Contract No. CV/2020/09 Particular Specification Construction of Lei Yue Mun Public Landing Facility SECTION 29 - PROTECTIVE COATING WORKS GENERAL Scope 29.01 (1) This section covers the requirements on the use of coating materials for the protection of the concrete structures, the performance criteria and necessary tests that define acceptance of the coatings. (2) Unless otherwise approved by the Supervisor, the coating materials and workmanship shall comply with the requirements of the Model Specification for Protective Coatings for Concrete, July 1994 and its subsequent updates published by Civil Engineering Department, Hong Kong Government (herein referred to as ‘The Model Specification’). In particular, the following clauses shall be complied with: (a) Specific Requirements for Carbonation Resistance (i) Clause 19 “New Construction” - (ii) Construction and Older Clause 19(2) with the minimum R-value for the paint system shall be 150m; and Clause 20 “Back Pressure Acting on Coatings”. (b) Specific Requirements for Chloride Resistance (i) (ii) Clause 22 “Concrete Subject to Chloride Spray and Carbonation” - Clause 22(2); and - Clause 22(3) with the amendment that the paint system shall be tested after 1000 hours artificial weathering to Appendix 3 of the Model Specification. Clause 23 “Concrete Subject to Cyclic Immersion in Seawater”. (c) Specific Requirements for Tidal Works (i) Clause 29 “Concrete Subject to Cyclic Immersion in Seawater; and (ii) Clause 30 “Wet Concrete Surfaces”. - PS29/1 - Contract No. CV/2020/09 Particular Specification Extent of Coating Submissions Construction of Lei Yue Mun Public Landing Facility 29.02 29.03 Protective coating works are specified to retard ingress of chloride in marine environment and/or carbon dioxide for marine structures, thus preserving the integrity of the concrete structures. The extent to be coated include: (1) A coating system shall be applied to the reinforced concrete surfaces of the new structures. All reinforced concrete surfaces above +1.35mPD except the deck surface shall be coated with protective coating unless otherwise agreed by the Project Manager. (2) For precast reinforced concrete units, all surfaces except the deck surface shall be coated unless otherwise agreed by the Project Manager. (1) One month prior to the commencement of the coating application and before any subsequent change in coating materials, the Contractor shall submit to the Supervisor technical data sheets and test certificates regarding the quality of materials and performance of products providing the following information required in the Model Specification, including but not limited to the following information as appropriate unless agreed by the Supervisor otherwise: (a) Salt spray resistance; (b) Salt water immersion; (c) Carbonation resistance (d) Water permeability resistance; (e) Weathering resistance; (f) Impact resistance; (g) Bond strength; and (h) Current test certificates supplied manufacturer(s) or suppliers. by the (2) Supplied test certificates shall be current and issued within 5 years from the commencement date of the Contract. (3) The Contractor shall also submit to the Supervisor detailed proposal for concrete surface preparation, materials for making good surface defects and coating application method (inclusive of staging of works). (4) No claim shall be approved for disapproval or amendments to the above submissions required by the Supervisor. The - PS29/2 - Contract No. CV/2020/09 Particular Specification Construction of Lei Yue Mun Public Landing Facility approval by the Supervisor shall not relieve the Contractor of his duties and responsibilities under the Contract. Storage of Materials on Site 29.04 (5) No coating application works shall be carried out unless the Supervisor has approved either fully or conditionally the above submissions. In the latter case, reasonable conditions of the Supervisor’s approval shall be complied with. (1) Materials shall be stored under cover, shaded from direct sunlight, not in contact with a damp floor or ground, kept in a controlled environment (where necessary) and shall be used in the order of delivery. Materials that have in any way deteriorated or stored beyond the manufacturer’s recommended shelf life shall not be used. Proprietary materials shall be stored strictly in accordance with the instructions and recommendations of the manufacturers. (2) The material shall remain in its original sealed and properly marked containers until use. Safety labels shall be displayed in accordance with the statutory safety requirements. Service Condition 29.05 The selected materials shall produce durable protective barriers of consistently high quality and to the specified requirements taking into account the local climatic conditions and the aggressive agents such as water borne chlorides, sulphates, flotsam and other deleterious matters which may exist at the Site. Samples 29.06 (1) The materials and articles supplied for any purpose are to be agreed by the Supervisor prior to their use in the works. Within 2 weeks after the commencement of the Works, the Contractor shall submit samples for the Supervisor’s consideration and approval if appropriate before bulk supplies are delivered to the Site. (2) Should any samples be rejected it shall be removed from the Site immediately. In the event of rejection, alternative specimens shall be submitted by the Contractor for the Supervisor’s approval. (3) Accepted samples shall be kept on the Site to serve as a standard for all subsequent material. If instructed by the Supervisor, the Contractor shall carry out tests and provide results to confirm the chemical content of the active ingredients of the sample material and the material used in the works at his own cost. - PS29/3 - Contract No. CV/2020/09 Particular Specification Construction of Lei Yue Mun Public Landing Facility MATERIALS AND WORKMANSHIP Protective Coating Systems 29.07 (1) The protective coating system shall be epoxy generic type. (2) The protective coating system shall be proven and suitable for application on damp and saturated existing and repaired concrete surfaces. (3) The coating system shall consist of component applications supplied by the same manufacturer. (4) Each consignment of materials shall be accompanied by a manufacturer’s certificate indicating the date and location of manufacture. (5) The colour of finished surface of the coating system shall be approved by the Supervisor. Water 29.08 All water used for any purpose in connection with the works under this specification shall be clean fresh water taken from the public supply. Workmanship 29.09 (1) The Contractor shall select methods to produce a durable protective coating system to designated surfaces. The works shall be of consistently high quality and to the specified requirements. (2) The Contractor will be deemed to have made himself fully aware of the nature and type of materials available and of any steps to be taken to ensure that the requirements of the manufacturer’s specification are met. (3) The Contractor shall carry work strictly in accordance with this Specification and the approved method statements. No variation from the Specification or method statements are allowed unless approved by the Supervisor and confirmation is obtained by the coating manufacturer. (4) Any unsatisfactory work or material shall be removed and replaced by the Contractor at the Contractor’s own cost. (1) The two work components for the coating of concrete surfaces are outlined as follows for the guidance of the Contractor: Work Components 29.10 (2) (a) Preparation of surface; and (b) Application of coating. The application of coating shall be a continuous process as much as practicable and subsequent coating of isolated areas shall be avoided. Detailed requirements of each of - PS29/4 - Contract No. CV/2020/09 Particular Specification Construction of Lei Yue Mun Public Landing Facility the above components are specified in the following Clauses. PROTECTIVE COATING DETAILS Surface Preparation Application of Coating 29.11 29.12 (1) Surfaces to receive the coating system shall be sound, free from laitance, dust, loose debris, contamination (such as oils and greases) and marine growth. Surface preparation shall be such that the bond strength requirement of the coating in accordance with the Model Specification can be achieved. (2) The concrete surface shall be prepared by light grit-blasting to remove all marine growth and contaminants to provide a strong, hard surface. Adequate protection shall be provided to prevent damage from abrasive blasting to any existing finishes on surfaces other than those designated to receive coatings or to applied coating. Precautions shall be taken to prevent damage to the existing structure. (3) Where necessary, areas of contamination shall be removed by the use of appropriate solvent. The blasted surface shall be thoroughly washed using high pressure water jet. The prepared surface shall be left for one day to allow defects to show up. (1) All liquid components shall be thoroughly stirred prior to blending or application. Multi-component systems shall be blended and mechanically mixed in accordance with the manufacturer’s recommendations. The batching and mixing of multi-component mixes shall be in accordance with the manufacturer’s recommendation. Part batches shall not be mixed. (2) All equipment used for the application of coating materials shall comply with the recommendations of the manufacturer. These equipment shall be maintained in a clean condition appropriate for next use. (3) The Contractor shall record and submit the batch number of all protective coating used, and shall record and submit against each batch number the location and extent of reinforced concrete structures coated. Coverage rate shall then be checked by the volume or weight of coating materials and the area to be coated for compliance with the stricter requirements of the manufacturer’s recommendation or the designated coverage rate in PS Clause 29.13. The Contractor shall also monitor the value and location of wet film thickness of coating from time to time to ensure compliance with the stricter dry film thickness (DFT) - PS29/5 - Contract No. CV/2020/09 Particular Specification Construction of Lei Yue Mun Public Landing Facility requirement of this Specification or the manufacturer’s recommendation. These information shall be submitted to the Supervisor on a weekly basis. Pre-application 29.13 (4) All surfaces shall be high pressure washed immediately prior to coating application. At the time of coating application, all concrete surfaces shall be clean with moisture not exceeding the limits set by the coating manufacturer. Under no circumstances shall coating be applied to surfaces with standing water (including water droplets) or during rain. The Contractor shall also observe the relevant limits regarding ambient temperature and relative humidity set by the manufacturer for coating application. (5) Uneven surfaces must be leveled with a scratch primer or leveling mortar as recommended by the manufacturer. (6) Spray equipment shall be used. All cleaning fluid shall be purged from the equipment using undiluted coating materials prior to application. All contaminated coating materials used for purging equipment shall be discarded and shall not be used in the works. Brush or roller techniques shall not be used unless approved by the Supervisor. When used, the brushes or roller heads shall be used for the day only and then discarded. The equipment shall not be re-used. (7) For multiple coat applications, the manufacturer’s stated minimum and maximum overcoating times for the prevailing weather and tidal conditions shall not be breached. The maximum coating thickness shall not be exceeded. Alternate colours shall be adopted as appropriate for multiple coat applications. (8) Between each coat application, the Contractor shall devise and apply protective measures such as polythene sheets to protect the coating surface from tidal water, dirt, oil or any element that may adversely affect the bond of the subsequent coat. In event of contamination, the surface shall be washed off with clean fresh potable water prior to application of further coats. (9) Where cracks have been repaired by resin injection or where instructed by the Supervisor, the coating shall be reinforced by an approved mat. The reinforcing mat shall be applied subsequent to the first coat being applied. The Contractor shall ensure that the reinforcing mat is fully incorporated into the coating. Prior to the application of any coating material, a pre-application - PS29/6 - Contract No. CV/2020/09 Particular Specification Construction of Lei Yue Mun Public Landing Facility testing shall be carried out according to the following steps :- Testing Testing Requirement and Frequency During and after Application Table 29.01 29.14 (1) The Contractor shall propose a testing area, on the marine structure to be coated, of not less than 5m2 representative of the coating area for approval by the Supervisor. The test area shall be prepared according to PS Clauses 29.11 & 29.12. The complete coating system shall be applied on this area in accordance with the manufacturer’s instructions and the performance criteria of this Specification. (2) The actual consumption of the coating system per l/m2 shall be recorded for the test area, in order that due allowance may be made for rough, irregular or exceptionally absorbent concrete. (3) After the coating system has been cured adequately, a test of surface adhesion shall be carried out in accordance with Appendix 8 of the Model Specification. The average bond of 3 dollies to the concrete, via the completed coating system, shall be satisfactory. A core sample shall be taken from the test area for measurement of the DFT. Should the minimum and mean DFT values of the core sample be less than those specified, the coverage rates for the coating system shall be proportionally increased for subsequent applications. (4) Should the bond strength failed to comply with the stricter requirements of this Specification and the manufacturer’s recommendation, the test surface shall be re-prepared, followed by re-application and re-testing in accordance with steps (1) to (3) inclusively above. (5) Upon acceptance of the coating system by the Supervisor, the actual consumption rate in (2) above or the coverage rate adjusted in (3) above whichever more stringent shall be taken as the designated coverage rate for actual coating application. (1) The minimum testing requirements are listed in Table 29.01. Additional testing at no extra cost shall be required when there are still doubts about the compliance with the performance requirements. (2) All site tests and samplings shall be carried out by the Contractor under the supervision of the Supervisor. Test Requirements and Frequency Test Required Performed By Standard Frequency of Testing Pre-qualification of Materials See PS Clauses 29.01 & 29.03 Model Specification --- - PS29/7 - Contract No. CV/2020/09 Particular Specification * Construction of Lei Yue Mun Public Landing Facility Bond Strength *Approved Laboratory Model Specification (Appendix 8) A rate of 1 sample set per 100m2 of applied area or 1 sample set per pier (whichever is the greater nos. of tests). Each sample set shall consist of 3 cores during the works at a location as instructed by the Supervisor Surface Finish of Final Coat Supervisor --- All applied area to record any visual defects on the coating surface. Wet Film Thickness of Applied Coating Contractor Suitable Instrument approved by the Supervisor 1 measurement per 5m2 of coated area to ensure achievement of the required dry film thickness Dry Film Thickness of Applied Coating *Approved Laboratory Model Specification (Appendix 8) A rate of 1 sample set per 100m2 of applied area or 1 sample set per pier (whichever is the greater nos. of tests). Each sample set shall consist of 2 cores taken during the works at a location as instructed by the Supervisor Laboratory to be proposed by the Contractor and approved by the Supervisor to carry out the testing. The Laboratory shall have the required accreditation for the tests. Acceptance Criteria Non-compliance 29.15 29.16 (1) The DFT shall not be less than the value set by the manufacturers. (2) The coating shall form a continuous film free from any visible defects including but not limited to voids, pinholes, blister, wrinkling and cracks. Where the dry film thickness fails the above test, the coating applied shall be condemned. The Contractor shall remove, reapply all area represented by the failed samples and retest at the Contractor’s own expense accordingly. (3) The adhesion of the coating as measured not less than seven days after application of the final coat shall be such that the bond strength to the concrete substrate shall not be less than 1.0MPa. For multiple coat systems, the bond strength between coats shall not be less than 1.0MPa. (1) The criteria for acceptance shall be the fulfillment of the performance requirements of this Specification for all sample sets/areas tested. In the event of non-compliance, the Contractor shall, unless agreed by the Supervisor otherwise :(a) for failure of bond requirement, condemn, remove and replace the coated area represented by the sample - PS29/8 - Contract No. CV/2020/09 Particular Specification Construction of Lei Yue Mun Public Landing Facility set yielding inadequate results. (b) for surface defects, rectify the defect/area by a method approved by the Supervisor. (c) for failure of dry film thickness requirement, retreat and re-test the area represented by the sample. OTHERS Contractors’ Attendance 29.17 The Contractor shall supply all labour, plant, materials and assistance, including provision of safe access, equipment and lighting, for the purpose of inspection and testing by the Supervisor. Making Good Test Locations 29.18 All destructive test locations shall be made good and reinstated to the profile and standard of the surrounding surfaces. Submission of Test Reports 29.19 The formal test reports for all quality testings shall be submitted to the Supervisor within 2 weeks after testings being carried out unless otherwise approved by the Supervisor. * * * * * - PS29/9 - Contract No. CV/2020/09 Particular Specification Construction of Lei Yue Mun Public Landing Facility THIS PAGE IS DELIBERATELY LEFT BLANK - PS29/10 -