Global HRIS Project - Phase 1 Steering Committee June 22, 2021 KKC HR / KKC ICTS / Accenture Agenda 1. Executive Summary 2. Global Design Result 3. Risk / Action / Issue / Decision Situation 4. System Replacement Plan © Kyowa Kirin Co., Ltd. 2 Agenda 1. Executive Summary 2. Global Design Result 3. Risk / Action / Issue / Decision Situation 4. System Replacement Plan © Kyowa Kirin Co., Ltd. 3 國井さん Executive Summary As Global Design Workshop, KKC and Accenture had 8 days / 40 hours workshop for determining Global Design. For finalizing Global Design, KK and Accenture had 37 individual meetings (approx. 54 hours). As the result of the global design discussion, 4 challenging points which we found during Discovery phase could be converged. In addition, we found 1 possible attention point of SuccessFactors Implementation during Global Design. The point can be manageable with workaround. As the overall status, fortunately, it seems there is no issue for proceeding Iteration / Trainer’s Training / User Acceptance Test from work effort perspective (excluding Global Data Hub Integration) After Phase 1 go-live, A AMS (Application Maintenance Support) will be needed. AMS discussion needs to be completed by the end of August. B Phase 2 prioritization is also needed. Also, in the previous steering committee (the end of Discovery Phase), we received feedback regarding “System Replacement Plan” and ICTS members will explain it today. Today, the project would like Murata-san / Hirose-san to update the latest. The next steering committee will be around the end of August for reporting Trainer’s Training / User Acceptance Test. © Kyowa Kirin Co., Ltd. 4 Ref) Proposal & Contracting Schedule for AMS / Phase 2 2021 Mar Current Project Delivery (Phase 1) A AMS B Phase 2 © Kyowa Kirin Co., Ltd. Apr May Jun Jul Aug Sep Oct Nov Dec Discovery / Imple Phase 1 HOPE Integ Contract Discussion Scheme Discussion w/ Rough Estimation Prioritization of Module Rough Estimation Contracting & Transition Application Maintenance Support (Scheme / Duration should be discussed) 2 Need to discuss whenPhase is feasible (Scope / Timing / Duration should be discussed) timing for the further phase. Official Estimation & Contracting 5 小河さん Executive Summary Global Design Highlight – Challenging Point found in Discovery Phase During the discovery phase, we found 4 challenging points. As the result of Global Design discussion, we recognized all points will not be critical. Challenging Points (Discovery Phase) Global Design Result 1. Almost no global alignments for the key HR Data Items (Job level, grading etc.) 1. Global Data Category (Portlet) and Field could be determined. Performance & Goal Management 1. Current 1st/2nd Layer performance evals cannot be configured in SuccessFactors (including Rating) 2. Performance will be evaluated only with goals because competencies are not aligned globally yet (miss to enjoy SuccessFactors Functions enough) 1. 1st/2nd Layer performance evals needs to be manual calculation in SuccessFactors. But the design and workaround could be concluded. 2. Performance/Goal Forms (w/o competency) / Route Map (Workflow) can be one global template. Succession Planning 1. Kyowa Kirin Succession Planning Policies/Operation Rules(such as Process Flow, detail criteria to refer data) are not concrete enough to enjoy SuccessFactors 1. Global Design for Succession Planning is in progress. Employee Central © Kyowa Kirin Co., Ltd. 6 小河さん Executive Summary Design Result – Challenging Point during Design Phase We discovered Kyowa Kirin Challenging Points during Design Phase. So, we need to consider workarounds or more clarification/definition to manage the challenging points. Baseline Assumption 1. Target go-live date will be on Sep 30. HOPE Integration © Kyowa Kirin Co., Ltd. Global Design Result 1. There is a possibility go-live date might be scheduled on Oct 31. (No impact from both business / system viewpoint) 7 Agenda 1. Executive Summary 2. Global Design Result 3. Risk / Action / Issue / Decision Situation 4. System Replacement Plan © Kyowa Kirin Co., Ltd. 8 里内 Weekly Implementation Phase 1 Schedule Weekly Schedule for Implementation Phase 1: Though September 30th, 2021. Legend: April Kyowa Kirin HR Both Kyowa Kirin / ACN Activities 12 19 May 26 3 10 17 June 24 31 7 14 July 21 Steering Committee for Discovery Phase ACN Activities 28 5 12 August 19 26 2 9 16 September 23 30 6 13 20 October 27 4 11 18 25 Steering Committee for Global Template Steering Committee for TT/UAT Iteration Prep WS Workshop Function Data Migration GDH Iteration 1 (Global) Iteration 2 (Local) Explanation Extract Data Design Prep TT Data Valid TT (Trainer’s Training) Import Extract Data Design Deployment Data Valid System Test Plan / Execution Build/Unit Test Integration HOPE UAT (User Acceptance Test) Build/Unit Test System Test Plan / Execution To Be Contracted Import Deploy Deploy *Workshop / Each Meeting on Iteration / Data Migration / Trainer’s Training will be conducted in one particular timezone for all regions. *Summer vacation is not considered in this schedule. © Kyowa Kirin Co., Ltd. 9 里内 Overall Status of Global Design Global Design Workshop was completed successfully. As the result of global design (incl Integration Design), there are two attention items. Function / Area Status Attention Comment EC No attention item. PMGM 1st/2nd Layer performance evals needs to be manual calculation in SuccessFactors. But the design and workaround could be concluded. SP No attention item. Data Migration No attention item. System Function HOPE (Oracle EBS) Integration GDH (Global Data Hub) © Kyowa Kirin Co., Ltd. There is a possibility the go-live date may be on Oct 31. No attention item. 10 中川さん Attention: 1st / 2nd Layer Performance Form Attention Level Based on Kyowa Kirin policy, “Financial Goal” should not be included in “Total Revived Score”. However, the auto-calculated “Total Received Score” will include “Financial Goal” based on the current SuccessFactors specification. For that, box to manually input “Total Received Score (Excluding Financial Score)” is also prepared. 1 Screen of Executive Performance Assessment Attention Rating will be done in each goal item. 2 Score Allocation (In total 100) is entered for each goal item. 3 Rating will be reflected in 1 2 3 “Total Received Score” and table. “Total Received Score” is calculated by summing up all the Scores, including Financial Goals. 4 “Total Received Score (Excluding Financial Score)” can be manual © Kyowa Kirin Co., Ltd. inputted. Workaround / Conclusion 1. In the form, “Total Received Score” will be auto-calculated but include “Financial Goal”. 2. For that, box to manually input “Total Received Score (Excluding Financial Score)” is also prepared. 3. HR will do double check with the ““Total Received Score (Excluding Financial Score)” with SuccessFactors report. 4 11 大木さん? Attention: Go-live Timing for HOPE Integration Attention Level * “HOPE”: Japan Oracle EBS Originally target go-live date for HOPE integration is Oct 1. But currently development schedule is arranging with the related vendor. So, there is a possibility the go-live timing for the integration might be on the end of Oct. (The go-live timing can be finalized around early July) Timeline: April 12 19 May 26 3 10 17 June 24 31 HOPE (Current Target) Design HOPE (Possible Go-live Timing) Design 7 14 July 21 28 5 12 August 19 26 2 9 Build/Unit Test Build/Unit Test 16 September 23 30 6 13 System Test Plan / Execution 20 October 27 4 11 18 25 Deploy System Test Plan / Execution Deploy Impact of go-live date change: Type of Impact Impact Business No Japan HR can continue to access HOPE. Also Japan HR can access SF with data as of migration timing. So, there is no impact for Japan HR from business perspective. System No SF data coming from HOPE will be integrated from SF to Global Data Hub (GDH). But no system (excl HOPE) will need to capture Japan HR data from GDH. So, there is no impact from system perspective. © Kyowa Kirin Co., Ltd. Reason of Impact Analysis 12 Ref) Integration Figure related to SF/HOPE Global HRIS SF SAP CPI Blob Storage Global Data Hub Related Systems HR Hub (人事Hub) HOPE (EBS) SF SFTP SF Provisioning SSO with E-mail address Azure AD © Kyowa Kirin Co., Ltd. 13 Agenda 1. Executive Summary 2. Global Design Result 3. Risk / Action / Issue / Decision Situation 4. System Replacement Plan © Kyowa Kirin Co., Ltd. 14 里内 Num of Risk / Action / Issue / Decision Item until Jun 18 Totally, 414 RAID items were raised in this project. Highlighted items will be shown in the next slide. Status © Kyowa Kirin Co., Ltd. Risk Action Issue Decision Total Open 4 56 1 - 61 In Progress 0 43 0 - 43 - On Plan 0 42 0 - 42 - Over Due 0 1 0 - 1 Pending 0 0 0 - 0 Withdrawn 0 0 0 - 0 Closed 4 164 0 142 310 Total 8 263 1 142 414 15 Highlighted Risks / Issues for the Project As of now, totally 5 risks / issue are opened. And 2 risks will be highlighted in the following table. # Title Description Action Plan / Mitigation Plan RISK- Difficulty on following Difficulty to keep focusing on the targetPassive Decision mindset : prefer to 0007 target agenda agenda in a meeting because of less say "not to say Decision, just Small recognition of this global project Decision Design principal. RISK- Request of module 0008 scope increased for future phase © Kyowa Kirin Co., Ltd. In meeting, there are many requests of Future phase policy needs to be adding module/function in aligned with each region HR and SuccessFastors such as mobile module / function prioritization will be function, recruiting, compensation etc. needed as a part of expectation Need to have alignment when and control. what function/module exactly implement. 16 Ref) RISK-0007 - Ground Rules of SuccessFactors Quickness Priority Implementation Project (1/2) © Kyowa Kirin Co., Ltd. 1 Use standard function of SuccessFactors, not to develop ad-on custom program as much as possible (The more customization, the more cost will be required) 2 Develop “Global Template (Global standard process & system function)” considering “To-Be HR Operating Model”. As-Is process shall not be the reason to change the “Global Template” without specific reason 3 To meet local regulatory requirement and for requirement which has critical impact on business in each country, only MUST HAVE country specific field, region / local permission can be configured. Other local requirements should be prioritized lower, and will be managed in the later phases. 4 Once “Global Template” is defined in Iteration 1, need to raise a request to obtain approval from Project Management, before any change can be made 17 Ref) RISK-0007 - Ground Rules of SuccessFactors Quickness Priority Implementation Project (2/2) The Implementation approach of this project will be “as minimum as possible” by utilizing the Global Template (Fit to Standard). Only mandatory requirement such as Legal / Regulatory items shall be considered as country specific configuration. Governance Global Template Standardization Policy Project Management Local Requirem ents Global Design Global standard process Specific requirements of each country/ company Global common functions and configuration Product Version up Technology Evolution © Kyowa Kirin Co., Ltd. 18 Agenda 1. Executive Summary 2. Global Design Result 3. Risk / Action / Issue / Decision Situation 4. System Replacement Plan © Kyowa Kirin Co., Ltd. 19 HRIS System Function Allocation The functions that are globally integrated into one system and the functions that should be held in locally are organized as follows. Global Scope Acquisition & Recruitment Local Scope 〇 〇 Recruitment & Deployment Transfer & Deployment 〇 Separation & Retirement 〇 Learning Delivery Learning & Development 〇 Assessment & Certification 〇 Skill & Competency Management 〇 Career Management Performance & Career 〇 Performance Review 〇 Succession Planning 〇 Core HR Personnel Data Management 〇 HR Information Organizational Data Management Management 〇 HR Report 〇 Employee Self Service Compensation Compensation Management Process Payroll & Incentive Pay Process Pension & Retirement Pay Expense & Reimbursements Benefits Health & Welfare Housing The legal requirements of each country are different and Other Benefits changing constantly, so that there is no benefit in global Workforce Management Labor Planning standardization. Time & Attendance In addition to legal requirements, payroll and attendance also depend on local rules, such as allowances and public holidays, and managing them globally would be complicated and © Kyowa Kirin Co., Ltd. unfeasible. 〇 〇 〇 〇 〇 〇 〇 〇 〇 20 HRIS System Function Allocation We will consider replacing them in the future. Will be replaced or newly installed Under consideration for replace NA Acquisition & Recruitment Recruitment & Deployment Greenhouse →Icims.com Transfer & Deployment Separation & Retirement Learning Delivery Learning & Development Assessment & Certification EMEA APAC JP Greenhouse Excel Cityray saraminrecruiting sys. Scratch None Linkedin LearnUpon Excel Cityray Scratch Excel Cityray Jade System Scratch Excel Linkedin Linkedin LearnUpon Excel Skill & Competency Management Career Management ADP Performance & Career Performance Review Oracle EBS SucessFactorsSuccess Factors Succession Planning Excel or Manual work SucessFactors Personnel Data Management HRIQ Organizational Data Management SFFactors Success Core HR HR Report HR Information Management Employee Self Service © Kyowa Kirin Co., Ltd. ADP Cascade Cityray Jade System Scratch Oracle EBS Each local Core HR will manage only the information necessary to run the local system. 21