In case, any of the sections is not readily available in the local market, approved weight and dimensional equivalent materials will be used as substitute after receiving client’s confirmation. EXCLUSION: 1. 2. 3. 4. 5. 6. Design, calculation and shop drawing Delivery, unloading and installation of fabricated items at site. Fireproofing, Painting over Galvanizing Any third party inspection Supply of fasteners and anchor bolts Anything which is not mentioned in the above scope of work The following are excluded from our scope of supply and works since those are not covered in the RFQ: ▪ Painting. ▪ Transportation to job site. ▪ Any connection design, design verifications or modifications. ▪ Any items / works not mentioned in the scope. ▪ Any restrictions / supplementary requirements beyond the specifications. ▪ Any requirements not covered in the above shall be charged extra cost. ▪ Geotechnical study / site survey / TPI inspection etc. ▪ Stainless steel / Alloy steel material, if any. ▪ Packing like wooden base / pallet / cage, if any. ▪ Civil / Electrical works, if any ▪ Supply any type of Fasteners, Clips, Anchor Bolts, Embedded items and Grouting etc. ▪ No modification works, if any drawing revised later stage. ▪ We will provide Structural Steel Members / Plate / sheets / material MTC with heat / lot / batch marking in the materials. ▪ Submission of Engineering & QC documents will follow as per standard format & specification,