ATTACHMENT -11
MINIMUM
ENGINEERING DELIVERABLES
PROJECT NO. : P11692
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field
TABLE OF CONTENTS
1
MINIMUM ENGINEERING DELIVERABLES ....................................... 3
2
GENERAL / COMMON DELIVERABLES .......................................... 3
3
PROCESS DELIVERABLES ........................................................... 3
4
PLANT LAYOUT AND PIPING DELIVERABLES ................................... 4
5
INSTRUMENTATION DELIVERABLES .............................................. 7
6
ELECTRICAL DELIVERABLES ....................................................... 9
7
CIVIL AND STRUCTURAL DELIVERABLES .......................................10
8
HSE AND LOSS PREVENTION....................................................11
9
CATHODIC PROTECTION DELIVERABLES .......................................13
10
PIPELINE .............................................................................14
11
MATERIAL & CORROSION CONTROL ............................................18
Page 2 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field
1
MINIMUM ENGINEERING DELIVERABLES
CONTRACTOR shall utilize the lists below as the basis of its proposed engineering
document deliverables.
These lists of deliverables are not definitive and indicate the minimum requirements
only. CONTRACTOR shall review these lists and update them adding all
deliverables required for CONTRACTOR to satisfactorily complete the Project
and meet all associated Contract requirements. The deliverable list shall not
constitute any limitation on the CONTRACTOR scope for the job completion.
Deliverables are to be issued by Plant area. CONTRACTOR shall not provide
“typical” drawings covering multiple areas (i.e. although the layout of each WIC
will be the same, separate GAs, Layout Drawings, etc. are required for
each W IC). CONTRACTOR shall also not provide single schedules and lists
for the Project. Schedules and Lists shall be prepared for each Plant area, as
appropriate (i.e. Line Schedules, Load Schedules, I/O Lists, etc.)
CONTRACTOR shall issue, within three (3) calendar weeks of the Effective Date of the
Contract, its proposed deliverable lists for ADNOC Onshore approval.
In
progression of the project detail engineering development the CONTRACTOR shall
include the deliverables necessary for the job completion.
The deliverables prepared & issued by Planning are as per the Planning & Scheduling
requirements attached to the EPC SOW.
2
GENERAL / COMMON DELIVERABLES
All common and applicable discipline deliverables shall be refer from BIFP Project.
EPC Contractor to raise the need list upon the award of the project.

3
FEED endorsement report
PROCESS DELIVERABLES

Process Design Basis

Process Flow Diagram

Piping and Instrument Diagram (Process, Utilities and Tie-in)

Cause & Effect Matrix diagrams

Line schedule

Utilities, Chemical Consumption summary

Vent and drain Summary

OPERATION & CONTROL NARRATIVE - PAD,MINIPAD,WELLBAYS

Process Conditions / Data sheets for Instruments.
Page 3 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field
4

Isolation Philosophy

Relief, Vent, Drainage & Blowdown Philosophy

Overpressure Protection Philosophy

Smart Plant P&ID Execution Philosophy

Smart Plant P&ID Extraction Procedure

Operating & Control Philosophy

Design Pressure And Temperature Philosophy

Sparing Philosophy

Emergency Depressurization Philosophy

ESD Philosophy

Pigging Philosophy

Equipment List

Heat & Material Balance For Pads, Minipads, Wellbays

Steady State Hydraulic Study Report - Pipelines

Design Review Close-Out Report

Process Simulation Report

Line Sizing Report

Hazop Review Report

Ram Study Sow For 3rd Party Consultant

Third Party Scope Of Work – Hazop Study

Line List

Tie-In Lists.

Site Visit Report - Process
PLANT LAYOUT AND PIPING DELIVERABLES
ADNOC onshore specifications are available and Contractor shall amend those to
add specific project requirements if any, for those new specification is not required.

Specification For Pipe Supports

Piping Material Specification
Page 4 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field

Specification For Piping Stress Analysis

Datasheet For Gate Valves

Data Sheet For Ball Valves

Data Sheet For Double Block & Bleed Valves

Data Sheet For Globe Valves

Data Sheet For Check Valves

Data Sheet For Access Fittings (Chemical Injection Quill, Sample Connection,
Etc)

Datasheet For Quick Coupling And Flexible Hose

Data Sheet For Access Fittings (Corrosion Coupon, Corrosion Probe, Etc.)

Data Sheet For Access Fittings (Chemical Injection Quill, Sample Connection,
Etc.)

Data Sheet For Insulating Gasket

Plant Layout & Piping Basis Of Design

Pipe Support Schedule Wellbays

Pipe Support Schedule Mini Pads

Pipe Support Schedule Pads

Piping Specialty Items List (Pads)

Piping Specialty Items List (Minipad)

Piping Specialty Items List (Wellbays)

Material Requisition For Piping Ball Valves

Material Requisition For Solid CRA (Alloy 825/625) Pipes (SMLS)

Material Requisition For Carbon Steel Pipes (SMLS And Welded)

Material Requisition For SS Pipes (SMLS And Welded)

Material Requisition For Solid CRA (Alloy 825/625) Fittings & Flanges (SMLS)

Material Requisition For Carbon Steel Fittings & Flanges (SMLS And Welded)

Material Requisition For SS Fittings & Flanges (SMLS And Welded)

Material Requisition For Ltcs Cladded Pipes, Fittings & Flanges

Material Requisition For Piping Valves (Gate, Globe, Check)

Material Requisition For Double Block & Bleed Valves
Page 5 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field

Material Requisition For Access Fittings (CC, CP)

Material Requisition For Gaskets

Material Requisition For Bolts And Nuts

Material Requisition For Access Fittings (Chemical Injection Quills, Sampling
Connection)

Material Requisition For Insulating Gasket

Technical Bid Evaluation For Piping Ball Valves

Technical Bid Evaluation For Solid CRA (ALLOY 825/625) PIPES (SMLS)

Technical Bid Evaluation For Carbon Steel Pipes (SMLS AND WELDED)

Technical Bid Evaluation For SS PIPES (SMLS AND WELDED)

Technical Bid Evaluation For Solid CRA (ALLOY 825/625) FITTINGS &
FLANGES (SMLS)

Technical Bid Evaluation For Carbon Steel Fittings & Flanges (SMLS AND
WELDED)

Technical Bid Evaluation For SS Fittings & Flanges (SMLS AND WELDED)

Technical Bid Evaluation For Ltcs Cladded Pipes, Fittings & Flanges

Technical Bid Evaluation For Piping Valves (GATE, GLOBE, CHECK)

Technical Bid Evaluation For Double Block & Bleed Valves

Technical Bid Evaluation For Access Fittings (CC, CP)

Technical Bid Evaluation For Gaskets

Technical Bid Evaluation For Bolts And Nuts

Technical Bid Evaluation For Access Fittings (CHEMICAL INJECTION
QUILLS, SAMPLING CONNECTION)

Technical Bid Evaluation For Insulating Gasket

Plot Plan

General Arrangement Piping

Piping Layout

Piping Isometric Drawing Index

Piping Isometric

Method Statement For Preheat And Piping PWHT

Method Statement for Operation of Automatic Welding Equipment
Page 6 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field
5

Material Take-Off For Piping Bulk Items (PADS / MINIPADS / Well bays)

Addendum To 3d Model Execution Philosophy

3D Modelling Procedure

2D Drawing Extraction Procedure (PDS 3D)

3D Model Review Procedure

Piping Stress Analysis Report

AIV Report

60%Model Review Report

90% Model Review Report

Scope Of Work For Flow Induced Vibration (FIV) & Acoustic Induced
Vibration (AIV) STUDY

Site Visit Report

ISO certificate and Quality Manual for Piping fabrication at Shop

As-built Drawings

Physical Tagging list
INSTRUMENTATION DELIVERABLES
For the purpose of project the Instrumentation deliverables inclusive of Design Basis,
Philosophies, Specifications, Reports, Study Reports, etc of the BIFP Project shall be
used for this project works. The attached Engineering deliverables were developed
based on the latest available revisions of BIFP project deliverables available at the
time of preparation of this scope of works. During the residual engineering phase the
CONTRACTOR shall obtain the latest deliverables from BIFP project and shall utilize
the same for development during Residual Engineering.
CONTRACTOR shall develop instrumentation engineering deliverables to address
works as required in this project. Requirements of standards and specifically of
SHELL DEP 32.31.00.34- Instrumentation Documents and Drawings shall be
complied. As a minimum following instrument engineering deliverables shall be
developed as the part of Engineering by the CONTRACTOR:

Site Survey Reports

Adequacy report

Instrument Data Sheets

Instrument Loop Diagrams
Page 7 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field

IO list

Instrument Index

Alarm and trip setting

Controller set point

Cable Block Diagrams including F & G detector

System architecture drawing

Cause & Effect Diagram

Logic Diagrams/ Software Configuration Diagrams

Modification scope of work for ICSS systemLayouts- Instrument Equipment
Room (Update BIFP drawing)

Layouts- Control Panel/ Auxiliary Racks (Update BIFP drawing)

Layouts- Instrument and JB Location

Layouts- Fire & Gas Detectors Location Layouts

Instrument Hook Up Diagrams

Instrument Tubing schedule

Instrument Interconnection/ Schematic/ Termination/ Wiring Diagrams

Lists/ Schedules/ Bill of Materials (Instrument Index/ Input Output Lists,
MTOs)

Layouts- Instrument and F&G Cable Routing Layouts
Engineering Sheets

Material Requisitions

Technical Bid Evaluations

Reports/ Calculations

Method Statements

Specification

Vendor Deliverables (All applicable instrument, VDRL and system drawing
and documents etc)

WHCP drawing (Vendor deliverables)

ICSS drawing and documents (Vendor deliverables)

Instrument part 3D model

Safety Requirement Specification
Instrumentation
Page 8 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field

6
All required deliverable to fulfil the project requirement
ELECTRICAL DELIVERABLES

Electrical Design Basis

Drawing index

Electrical Specifications

Electrical Data Sheets

Electrical Load Lists

Electrical Procedures

Electrical Calculations and Equipment sizing calculations including cable
sizing, conductor sizing andEarthing Calculation, All Single Line Diagrams,
including Key Single Line Diagram Electrical Schematic and Wiring Diagrams

Electrical Interconnection Diagrams

Substation Control and Monitoring System (SCMS) Architectural Block
Diagram

Equipment layout arrangement update

Instrumentation interface block diagram,

SCMS Detail Diagrams

SCMS I/O Schedules

Electrical Power Skid Layouts update

Electrical Cable Routing Layouts

Lighting Layouts and Detail drawings

Earthing Layouts and Detail drawings

Material and purchase requisitions for all equipment’s and materials

Technical Bid Evaluations for all equipment’s and materials

Electrical Equipment (Vendors) drawings and data

Vendors quality plans

Topographical survey/site survey report including existing underground
services/facilities

Electrical Equipment List

Electrical Cable Schedule

Electrical Junction Box (JB) Schedule
Page 9 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field

Material Take-offs (MTOs)

Installation Details, including Power, Lighting and Earthing

Hazardous Area Schedule

Hazardous Area Classification drawings and layouts

Tie-in Schedule

Electrical junction box schedule

Cable Joints location Schedule

Site Visit Reports

Method statements

Protection relay Co-ordination Study Report, setting and update existing
schedule and curves (including modifications to the existing relay settings, as
required) and submit a comprehensive relay co-ordination study report and
setting schedule for whole system

Electrical Legend and Symbol drawings

Key Plan Drawings

Field Test Procedure for electrical installation and equipment, plus test record
forms

Pre-Commissioning, Commissioning and SAT and ISAT procedure

Change-over procedure,

Operation and maintenance manuals,

Electrical data books,

Modification of all existing drawings/ documents affected by the works carried
out under the Project,

Factory Test Procedure and QCP for all electrical equipment

Electrical Part of 3D Model

List of tag plates and painting schedule for physical tagging

Legend and symbols

Any other drawing/ document required for completion of project
o
7
Other systems as required
CIVIL AND STRUCTURAL DELIVERABLES
Page 10 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field
8

Topographic survey, Underground detection and Geotechnical investigation
Scope of work documents and reports.

Construction specifications.

Site grading plans and sections and fence layout drawings

Roads and paving layout as applicable

Civil General Arrangement (GA) drawings including UG services, trenches,
etc.

Structural General Arrangements including Pipe support layout and details.

Structural Fabrication Drawings with supporting connection design calculation
report.

Reinforced concrete foundation drawings including Pipe Support layouts,
plans, and elevation and section drawings showing rebar details / schedule.

Platform Layout Drawings and details as applicable

Crossovers / Ladder / Stair / Handrail Layouts and details as applicable

Design Calculation Reports for Pipe supports, platforms, crossovers and all
foundations with all software printouts including native files.

Adequacy verification of existing Sleepers on Pipe corridor based on the
latest stress analysis.

Cable tray supports and Trench layout & detail Drawings

Layouts and details of all other miscellaneous civil and Structural works.

As-built Red Mark-up drawings, and Master drawings of new and existing
drawings wherever applicable.
HSE AND LOSS PREVENTION
In addition to those HSE deliverables mentioned herein, CONTRACTOR shall
be required to provide any additional HSE deliverables required by ADNOC
CoPs, ADNOC ONSHORE Manual 10, ADNOC ONSHORE standard
30.99.90.015 Appendix-II, or by any of the other ADNOC ONSHORE HSE policies,
procedures, guidelines or manuals provided in Volume 5 – HSE Requirements for
Contractors.

HSE Philosophy

Fire Protection and Fire and Gas Detection Philosophy

Project HSE Plan
Page 11 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field

Engineering HSE Plan

HAZID / ENVID / OHID Report

HAZID Closeout Report

HAZOP Report

HAZOP Closeout Report (By Process)

Fire and Gas Datasheet (by I&C)

Fire and Gas layouts

Fire and Gas Cause and Effects

Hazardous Area Classification Schedule

Hazardous Area Classification Layouts

Firefighting and Safety Equipment Specification

Firefighting and Safety Equipment datasheets

Firefighting and Safety Equipment layouts

Escape Route and Safety Sign layouts

Fireproofing schedule

Fireproofing Zone layouts

SIMOPS Report

Constructability Review Report

SIMOPS and Constructability Closeout Report

Flare / vent Dispersion Radiation Analysis Assumptions

Flare / vent Dispersion Radiation Analysis Report

SIL Assessment Report

Safety Requirement Specifications

SIL Verification Report
Page 12 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field
9

HSE Action Tracking Register

PHSER III Report

PHSER III Closeout Report

PHSER IV Report

PHSER IV Closeout Report

PHSER V Report

PHSER V Closeout Report

PSSR Report

PSSR Closeout Report
CATHODIC PROTECTION DELIVERABLES

Cathodic Protection System Design Report, including calculations

Specifications for Cathodic Protection Equipment and Materials

Data Sheets for Cathodic Protection Equipment and Materials

Cathodic Protection System I/O List for remote monitoring

General Arrangement drawing of Cathodic Protection Equipment

Schematic Layout of Cathodic Protection System

Cathodic Protection Appurtenance Schedule

Typical Cathodic Protection Installation Details (potential monitoring facilities,
welded pad brazing connection, pin brazing connection, test facilities,
termination details, etc.)

Cathodic Protection Cable Schedules

Cathodic Protection Material Schedules

Cathodic Protection Material Take-off

Corrosion Monitoring Schedule

Corrosion Monitoring Frame Work
Page 13 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field
10

Corrosion Inhibitor Injection Point and Corrosion Monitoring Equipment
Installation drawings

UT Baseline Wall Thickness Survey Report

Soils Resistivity Test Reports

Scope Of Work For Cathodic Protection System

CP Preworks Survey Report - For Pipelines And Crossings

Technical Bid Evaluation For Cathodic Protection Systems
PIPELINE
ADNOC onshore specifications are available and Contractor shall amend those to
add specific project requirements if any, for those new specification is not required.

Pipeline Design Basis

Pipeline Material Specification

Datasheet For Seamless Line pipes

Datasheet For Anchor Flange

Datasheet For Pig Signaller (INTRUSIVE TYPE)

Datasheet For Pipeline Induction Bends

Datasheet For Monolithic Isolating Joints

Datasheet For Pipeline Valves

Datasheet For Barred Tees

Pipeline Stress Analysis Report

Pipeline Mechanical Design Calculation Report (WALL THICKNESS,ROAD
CROSSING,BUOYANCY,PRESSURE TEST,ANCHOR FORCE)

Specification For Pig Signallers (INTRUSIVE TYPE)

Specification For Anchor Flange

Specification For Pipeline External Field Joint Coating

Specification For Pipeline Flanges And Fittings
Page 14 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field

Specification For Flexibility Analysis

Pipeline Hydrostatic Pressure Test Calculation Report

Pipeline Anti-Buoyancy Calculation Report

Pipeline Anchor Force Calculation Report

Field Layout - Overall Facilities

Overall Field Layout For Water Injection System

Overall Field Layout

Field Area layout

Line routing Plan

Pipeline route survey sketches

Pipeline Route Plans

Pipeline/flowline approach drawings

Pipeline Alignment Sheet

Pipeline Hydrostatic Test Diagram

Pipeline Schematic Diagram

Flowline Schematic Diagram with all flowlines in PAD/RDS

Pipeline Crossing matrix for each pipeline/flowline

Material Requisition For Seamless Line Pipe

Material Requisition For Field Joint Coating

Material Requisition For Isolating Joints

Material Requisition For Barred Tees

Material Requisition For Pipeline Bulk Materials

Material Requisition For Anchor Flanges

Material Requisition For Pipeline Valves
Page 15 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field

Material Requisition For Hot Induction Bends

Technical Bid Evaluation For Seamless Line Pipe

Technical Bid Evaluation For Field Joint Coating

Technical Bid Evaluation For Isolating Joints

Technical Bid Evaluation For Barred Tees

Technical Bid Evaluation For Pipeline Bulk Materials

Technical Bid Evaluation For Anchor Flanges

Technical Bid Evaluation For Pipeline Valves

Technical Bid Evaluation For Hot Induction Bends

Technical Bid Evaluation Topography & Underground Detection Survey
Report -Pipeline

Geotechnical Investigation Report For Pipelines

Scope Of Work For Topographic & Underground Detection Survey
(Pipelines)

Typical Pipeline Drawing - (PLAN & SECTION) Cable Crossing

Typical Pipeline Drawing - (PLAN & ELEVATION) GATCH ROAD / SAND
Track Crossing For Buried

Typical Pipeline Drawing - (PLAN & SECTION) Buried Pipeline Crossing
(TYPE-1)

Typical Pipeline Drawing - (PLAN & SECTION) OVERHEAD POWER LINE
CROSSING.

Typical Pipeline Drawing - (PLAN & ELEVATION) ASPHALT ROAD
CROSSING ABOVE GROUND PIPELINES/PIPELINES

Typical Detail Of Pipeline Identification Slab & Cable Identification

Typical Detail Of Concrete Safety Barriers For Asphalt Road Crossing

Typical Details Of Access Barrier For Road/Track/Rig Crossing
Page 16 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field

Typical Pipeline Drawing - (Plan & Elevation) Rig Road Crossing For Above
Ground Pipelines/Pipelines

Typical Pipeline Drawing - (Plan & Section) Overhead Power Line Crossing
For Above Ground Pipelines/Pipelines

Typical Pipeline Drawing - Right Of Way

Typical Pipeline Drawing - Pipeline Markers & Warning Sign

Typical Pipeline Drawing - (Plan & Elevation) Asphalt Road Crossing For
Buried Pipeline

Typical Road Crossing Drawing For Pipeline

Typical Track Crossing Detail For Above Ground Pipelines

Typical Pipeline Drawing - Configuration/Details For New Above Ground
Pipeline Crossings To Existing Roads/Tracks & Pipelines

Typical Pipeline Drawing - Marker Post And Warning Notice Detail For
Aboveground Pipelines/Pipelines

Typical Pipeline Drawing - (Plan & Section) Underground Pipe Crossing
Above Existing Pipeline Crossing (Type-2)

Typical Pipeline Drawing - (Plan & Elevation) New Buried Pipeline Crossing
Existing Aboveground Pipeline

Typical Pipeline Drawing - Pipe Hurdles Support Detail In SABKHA Area
For Above Ground One Pipeline

Typical Pipeline Drawing - Hurdle Support In Expansion Loop & Station
Approach (Sandy Area) For Single Pipeline

Typical Sleeper Details
Pipelines/Pipelines

Typical Pipeline Drawing - CICPA Fence Crossing (Trenchless)

Typical Pipeline Drawing - Pipe Trench Details

Site Visit Report- Pipeline
In
SABKHA
Area
For
Above
Ground
Page 17 of 18
ADNOC Classification: Internal
TECHNICAL CENTERS & PROJECTS (TC&P)
EPM for Non-Conventional Well Tie-Ins at BAB Field
11
MATERIAL & CORROSION CONTROL

Material Selection & Corrosion Control Report

Corrosion Monitoring Philosophy

Specification for Positive Material Identification

Specification For External Pipeline Coating

Specification For External Painting & Coating Of Equipment

Specification For CRA Clad Pipelines & Piping Material

Chemical Treatment Philosophy

Corrosion Management Framework

Specification For Piping, Forging, Plates & Castings For Sour Service
Page 18 of 18
Download