Supply and Installation of Distribution Transformers to Bagaji/Raiban Mada and Environs at Keffi, Nassarawa State. Material Requirement for 4 No. 500KVA, 11/0. 415KV Distribution Substation with 9 Spans of 11KV O/H Line and 43 Spans of LT reticulation at Bagaji/Kaiban Mada. All Prices Must be Indicated in Naira Exchange Rate…………………………. Lot S/N (A) Description of Materials Unit Qty A29 1. 2. 3. 4. 5. 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 10.6m High Tension pre-stressed concrete poles 11KV Fibre Croos arm 11KV tie Strap Disc Insulator 6-Bolt clamp Adaptor Socket tongue Adaptor Clevis ball/J-Hook 11KV galvanized channel Iron 9” 5/8 x 9” bolt & nut 5/8 x 10”bolt & nut 5/8 x 11” bolt nut 5/8 washers 150mm2 Aluminum Conductor 5/8 x 6” bolt & nut 5/8 x 3” bolt & nut 11kv Spindle 11KV Jumper Spindle 11KV Pin Insulator Stay Rod (HT) Stay wire Stay Insulator Stay block J & P fuse (11KV type) Lightening arrestor (11KV type) 35mm2 x 1 core 11KV XLPE down dropper cable 500mm2 x 1 core LT underground cable 150mm2 x4 core LT upriser cable 70mm2 bare copper earth wire 35mm2 cable lug 500mm2 cable lug 150mm2 cable lug 70mm2 cable lug Galvanized earth rod 4-way, 800A feeder pillar Shackle insulator complete with spindle & washers Sub- total (A) No No No No No No No No No No No No Mtrs No No No No No No Mtrs No No Set Set Mtrs Mtrs Mtrs Mtrs No No No No No No No 18 7 14 21 21 21 21 10 64 128 48 640 1,500 40 40 21 18 21 16 240 16 16 4 4 180 80 120 400 24 32 40 64 40 4 172 B 41 42 43 Materials Requirement for the construction of LT Overhead Lines D’lron with bolt and nut No 172 150mm2 Aluminum Conductor Mtrs 8,600 Stay Rod (LT) No 16 Unity Price 44,000 24,760 325 1,560 1,950 650 650 5,200 260 260 260 50 364 130 130 650 1,560 1,105 2,990 195 195 520 15,600 15,600 1,560 10,660 17,940 1,300 130 1,560 325 195 6,240 162,500 800 1,040 364 1,950 Total 3,168,000 580,000 41,600 149,760 187,200 62,400 62,400 296,000 25,600 51,600 19,200 64,000 2,329,600 10,400 10,400 106,080 99,840 779,220 36,400 234,000 36,400 41,600 227,500 195,000 561,600 2,392,000 4,305,600 1,040,000 6,240 99,840 26,000 24,960 249,600 650,000 137600 6,991,615 178,880 3,130,400 31,200 44 45 46 47 48 49 50 51 Stay wire Stay Insulator Stay block Bi- Metal line tap 8.53m concrete pole 17” bolt (Short) 17” bolt (washer) 500KVA, 33/0.415KV Transformer SUB- TOTAL (B) TOTAL (A+B) ADD 5% VAT GRAND TOTAL 25,585,659.75+4,439,820 Total=30,025,479.75 Mtrs No No No No No No No 160 16 16 44 20 160 160 4 156 195 520 1,300 37,000 260 100 3,250,000 24,960 3,120 8,320 57,200 740,000 41,600 160,000 13,000,000 17,375,680 24,367,295 1,218,364.75 25,585,659.75 Supply and Installation of Distribution Transformers to Bagaji/Kaiban Mada and Environs at Keffi, Nassarawa State. (4 no.500KVA,11/0.415KV Distribution Substation with 9 spans of 11KV O/H Line and 43 spans of L.T reticulation. S/N. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Event / Activity Clearing of Substation site, 5 spans of route length each of High Tension and Low Tension over head lines Surveying both HT and LT Route Lengths and pegging the pole-holes for both Digging of Pole-hole for high Tension line Digging of Pole-hole for low Tension line Digging of stay – holes Transportation of the High and Low Tension Poles from AEDC Stores in FCT Erection of HT Poles and backfilling the Poleholes Erection of LT Poles and backfilling the Poleholes Drilling and cutting of Channel Irons to 11KV Specifications Dressing of HT Poles with channel Irons, 1KV Wooden Cross arms, Galvanized Tie strap and Bolts & Nuts together with associated insulators Dressing of LT Poles with ‘D’ Irons, Shackle Insulators and Bolts & Nuts Weaving of and installation of complete stay assembly with stay block Laying of the 150mm2 (AAC) al Aluminum Conductor in readiness for both TT and LT overhead line stringing Stringing of the High Tension O/H Line using 150mm2 AAC Stringing of the Low Tension O/H Line using AAC Haulage of all overhead line materials from AEDC stores in FCT Abuja to site Use of special crane to convey Distribution Transformer and 4-way Feeder Pillar from AEDC stores in FCT Abuja to site. Casting of standard Transformer Plinth to a height of 1.4m with concrete mix of 1:2:4 Casting of standard Feeder Pillar Plinth to a height of 0.2m with concrete mix of 1:2:4 Unit Qty Unit of Cost No 4 5,000 20,000 Lot Lot Lot 120,000 No No No Trip 18 20 32 Lot 2,500 2,500 2,500 Lot 45,000 50,000 80,000 150,000 No 18 5,000 90,000 No 20 4,000 80,000 Length 10 3,000 30,000 No 18 4,000 72,000 No 20 5,000 100,000 Lot 32 1,000 32,000 Lot Lot Lot 250,000 Span 18 2,500 45,000 Span 20 3,000 60,000 Trip Lot Lot 150,000 Trip 4 50,000 200,000 No 4 60,000 240,000 No 4 40,000 160,000 20. Mounting of Transformer and Feeder Pillar on their respective Pilinths 21. Connection of Transformer Primary Side to the O/H Line via 33KV J & P ‘D’ Fuse Assembly and the Secondary to the 4 way Feeder Pillar using 500mm2 x 1 –core LT 22. Preparation of Cable terminals using appropriate indoor and Outdoor termination Kits 23. Digging of 6’ x 6’ x 6’ Earth pits for substation earthling. 24. Weaving of Earth Mats using 70mm2 Bare Copper Earth Wire for Installation into the Earth pits 25. Driving in the earth Rods into the Earth Pits Floors 26. Backfilling the earth Pits with charocoal and animal dung for soil resistivity improvement 27. Earthing all metallic – non- current – carrying path of the installations and the transformer Neutral 28. Gravelling the substation with 20-50mm diameter granite chippings to an average of 150mm thickness 29. Fencing the substation with sancrete blocks and provision of lockable steel gate 30. Appropriate drilling and installation of Danger Caution signs as provided by the 31. Installation of Anti-Climbing devices as shall be provided by PHCN 32. Invitation of Inspectorate Division of Federal Ministry of Power for inspection and testing. 33. Invitation of Protection, Control & Metering Engineers for comprehensive testing of the installation 34. Project commissioning and handing over 35. Allow a Provisional Sum of N300,000. 00 to be expended in part or in full, subject to the Client’s approval, for Supervision 36. Installation 500KVA, 11/0.415KV Transformer Sub Total Allow 10% Contingency TOTAL Allow 5% Value Added Tax (TAX) Grand Total TOTAL MATERIAL AND LABOUR Lot 8 15,000 120,000 Lot Lot 50,000 50,000 No Lot 80,000 80,000 No 4 30,000 120,000 No Lot Lot 60,000 No 3 - - No 4 5,000 20,000 No 3 - - No 4 25,000 100,000 Lot 4 50,000 200,000 No Lot Lot 40,000 No - Lot 60,000 Lot 4 50,000 200,000 Lot 4 65,000 260,000 Lot Lot 4 - 65,000 - 260,000 300,000 Lot 3 - 3,844,000 384,400 4,228,400 211,420 4,439,820