DEPARTMENT OF EDUCATION Region V Division of Camarines Sur LUPI NATIONAL HIGH SCHOOL San Fernando, Camarines Sur SCHOOL YEAR 2022-2023 TLE and TVL DEPARTMENT Project Title: Sharing Knowledge thru Innovative Learning for Life-long Skills ( SKILLS) Problem Statement: Unsatisfactory physical condition of TLE/TVL laboratory rooms which is not conducive for learning. Mastering TLE/TVL Competencies using TV as instructional materials for better delivery of instructions. Poor performance on laboratory tasks due to a lack of instruments and equipment in the lab for the corresponding TLE and TVL specializations Project Objective Statement: 1. To address poor performance of students in TLE/TVL subject in terms of mastering competencies. 2. To provide support to students in mastering competencies in TLE/TVL using Smart TV as instructional materials for better delivery of instructions. 3. To provide students quality laboratory experience during their laboratory period. Root Cause: 1. Low average grade of Students in TLE and TVL due to lack of contextualized and Localized learning Materials, Lack of laboratory equipment and tools and lack Instructional Materials/equipment such as TV resulting to high number of unmastered competencies. PROJECT WORK PLAN AND BUDGET MATRIX TECHNOLOGY AND LIVELIHOOD EDUCATION-DEPARTMENT Activity Output Date of Implementation August 2022 – June 2023 Person Responsible Principal, Teachers Stakeholders Admin. Staff NGO,LGU Budget Integration of ICT on Instructional Activities using Smart TV. Purchase of 2 units Smart TV Junior High School H.E. Laboratory Roof and indoor ceiling Repair or Build/Construct Senior High School TVLH.E. Laboratory Building Conduct Different Activities like Ninong and New Laboratory for TVL SHS Or Repair of indoor ceiling for Junior High School H.E. Laboratory Building SY 2022 – 2023 SY 2023 - 2024 SY 2024- 2025 Principal, Teachers Stakeholders Admin. Staff NGO,LGU 100,000.00 150,000.00 Equipment and tools needed for Senior High School and SY 2022 – 2023 SY 2023 - 2024 SY 2024- 2025 Principal, Teachers Stakeholders Admin. Staff 150,000.00 40,000.00 Budget Source MOOE JHS and SHS /PTA Fund or any available fund MOOEJHS and SHS /PTA Fund, LGU or NGO Funding or any available fund MOOE/PTA Fund, LGU or NGO Funding or Ninang nang Pasko or Mr. and Mrs. Foundation to raise fund. Junior High School cookery, bread and pastry and Food and services Laboratory. Provision of August 2022 – another academic June 2023 classroom for JHS. NGO,LGU and other Stakeholders, Principal, Teachers Stakeholders Admin. Staff NGO,LGU and other Stakeholders, 15,000.00 MOOE To repair and replace damaged door of 1 academic classroom SY 2022 - 2023 Principal, Teachers Stakeholders Admin. Staff NGO,LGU and other Stakeholders, Php. 8,000.00 LGU (SEF), PTA fund, MOOE JHS Provision of three sets of chalkboard for three classroom SY 2022 - 2023 Principal, Teachers Stakeholders Admin. Staff NGO,LGU and other Stakeholders, Php. 10,500.00 LGU (SEF), PTA fund, MOOE JHS Installation of electrical convenience outlet for ICT room and Dressmaking Shop. To install 10 (2gang) outlet in each room with separate circuit beaker/ panel. SY 2022 - 2023 Principal, Teachers Stakeholders Admin. Staff NGO,LGU and other Stakeholders, Php. 40,000.00 MOOE JHS, LGU, PTA fund repairing the indoor ceiling by replacing the damaged structure. repair and replacement of the entire indoor ceiling of the classroom SY 2022 - 2023 Principal, Teachers Stakeholders Admin. Staff NGO,LGU and other Stakeholders, Php. 49,000.00 MOOE JHS Repairing of water facilities Provision of another water drinking facilities/ handwashing for students. (8 faucets). SY 2022 - 2023 Php. 49,000.00 MOOE JHS Repairing of electrical facilities To repair and replace damaged outlet for TVL classroom SY 2022 - 2023 Principal, School Physical Facilities Coordinator. Faculty and staff, Students, stakeholders Principal, School Physical Facilities Coordinator. Faculty and staff, Php. 7,000 MOOE SHS Construction of wall partition of 2ns room of two storey building (2STY 2CL regular workshop) located at the 2nd floor Replacement and Installation of two flush doors for entrance and exit of academic classroom Installation of chalkboard in the ICTand H.E. Laboratory room and Grade 7 Joy Classroom any available fund Repair of 8 units sewing machine To repair the 8 units Sewing machines that haven't been used in the last two years SY 2022 - 2023 Nutrition Month Culminating Activity Feeding Program Poster Making Contest Video Making Contest Culminating Activity SY 2022 - 2023 Students, stakeholders Principal, School Physical Facilities Coordinator. Faculty and staff, Students, stakeholders Principal, School Physical Facilities Coordinator. Faculty and staff, Students, stakeholders Php. 8,000 MOOE SHS/JHS, PTA, or other available fund Php. 5,000 PTA Fund, or other source of fund Prepared By: Noted: MA. LUISA Q. SIBULO Teacher- I TLE/TVL Coordinator FLORENTINA R. MARQUEZ Principal-I Approving Authority: EDNA C. FERNANDEZ, ED.D. Public Schools District Supervisor (San Fernando)