7. QA/QC Activities
NO.
7
Main Activities
1
Inspection of steel fixing of WTG 39 and base layer of 38 and 47.
2
Inspection of lean concrete was performed at WTGs 30,32, 42 and 43.
3
Soil testing was performed at WTG 30,32, 42 and 43.
4
Inspection of Road (T48~T57), Subgrade from St. 5+320 to 4+560 and quality
testing was performed.
5
Road (T31~39), Subgrade up to St. 5+100 and Base Coarse from St. 3+600 to
4+360, quality testing was performed.
6
Revised MoS of WTG Foundation is submitted.
Inspection of Lean concrete of Switchgear room and Control building and quality
tests were performed