E-BIKE PRODUCTION WORKFLOW 1) Order is received from the production planning department, e-bike materials are drawn to the assembly area to start the assembly process. 2) Chassis number is written on the chassis. 3) Chassis label in accordance with the written chassis number,attached to the chassis 4) Handlebars are mounted on the numbered chassis. 5) Display, gear mechanism, brake levers and horn are mounted on the steering wheel. 6) The steering wheels, which are ready for assembly, are mounted on the chassis. 7) The steering wheel is made ready for electrical connection by drawing the electrical wiring on the mounted chassis. 8) Rear fender is mounted on the rear part of the chassis with electrical connections. Rear fender is mounted on the rear part of the electrically connected chassis. 9) Gearbox is assembled and made ready for chain assembly. 10) After the rear of the chassis is ready for assembly, the front fender assembly is mounted. 11) Front headlights are installed. 12) Front brake center assembly is done 13) It is made ready for assembly by mounting a stop lamp on the rear passenger iron. 14) Motor and gear are mounted on the rear wheel. 15) Rear passenger iron is mounted on the rear fender. 16) ) Brake adjustment is made by pulling the rear brake rope. 17) For chain assembly, bottom bracket and pedal assembly are made. 18) A jack is mounted to keep the vehicle in balance. 19) After the rear assembly is finished, the front wheel and front disc are assembled. 20) Front brake adjustments are made by pulling the front brake center rope. 21) The brain (main board) and cable connections of the electrically installed vehicle are made. 22) The electrical components are checked by assembling the battery to the vehicle with electrical connections. 23) Chain assembly is done. 24) The gear shift settings and general controls of the vehicle with the chain attached are made and sent to the final control test area. 25) Vehicles whose assembly processes have been completed are tested in the final control test area according to our final control test forms prepared in accordance with ISO quality standards. 26) Last checked vehicles are sent to the labeling department for brand labeling and their labels are made. 27) ) Bicycles whose labeling process is completed are kept in a room with a temperature of 30°C for at least 3 hours to dry the paint and labels. 28) Bicycles that have been labeled are taken to the packaging area and cleaned. 29) Bicycles that have been cleaned; It is protected so that both the vehicle label and paint and the electronic and mechanical parts of the vehicle are not damaged during shipment. 30) vehicles, whose cleaning and vehicle protection processes are completed, are folded and made ready for packing 31) Bicycles placed in the parcel are fixed to the parcel, preventing the vehicle from moving in the parcel during shipment 32) Bicycles that are placed in a box and packed are made ready for shipment by strapping them with a box strip. 33) Bicycles that are ready for shipment are kept in the stock area.