7. QA/QC Activities NO. 7 Main Activities 1 Inspection of steel fixing of WTG 39 and base layer of 38 and 47. 2 Inspection of lean concrete was performed at WTGs 30,32, 42 and 43. 3 Soil testing was performed at WTG 30,32, 42 and 43. 4 Inspection of Road (T48~T57), Subgrade from St. 5+320 to 4+560 and quality testing was performed. 5 Road (T31~39), Subgrade up to St. 5+100 and Base Coarse from St. 3+600 to 4+360, quality testing was performed. 6 Revised MoS of WTG Foundation is submitted. Inspection of Lean concrete of Switchgear room and Control building and quality tests were performed