Uploaded by nitab42373

LAG-190 GL of Aquagen 27-07-2012

advertisement
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
Article-1
Definitions
1.1
In this Licence
(a)
"Act" means the Regulation of Generation, Transmission and
Distribution of Electric Power Act, 1997 (XL of 1997);
(b)
"Authority" means the National Electric Power Regulatory Authority
constituted under Section 3 of the Act;
(c)
"Licensee" means Aauagen (Pvt.) Limited;
(d)
"Power Purchaser" means a bulk power consumer [i.e. PNS
KARSAZ/PAKISTAN NAVY (PN)] purchasing electricity from the
Licensee, pursuant to a power purchase agreement;
(e)
"Rules" mean the National Electric Power Regulatory Authority
Licensing (Generation) Rules, 2000.
1.2
Words and expressions used but not defined herein bear the meaning given
thereto in the Act or in the Rules.
Article-2
Application of Rules
This Licence is issued subject to the provisions of the Rules, as amended
from time to time.
Article-3
Generation Facilities
3.1 The location, size (capacity in MW), technology, interconnection
arrangements, technical limits, technical
specifications and other details
Page 2 of 5
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
specific to the power generation facilities of the Licensee are set out in Schedule-I
to this Licence.
3.2
The net capacity of the generation facilities of the Licensee is set out in
Schedule-II hereto.
Article-4
Term of Licence
4.1
This Licence is granted for a term of eleven (11) years from the date of its
issuance.
4.2
Unless suspended or revoked earlier, the Licensee may within ninety (90)
days prior to the expiry of the term of the Licence, apply for renewal of the Licence
under the Licensing (Application and Modification Procedures) Regulation, 1999
as amended or replaced from time to time.
Article-5
Licence Fee
After the grant of the Generation Licence, the Licensee shall pay to
the Authority the Licence Fee, in the amount and manner and at the time set out in
the National Electric Power Regulatory Authority (Fees) Rules, 2002.
Article-6
Tariff
The Licensee shall charge only such tariff which has been approved,
determined, adjusted or specified by the Authority.
Article-7
Generating Capacity Reserve Requirements
The Licensee shall comply with the minimum and maximum generation
capacity requirements as stipulated and agreed in the Po er Purchase Agreement
signed between the Licensee an.
ri'd' - "urchaser.
'
_1
4 REGISTRAR
Page 3 of 5
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
Article-8
Competitive Trading Arrangement
8.1
The Licensee shall participate in such measure as may be directed by the
Authority from time to time for development of a Competitive Trading
Arrangement. The Licensee shall in good faith work towards implementation and
operation of the aforesaid Competitive Trading Arrangement in the manner and
time period specified by the Authority. Provided that any such participation shall be
subject to any contract entered into between the Licensee and another party with
the approval of the Authority.
8.2
Any variation or modification in the above-mentioned contracts for allowing
the parties thereto to participate wholly or partially in the Competitive Trading
Arrangement shall be subject to mutual agreement of the parties thereto and such
terms and conditions as may be approved by the Authority.
Article-9
Maintenance of Record
9.1
As required under sub-rule (1) of Rule 19 of the Rules, the Licensee shall
keep complete and accurate record and data in respect of all aspects of the
generation business and the second-tier supply business, in their original as well
as in electronic form. Such record, subject to just claims of confidentiality, be
accessible by authorized officers of the Authority.
9.2
Unless provided otherwise, all record and data shall be maintained for a
period of five (5) years. The Licensee shall not destroy or dispose off any such
record or datafter
t the aforesaid period without thirty days prior written notice to
the Authority.
NEPRN
Page 4 of 5
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
Article-10
Compliance with Performance Standards
The Licensee shall comply with the relevant provisions of National Electric
Power Regulatory Authority Performance Standards (Generation) Rules, 2009 as
amended or replaced from time to time.
Article-11
Compliance with Environmental Standards
The Licensee shall comply with the environmental standards as may be
prescribed by the relevant competent authority from time to time.
Article-12
Provision of Information
12.1 The obligation of the Licensee to provide information to the Authority shall
be in accordance with Section 44 of the Act.
12.2 The Licensee shall be subject to such penalties as may be specified in the
relevant rules made by the Authority for failure to furnish such information as may
be required from time to time by the Authority and which is or ought to be or has
been in the control or possession of the Licensee.
Article-13
Restriction for the Generation Facility
13.1 The generation facility of the Licensee as detailed in Schedule-I shall be
operated and utilized solely for the supplying power to PNS KARSAZ/PAKISTAN
NAVY (PN) for its installations for defence purpose.
1
13.2 No part of the generation facility of the Licensee will be utilize
for any
commercial activity in the vicinity PNS KARSAZ/PAKISTAN NAVY (PN).
Page 5 of 5
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
SCHEDULE-I
The Location, Size (i.e. Capacity in MW), Type of Technology,
Interconnection Arrangements, Technical Limits, Technical/Functional
Specifications and other details specific to the Generation acilities of the
Licensee are described in this Schedule.
Page 1 of 10 of Schedule -1
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
PROPOSED ELECTRICAL MD
Plant Layout & Single Line Diagram of
Electrical System
.
•
0
•
I
I
HU I
I
-1
I1
a
—
I
I,
iii 1 I I
i
I
r
i
• ii- I!:
I
Ni1111
I i
1
I
_N—.._1.
Iii
1
i1
_
iiit
—
—
itI
i
M/s Aquagen (Private) United
r
1
I-
\.
N..
was
li
Dot:
-
Ins :
-
5
I
..
..
i
*
OrientEnergy Systems (PvL)Ltd
! D
12
2 /
di
.
q
1
1
,
......_..
\
__, 4
I
4
J
2
IN
2
i
3
i1i
_
1
si
Z
I
u-
3 3 3
Page 4 of 10 of Schedule -I
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
INTERCONNECTION/TRANSMISSION
ARRANGEMENT FOR THE DISPERSAL OF
POWER FROM THE POWER PLANT
The Power generated by Aquagen (Private) Limited (APL) from its proposed
Natural Gas operated Thermal Generation facility shall be dispersed to PNS
Karsaz/Pakistan Navy (PN), Karachi directly.
The Interconnection/Transmission Arrangement for the above mentioned
facilities will be at 11 KV voltage; connecting the generation facility of APL to 11- KV
Sub-Station through one double circuit 11 KV underground Feeder.
The final Interconnection and Transmission Arrangement(s), for the dispersal of
power, as agreed byl APL and PNS Karsaz/PN shall be communicated to NEPRA in
due course of time.
Page 5 of 10 of Schedule -I
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
Details of
Generation Facility/
Power Plant
(A).
General Information
(i).
Name of Applicant
Aquagen (Private) Limited
(.
ii)
(1'
Registered/Business
Office
495-Deh Landhi, Main National Highway, Karachi.
(iii).
Plant Location
Hanif SRE, PNS Karsaz, Habib Rehmatullah
Road, Karachi.
(iv).
Type of Generation
Facility
Thermal Co-Generation
(B).
Plant Configuration
(i).
Plant Size Installed
7.357 MW
Capacity (Gross ISO)
(ii).
Type of Technology
(iii).
Number of
Units/Size (MW)
Power Plant (with Gas Engines)
Gas Engine
Steam
Turbine
Gas Engines
(iv).
(v).
Unit Make & Model
Steam
Turbine
7 x 1.053 MW Gas Engines
None
General Electric Jenbacher/JGS
320 GS-N.L
N/A
Commissioning
/Commercial Operation January 01, 2012
Date (CoD)
' As prowled by the Licensee
Page 6 of 10 of Schedule -I
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
Minimum Expected
Life of the Facility from
Commissioning/ CoD
(C).
25 Years
Fuel Details
(i).
Main Fuel
(ii)
''
Alternative/Back
Fuel
(iii)
Start-Up Fuel
Same as Main fuel
(iv).
Fuel Source
(Imported/Indigenous)
Indigenous
(iii).
Fuel Supplier
Sui Southern Gas Company Limited
(iv).
Supply Arrangement
Through Pipeline
(D).
Natural Gas (Pipeline Quality)
Up-
Not Applicable (N/A)
Emission Values (Main Fuel)
(i).
SOx
0 mg/Nm3
(ii).
NOx
<500 mg/Nm3
(iii).
CO
950 mg/Nm3
(iv).
NHMC
50 mg/Nm3 )
150
Page 7 of 10 of Schedule -I
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
(E).
Cooling System
Cooling Water
Source/Cycle
(F).
Tube Wells installed at Site/Closed Loop
Plant Characteristics
(i).
Generation Voltage
11 KV
(ii).
Frequency
50 Hz
(iii).
Power Factor
0.8
i \
(iv).
Automatic Generation
Control (AGC)
NA
(v).
Ramping Rate
NA
(vi).
Time required to
Synchronize to Grid
and loading the
complex to full load.
NA
Page 8 of 10 of Schedule -I
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
Information Pertaining to the
Bulk Power Consumer-BPC (in the Name of PNS Karsaz) of the Licensee (i.e.
Aquagen (Private) Limited (APL)1
One (01)
A.
No. of Consumers
B.
Location of consumers (distance PNS Karsaz, Hanif SRE,
and/or identity of premises)
Rehmatullah Road, Karachi.
C
Contracted Capacity and Load
PNS Karsaz
Factor for consumer
Habib
5.00 MW
Specify Whether
(I)
a
(ii)
(iii)
The consumer is an
Associate undertaking of
the APL- If yes, specify
percentage ownership of
equity;
N/A
There are common
directorships:
N/A
Either
can
exercise
influence or control over Only contractually
the other.
Specify nature of contractual
Relationship
E.
0)
Between each consumer
and APL.
(ii)
Consumer and KESC.
Firm Supply of Electricity on Continuous
basis
Yes/ C-2 Bulk tariff from KESC as back
F.
Any other information deemed
relevant to the BPC for
disclosure to or for consideration
of NEPRA.
up consumer
N/A
/
A
L1
Page 9 of 10 of Schedule -I
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
Information Regarding Distribution Network for
Supply of Power to Bulk Power Consumer (in the Name of
Aquagen (Private) Limited -APL)
A.
No. of Feeders
Two (02)
B.
Length of Each Feeder (Meter)
600 Meter
C
Length of Each Feeder to each -DoConsumer
D.
E.
F.
G.
In respect of all the Feeders,
describe the property (streets,
farms, Agri land, etc.) through,
under or over which they pass
right up to the premises of
customer, whether they crossover or pass near the DISCO
(i.e. KESC) lines.
The 11 KV Underground Cable supplying
power to PNS KARSAZ is located on naval
base owned by (Pakistan Navy) PN,
without any crossing etc.
Whether owned by APL,
Consumer or DISCO -(deal
with each Feeder Separately)
- If owned by DISCO,
please furnish particulars of N/A
contractual arrangement
- Operation and
The Operation and Maintenance is the
maintenance responsibility
responsibility of PNS Karsaz (i.e. BPC).
for each feeder
Whether
connection
with
network of DISCO exists
Yes/C-2 Bulk tariff from KESC (as back up
(whether active or not)- If yes,
provide details of connection arrangement)
arrangements (both technical
and contractual)
Any other network information
deemed relevant for disclosure N/A
to or for consideration of
NEPRA.
i
Page 10 of 10 of Schedule -I
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
SCHEDULE-II
The Installed/ISO Capacity (MW), De-Rated Capacity At Mean Site
Conditions (MW), Auxiliary Consumption (MW) and the Net Capacity
At Mean Site Conditions (MW) of the Generatio acilities of
Licensee is given in this Schedule
Page 1 of 2 of Schedule-II
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS Karsaz
Habib Rehmatullah Road
Karachi
Sindh
SCHEDULE-II*
1.
Installed Capacity Gross ISO
7.357 MW
2.
De-rated Capacity at Mean Site Conditions
6.620 MW
3.
Auxiliary Consumption
00.100 MW
4.
Net Capacity at Mean Site Conditions
6.52 MW
Note
All the above figures are indicative only as provided by the Licensee. The
Net Capacity available to PNS Karsaz for dispatch will be determined through
procedure(s) contained in the Bi-lateral Agreement(s) or any other applicable
document(s).
• As provided • he Licensee
Page 2 of 2 of Schedule-II
Generation Licence
Aquagen (Pvt.) Limited
Hanif SRE, PNS KARSAZ
Habib Rehmatullah Road
Karachi
Sindh
Authorization
by National Electric Power Regulatory Authority (NEPRA) to
Aquagen (Pvt.) Limited
Incorporated under the Companies Ordinance, 1984
Under Corporate Universal Identification
No. 0072707, dated June 03, 2010
NEPRA GENERATION LICNCE No. SGC/79/2012
For
Sale to Bulk Power Consumer(s)
Pursuant to Section 22 of the Act and Rule 7 of the NEPRA Licensing
(Generation) Rules-2000, the Authority hereby authorize Aquagen (Pvt.) Limited
(Licensee) to engage in second-tier supply business, limited to the following
consumers also mentioned in Schedules-I of the Generation Licence No.
SGC/79/2012.
1.
PNS KARSAZ/ PAKISTAN NAVY (PN)
(Shaukat All Kundi)
Member
.2- S 0 "?.- •
42
(Habibullah Khilji)
Member
a'Yr(Khawaja Muhammad Naeem)
Member
(G h iasudd in iChmed )
Member/Acting Chairman
Page 1 of 1
Download