SBI, Amaravati LHO ANNEXURE-I FORMAT OF ELECTRICAL SAFETY AUDIT REPORT I. BRANCH / OFFICE DETAILS 1 2 3 4 5 6 7 8 9 10 BRANCH NAME & ADDRESS BRANCH CODE REGION MODULE NETWORK SANCTIONED LOAD CONNECTED LOAD BILLING DEMAND MAXIMUM DEMAND (MD) REACHED BETWEEN MAR TO JUNE ELECTRICAL SAFETY AUDIT M/s. CONDUCTED BY NW-I / NW-II / NW-III II. MONTHLY ELECTRICITY BILL DETAILS Billing month of Maximum Demand KW Units Consumed KWH Power Factor Penalty (if any) Rs. JUL-20 AUG-20 SEP-20 OCT-19 NOV-20 DEC-20 JAN-21 AVERAGE Amount paid COPY Rs. ENCLOSED Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No III. TOTAL ELECTRICAL LOAD OF THE BRANCH / OFFICE Sr. No. 1. 2. 3. 4. 5. Description Air-conditioning load (ACDB) Power load (PDB) Lighting load (LDB) Ups load (UDB) Capacitor bank Load Details (KW/ KVAR) IV. CRITICAL EQUIPMENTS A. UPS / BATTERIES IN BRANCH & ON-SITE ATM S. No. Description 1 UPS Capacity 2 UPS Make Details Observation / Remarks KVA Page 1 of 12 SBI, Amaravati LHO 3 UPS installation & commissioning date 4 UPS Type (1-phase or 3 phase) 5 No. of Batteries 6 Battery Rating 7 Whether SMF or Tubular? 8 Battery bank installation date 9 AMC period 10 Whether AMC of UPS is carried out through original equipment manufacturer? AH YES / NO Name: B. EARTHING SYSTEM Sr. No. Description Details 1 Total No. of Earth pits 2a No. of Earth pits for UPS 2b Whether UPS & DG are provided with separate Earthing? 2c UPS Earthing value 2d Neutral to Earth voltage 3a No. of Earth pits for Raw power 3b Raw power Earthing value 3c Neutral to Earth voltage 4a No. of Earth pits for DG Observation / Remarks YES / NO 1. 2. Ohms Ohms Volts 1. 2. 3. Ohms Ohms Ohms Volts 1. 2. 3. 4. Ohms Ohms Ohms Ohms 4b DG Earthing value 4c Neutral to Earth voltage 5 Whether Earthing is provided for neutral points of UPS & DG separately? YES / NO 6 Whether Earthing reports are provided by the Electrical Maintenance Contractor? YES / NO Volts C. AIR-CONDITIONERS IN BRANCH & ON-SITE ATM Sr. No. Description Details Observation / Remarks Type of AC 1 Split / Cassette Ductable / VRF / Make Qty. Tr. Page 2 of 12 SBI, Amaravati LHO a b c d e TOTAL 2 AC installation & commissioning date 3 AMC period 4 Name of the AMC vendor 5 Whether AMC of ACs is carried out through original equipment manufacturer or empaneled contractor? Name: YES / NO D. DIESEL GENERATOR (DG) SET Sr. No. Description Observation / Remarks Details 1 DG set Capacity KVA 2 DG set Make 3 DG set installation date 4 No. of DG set Batteries 5 DG set Battery Rating 6 AMC period 7 Whether AMC of DG set is carried out through original equipment manufacturer/ authorized service provider of the original equipment manufacturer.? YES / NO 8 Whether the Earthing for connecting to Body and neutral are provided for the DG set? YES / NO 9 Whether the DG set cabin and fuel tank are in lockable condition? YES / NO 10 Whether the CEA approval for DG Set is available at the site? YES / NO Name: V. ELECTRICAL SAFETY AUDIT OF BRANCHES / OFFICE WITH LT CONNECTION S. No. 1 2 Description Whether separate electrical room is there or not? In case of Branch with ATM, whether branch entry is made separately through other than ATM Premises (Entrance of branches should not be made through ATM as per safety norms) Details Observation / Remarks Photo graph YES/NO YES/NO Page 3 of 12 SBI, Amaravati LHO 3 4 a b 5 6 a Whether total load is within the limits of sanctioned load/ demand Whether penalty is being imposed in electricity bills on account of higher load/poor power factor etc. (It may be ascertained from the electricity bill of April / May / June / July). Additional electrical load required if any (from power Distribution company) Excessive sanctioned load to be surrender if any (to power Distribution company) Whether Load is Distributed in all 3 phases to avoid unbalancing of phases and no loose electrical connection/ haphazard wiring observed in the branch/ office / premises Whether incomer cable is of adequate size suitable for connected load Gauge / Size of existing cable YES/NO YES / NO / NA YES / NO / NA YES/NO b RY: Incoming Voltage Value YB: BR: c R: Incoming Current Value Y: B: d Frequency Value e a Neutral to earth voltage value Whether Main MCCBs/ MCBs/ ELCBs are provided with proper rating to cater the load Main MCCB/ MCB/ ELCB Rating b Main MCCB/MCB/ELCB make 7 8 9 10 a b 11 12 13 General Condition of electrical control panels, Main switch, electric meter board and change over switch, AC’s, Water coolers, water filter, wiring cables etc. is good and all Dbs, Panels, Switch boards are properly covered. Whether light and emergency light are provided in electrical rooms/operating areas for easy operation & maintenance works Whether emergency light is provided in UPS/ Security rooms Number of emergency lights in ATM Power source of emergency lights Whether Earthing pits are properly connected to the equipment, Body of the connected equipment like Panel, DG, UPS…etc. Whether sufficient Earthing is provided for LDB, PDB, UDB, LT panels, APFC, COS, etc.? Whether the earthing pits are properly maintained YES / NO / NA Satisfactory / Modification required YES / NO / NA YES/NO YES / NO / NA YES / NO YES / NO / NA Page 4 of 12 SBI, Amaravati LHO 14 Whether earth pits are provided separately for Panels, DG & UPS…etc. YES/NO 15 Whether neutral to earth voltage is below permissible limits YES/NO 16 Whether the capacity of UPS is adequate as per requirement of branches. YES/NO 17 Whether UPS room is properly ventilated with Exhaust fans? YES/NO 18 Whether UPS/ Electrical room is provided with Fire rated doors? YES/NO 19 Whether the MCCB / MCB provided for the UPS are of correct rating & fully operational? YES / NO 20 21 22 23 24 25 26 27 28 29 a b Whether the capacity of DG is adequate as per requirement of branches load except AC. Whether DG set is safely placed in the premises? Fuel for the DG set is stored in closed container and placed at a safe location? Whether Diesel i.e. inflammable materials are safely stored? Whether the DG set panels, instrument clusters, etc. are in good condition? Whether proper exhaust fan for Ventilation of panel room/electrical room/UPS room/DG Room is provided and paper, old material or any other scrap kept near DB/DG/ Panels/UPS/Batteries etc. are not kept there. Whether Pump room, DG set room, UPS room, electrical room...etc. are maintained dry and in good condition and obsolete/ hazardous/ old items are not dumped there. General condition of air conditioners, etc. Whether Appropriate timers used in the changeover of Air conditioners for server room Ac’s and for signage Boards to make auto ON/OFF (for schedule timings). The thermostat of Ac’s at server rooms should be set to say 30 degree centigrade so they are not run only when the temperature is too high (to minimize chances of fire due to idle running of Ac’s during the nights) Whether the MCB & RCCB provided for the ACs are of correct rating & fully operational? YES/NO YES / NO YES / NO YES / NO YES / NO YES / NO YES / NO / NA Satisfactory / Modification required YES / NO / NA YES / NO Temperature in ATM Room maintained If AC machine is more than 10 years age, Load drawn by AC machine Page 5 of 12 SBI, Amaravati LHO 30 General condition of Electrical fixtures a Type of Lighting. Whether LED/ Conventional / Florescent type b Age of lighting fixtures c Type of lighting in Signage boards d Age of Wall mount/ ceiling fans 31 32 33 34 a 35 36 37 38 a b c Whether electrical equipment’s of Pantry etc. are properly connected to Iron socket box with MCBs. MCB s or latest type switches are provided to switch on/off the AC s and protect them from overload. Whether gland Earthing provide for all cables? Whether isolating switches are provided for the switching off & on of essential loads premises during night and main switch to switch off the power supply to the branch in case of fire/Emergency Whether Proper preventive maintenance after opening of Panel boards and distribution Boards are carried out by the license holder Electrician or skilled technicians of Equipment manufacturers/ Service providers. Name of preventive maintenance person with contact details Whether preventive maintenance of equipment is carried out by skilled license holder electricians? Whether the contact numbers of persons, electricians, power distribution company, Generator service provider, Vendor UPS vendor, Ac’s etc. are available with Accountant / Security guard and other staff and they are displayed in Electric Room / UPS room. Whether the power factor panel of appropriate rating is installed FIRE PREVENTION MEASURES All old disposable records, broken furniture etc. accumulated at the premises have been cleared. Combustible leaf, litter / waste papers etc. in and around the branch is removed / cleaned periodically No stationery / records / old obsolete items are stored / kept in the system / UPS room Satisfactory / Modification required YES / NO / NA YES / NO YES / NO / NA YES / NO / NA YES/NO YES / NO / NA YES / NO / NA YES / NO / NA YES / NO / NA YES / NO / NA Page 6 of 12 SBI, Amaravati LHO d Storage racks in stationery / record room kept at a safe distance of at least 3 ft from electrical points / switch / junction boxes. YES / NO / NA e In the pantry / canteen LPG is used YES / NO / NA 39 SERVER AND UPS ROOM Server room have dual AC units having timer circuit device with independent circuit Whether fan installed in UPS room 40 YES / NO / NA ELECTRICAL SAFETY Power supply to record / stationery room is made through plug and socket arrangement 41 YES / NO / NA FIRE PROTECTION / FIRE CONTROL EXTINGUISHERS AND FIRE ALARM SYSTEM Are fire extinguishers available in the following work area and clearly marked and accessible YES / NO / NA YES / NO / NA A. Systems/UPS Room: CO2(3kg/4.5kg) x 2 42 43 a b c d 44 45 46 B. Banking Hall: Water CO2 type C. Stationery Room: Water CO2 type DG SET / GENERATOR At least two 6 kg ABC or CO2- 3/ 4.5 kg capacity fire extinguishers are placed near the DG General condition of wiring Whether loose electrical connections/ haphazard wiring observed in the Branch premises? Whether the wires in the DB'S are properly dressed, terminated and covered? Whether electrical wires are properly covered/ insulated to prevent exposure of wires? Whether wires are properly connected to fixtures, plugs, circuit breakers, and other equipment? Whether proper marking done for identifying the Electric Panels, DBs, switch boards, Earthing pits, etc.? Whether electrical covers in place for junction boxes, Outlets, and panel boards? Whether power supply to Safe room, Locker room, Record room & Stationary room are made through Plug and Socket disconnecting arrangement for foolproof disconnection? YES / NO / NA Satisfactory / Modification required YES / NO / NA YES / NO / NA YES / NO / NA YES / NO / NA YES / NO / NA YES / NO / NA YES / NO / NA Page 7 of 12 SBI, Amaravati LHO 47 48 49 50 51 52 53 54 Whether sticker related to safety, switching off power and energy saving etc. are pasted in the branch? Whether Lightning arrestor/conductor is provided for the Multi storied Building and connected to independent Earthing system? Whether water seepage is observed near any of the Electrical Panel, Distribution Boards, Electrical equipment, DG… etc. Whether all the electrical accessories like lights, ACs...etc. are fiercely fixed from falling Any melted switches / sockets / cable terminations found Whether Electrical Renovation/ Any Electrical wiring Changes done within 10 years Any occurrence of Fire accidents in last one year Whether any modifications concern to Electrical safety to be done on priority basis immediately in branch? if yes, mention the list below in priority basis YES / NO / NA YES / NO / NA YES / NO / NA YES / NO / NA YES / NO / NA YES / NO / NA YES / NO / NA YES / NO / NA High Priority Medium Priority Page 8 of 12 SBI, Amaravati LHO Low priority Thermography: observations on thermographic images at Electric Panels, Distribution Boards and all to be submitted with this report for branches above 60 KW Load. DECLARATION: All the above readings and observations were recorded by me between 10.00am and 4.00pm. The above observations and readings are true and actually recorded by me. Name of the Auditor: Branch Manager: Name of the Personnel: PF ID: Supervisor License No. Signature of The BM / Head: Signature of the Auditor: Place: Date: Page 9 of 12 SBI, Amaravati LHO ANNEXURE-II ADDITIONAL POINTS FOR BUILDINGS HAVING OWN HT SUBSTATION Billing Demand Maximum Demand (MD) of (preferably April / May / June months) Power factor and peak load as mentioned in the electricity bill (preferably April / May / June months) Capacity of substation and voltage S, No Description Details 1 Whether the permission for substation and DG sets, Electric shock treatment chart, Electrical & fire safety charts, Single line Diagram etc. are displayed in substation. YES/NO 2 Whether Electric shock treatment charts Electrical and Fire safety Charts YES / NO and Single line diagram are displayed? 3 Whether emergency contact numbers of nearest Fire station, Hospital, YES / NO DISCOM office, etc. are displayed at substation and control room 4 Weather electrical danger plate (fig of skull & cross bones, 440V / 230V) is YES / NO provided on Main Electrical Panel / electrical room / operating areas 5 Safety equipment / materials like Fire extinguishers, Sand buckets, Rubber YES / NO Mats, Hand Gloves, first aid box etc. are available in substation? 6 Whether the inspection of sub-station / DG Set / Lifts is done by Electrical YES / NO Inspectorate at least once in a year and inspection fees paid well in time? 7 Whether the observations by Electrical Inspector during his last visit have YES / NO been attended? (Copy of letters in this regard should be enclosed) 8 Whether Preventive Maintenance of Breakers, Transformer, Panels etc. is YES / NO carried out through respective original equipment manufacturer as per schedule? (Copy of service reports to Observations / Remarks Photograph Page 10 of 12 SBI, Amaravati LHO be attached) 9 10 Whether Annual Operations & Maintenance contract is provided for YES / NO the sub-station 24 x 7? a) Whether the maintenance Contractor has “A” Class Electrical contractor’s license as per prevailing guidelines of the Concerned State/ Central Govt.? b) The Workmen/ Technicians possess the Supervisor / wireman / Electrician license? (Copies should be available with the concerned official) YES / NO 11 In case of outdoor substation, a. Whether the stone cities provided in substation yard? YES / NO b. Whether the Substation structure fencing boundary is provided, painted and well maintained? 12 Whether proper nomenclature and painting is done on Electric Panels and YES / NO Earthing pits? 13 Whether Earthing Test reports of substation are provided by the YES / NO Electrical Maintenance contractor? 14 Whether the Earthing pits are identified and free from obstruction for routine YES / NO maintenance? 15 Whether the Transformers, MV panels, HT panels, RMG, APFC panels, etc. YES / NO are earthed from dedicated Earthing pits? 16 Whether Transformer oil level and breather condition is checked at least YES / NO once in a week? 17 Check last date of transformer oil BDV test and confirm the BDV value YES / NO whether it is permissible or not? (Copy of required test report can be attached) 18 Whether mechanical and electrical interlocks of critical equipment’s are YES / NO working or not? 19 Operating manuals for critical YES / NO equipment’s like transformer, breakers Page 11 of 12 SBI, Amaravati LHO etc. are available on site or not? 20 Whether Automatic Power Factor Control (APFC) Panel is provided and YES / NO fully operational? 21 Whether the maintenance personnel are provided with good quality of protective gears (shoes, hand gloves, YES / NO etc.), uniforms and measuring instruments, tool kits etc. 22 Whether Some training / meeting with Maintenance Staff about safety YES / NO challenges is arranged at least half yearly 23 Whether the sub-station building is YES / NO ventilated sufficiently. 24 Whether electrical covers in place for junction boxes, Outlets, and panel YES / NO boards? 25 Whether power supply to Safe room, Locker room, Record room & Stationary room are made through YES / NO Plug and Socket disconnecting arrangement for fool proof disconnection? 26 Whether sticker related to safety, switching off power and energy saving YES / NO etc. are pasted in the branch? 27 Whether Lightning arrestor/conductor is provided for the Multi storied YES / NO Building and connected to independent Earthing system? 28 Thermography: observations on thermographic images at Electric Panels, Distribution Boards and all. Upload the thermos graphic images on the system DECLARATION: All the above readings and observations were recorded by me between 10.00am and 4.00 pm. The above observations and readings are true and actually recorded by me. Name of the Auditor: Branch Manager: Name of the Personnel: PF ID: Supervisor License No. Signature of The BM / Head: Signature of the Auditor: Date: Page 12 of 12