INSTRUMENTATION

advertisement
ITEM
NO.
DESCRIPTION OF TOOL URGENCY OF TOOL AND IT’S APPLICATION
WITH SPECIFICATIONS
0.1
FLUKE(USA PRODUCT) 378
FC NON-CONTACT VOLTAGE
TRUE RMS AC/DC CLAMP
METER WITH iFLEX
0.2
FLUKE
(USA
ORIGIN
PRODUCT) 289 TRUE-RMS
INDUSTRIAL STAND ALONE
LOGGING
MULTIMETER
WITH
TRENDCAPTURE
MODEL TYPE-DMM.
QTY
UNIT
COST
PER SUB-TOTAL
QUANTITY
shs
shs
It is applied on supply cables, LOAD cables, O1
final circuit cables, Distribution phase busbars to determine actual load current
consumption which enables to determine the
required size of protective device such as
circuit-breaker, and the actual size of cable
when upgrading the existing electrical
installation.
It helps to identify the load that over
consumes current and this enables the
technician to get solution on how to minimize
on power consumption.
It helps to balance load consumption on
three phase system. Hence maintaining
power flow stability in the distribution
network.
The tool is useful during upgrading,
maintenance, alteration, extension of
electrical installations and fittings.
KIT
4,980,000.
4,980,000.
 It is a daily useful tool both 01
on preventive and collective
maintenance
on
the
following troubleshooting of
the
existing
electrical
installations
such
as
continuity of conductors,
identification
of
shortcircuits and open circuits,
stability of norminal supply
voltage both AC/DC. i.e. on
generator battery and AC
mains equipment and it is
therefore urgently to do
following purposes;
To investigate through measuring to verify
power systems Norminal supply voltage of
both ac mains (umeme) and power back up at
generator set from point of origin at power
house to every end user at campus.
To investigate through measuring to verify
overvoltage and under voltage in the
electrical installation network system.
pc
4,950,000.
4,950,000.
To investigate through measuring to verify
short-circuits, earth leakage current/voltage
before a tripped circuit breaker is reset and
normalized back to service.
To investigate through measuring faulty
components and equipments, insulation
resistance of cables, and continuity of
conductors.
To capture and store all status trends of
electrical quantity measurements carried
during fault analysis, routine maintenance
measurement of electrical quantities both on
mains power and generator power source so
as to enable quick planning of the right action
needed to be taken for power system
stability. So as to eliminate or minimize
power disturbances or unnecessary internal
power outages
0.3
0.4
0.5
MEGGER DET24C ELLIPTICAL To measure the effectiveness of the 01
CLAMP SHAPE DIGITAL resistance (ohms) of the ground soil
EARTH CLAMP
surrounding the earth electrode of the main
electrical earthing terminal of the structure.
To measure the effectiveness of the
resistance (ohms) of the ground soil
surrounding the earthing electrode of the
main earthing terminal of lightening
protection.
The readings of the instrument in ohms will
determine the action to be taken by
technician
FLUKE9062
PHASE Highly required to ensure mains supply phase 01
ROTATION INDICATOR(USA rotation and synchronized with generator
ORIGIN PRODUCT)
phase supply.
ALUMINIUM HEAVY DUTY To provide safe supporting working platform 01
GUAGE
SCALFFOLDING for new construction and installation of new
LADDER
OF security lights, maintenance, repairing or
2FT(W)X1MTR(L)X5.6MM(H) renovating of security lights and ceiling lights
in the building structures which are at
different working heights and help lifting
materials at once for immediate uses at
different heights by the working technical
personnel.
It reduces a numbery of men needed to
support a ladder of a similar height and safety
KIT
6,500,000.
6,500,000.
kit
2,660,000.
2,660,000.
set
13,500,000
13,500,000.
of both supporting men and the overhead
working person will be at risk.
It requires minimal storage facility compared
to the similar height of the ordinary ladder
Saves working time as it eliminates a lot of
time taken when unscrewing security light
base support to bring down the light fitting
for repairing or replacement and lifting it
back to position. This requires a minimum
number of 10 men due to weight of the light
fitting and tis supporting structure and
improper balance of weight of the supporting
structure can cause mechanical damages to
the men lifting.
TOTAL COST
32,590,000.