INSTRUCTOR’S RESOURCE MANUAL
CHAPTER FIVE
Scope Management
To Accompany
PROJECT MANAGEMENT:
Achieving Competitive Advantage
By
Jeffrey K. Pinto
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
2
CHAPTER FIVE
PROJECT PROFILE — Airbus A380: Plane of the Future or Enormous White Elephant?
Introduction
5.1 CONCEPTUAL DEVELOPMENT
The Statement of Work
5.2 THE SCOPE STATEMENT
The Work Breakdown Structure
Purpose of the Work Breakdown Structure
The Organization Breakdown Structure
The Responsibility Assignment Matrix
5.3 WORK AUTHORIZATION
5.4 SCOPE REPORTING
Project Management Research in Brief: IT Project Failure – Burying Our Heads in the
Sand
5.5 CONTROL SYSTEMS
Configuration Management
5.6 PROJECT CLOSEOUT
Summary
Key Terms
Discussion Questions
Problems
Case Study 5.1: Calcutta’s Metro
Case Study 5.2: Project Management at Dotcom.com
Cas Study 5.3: Runaway Scope – The Bradley Fighting Vehicle
Internet Exercises
MSProject Exercises
Integrated Project – Developing the Work Breakdown Structure
Bibliography
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
3
TRANSPARENCIES
5.1 ELEMENTS IN PROJECT SCOPE MANAGEMENT
1. Conceptual Development
- Problem statement
- Information gathering
- Constraints
- Alternative analysis
- Project objectives
- Statement of Work (SOW)
2. Scope Statement
- Goal criteria
- Management plan
- Work Breakdown Structure (WBS)
- Scope baseline
- Responsibility Assignment Matrix (RAM)
3. Work Authorization
- Contractual requirements
- Valid consideration
- Contracted terms
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
4
5.1 ELEMENTS IN PROJECT SCOPE MANAGEMENT
(Con’d)
4. Scope Reporting
- Cost, Schedule, Technical performance status
- S curves
- Earned value
- Variance or exception reports
5. Control Systems
- Configuration control
- Design control
- Trend monitoring
- Document control
- Acquisition control
- Specification control
6. Project Closeout
- Historical records
- Post-project analysis
- Financial closeout
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
5
5.2 PURPOSES OF THE WORK BREAKDOWN
STRUCTURE
1. IT ECHOES PROJECT OBJECTIVES.
2. IT IS THE ORGANIZATION CHART FOR THE PROJECT.
3. IT CREATES THE LOGIC FOR TRACKING COSTS,
SCHEDULE, AND PERFORMANCE SPECIFICATIONS FOR
EACH ELEMENT IN THE PROJECT.
4. IT MAY BE USED TO COMMUNICATE PROJECT STATUS.
5. IT MAY BE USED TO IMPROVE OVERALL PROJECT
COMMUNICATION.
6. IT DEMONSTRATES HOW THE PROJECT WILL BE
CONTROLLED.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
6
5.3 PARTIAL WORK BREAKDOWN STRUCTURE
1.0
1.2
1.3
1.4
1.2.1
1.3.1
1.4.1
1.2.2
1.3.2
1.4.2
1.2.3
1.5
1.4.3
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
7
5.4 THE INTERSECTION OF THE WBS AND OBS
1.0
IT
Installation
1.3
Prepare
proposal
1.4
Seek & hire
IT consultant
1.4.1
Search
committee
Project
1.5
Seek support
for IT
1.4.2
Develop
criteria
Deliverables
1.4.3
Select
consultant
Departments
Information
Systems
Cost
Account
Cost
Account
Human
Resources
Cost
Account
Cost
Account
Procurement
Cost
Account
Cost
Account
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Work
Packages
8
5.5 COST ACCOUNT ROLLUP USING OBS
1.0
IT
Installation
1.3
Prepare
proposal
1.4
Seek & hire
IT consultant
1.4.1
Search
committee
Project
1.5
Seek support
for IT
1.4.2
Develop
criteria
Deliverables
1.4.3
Select
consultant
Departments
Information
Systems
$500
Human
Resources
$500
Procurement
$500
Totals
-0-
$1,500
$1,000
$1,000
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Work
Packages
9
5.6 RESPONSIBILITY ASSIGNMENT MATRIX
LEAD PROJECT PERSONNEL
Deliverable
Task
& Code
Match IT to
Org. Tasks –
1.1
Bob
IS
David
IS
Susan
HR
Beth
Procurement
James
Engineering
Problem
Analysis
- 1.1.1
Develop info
on IT technology
- 1.1.2
Identify IS
user needs –
1.2
Interview
potential users
- 1.2.1
Develop
presentation
- 1.2.2
Gain user
“buy in”
- 1.2.3
Prepare
proposal
- 1.3
Develop cost/
benefit info
- 1.3.1
Responsible
Support
Notification
Approval
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Terry
Legal
10
DISCUSSION QUESTIONS
1. What are the primary benefits of developing a comprehensive project scope analysis?
A comprehensive project scope analysis serves several benefits that permit a company to
guide the dream of a project to a successful completion. One benefit is transforming the
idea of the project into a working concept. Once the concept is developed, project details
can be mapped out. Scope analysis outlines each step of the project in a detailed manner.
The primary benefit to this is it aligns the project so that the final product will be
consisted with the original goals/objectives. By outlining each step, scope analysis
increases the likelihood that the project will stay within budget and time constraints as
well as meet predetermined specifications and quality parameters.
2. Refer to the Bradley Fighting Vehicle case at the end of the chapter (Case Study 5.3).
When is “Scope creep” useful and when is it dangerous? Under what circumstances
might an organization refuse to freeze design specifications for valid reasons (e.g.
Microsoft)?
Scope creep occurs when the project specifications are continually readjusted. This is
undesirable when the objective of the project is highly standardized product – one that is
needed to serve a very exact purpose. However, in the case of a product such as
computer software, scope creep may be beneficial. Companies like Microsoft stay
competitive through innovation. By allowing project team members to have more
freedom in design and creation, they are fostering an environment conducive to
innovation. As software engineers see areas for improvement or innovation they are
allowed to act on it. Thereby creating a more creative and competitive product.
3. What are the key characteristics of a work package?
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
11
A work package is a specific step of the project. Work packages are smaller pieces of the
whole project, which are more manageable and definable than the whole. They create a
chronological map from one step to the next detailing what needs to be completed at each
stage. Each work package includes its own deadline, resource requirements and
supervisor. Work packages can be further broken down into subtasks that can be
assigned to an individual worker or group. Collectively, all the work packages of a
project combined lead the project team from the start to completion of the project.
4. Create a Work Breakdown Structure for a term paper project or another school-related
project you are working on. What are the steps in the WBS? Can you identify any substeps for each step?
This assignment is designed to get students comfortable with deconstructing the project
into various levels, including Deliverables, and Work Packages. The goal is identifying
the relevant elements in the project, not the sequential nature of those steps. If instructors
wish, they can ask students, as a second step, to create some idea of the sequentiality of
these WBS elements.
5. What are the benefits of designing a Responsibility Assignment Matrix (RAM) for a
project?
An RAM outlines the team members directly responsible for each task. It also includes a
list of supporting organizational members. It is beneficial for following chain of
command, solving interdepartmental issues and receiving proper approval. Additionally,
an RAM increases the flow of communication throughout the team. By knowing who is
in charge of what, members can notify the necessary people of progress or completion of
tasks. This keeps the group informed of potential problems and up-to-date on the
project’s current status.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
12
The process of creating the RAM is also beneficial to the project manager. It requires the
identification of team members’ abilities, qualifications, strengths and weaknesses.
Tasks and assignments can then be better coordinated to create the highest level of
efficiency.
6. Develop an argument for scope reporting mechanisms. At a minimum, what types of
reports do you consider necessary for document control of a project? Why?
Two main concerns of project scope are seeing that the project meets time and budget
constraints. Without some sort of limits (i.e. project scope), projects can quickly become
expensive, long-term investments of a company’s time and resources. Scope reporting
can help reduce the risk of such runaway projects. Reports that update on costs incurred
using S-curves and variance updates are important for keeping the project within budget
constraints. These reports may also serve as control mechanisms. If team members
know they will have to publish spending reports frequently to other members in the
organization, they may be less likely to approve unscheduled expenditures. Reports
related to adherence to the planned time schedule work in a similar fashion. If the project
begins to lag behind, team members may have more incentive to look for the cause of the
delays if they are required to report variances from the planned time table.
7. What is the chief purpose of configuration management? In your opinion, why has it
become increasingly popular in recent years as part of the project management process?
The main purpose of configuration management is to manage and control change within
projects. A plan for execution of activities and tasks is agreed upon by those involved in
the project. Configuration management then monitors variations from this preestablished plan. Change is an anticipated factor of project management. Configuration
management provides a way to deal with changes as they arise, so they do not cause more
disruption than necessary. Changes are documented so that all involved in the project
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
13
may be notified and modifications can be made universally. By identifying necessary
changes as early as possible and handling the problem early on, configuration
management decreases time delays related to unforeseen conditions and helps reduce
obstacles that may result from change later on in the project process.
8. What is the logic behind developing a plan for project close-out prior to even
beginning the project?
Upon completion of the project, certain documentation will be required by management
and/or the client involved. The documentation may be used for legal purposes, as
training material or in auditing procedures. Therefore, it is important that the closeout
information be thorough and accurate. Creating a plan early on is important because
proper documentation may need to be performed as the project progresses. By knowing
what information will be required at the end of the project, the team can keep proper
records at various stages as the project advances. Trying to create this documentation
after the fact may be difficult or inaccurate.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
14
CASE STUDIES
Case Study 5.1: Calcutta’s Metro
Calcutta’s Metro project is a true story of a project disaster, when measured against
schedule and budget. The case lists a number of problems with a project that was
relatively modest in scope (10 miles of track and 17 stations) but ended up costing over
$5 billion dollars and taking 23 years to complete. The case is enjoyable for students
because, using 20/20 hindsight, several of the problems they encountered seem to be
obvious. It is useful to send students to the internet to research Boston’s “Big Dig”
harbor tunnel project and develop some comparisons and contrasts between that project
(which is also well over budget and behind schedule) and the Calcutta metro case. For
example, the Big Dig’s final cost is expected to be $14.6 billion and one of the two
tunnels has become leaking! Students can be directed to an interesting website for the
Boston project at http://www.tollroadsnews.com/cgibin/a.cgi/6S2C!DOMEdmcEIJ61nsxIA. It presents a useful starting point to their own
analysis of the Calcutta project.
Questions:
1) Assume that you are the mayor of Calcutta soliciting bids for the construction of
the Metro. How would you construct a Statement of Work for the project to
encourage efficient and creative means for undertaking this project?
Students can be asked to use the sample Statement of Work (SOW) from the chapter to
begin developing their own set of details and specifications for the project’s scope. How
would they redesign the scope to minimize the disruptions that digging a metro through a
densely populated city are bound to create? Among the interesting elements of this
problem are the identification of significant risks of all types. How do they account for
them? Also, what about resource requirements? It is useful to get students thinking in
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
15
terms of a society with huge amounts of manpower but limited machinery means to
engage in a project of this scope? How are these various factors each accounted for?
2) How much of the problems the Metro project faced were the result of a poorly
conceived project scope and how much was due to simple bad luck? Defend your
position.
This question allows people to debate the two perspectives. Certainly, there is always
some bad luck associated with large projects, like the Calcutta Metro. The question
becomes whether or not such “bad luck” should be factored into the initial scope
statement and expectations for project development. For example, while it is not the fault
of the project organization that they kept hitting gas and water pipes due to poorly
charted infrastructure, the lack of these maps should have been taken into consideration
when they originally developed the timeframe for completion. Without detailed
drawings, they were bound to hit these mains. Further, common sense might suggest that
when the organization provided comprehensive housing, wages, and benefits (including
school for workers’ children) for employees, they were bound to work at a pace that
allowed them to maximize those benefits (in this case, 23 years).
Case Study 5.2: Project Management at Dotcom.com
This case is based on a true story and illustrates some of the key challenges that IT
organizations face when they attempt to develop solutions for clients. Many of these
clients understand their problems but don’t see how to create an appropriate solution.
Others, however, think they understand their needs but find the solutions generated for
them to be inadequate or simply addressing the wrong issues. It is a classic story of cope
definition that many IT organizations routinely deal with when trying to satisfy the needs
of clients.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
16
Questions:
1. How would you begin redesigning Dotcom.com’s project management processes
to minimize the problems they are experiencing with poor scope management?
One suggestion might be the inclusion on the project team of a representative of the
client. It appears that one key problem lies in the fact that project teams talk to the
customer and then go away to develop the solution in a vacuum. Then, at the back end of
the development cycle, the customer is presented with a project solution that many times
does not satisfy them. This lack of communication is a key factor in the problems the
company is experiencing with their projects.
2. How do the company’s consulting clients contribute to the problems with “scope
creep?” If you were to hold a meeting with a potential customer, what message
would you want them to clearly understand?
Customers often do not recognize the link between project changes and cost. They may
assume that the project contract gives them unlimited rights to suggest or demand any
changes after the project was developed, or that the IT solution presented to them is only
a working model and subject to modifications. Without good communication between
the project organization and their clients, these misunderstandings will escalate as the
consulting firm demands more money for the changes and the clients argue that they will
not pay for modifications because the project firm did not do it right the first time. “Why
should we pay for your mistakes,?” is a comment commonly expressed by customers.
The key message that the customers must understand is the need to maintain strong lines
of communication and develop some milestones that allow for “reality checks”
throughout the development cycle. There should be no surprises at the time of delivery.
3. How do you balance the need to involve clients with the equally important need to
freeze project scope in order to complete the project in a timely fashion?
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
17
This may be the key conundrum in managing IT projects and is a great point of departure
for in-class discussion. Students are usually quick to point the finger of blame; either at
the IT firm for not getting clear information or at the customer for not providing it.
Instructors can set up a “point/counter-point” discussion on the causes of IT project
failure and how many are linked precisely to this problem and the failure to resolve it as
early in the project contract as possible.
4. Why are configuration management and project change control so difficult to
perform in the midst of a complex software development project such as those
undertaken by Dotcom.com?
One of the keys to configuration management is communication between customer and
client as both parties observe early versions of the system and identify the needed
modifications. The problem for IT organizations is that they are loath to grant too much
power to modify the system in mid-development for fear that the initially contracted
terms will become meaningless through multiple changes orders. They desire spec freeze
precisely for the reason that customers hate it. Hence, configuration management is
difficult because it is hard for customers, who are not sophisticated with IT technologies,
to identify relevant points when configuration management should occur. Their lack of
understanding of the development process often makes it hard to create good a priori
change controls processes. Instead, they usually simply react (negatively) to perceived
inadequacies of the solution, after installation.
Case Study 5.3: Runaway Scope: The Bradley Fighting Vehicle
This case is a famous true story of a project for which the original scope (the
development of a replacement armored infantry vehicle) changed so often and
dramatically that the Army ended up with a hybrid vehicle that could not perform any of
its missions well (e.g., too little room to transport troops, too lightly armored and slow to
serve as a scout vehicle).
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
18
1) The Bradley suffered from the problem of “scope creep,” the continual
reassessment and change of a project’s original specifications. How did scope
creep directly affect the Bradley’s final design?
Scope creep is the process of allowing a project’s scope to remain unfixed; that is, to
refuse to lock in the specifications prior to the start of project execution. As a result, the
final product can undergo numerous changes and reconfigurations throughout its
development and end up as a product that satisfies nobody. In the case of the Bradley,
the desire to create an armored scout and an infantry transport vehicle resulted in a design
that did not perform either task well.
2) When is scope creep useful and when is it dangerous? Under what circumstances
might an organization refuse to freeze project design specifications for valid
reasons?
Scope creep can be useful in cases where the project is still undergoing modifications of
its initial specifications; that is, when the scope has not yet been loced in. It can also be
useful when it reflects market realities. For example, a company may be developing a
product only to have a competitor get their version to market first. Under this situation,
remodification of the project could result in a superior design or help correct deficiencies
that could only be detected once the project was under development. Scope creep is
dangerous if it is not coupled with discipline in the project management process. At
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
19
some point, it does become necessary to stop the design phase and get started with the
execution of the project.
The reasons an organization may refuse to freeze specs are usually related to technical
issues that require continuous testing and approvals or when market conditions mandate a
change in the project’s characteristics to reflect realities. One famous example was Texas
Instruments desire to penetrate the PC market backing the 1980’s with a vastly inferior
product. They should have recognized that the technology had passed them by while
they were developing their PC and reconfigured it.
3) Suppose you were brought in as a consultant for the Bradley development during
the 1960s. What would been some of the warning signs of development problems
you could have observed?
One warning sign was the inability to select a primary mission for the vehicle. What was
the key role it was expected to play? As long as the Army flirted with multiple and
competing roles, they were not likely to develop a product that could adequately fulfill
any of them. Another warning sign was the poor testing that seemed designed to pass the
Bradley without any controversy. Clearly, this was a weapon system the Army wanted
regardless of what independent analysis would recognize.
4) Develop a strategy for managing the various stakeholders on the Bradley project.
In terms of its scope, are there middle ground compromises you can identify?
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
20
This question asks students to first identify the various stakeholders for the project (FMC
Corporation, the Army, the Army testing branch, Government oversight personnel, etc.).
They are then asked to identify how these stakeholder demands will conflict with each
other and what strategies they might undertake to address them, without violating the
needs of other stakeholders. This example works best if stakeholders are first identified,
they desires named, some prioritization of these desired is developed, and then students
are expected to develop strategies that will allow them to address one set of stakeholder
needs without violating the critical needs of other groups. Do they perceive the nature of
tradeoffs? This is a critical point to get across; namely, there may be no “ideal” strategy
but there are still methods for “satisficing” the needs of the various stakeholder groups.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
21
MSProject EXERCISES
Using the information provided below, construct a simple WBS table for the project
example.
Project Outline – Remodeling an Appliance
I
Research Phase
II
Design and Engineering Phase
III
Testing Phase
IV
Manufacturing Phase
V
Sales Phase
I
Research Phase
A. Prepare product development proposal
1) Conduct competitive analysis
2) Review field sales reports
3) Conduct technological capabilities assessment
B. Develop focus group data
C. Conduct telephone surveys
D. Identify relevant specification improvements
II
Design and Engineering Phase
A. Interface with Marketing staff
B. and so on
III
Testing Phase
IV
Manufacturing Phase
V
Sales Phase
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
22
Solution:
Entering Tasks Using Custom WBS Codes
1. To view WBS codes, display the sheet view
2. Enter each activity on the MS Project task sheet
3. On the Project menu, point to WBS, and then click Define Code (See Figure 5.13)
Figure 5.13 – WBS Screen Shot
Microsoft product screen shot(s) reprinted with permission from Microsoft Corporation.
4. As you begin to enter each task and identify it as either a first-level, second-level,
or third-level heading, the WBS will demonstrate the organization of the project
(See Figure 5.14). Your final output should resemble the following:
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
23
Figure 5.14 – WBS Codes
Microsoft product screen shot(s) reprinted with permission from Microsoft Corporation.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall