ITEM NO. DESCRIPTION OF TOOL URGENCY OF TOOL AND IT’S APPLICATION WITH SPECIFICATIONS 0.1 FLUKE(USA PRODUCT) 378 FC NON-CONTACT VOLTAGE TRUE RMS AC/DC CLAMP METER WITH iFLEX 0.2 FLUKE (USA ORIGIN PRODUCT) 289 TRUE-RMS INDUSTRIAL STAND ALONE LOGGING MULTIMETER WITH TRENDCAPTURE MODEL TYPE-DMM. QTY UNIT COST PER SUB-TOTAL QUANTITY shs shs It is applied on supply cables, LOAD cables, O1 final circuit cables, Distribution phase busbars to determine actual load current consumption which enables to determine the required size of protective device such as circuit-breaker, and the actual size of cable when upgrading the existing electrical installation. It helps to identify the load that over consumes current and this enables the technician to get solution on how to minimize on power consumption. It helps to balance load consumption on three phase system. Hence maintaining power flow stability in the distribution network. The tool is useful during upgrading, maintenance, alteration, extension of electrical installations and fittings. KIT 4,980,000. 4,980,000. It is a daily useful tool both 01 on preventive and collective maintenance on the following troubleshooting of the existing electrical installations such as continuity of conductors, identification of shortcircuits and open circuits, stability of norminal supply voltage both AC/DC. i.e. on generator battery and AC mains equipment and it is therefore urgently to do following purposes; To investigate through measuring to verify power systems Norminal supply voltage of both ac mains (umeme) and power back up at generator set from point of origin at power house to every end user at campus. To investigate through measuring to verify overvoltage and under voltage in the electrical installation network system. pc 4,950,000. 4,950,000. To investigate through measuring to verify short-circuits, earth leakage current/voltage before a tripped circuit breaker is reset and normalized back to service. To investigate through measuring faulty components and equipments, insulation resistance of cables, and continuity of conductors. To capture and store all status trends of electrical quantity measurements carried during fault analysis, routine maintenance measurement of electrical quantities both on mains power and generator power source so as to enable quick planning of the right action needed to be taken for power system stability. So as to eliminate or minimize power disturbances or unnecessary internal power outages 0.3 0.4 0.5 MEGGER DET24C ELLIPTICAL To measure the effectiveness of the 01 CLAMP SHAPE DIGITAL resistance (ohms) of the ground soil EARTH CLAMP surrounding the earth electrode of the main electrical earthing terminal of the structure. To measure the effectiveness of the resistance (ohms) of the ground soil surrounding the earthing electrode of the main earthing terminal of lightening protection. The readings of the instrument in ohms will determine the action to be taken by technician FLUKE9062 PHASE Highly required to ensure mains supply phase 01 ROTATION INDICATOR(USA rotation and synchronized with generator ORIGIN PRODUCT) phase supply. ALUMINIUM HEAVY DUTY To provide safe supporting working platform 01 GUAGE SCALFFOLDING for new construction and installation of new LADDER OF security lights, maintenance, repairing or 2FT(W)X1MTR(L)X5.6MM(H) renovating of security lights and ceiling lights in the building structures which are at different working heights and help lifting materials at once for immediate uses at different heights by the working technical personnel. It reduces a numbery of men needed to support a ladder of a similar height and safety KIT 6,500,000. 6,500,000. kit 2,660,000. 2,660,000. set 13,500,000 13,500,000. of both supporting men and the overhead working person will be at risk. It requires minimal storage facility compared to the similar height of the ordinary ladder Saves working time as it eliminates a lot of time taken when unscrewing security light base support to bring down the light fitting for repairing or replacement and lifting it back to position. This requires a minimum number of 10 men due to weight of the light fitting and tis supporting structure and improper balance of weight of the supporting structure can cause mechanical damages to the men lifting. TOTAL COST 32,590,000.