ELK322E POWER TRANSMISSION SYSTEMS Homework Faulted PTS Submission Date: June 03, 2022 Name and Family Name: Q1 Q2 Q3 Student Number: Total Q4 Signature: Students may work together, but cannot write together. Ö Usta & R ÇaΔlar PROBLEM 1. Assume that the unbalanced rms phase voltage and rms current phasors are given as below. ππππ ππ 120∠0° = [ππ ] = [120∠ − 30°] π, ππ 120∠60° πΌπππ πΌπ 6∠ − 60° = [πΌπ ] = [ 6∠30°] π΄ πΌπ 6∠180° (a) Find the three-phase complex power, active and reactive power, apparent power, and the angle of complex power using phase quantities. [15pts] (b) Find the sequence voltages (π012 ) using symmetrical transformation. [20pts] (c) If the sequence currents (πΌ012 ) are given as below, find the three-phase complex power using sequence voltages (π012 ) and currents (πΌ012 ). [15pts] πΌ0 1.0352∠ − 45° [πΌ1 ] = [ 1.0353∠75°] A πΌ2 5.8185∠ − 69.895° ELK322E POWER TRANSMISSION SYSTEMS Homework Faulted PTS Submission Date: June 03, 2022 PROBLEM 2. A single-line diagram of the power system shown in the Figure, where negative- and zero-sequence reactances are also given. The neutrals of the generator and Δ–Y transformers are solidly grounded. The motor neutral is grounded through a reactance Xn = 0.05 per unit on the motor base. (a) Draw the per-unit zero-, positive-, and negative sequence networks on a 100-MVA, 13.8-kV base in the zone of the generator. [15pts] (b) Reduce the sequence networks to their Thévenin equivalents, as viewed from bus 2. Pre-fault voltage is VF = 1.05β0o per unit. Pre-fault load current and Δ –Y transformer phase shift are neglected. [10pts] (c) Calculate the per-unit subtransient fault currents in phases a, b, and c for a bolted three-phase-to-ground short circuit at bus 2. [10pts] (d) Calculate the subtransient fault current in per-unit and in kA for a bolted single lineto-ground short circuit from phase a to ground at bus 2. Also calculate the per-unit line-to-ground voltages at faulted bus 2. [15pts] (e) Calculate the subtransient fault current in per-unit and in kA for a bolted line-to-line fault from phase b to c at bus 2. [10pts]