Work completion Report To, M/S RASHLEELA ENTERPRISES PVT. LTD. Sir, Sub: Submission of work completion report. Ref: Your P.O no: 80 DT: 12 Dec 2022. Dtd With reference to the above, the work of Four Earthing Station installation and One Lighting Arrestor system is completed at Govindpur Plant and I would like to submit the following information for your kind needful. A. Earthing 1 2 3 Earth resistance Size of the Earth flat ( 3 x 25 sq.mm galvanic iron flat) Four separate Earthing points(50 MM , 3 Mtr) 1. 2. 3. 4. Machine Feeder Contral panel. Pit No 1 Plant Machine (Body Earth). Pit No 2 Plant Machine (Body Earth). Pit No 3 Lightening Arrester . Pit no 4 B. Lightning arrestor. 4 Copper Bonded Spike rod LA (2 Mtr) 2 Ohms 76 Mtr N-E readings 0.18 V 0.11 V 0.24 V 0.17 V Installed at Plant We certify that the above said system is installed and the equipment used in the system comply the Technical and Safety Standards as specified in the regulations notified by the OMC , Odisha . Signature of the Contractor Elefix Services Private Limited License No -3629(MV) Address –Plot No 3D/229 , Sec-9 CDA , Cuttack , Pin -753014 Date: 22/12/2022