IVANHOE MINES Oyu Tolgoi Project Project No. A2MW Concrete Batch Plant Specification Document No. SP-15-007 Rev. 0 November 14, 2006 Document SP-15-007 Ivanhoe Mines Mongolia Inc., XXK Oyu Tolgoi Project Project No. A2MW Page 2 of 11 Rev 0 CONCRETE BATCH PLANT SPECIFICATION This document has been revised as indicated below. Changes after revision 0 are identified by vertical bars at the right side of the page, with additions being underlined. Please replace all pages of this specification and destroy the superseded copies. Rev No. 0 Originator (name/initials) Bill Thron Rev Date 11/14/06 New Issue Revision Description Issued for Construction Ent APPROVALS ORIGINAL SIGNED BY Client Approval: Steve Garcia Project Manager: Michael Chalker Engineering Manager: Henry Hwa Site Field Engineer: David Kim Site Manager: Dave Williams Originator: Gilbert Foucault Entire Specification Re-issued DATE H:\IVANHOE MINES\430 CONTRACTING\CONTRACTS\K922B CMTCC ONSHORE\2.POST-AWARD\430E.301R\9.SPECS\SWP5_SPECIFICATIONS\SP-15-007 CONCRETE BATCH PLANT SPEC.DOC ARCHITECTURAL Document SP-15-007 Ivanhoe Mines Mongolia Inc., XXK Oyu Tolgoi Project Project No. A2MW Page 3 of 11 Rev 0 CONCRETE BATCH PLANT SPECIFICATION TABLE OF CONTENTS 1.0 GENERAL ............................................................................................................................................... 4 1.1 INTRODUCTION..................................................................................................................................... 4 1.2 PURPOSE ............................................................................................................................................... 4 2.0 CODES AND STANDARDS ................................................................................................................... 4 3.0 REFERENCE DOCUMENTS .................................................................................................................. 5 3.1 PROJECT SPECIFICATIONS ............................................................................................................... 5 3.2 ATTACHMENTS .................................................................................................................................... 5 4.0 QUALITY ASSURANCE/QUALITY CONTROL ..................................................................................... 5 5.0 DOCUMENTATION ................................................................................................................................ 6 6.0 BATCH PLANT ....................................................................................................................................... 6 7.0 MATERIALS............................................................................................................................................ 8 8.0 MATERIAL STORAGE AND HANDLING .............................................................................................. 9 8.1 CEMENT STORAGE .............................................................................................................................. 9 8.2 STORAGE OF AGGREGATES .............................................................................................................. 9 9.0 CONCRETE DELIVERY ....................................................................................................................... 10 10.0 FACILITIES INSPECTION AND CALIBRATION ............................................................................... 10 11.0 RECORDS .......................................................................................................................................... 10 12.0 REPORTS ........................................................................................................................................... 11 13.0 LIAISON WITH ON-SITE TESTING LABORATORY ......................................................................... 11 H:\IVANHOE MINES\430 CONTRACTING\CONTRACTS\K922B CMTCC ONSHORE\2.POST-AWARD\430E.301R\9.SPECS\SWP5_SPECIFICATIONS\SP-15-007 CONCRETE BATCH PLANT SPEC.DOC ARCHITECTURAL Document SP-15-007 Ivanhoe Mines Mongolia Inc., XXK Oyu Tolgoi Project Project No. A2MW Page 4 of 11 Rev 0 CONCRETE BATCH PLANT SPECIFICATION 1.0 1.1 GENERAL INTRODUCTION This specification provides the requirements for production and delivery of ready-mixed concrete for the Ivanhoe Mines Oyu Tolgui project in Mongolia. 1.2 PURPOSE This specification provides the requirements for establishing an on-site Batch Plant for production and delivery of ready-mixed concrete which includes: 2.0 Facilities for receiving, storing, handling, and proportioning materials required to produce concrete. Delivering concrete in appropriate transporting vehicles to various areas of jobsite. Facilities and equipment for testing the concrete produced. Facilities at the Batch Plant for the operating personnel including offices, break rooms, toilets, etc. CODES AND STANDARDS The following codes and standards to the extent specified herein form a part of this specification. When an edition date is not indicated for a code or standard, the latest edition in force at the time of CONTRACTOR’S proposal submittal shall apply. American Concrete Institute (ACI): ACI 304R Guide for Measuring, Mixing, Transportation and Placing Concrete American Society for Testing and Materials (ASTM): ASTM C94 Standard Specification for Ready Mixed Concrete National Ready Mixed Concrete Association (NRMCA): NRMCA QC 3 Quality Control Manual: Section 3, Plant Certifications Checklist: Certification of Ready- Mixed Concrete Production Facilities International Organization for Standardization (ISO): ISO-9001 Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing ISO-9003 Quality Systems - Model for Quality Assurance in Final Inspection and Test ISO-9004 Quality Management and Quality System Elements - Guidelines H:\IVANHOE MINES\430 CONTRACTING\CONTRACTS\K922B CMTCC ONSHORE\2.POST-AWARD\430E.301R\9.SPECS\SWP5_SPECIFICATIONS\SP-15-007 CONCRETE BATCH PLANT SPEC.DOC ARCHITECTURAL Ivanhoe Mines Mongolia Inc., XXK Oyu Tolgoi Project Project No. A2MW Document SP-15-007 Page 5 of 11 Rev 0 CONCRETE BATCH PLANT SPECIFICATION 3.0 REFERENCE DOCUMENTS The following reference documents to the extent specified herein form a part of this specification. When an edition date is not indicated for a document the latest edition in force at the time of CONTRACTOR'S proposal submittal shall apply. 3.1 3.2 4.0 PROJECT SPECIFICATIONS DC-10-001 General Site Conditions DC-10-002 Civil Design Criteria DC-15-001 Structural Design Criteria DC-35-001 Dust Control Design Criteria DC-35-002 Fire Protection Design Criteria DC-35-004 Plumbing Design Criteria DC-65-001 Electrical Design Criteria CS-15-002 Structural Concrete ATTACHMENTS 1 Location of concrete batch plant 2 Summary of the Concentrator Site geotechnical work, Oyu Tolgoi QUALITY ASSURANCE/QUALITY CONTROL The CONTRACTOR shall have in effect at all times, a QA/QC program which clearly establishes the authority and responsibility of those responsible for the quality system. Persons performing quality functions shall have sufficient and well defined authority to enforce quality requirements that initiate, identity, recommend and provide solutions to quality problems and verify the effectiveness of the corrective action. CONTRACTOR'S proposed quality system shall fully satisfy all the elements of ISO 9001, “Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing”; ISO 9003 - “Quality Systems - Model for Quality Assurance in Final Inspection and Test”; and ISO 9004, "Quality Management and Quality System Elements - Guidelines". The quality systems shall provide for the planned and systematic control of all quality-related activities performed during execution of the work. Implementation of the system shall be in accordance with the CONTRACTOR'S Quality Manual and Project Specific Quality Plan, which shall both together with all H:\IVANHOE MINES\430 CONTRACTING\CONTRACTS\K922B CMTCC ONSHORE\2.POST-AWARD\430E.301R\9.SPECS\SWP5_SPECIFICATIONS\SP-15-007 CONCRETE BATCH PLANT SPEC.DOC ARCHITECTURAL Ivanhoe Mines Mongolia Inc., XXK Oyu Tolgoi Project Project No. A2MW Document SP-15-007 Page 6 of 11 Rev 0 CONCRETE BATCH PLANT SPECIFICATION related/referenced procedures be submitted to the OWNER’s Project Management Team (PMT) for review, comment and approval. The OWNER’s PMT QA/QC department reserves the right to inspect materials and workmanship at all stages of concrete production and delivery and to witness any or all tests. The PMT QA\QC department would have the authority to reject, inspect or modify any portions of the work and have unrestricted access to the plant and records. There will also be a third party testing agency performing field and material testing for both the PMT and the batch plant CONTRACTOR. Results and Records will be made available to all parties. The CONTRACTOR, 30 days after award, but prior to the pre-inspection meeting, shall provide the OWNER with a copy of the Inspection plan for review and inclusion of any mandatory OWNER witness points. 5.0 DOCUMENTATION The Batch Plant CONTRACTOR shall submit the following in accordance with the Data requirements section 8.0 of the contract: 6.0 Overall plant layout, batch plant system description, equipment and operation manuals and details including automation, computerization, maintenance manuals and 2 year spare parts list. All operation and maintenance manuals for the concrete transportation equipment including mixer trucks and pump trucks and 2 year spare parts list. Operator qualifications and certificates. All records and reports as described in Sections 11.0 and 12.0 respectively Concrete Batch tickets BATCH PLANT The batch plant, including storage facilities, and delivery trucks shall meet the requirements of ASTM C94 and ACI 304R Chapters 2, 3, and 4. The batch plant, including storage facilities, and delivery trucks shall be capable of producing quality concrete, and shall be able to become certified in accordance with the certification process of NRMCA QC 3. The CONTRACTOR shall be fully responsible for the quality of the concrete, up to the discharge end of the delivery equipment chute. The batch plant shall include, but not be limited to: Full automation Full computerization Full segregation of materials Shaded and covered areas for materials to prevent contamination by rain, dirt, sand, mud, air borne chlorides, dust and other contaminants H:\IVANHOE MINES\430 CONTRACTING\CONTRACTS\K922B CMTCC ONSHORE\2.POST-AWARD\430E.301R\9.SPECS\SWP5_SPECIFICATIONS\SP-15-007 CONCRETE BATCH PLANT SPEC.DOC ARCHITECTURAL Ivanhoe Mines Mongolia Inc., XXK Oyu Tolgoi Project Project No. A2MW Document SP-15-007 Page 7 of 11 Rev 0 CONCRETE BATCH PLANT SPECIFICATION Facilities for washing and cleaning materials with adequate drainage Automatic compensation for moisture in fine aggregate Adequate production capacity Winterization and Heating for cold weather operations Heated water and heated aggregates for cold weather production. Admixture storage facilities with spill containment plan. Adequate heated storage for thawing admixtures during winter. Wash Water \ Settling ponds for concrete wash out Loaders for filling aggregate bins and Handling Chemical and Cement materials. Capability to measure and adjust the concrete temperatures during batching in cold and hot weather to meet the minimum and maximum concrete temperatures. Water holding tanks capable of storing 4 hours of operation within enclosure with heating for winter operations. Silos capable of storing 200 tons and 4 types of cement. Ability to provide computer print out of mix design together with actual mix Ability to provide computer calculation and print out of actual water/cement ratio The CONTRACTOR shall ensure that the concrete is mixed in a fully automatic computerized batching plant. The mixing pan capacity shall be selected to ensure that the required maximum production can be comfortably achieved. The weights of fine and coarse aggregates shall be automatically adjusted to allow for any free water contained in them. Accordingly, the amount of water to be added shall be reduced by this amount of free water contained in the aggregates. The quantities of all materials for concrete shall be charged to the pan by weight. Admixtures that have been approved as part of the mix design shall be added by approved automatic dosing equipment capable of feeding fixed quantities into the mixing water before the water is charged into the mixer. The measuring equipment shall be maintained in a clean, serviceable condition. Mixing shall continue until uniform distribution of materials and uniformity of consistency and color is obtained. H:\IVANHOE MINES\430 CONTRACTING\CONTRACTS\K922B CMTCC ONSHORE\2.POST-AWARD\430E.301R\9.SPECS\SWP5_SPECIFICATIONS\SP-15-007 CONCRETE BATCH PLANT SPEC.DOC ARCHITECTURAL Ivanhoe Mines Mongolia Inc., XXK Oyu Tolgoi Project Project No. A2MW Document SP-15-007 Page 8 of 11 Rev 0 CONCRETE BATCH PLANT SPECIFICATION The CONTRACTOR shall ensure that the materials used for each batch in the mixer do not exceed the MANUFACTURER'S rated capacity for the machine. The machine shall be kept clean, free of any residual material after depositing each batch of concrete and the mixer pan drum shall be washed and cleaned out immediately following the completion of each concreting operation. The batch plant shall be able to provide a computer printout batch ticket of the following for each truck: 7.0 Serial number of ticket Contractor’s Name Date Truck number Grade of concrete Amount of concrete Amount and type of cement(s) and any supplementary cements Information necessary to calculate total mixing water added (free water on aggregates, water, and ice batched at plant) Type, brand, and amount of admixtures Weights of fine and coarse aggregate Time loaded or time of first mixing of cement and aggregates Reading of revolution counter at the first addition of water Time and reading of revolution counter at the time of the start of discharge of the load of concrete. Unique location identification as provided by the structure number and concrete placement number Signature or initials of batch plant representative Signature of the Contractor’s Representative for Acceptance of the Load? MATERIALS All materials required for the production of ready-mixed concrete shall in accordance with Project approved Concrete Mix Designs. All materials must be selected from the approved project sources and listed as part of the Concrete Mix Designs. The CONTRACTOR shall record on a daily basis the quantity of materials received and consumed during production. H:\IVANHOE MINES\430 CONTRACTING\CONTRACTS\K922B CMTCC ONSHORE\2.POST-AWARD\430E.301R\9.SPECS\SWP5_SPECIFICATIONS\SP-15-007 CONCRETE BATCH PLANT SPEC.DOC ARCHITECTURAL Ivanhoe Mines Mongolia Inc., XXK Oyu Tolgoi Project Project No. A2MW Document SP-15-007 Page 9 of 11 Rev 0 CONCRETE BATCH PLANT SPECIFICATION Records shall be maintained by the PMT QA/QC department and supplied to the batch plant operator indicating: 8.0 8.1 VENDOR’S details pertaining to cement and admixtures, and test data of aggregates and sands Fully detailed data sheets showing all chemical and physical information Recent test results (not older than three months) Details of VENDOR’S Quality Assurance System Details of VENDOR’S Quality Control procedures MATERIAL STORAGE AND HANDLING CEMENT STORAGE Cement storage shall afford easy access for inspection and identification of each shipment in accordance with test reports. It shall be used in the order in which it is delivered to the site. Bagged cement shall be transported to the batch plant in the VENDOR’S original sealed bags or containers and shall be stored in a dry, weather tight, properly ventilated covered structure, with adequate provisions for preventing the absorption of moisture, and raised at least 150 mm off the floor to prevent deterioration. The storage shall be large enough to allow sufficient cement to be kept to allow continuity of work. Not more than 10 small bags or 3 “Big Bags” shall be piled one on top of the other while stored at site. Suitable shading shall be provided to limit the temperature to 40 C. Temperature of cement stored in bulk silos shall not exceed 75 C. No cement shall be stored on site for more than three months. 8.2 STORAGE OF AGGREGATES The concrete plant shall at all times maintain sufficient quantities of each type of aggregate to ensure continuity of work. Each type and grade of aggregate shall be stored separately in bins; in such a manner that segregation of the various size particles shall not occur. The floors of the bins shall be of concrete or other approved material having sufficient slope to ensure adequate drainage of aggregates before being used for concreting. Strict precautions shall be taken to avoid contamination of aggregates by wind blown dust, chlorides, etc. Suitable shading shall be provided to control the temperature and any contaminations, especially chlorides. Storage bins shall be emptied and cleaned at regular intervals. H:\IVANHOE MINES\430 CONTRACTING\CONTRACTS\K922B CMTCC ONSHORE\2.POST-AWARD\430E.301R\9.SPECS\SWP5_SPECIFICATIONS\SP-15-007 CONCRETE BATCH PLANT SPEC.DOC ARCHITECTURAL Document SP-15-007 Ivanhoe Mines Mongolia Inc., XXK Oyu Tolgoi Project Project No. A2MW Page 10 of 11 Rev 0 CONCRETE BATCH PLANT SPECIFICATION 9.0 CONCRETE DELIVERY Delivery Trucks shall be of revolving drum type, watertight, and so constructed that the concrete can be conveyed and discharged into the pumps at site maintaining the uniform distribution of materials throughout the mass. The drum shall be painted white and kept clean to ensure maximum reflectivity. The maximum size of batch in truck mixers shall not exceed the maximum rated capacity of the mixer as stated by the MANUFACTURER and stamped in metal on the mixer. On no account shall water from the concrete truck be used in the mix. Concrete trucks shall have their water tanks completely disconnected from the drum. Concrete temperature, when discharged in the formwork, shall not be more than 30 C. For thick elements the temperature shall be less than 24 C. Thick elements shall be defined as any concrete member that has both plan and cross sectional dimensions exceeding one meter, and containing a total volume exceeding six cubic meters. Acceptance of the concrete is dependent on field testing by the QA\QC department. QA\QC representatives will have the authority to reject concrete based on field results, expiry of the concrete for exceeding time restraints or slump loss. 10.0 FACILITIES INSPECTION AND CALIBRATION At intervals not exceeding 90 days, all scales, volumetric devices, and dispensers of the batch plant shall be inspected and calibrated. The accuracy of the measuring equipment shall be within 3%. Normally; Admixtures +/- 3 % Aggregates +/- 2 % Water \ Cement +/- 1 % At intervals not exceeding 90 days revolution counters shall be inspected and calibrated prior to use for hauling or mixing concrete. At intervals not exceeding 90 days, the batch plant mixers and mixer trucks shall be visually examined to detect changes in condition due to accumulation of hardened concrete and examined to detect wear of blades. Mixer blades shall be replaced when they have lost 10% of their original height in accordance with NRMCA QC3. Restrictions shall conform to requirements of ASTM C94. Documentation of these inspections will be kept and submitted to PMT QA/QC once performed. 11.0 RECORDS Records shall be maintained for the following: Material certification reports received with all delivered materials (cement, aggregate, and admixtures), as described in Section 8.0. Originals of these documents shall be retained at the batch plant. H:\IVANHOE MINES\430 CONTRACTING\CONTRACTS\K922B CMTCC ONSHORE\2.POST-AWARD\430E.301R\9.SPECS\SWP5_SPECIFICATIONS\SP-15-007 CONCRETE BATCH PLANT SPEC.DOC ARCHITECTURAL Ivanhoe Mines Mongolia Inc., XXK Oyu Tolgoi Project Project No. A2MW Document SP-15-007 Page 11 of 11 Rev 0 CONCRETE BATCH PLANT SPECIFICATION Required testing of concrete produced at the batch plant will be preformed according to the Project Specification, CS-15-002 Section 3.5. Originals of these test reports shall be retained at the batch plant. All other testing will be performed by a third party testing laboratory under contract to PMT QA/QC department. Records of maintenance of all batch plant and delivery equipment based on MANUFACTURER'S recommendations on a 90 day basis. Records of all required inspections and calibrations, as described in Section 12.0. Printed batch records retained for each load of concrete submitted yearly or upon request to the QA\QC department. 12.0 REPORTS The CONTRACTOR shall provide a detailed weekly summary report to the Owner’s PMT team pertaining, but not limited to, the following: All aspects of material acquisition, transporting, storage, handling, batching, production of concrete and transportation of the concrete to the jobsite. The operating aspects of plant equipment, computerization and any problems encountered during the production of concrete. The liaison aspects of CONTRACTOR’S work with the mix design specialist and the testing laboratory. Deviations in concrete mix production from the approved mix design and documentation. 13.0 LIAISON WITH ON-SITE TESTING LABORATORY All material tests will be performed by an on-site testing laboratory. The CONTRACTOR shall facilitate the work of, and cooperate with the laboratory inspectors at all time. The Owners PMT QA\QC department shall govern both testing agencies. H:\IVANHOE MINES\430 CONTRACTING\CONTRACTS\K922B CMTCC ONSHORE\2.POST-AWARD\430E.301R\9.SPECS\SWP5_SPECIFICATIONS\SP-15-007 CONCRETE BATCH PLANT SPEC.DOC ARCHITECTURAL