Mendrez Name of Project: Wood Craft (Mini Picture Frame) Block or Unit: IA 605 Date Begun: August 12, 2017 Date Finished: August 12, 2017 No. Of Hours Spent: 2 hours PURPOSE: 4. Utility 5. Operation: 6. Related Information: IX. PLANNING: D. Working drawing: Draw the pictorial drawing and orthographic projection of the project you wish to make. Use the back space or another sheet. E. Bill of Materials Qty. 20 1 1 1 1 Unit pcs pc sheet set pc Description Popsicle sticks Glue stick 3x3 inch picture Handmade quilled flowers 24inch twine Unit Cost 0.3 5 8 10 3.00 Total Cost of Materials: ₱32.00 Cost of Finish Project : ₱48.00 Tools and Equipment Needed: Glue gun, pair of scissors X. PROCEDURE 1. Assemble the popsicle sticks into a frame; use glue gun in binding the sticks. 2. Assemble the frame stand. 3. Match the frame and the frame stand. Adjust when necessary. Total 6.00 5.00 8.00 10.00 3.00 4. Attach embellishments using glue gun– the twine, quilled flowers, wooden heart. 5. Attach printed picture on the back of the frame using glue gun, place the frame on its stand and you are done! XI. JUDGING OR EVALUATION 11. 12. 13. 14. Quality of Work Speed and Accuracy Use and care of Tools Knowledge or related information 15. Attitude, Punctuality, Attendance REMARKS Weight 20% 20% 20% 20% Student’s Rating Teacher’s Rating 20% 100% EDDIE E. SABESAJE, Ph. D. Assoc. Prof. IV Name of Project: Shell Craft (Wall Decor) Block or Unit: IA 605 Date Begun: July 27,2017 Date Finished: July 27, 2017 No. Of Hours Spent: 4 hours