King Fahd University of Petroleum & MineralsCollege of Engineering Sciences & Applied Engineering Civil & Environmental Engineering Dept. CE422- Construction Management and Economy Final Exam Part 1 Closed Book (40 points) Student Name: ------------------------------------------------------------------------ID# : -------------------------- ___________________________________________________________________________ Total Time: 30 minutes for part 1 and 90 minutes for part 2 Date: 21-December-2020 Good Luck King Fahd University of Petroleum & MineralsCollege of Engineering Sciences & Applied Engineering Civil & Environmental Engineering Dept. CE422- Construction Management and Economy Part 1: Q1: 40 points Check whether the following sentences are true () or false (X). [One point each] No. 1 Statement Ans wer T 3 The processes in flow process chart are classified as : operation, transportation, inspection, delay and storage. Time studies are done for statistical analysis and determining level of work activity Crew balance chart shows locations of facilities and materials 4 A36 Carbon Structural Steel has a yield strength of 36,000psi T 5 F 6 In Steel erection, and under AISC standards the vertical (or plumb) error cannot exceed 1 unit in 100 units of height Simulation is one method to improve productivity T 7 Renting is usually least expensive for equipment which has high utilization F 8 Typical lifetime repair cost is a function of equipment type and operating field conditions Repair cost usually constitutes the lowest item of operating expense for construction equipment. Weathering steel is a type of steel that doesn't need painting for protection against most atmospheric corrosion The hourly consumption of fuel is a function of equipment type, engine horsepower and operating field conditions The straight-line method of depreciation produces a decreasing depreciation each year of equipment life Proprietary specifications is specifying the product by its final performance T In double-declining-balance method, and for a 5-year equipment life, the annual depreciation factor is 0.50 (or 50%). Fuel cost and repair cost are calculated for equipment operating cost F 2 9 10 11 12 13 14 15 16 T F F T T F F T In general, purchasing equipment will result in the lowest hourly equipment cost if the equipment is properly maintained and fully utilized The normal progress or S-curve is generally used for non-repetitive work T T 20 The purpose of construction safety program is to minimize accidents and ensure compliance safety regulations. The major difference between CPM and PERT method is the use of concept of uncertainty with activity-time estimate The earned value method is used to control time and budget 21 Depreciation is the increase in equipment book value over operating years F 17 18 19 T T T King Fahd University of Petroleum & MineralsCollege of Engineering Sciences & Applied Engineering Civil & Environmental Engineering Dept. CE422- Construction Management and Economy 22 Hourly cost of operation of equipment is considered in project economics T 23 OSHA only publish the Safety, Health and Environment regulations F 24 Project cash flow schedule shows the planned rate of project expenditure and project income When workers are required to enter a trench excavation of 4 ft (1.2192 m) or more in depth, a stairway, ladder, or ramp must be placed about (6) time the depth lateral travel in the trench. Performance Bond guarantee the owner protection against any charges against the project that are unpaid as a result of the contractor’s default The sum-of-the-years'-digits method of depreciation produces a non-uniform depreciation which is the highest in the first year of life and gradually decreases thereafter Proposal form establishes the contractor intent to enter into a contract to complete the work specified at the cost indicated in the proposal If delay is due to the owner, the insurance will pay damages Liquidity Damages is the Cost resulting from late completion Asbestos dust is a radiation hazard in construction areas Generally, the project expenditure at the beginning of the project is higher than that at the middle of it. Double-declining-balance method does not automatically reduce the equipment's book value to its salvage value at the end of the depreciation period. Solicitation is the request from contractors to bid The human body can acclimate itself to low -temperature in less time compared to high -temperature conditions. Equipment-owning cost is variable and equipment-operating cost is fixed. Castellated steel beams have higher strength/weight ratio than the standard rolled steel sections Erection procedure employs four crews: Raising crew, Fitting crew, Fastening crew, and Painting crew Gin Pole is a lifting equipment used for steel erection Guy ropes and supports are often used in the process of bringing steel into alignment T 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 T F T T F T F F T T F F T F T T