King Fahd University of Petroleum and Minerals College of Environmental Design Architecture Engineering Department ARE 520 Principles of Facility Management Term Paper Study BIM Impact on Outsourcing in Facility Operation & Maintenance Activities Instructor: Dr. Mohammed Hassanain Student name: Abdulwahab Alqanas ID: 202110470 Abstract: outsourcing is a critical section in operation and maintenance activities therefore in in facility management in general, and regarding that BIM technology has become trend currently in AEC industry, this paper tries to spot light on its impact on FM & O&M from outsourcing perspective. In order to achieve such a goal this paper uses literature review and survey with experts to study impact of BIM on outsource selection criteria. Nonetheless, study shows that BIM has high impact on cost and time schedule in O&M activities and low impact on safety of the facility and moderate impact on variation order and waste products. Introduction: Background & motivation: Architectural engineering or Building Engineering, is a major of science that deals with engineering aspects in buildings, such as structure, construction, site management, mechanical, electric, lighting, acoustic, safety & fire protection and energy efficiency. Architecture engineering is one of unique fields that is strongly connected with all other types of engineering majors. In addition, it is connected to human basic life directly, and its application is able to noticed easily. However, this paper will spot light on major side of building life period, which is period of operation and maintenance and ensuring good indoor quality for users, which is part of big segment in architecture engineering, or also called facility management. A three major terms will be repeated and connected to each other, or better said the relation between them will be identified, these terms are BIM, outsourcing & tender. This guide will discuss the impact of BIM in tender outsourcing while providing a service related to building operation and maintenance. Literature review, surveys are the selected tool to get a conclusion and result. Problem statement: Tendering or bedding process in one of the most important steps in project life in general and in project procurement particularly, but it doesn’t stop by the end of construction process of the project, it continuous while the building is being operated, that maintaining, maintenance and operation activities may require specialized service providers or contractors. The aim of any contractor is to procure as many projects as he can with highest margin of profit possible. But in the same time contractor need to provide a good price to be able to compete with other contractors, otherwise he will lose the procurement. So, in order to win as much outsourcing projects as possible, contractor should provide a good offer to the owner, this offer could be represented as quality, cost, or time. Contractors nowadays are always searching for bedding strategies, tool, and methods which make them able to persuade the stakeholders with the tender document delivered, However, there is an international trend to use BIM in working, drawing, & drafting, that it gave architects and engineers ability to avoid conflict between disciplines in the building modeling. Using BIM is in a continuous increasing around the world, countries and governments like Scotland start to manage their assets by BIM, and start use BIM strategy as fundamental condition to be able to compete in tender in healthy building construction and while building is being operated. Nevertheless, assuming that BIM would be an effective tool to model the project and make strong base of concrete for design process, there should be an efficient mechanism that would effectively invest BIM properties. Goal: This paper aims to study impact of BIM on outsource contractor selection for MEP operation and maintenance activity. Methodology: This chapter will discuss the steps and process need to be accomplished to obtain the objectives of this guide. There will be a detailed description over the method used to collect experts’ perspective and analysis of the results, moreover, this chapter will discuss the framework design if the questionnaire in order the produce outcome with minimum margin of error. Nonetheless, in order to obtain the research goals this guide will depend on survey, literature reviews. Regarding that this study built on surveys, a pilot study required to be done in order to improve the question quality, and make it able to reflect the reality in effective way. The pilot study was applied on BIM experts, academic experts & facility mangers and operator, with variety of experience range. Factors were listed to them with alternative ways of questions for each of the nine criteria, and a space of adding and modifying and selecting was open for them. Nonetheless, these factors as their terms was discussed in the previous chapter were as listed: 1. Cost offered 2. Time scheduling 3. Operation & maintenance management 4. Facility Revenue 5. Data information quality 6. Safety 7. Communication at the built environment 8. Variation order So, the goal of this paper basically is to find impact of BIM in these criteria, therefore, on outsourcing in activities related to operation and maintenance in facilities. However, the schedule below shows pilot sample and their details. 3- Literature Review: