FIRE INSPECTION REQUIREMENTS

advertisement
INSPECTION OF:
FIRE INSPECTION
INSPECTION METHOD TEMPLATE
SANS 0400 SECTION T
AS PER:
GENERAL
Client moving in.wooden doors
Area dived by wooden walls
Clean and well illuminated
SAFETY DISTANCES
Separate from other parts of the building ie business same entrance and exit
FIRE RESISTANCE OF EXTERNAL WALLS
External walls brick and motar
Internal load bearing walls brick and motar
Partitions are dry wall /rhinoboard
OCCUPANCIES IN BUILDINGS
Fashion design business next door
FIRE PERFORMANCE GENERAL
No sprinklers
All signages for ohs needed
And emergency signs to be installed
1x 2.5 dcp to be mounted
FIRE RESISTANCE OF OCCUPANCY AND DIVISION SEPERATING ELEMENTS
Walls are a minimum of 5 hour burn rate
Partition are 30 min burn rate
DGA and RSS Training Academy
Page 1 of 9
FIRE STABILITY OF STRUCTURAL ELEMENTS OR COMPONENTS
Medium computers hard drives extension cords ,cellphone plugs
15 students at time
PARTITION WALLS AND PARTITIONS
Brick
PROTECTION OF OPENINGS
Burglar guards of flat bar
1 to have emergency opening for escape
RAISED ACCESS AND SUSPENDED FLOORS OF COMBUSTIBLE MATERIALS
None
ROOF ASSEMBLIES AND COVERINGS
No trap door, solid concrete
CEILINGS
Concrete ceiling
FLOOR COVERINGS
Veniolium -worn out, natural pathways-suggestion of interlocking rubber mat as over carpet usage
Page 2 of 9
WALL FINISHES
Good condition painted
PROVISION OF ESCAPE ROUTES
Only one corridor to stay away
Signage to be installed
EXIT DOORS
Same as entrance door
FEEDER ROUTES
Only one corridor from lift and stairs to business front door
EMERGENCY ROUTES
Need to be marked (signage to be installed)
Emergency evacuation plan to be drawn
Emergency tel no in place
DIMENSIONS OF COMPONENTS OF ESCAPE ROUTES
Corridor no extra lighting
No numbering of floors
Hose reels to be services 08/23 FE Missing
Doors unmarked
Client on second floor,mainsecurity on 4th floor,8 floor in total
WIDTH OF ESCAPE ROUTES
1.5 meters
Page 3 of 9
BASEMENTS
None
STAIRWAYS AND OTHER CHANGES OF LEVEL ALONG ESCAPE ROUTES
Main staircase in use
VENTILATION OF STAIRWAYS IN AN EMERGENCY ROUTE
None
PRESSURIZATION OF STAIRWAYS IN AN EMERGENCY ROUTE
None
OPENING IN FLOORS
None
EXTERNAL STAIRWAYS AND PASSAGES
None
LOBBIES FOYERS AND VESTIBULES
Clean need correct signage and marking as discussed with client
Page 4 of 9
MARKINGS AND SIGNPOSTING
Not be placed
LIGHTING OF FEEDER AND EMERGENCY ROUTES
None
FIRE DETECTION AND ALARM SYSTEMS
Building use a siren for fire emergency
Client have a first aid bag with burns kit
Suggested regulation 3 box
PROVISION OF FIRE FIGHTING EQUIPMENT
One dcp 2,5 kg to be mounted correctly
One co2 2kg to be placed in computer lab
One 9kg dcp for complete coverage as backup
WATER RETICULATION FOR FIRE FIGHTING PURPOSES
Hose reel in corridor ,internal hydrant in corridor
HOSE REELS
Two hose reels to be serviced august 2023
HYDRANTS
Internal hydrant
Page 5 of 9
SPRINKLER SYSTEMS
None
PORTABLE FIRE EXTINQUISHERS
Require 1 co2 2kg for computer lab
MOBILE FIRE EXTINGUISHERS
One in place
9kg needed as a backup
Co2 as a suggestion
FIRE STOPPING OF INACCESSIBLE CONCEALED SPACES
Outside area for emergency exit
PROTECTION IN SERVICE SHAFTS
Lifts
SERVICES IN STRUCTURAL OR SEPERATING ELEMENTS
None only stairs
SMOKE CONTROL
Natural ventilation
Doors to windoors
Page 6 of 9
AIR-CONDITIONING AND VENTILATION SYSTEMS
None
NO SMOKING SIGNS
No smoking signs,need to be placed
LIFT SHAFTS
One main set in building
LIFT
One good condition
FIREMEN’S LIFT
None
STRETCHER LIFT
None
STAGE AND BACKSTAGE AREAS
None
Page 7 of 9
SEATING ARRANGEMENTS IN AUDITORIA OR HALLS ON GRANDSTANDS
None
PARKING GARAGES
None
OPERATING THEATRES AND INTENSIVE CARE UNITS
None
INSTALLATION OF LIQUID FUEL DISPENSING PUMPS AND TANKS
None
INSTALLATION OF OTHER TANKS
None
ACCESS TO BUILDINGS FOR FIRE FIGHING AND RESCUE PURPOSES
Stairways, landing area outside of second floor
Mountain rescue number available
PRESUMED FIRE RESISTANCE OF BUILDING MATERIALS AND COMPONENTS
2 hours breakthrough
Page 8 of 9
NON-COMBUSTIBLE BUILDING MATERIALS
Brick and motar
SURFACE FIRE INDEX OF MATERIALS
Medium
FIRE INDEX OF FLOOR COVERINGS
Low
PHOTO: 5 photographs taken
WRIITEN: written report
LINE MANAGER:
INSPECTOR:
DATE
TIME:
OWNERS OR REPRESENTATIVE SIGNATURE: Signed on hard copy
above document to be emailed to management