BRIEF INTRODUCTION OF Warm startup of Boiler & Turbine rolling and loading procedure PRESENTED BY: Mahendra singh Boiler Startup DEPENDS ON TURBINE HP SHAFT TEMPERATURE COLD STARTUP - <150 DEG C WARM STARTUP - 150-350 DEG C HOT STARTUP - >350 DEG C LIGHTUP PRE-CHECKS AND READINESS FOR LIGHTUP. Lightup Pre-checks CHECK ALL PTW RETURNED. M/C ON BARRING, AND LUB OIL TEMP IS >550C TAKE ELECTRICAL .BMD,AHP,TMD AND C & I DEPARTEMENT CLEARANCE PRIOR TO LIGHTUP. ALL POWER SUPPLY VIZ. 6.6 KV, 415V, 220V DC, 110 V AC, AND 24 V DC SUPPLY TO THE RESPECTIVE SYSTEMS SHOULD BE AVAILABLE. INFORM TO DM PLANT PRIOR TO LIGHTUP SO THAT THEY CAN START CHEMICAL DOSING SYSTEM AS REQUIRED. Lightup Pre-checks cont. INFORM TO SWITCHYARD ABOUT LIGHTUP. LINEUP AND START 1 NO. CW PUMP AND 1 NO. ACW PUMP. ENSURE RUNNING OF COMPRESSOR OTHERWISE START ONE COMPRESSOR. TAKE ONE AIR DRYER IN SERVICE FOR INSTRUMENT AIR. CHECK AIR SUPPLY ESTABLISED AT ALL POINTS i,e INSTRUMENT AIR FOR ALL CONTROL VALVES AND SERVICE AIR FOR OIL ATOMISING. CHECK ADEQUATE CST LEVEL AND AVAILABILITY OF BOILER FILL PUMP AND HOTWELL MAKEUP PUMP Lightup Pre-checks cont. CHECK ALL SOOT BLOWERS TO BE RETRACTED POSITION. CHECK ALL GAGS FROM THE SAFETY VALVES ARE REMOVED. INFORM TO CHP AND CONFIRM COALS ARE AVAILABLE IN COAL BUNKERS. OPEN DRUM, SH , AND ECONOMISER VENTS. SH AND STEAM COOL WALL DRAINS AND TURBINE SIDE DRAINS TO BE OPENED. OPEN FULLY THE STARTUP VENT AND CBD VALVE SHOULD BE LINE UP. Lightup Pre-checks cont. OPEN ECONOMISER RECIRCULATION VALVE. ENSURE DMCW LINES IN LUBE OIL COOLERS OF BOILER SIDE ARE CHARGED AND START ALL LOP’S. ENSURE THE DMCW LINES ARE CHARGED IN TG SIDE FOR CEP,BFP,GENERATOR ,EXCITER, SEAL OIL COOLERS AND TG LUBE OIL COOLERS. START ACW, DMCW , AND DMCW BOOSTER PUMPS START LDO PUMP IN RECIRCULATION MODE. Lightup Pre-checks cont. FILL THE BOILER DRUM THROUGH BOILER FILL PUMP OR THROUGH BFP UPTO -80 MMWC. START 1 NO. OF DM MAKE-UP PUMP AND FILL THE HOTWELL UPTO 1200 MMWC. START 1 NO. OF CEP AND FILL THE DEAERATOR UPTO 350CMMWC. START 1 NO. OF BFP IN RECIRCULATION MODE. Lightup Pre-checks cont. START BOTH APH BY AIR MOTOR FIRST AND THEN BY AC MOTOR. START 1 NO. OF ID AND FD FAN AND MAINTAIN AIR FLOW BETWEEN 30% TO 40% APPROX. 350 tons/hour AND FURNACE DRAFT BETWEEN -10 TO -12 MMWC. START FURNACE PURGING. PUT SADC IN AUTO TO MAINTAIN FURNACE TO WIND BOX DP AFTER MODULATION. START AC SCANNER AIR FAN AND CHECK DC SCANNER AIR FAN IS COMING IN AUTO IF AC FAN TRIPS. BOILER PURGING Boiler Purging FOLLOWING PURGE PERMISSIVES SHOULD BE SATISFIED BEFORE PURGING. NO BOILER TRIP HOTV CLOSED LOTV CLOSED ALL HONV CLOSED ALL LONV CLOSED ALL PA FANS OFF ALL FEEDERS OFF ALL HOT AIR GATE CLOSED ALL AUX. DAMP MODULATING AIR FLOW>30% & <40%. ALL SCAN NO FLAME. Boiler Purging cont. START PURGING. WAIT UNTIL PURGE IS COMPLETED.(BOILER PURGING TIME IS 5 MINUTES.) DURING PURGING SEE AL L SADC DAMPERS ARE FULL OPEN POSITION AND AFTER PURGING WAIT UNTIL IT COMES TO MODULATING POSITION. BOILER IS READY FOR LIGHTUP. BOILER LIGHT-UP Boiler Light-up ENSURE ALL OIL GUNS ARE CLEANED BEFORE LIGHTUP. ESP: ALL HOPPER,INSULATORS HEATERS ARE ON. CHECK OIL ELEVATION SHOULD BE READY FOR TAKING IN SERVICE FROM LOCAL AND REMOTE. CHECK OIL GUN SHOULD BE IN REMOTE MODE AND ALL ISOLATION VALVES OF LONV AND HONV SHOULD BE OPEN. CHECK ATOMISING AIR VALVE IN OPEN POSITION AND MAITAIN AIR PRESSURE 7 KG/CM2 APH SOOT BLOWING SHOULD BE CONTINUE TILL OIL SUPPORT WITHDRAWN. ENSURE BOTTOM ASH HOPPER & SEAL TROUGH IS OVERFLOWING. FIREMEN SHOULD BE PROVIDED AT FIRING FLOOR AND TG FLOOR Boiler Light-up cont. OPEN LOTV VALVE AND LOFCV AND MAINTAIN PRESSURE UPTO 10 KG/CM2. ENSURE THE OIL SELECTION SHOULD BE IN LDO. LIGHT-UP THE BOILER BY GIVING COMMAND TO AB ELEVATION LDO CORNER 1 & 3. MAINTAIN OIL PRESSURE AGAIN UPTO 10 KG/CM2 FOR TAKING NEXT TWO OIL GUNS. TAKE OIL PAIR FOR AB ELEVATION CORNER 2 & 4. MAINTAIN OIL PRESSURE AT 6 KG/CM2. OIL PRESSURE VERSUS OIL FLOW HFO PRESSURE VS FLOW OIL PR. OIL FLOW PER GUN (KG/CM2) (KG/HR.) 4.6 750 5 815 5.5 6 6.5 7 7.5 8 8.5 9 9.5 9.7 895 976 1057 1137 1218 1299 1379 1460 1541 1573 LDO PRESSURE VS FLOW OIL PR. OIL FLOW PER (KG/CM2) GUN (KG/HR.) 3.5 750 4 849 4.5 5 5.5 6 6.5 7 7.5 948 1047 1145 1244 1343 1442 1541 Boiler Light-up cont. CONTROL THE FIRING RATE BY OIL PRESSURE SO THAT THE BOILER STARTS STEAMING AFTER 45 MINUTES. SEE THE TEMPERATURE RISE OF DRUM METAL (110 DEG/HR) ENSURE THE FURNACE FLUE GAS EXIT TEMPERATURE SHOULD NOT INCREASE 500 DEG C . THIS IS TO PROTECT THE REHEATER TUBES BEFORE THE FLOW IS ESTABLISED.(FURNACE TEMPERATURE PROBE IS PROVIDED TO MEASURE THE FURNACE TEMPERATUE). WAIT FOR RAISE IN DRUM PRESSURE AND TEMP MEANWHILE START THE TURBINE SIDE ACTIVITIES. TAKE CD ELEVATION OIL GUNS IN SERVICE TO INCREASE STEAM GENERATION IN CONTROL WAY Boiler Light-up cont. ENSURE TURBINE SIDE MS, CRH, HRH DRAINS AND MAL VALVES SHOULD BE OPEN POSITION. UPTO THIS TIME THE TURBINE SHOULD BE TAKEN IN BARRING GEAR. GENERATOR SEAL OIL SYSTEM STARTED. GENERATOR HYDROGEN SHOULD BE CHARGED. VACUUM PUMP STARTED. VACUUM IN TG MAINTAINING APPROX -.910 KG/CM2. Boiler Light-up cont. Boiler Light-up cont. Boiler Light-up cont. CLOSE THE DRUM AND SH VENTS AT 2-3 KG/CM2 DRUM PRESSURE. CLOSE THE SH DRAINS AT 5 KG/CM2. BEFORE CHARGING MS LINE COND. SHOULD HAVE PROPER VACCUM i.e. -.91 OPEN BYPASS VALVE OF MS STOP VALVE FOR WARM UP THE LINE AT 8--10 KG/CM2 PRESSURE THEN CHARGE THE MAIN STEAM LINE. THROTTLE THE STARTUP VENT RAISE THE DRUM PRESSURE/MS PRESSURE UPTO 10 KG/CM2 Boiler Light-up cont. OPEN HPBP AND LPBP VALVES WHEN STEAM PRESSURE REACHES UPTO 08 KSC AND STEAM TEMP UPTO 160-180 DEG C. CLOSE THE STARTUP VENT. AS WE ARE FOCUSING IN WARM LIGHT UP TODAY REQUIRED MAXIMUN STEAM TEMP SHOULD BE +30 DEGREE ABOVE SHAFT TEMP. RAISE THE PRESSURE & TEMP UP TO DESIRED VALUE RESET ALL THE RELAYS AT GRP AND LINE UP OF GT AS PER REQUIREMENT START ONE PA FAN TO RAISE THE STEAM TEMP. & PRESSURE START ADJECENT MILL B OR MILL C AS BOTH ELEVATION HAVE 3 OR MORE GUNS AFTER TAKING MILLS KEEP CLOSE WATCH ON STEAM TEMP. & PR. & REGULATE FUEL IN MILLS ACCORDING TO REQUIRED TEMP. BOTH SEAL AIR FAN STARTS IN AUTO WITH STARTING OF PA FAN. STOP ONE FAN X1 = X1A = X2 = X3 = X41 = X42 = X5 = X61 = X61 = X62 = X62 = X7 = FOR OPENING MAIN STOP VALVE FOR OPENING MAIN STOP VALVE FOR OPENING MAIN STOP VALVE FOR OPENING MAIN STOP VALVE HP SHAFT FOR 600 RPM HP CYLIMDER 600 RPM FOR 600 RPM CONSTANT PRESSURE FOR 3000RPM SLIDING PRESSURE FOR 3000RPM CONSTANT PRESSURE FOR 3000RPM SLIDING PRESSURE FOR 3000RPM FOR LOADING Boiler Light-up cont. * BEFORE STEAM ADMISSION ENSURE STEAM QUALITY AT 25 KSC STEAM PRESSURE AND STEAM TEMP ABOVE SHAFT TEMP DEG C TURBINE STOP VALVES IS OPENED. WAIT UNTIL CRITERIA X41/HPS, X42/HPC, X5, is fulfilled) CHANGE LUB OIL TEMP SET POINT ROLL THE TURBINE TO 600 RPM. SOAK THE TURBINE UNTIL PARAMETER COME UNDER CONTROL LIKE VIBRATION ,DIFFERENTIAL EXPANSION, TOP- BOTTOM TEMP , TSE UPPER MARGIN, SUFFICIENT STEAM FLOW etc. . JOP IS CUT OFF AT 540 RPM. ( WAIT UNTIL CRITERIA X6 IS SATISFIED). OBSERVE THE TURBINE VIBRATIONS DURING ROLLING TO 2980 RPM. STOP AOP AFTER 2850 RPM ,AND SUFFICIENT LUB OIL PR. BEFORE SYNCHRONISING TAKE CLEANCE FROM DM PLANT REGARDING THE SILICA CONTENT OF THE BOILER DRUM AND MS STEAM. MAINTAIN DRUM PRESSURE WITHIN THE PERMISSIBLE LIMITS AT OPERATING PRESSURE. Boiler Light-up cont. Boiler Light-up cont. Boiler Light-up cont. INFORM THE SWITCHYARD and WRLDC THAT THE MACHINE IS GOING TO BE SYNCHRONISED. PUT LOAD REFERENCE AT 30 MW AND LOAD GRADIENT AND LOAD CONTROL IN ‘ON’ POSITION. LOAD GRADIENT TO BE PUT TO 10MW/MIN. ABOVE 2850RPM ON EXCITER BKR. AND MAINTAIN VOLTAGE MATCH THE GENERATOR VOLTAGE WITH THE INCOMING VOLTAGE WITH THE HELP OF EXCITATION SYSTEM. MATCH THE FREQUENCY OF THE GENERATOR WITH THE GRID FREQUENCY BY CHANGING THE SPEED REFERENCE. SYNCHRONISE THE MACHINE. Boiler Light-up cont. INCREASE THE SPEED REFERENCE TO INCREASE THE LOAD TO AVOID TRIPPING ON REVERSE POWER. THE TURBINE WILL GO FROM SPEED CONTROL TO LOAD CONTROL WHEN LOAD CONTROLLER OUTPUT WILL BECOME MORE THAT SPEED CONTROLER OUTPUT. THEN LOAD IS CHANGED BY CHANGING THE LOAD SET POINT. LOAD CONTROL MADE ON AFTER 25MW MAINTAIN GEN VOLTAGE TO EXPORT VAR(LAGGING) CLOSE ALL DRAINS. CLOSE MAL DRAIN VALVES. Boiler Light-up cont. CLOSE ECO. REC. VALVE E024 INCREASE FIRING TO REACH 40 MW AT 35 KSC. START OTHER PA FAN AND INCREASE THE PA HEADER PRESSURE UP TO 800 MMWC. AND BALANCE THEM START MILL A AND INCREASE THE LOAD. CHARGE LPH-1,2,3. Boiler Light-up cont. START SECOND SET OF ID FAN, FD FAN, CEP AND BFP. AFTER 50 MW CHARGE DEARATOR EXTRACTION LINE.. AFTER 75 MW CHARGE HPH-5 . AND 6 PUT IN FLUSHING/ WARMUP. Boiler Light-up cont. Boiler Light-up cont. GRADUALLY INCREASE THE CAOL FEEDEING, MS PRESSURE, MS & HRH TEMPERATUE BELOW 540 DEG C. AT LOAD 90MW TAKE UAT TRANSFER. UNIT TRANSFORMER PUT IN LOAD SLOWLY INCREASE THE LOAD TO 150 MW TAKE OUT ALL OIL GUNS. TAKE MILL-D IN SERVICE. SLOWLY INCREASE THE LOAD UPTO 250 MW.