HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL
LOCATION/
PROJECT
DANGAN PEMBANGGUNAN RUMAH SELANGORKU YANG MENGANDUNGI 3BLOK RUMAH SELANGORKU JENIS D APARTMENT ‘VILLA’ (3 TINGKAT 54 UNIT), DI PANGSAPURI SERI ADURIA, JALAN NOVA U5/81,
SUBANG BESTARI, SEKSYEN U5, 40150 SHAH ALAM, SELANGOR DARUL EHSAN
HAZARD IDENTIFICATION
NO
WORK ACTIVITY
(A)
1
HAZARD
CONSEQUENCES
RISK ASSESSMENT
EXISTING RISK CONTROL
LIKELIHOOD
SEVERITY
RISK
RATING
• Caught in moving
part of machine
• Flying part or rod
• Sharp edge on cut
bar ends
• Inhalation of
diesel engine
fume from
machine
• No proper
walkway
• Exposure of noise
• Hot weather
• Bodily injury/ fatal
• Bodily injury
• Bodily injury/ Hand
injury
• Short term – irritate the
eye and lung
• Long term – may cause
cancer
• Slip, trip and fall
• Hearing Impairment
• Dehydration and
dizziness
• Ensure machine guarding
for moving part is in place
• Only fully trained worker
can operate the machine.
It must be the same
person to do the
operation and press the
pedal
• Provide personal
protective equipment
such as safety goggle and
protective clothing
• Ensure rebar is properly
fixed to the platform
• Ensure machine guarding
for moving part is in
placed
• Ensure operator is
wearing hand gloves
• Diesel engine shall locate
at the location that less
workers exposed to it
• Ensure engine is shut off
when rest time
• Job rotation for the
operator
• Regular maintenance for
the machine.
• Ensure access kept clear
from any obstruction and
dry
• Provide barricade for the
rebar yard
• Provide and ensure
worker wearing earplug
• Proper maintenance
need to carry out for the
machine
• Sufficient rest time
• Provide drinking water
near by the working area
:
:
REVISION
REVISION DATE
PAGE
:
:
:
FORM/SHE/HIRARC/01
01
02
12 .01 .2022
PAGE 1 of 16
RISK CONROL
RISK CLASIFICATION
(K) BARBENDING AND BARCUTTING WORK
Bar bending and Bar
cutting Works
FORM REF
VERSION
2
3
6
LOW
2
3
6
MEDIUM
3
1
3
LOW
3
3
9
MEDIUM
3
2
9
MEDIUM
3
2
6
MEDIUM
2
2
4
LOW
PIC
RECOMMEND CONTROL
MEASURES
LIKELIHOOD
SEVERITY
RISK
RATING
RISK CLASIFICATION
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL
LOCATION/
PROJECT
DANGAN PEMBANGGUNAN RUMAH SELANGORKU YANG MENGANDUNGI 3BLOK RUMAH SELANGORKU JENIS D APARTMENT ‘VILLA’ (3 TINGKAT 54 UNIT), DI PANGSAPURI SERI ADURIA, JALAN NOVA U5/81,
SUBANG BESTARI, SEKSYEN U5, 40150 SHAH ALAM, SELANGOR DARUL EHSAN
• Manual handling
carrying rebar
• Muscle pain
• Provide training or
briefing on recognize and
prevent heat illness
• Provide information
about the maximum load
that a person can carry
• Stretching before start
work
3
2
6