OF: TEXAS BECK PROPERTIES 1 LP CONDOMINIUMS PORT ISABEL, PROJECT: TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 FIRM No. F-7906 TREVIÑ0 ENGINEERING SEAL 11/18/2019 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT OF: BECK PROPERTIES 1 LP CONDOMINIUMS PHASE I PORT ISABEL, TEXAS PROJECT: TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 FIRM No. F-7906 TREVIÑ0 ENGINEERING SEAL 11/18/2019 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT OF: BECK PROPERTIES 1 LP CONDOMINIUMS PHASE II PORT ISABEL, TEXAS PROJECT: TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 FIRM No. F-7906 TREVIÑ0 ENGINEERING SEAL 11/18/2019 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT STEEL COVER 5.0' CON CRETE WA LK VALLEY GUTTER 5.0' CON C. WALK S 27° 14' 00" E 227.16' MARINA D RIVE (60 Ft. R.O.W.) VALLEY GUTTER Back of Curb DETENTION POND 480 C.F. F.F.:5.50 TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 FIRM No. F-7906 PROPOSED BUILDING TREVIÑ0 ENGINEERING (60 Ft. R.O.W.) F.F.:6.00 MADISON ST. PROPOSED BUILDING OF: Back of Curb SEAL 120.0' PROPOSED BUILDING N 54° 51' 30" E PROPOSED BUILDING VALLEY GUTTER 11/18/2019 Waste VALLEY GUTTER 120.0' DETENTIO 1,308 NC.POND F. BECK PROPERTIES 1 LP CONDOMINIUMS PHASE I PORT ISABEL, TEXAS SIDEWALK OPENING 5.0' CONCRETE WALK F.F.:6.50 DETENTIO N PON 1804 C.F D . F.F.:6.75 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT 20' Alle y PROJECT: S 54° 51' 30" W Phase One Block 79 N 27° 14 ' 00" W 227.16' DETENTIO N PON 780 C.F. D Disp. STEEL COVER N 54° 51' 30" E 5.0' CONCRETE WALK PROPOSED BUILDING F.F.:5.00 PROPOSED BUILDING F.F.:4.60 PROPOSED BUILDING F.F.:5.00 MARINA D RIVE (60 Ft. R.O.W .) E " 0 3 ' 5 5 ° 8 4 S 88.71' 1: 2: 3: 4: 11/18/2019 SIDEWALK OPENING R=300' L=113.58 VE I R D A R.O.W.) N I R A M (60 Ft. ' 5 1 . 1 6 OF: Back of Curb STEEL COVER BECK PROPERTIES 1 LP CONDOMINIUMS PHASE 2 PORT ISABEL, TEXAS S 27° 14' 00" E SIDEWALK OPENING PROJECT: DETENTION POND 528 C.F. S 54° 51' 30" W SIDEWALK OPENING 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 F.F.:5.10 TEL No. (956) 283-8847 ident@trevinoengineering.com F.F.:4.60 PROPOSED BUILDING FIRM No. F-7906 PROPOSED BUILDING TREVIÑ0 ENGINEERING DETENTIO N PO 1,080 C. ND F. SEAL N DETENTIO F. 1,020 C. STEEL COVER * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT E " 0 3 ' 5 5 ° 8 4 S POND (60 Ft. R.O.W.) Disp. Phase Two Block 78 JEFFERSON ST. 146.18' VALLEY GUTTER 120.0' Waste 20' Alle y 120.0' N 27° 14 ' 00" W ' 2 6 . 118 ey l l A 20' DETENTIO 1,308 NC.POND F. 1: 2: 3: 4: 20' Alle y * REVISION: Phase One Block 79 PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT N 27° 14 ' 00" W 227.16' DETENTIO N PON 780 C.F. D Disp. S 27° 14' 00" E 227.16' VALLEY GUTTER DETENTION POND 480 C.F. Back of Curb MARINA D RIVE (60 Ft. R.O.W.) LEGEND FL: FLOW LINE T.O.S: TOP OF SIDEWALK T.O.P.: TOP OF PAVEMENT T.G.: TOP OF GROUND F.F.: FINISH FLOOR 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 OF: Back of Curb 5.0' CON C. WALK (60 Ft. R.O.W.) VALLEY GUTTER MADISON ST. 5.0' CON CRETE WA LK N 54° 51' 30" E STEEL COVER VALLEY GUTTER SIDEWALK OPENING 5.0' CONCRETE WALK F.F.:5.50 TEL No. (956) 283-8847 ident@trevinoengineering.com PROPOSED BUILDING FIRM No. F-7906 S 54° 51' 30" W F.F.:6.00 TREVIÑ0 ENGINEERING PROPOSED BUILDING BECK PROPERTIES 1 LP CONDOMINIUMS PHASE I PORT ISABEL, TEXAS F.F.:6.50 DETENTIO N PON 1804 C.F D . PROPOSED BUILDING SEAL F.F.:6.75 PROJECT: PROPOSED BUILDING 120.0' VALLEY GUTTER 11/18/2019 120.0' Waste F.F.:5.10 STEEL COVER PROPOSED BUILDING F.F.:5.00 PROPOSED BUILDING F.F.:4.60 PROPOSED BUILDING F.F.:5.00 .) E " 0 3 ' 5 5 ° 8 4 S 88.71' ' 5 1 . 1 6 R=300' L=113.58 VE I R D A R.O.W.) N I R A M (60 Ft. LEGEND FL: FLOW LINE T.O.S: TOP OF SIDEWALK T.O.P.: TOP OF PAVEMENT T.G.: TOP OF GROUND F.F.: FINISH FLOOR 1: 2: 3: 4: 11/18/2019 OF: MARINA D RIVE (60 Ft. R.O.W SIDEWALK OPENING BECK PROPERTIES 1 LP CONDOMINIUMS PHASE 2 PORT ISABEL, TEXAS Back of Curb STEEL COVER PROJECT: S 27° 14' 00" E SIDEWALK OPENING FIRM No. F-7906 N 54° 51' 30" E 5.0' CONCRETE WALK DETENTION POND 528 C.F. S 54° 51' 30" W SIDEWALK OPENING 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 F.F.:4.60 PROPOSED BUILDING TEL No. (956) 283-8847 ident@trevinoengineering.com PROPOSED BUILDING TREVIÑ0 ENGINEERING DETENTIO N PO 1,080 C. ND F. SEAL N DETENTIO F. 1,020 C. STEEL COVER * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT E " 0 3 ' 5 5 ° 8 4 S POND (60 Ft. R.O.W.) Disp. Phase Two Block 78 JEFFERSON ST. 146.18' VALLEY GUTTER 120.0' Waste 20' Alle y 120.0' N 27° 14 ' 00" W ' 2 6 . 118 ey l l A 20' STEEL COVER 5.0' CON CRETE WA LK VALLEY GUTTER 5.0' CON C. WALK S 27° 14' 00" E 227.16' MARINA D RIVE (60 Ft. R.O.W.) VALLEY GUTTER Back of Curb DETENTION POND 480 C.F. F.F.:5.50 TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 FIRM No. F-7906 PROPOSED BUILDING TREVIÑ0 ENGINEERING (60 Ft. R.O.W.) F.F.:6.00 MADISON ST. PROPOSED BUILDING OF: Back of Curb SEAL 120.0' PROPOSED BUILDING N 54° 51' 30" E PROPOSED BUILDING VALLEY GUTTER 11/18/2019 Waste VALLEY GUTTER 120.0' DETENTIO 1,308 NC.POND F. BECK PROPERTIES 1 LP CONDOMINIUMS PHASE I PORT ISABEL, TEXAS SIDEWALK OPENING 5.0' CONCRETE WALK F.F.:6.50 DETENTIO N PON 1804 C.F D . F.F.:6.75 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT 20' Alle y PROJECT: S 54° 51' 30" W Phase One Block 79 N 27° 14 ' 00" W 227.16' DETENTIO N PON 780 C.F. D Disp. STEEL COVER N 54° 51' 30" E 5.0' CONCRETE WALK PROPOSED BUILDING F.F.:5.00 PROPOSED BUILDING F.F.:4.60 PROPOSED BUILDING F.F.:5.00 MARINA D RIVE (60 Ft. R.O.W .) E " 0 3 ' 5 5 ° 8 4 S 88.71' 1: 2: 3: 4: 11/18/2019 SIDEWALK OPENING R=300' L=113.58 VE I R D A R.O.W.) N I R A M (60 Ft. ' 5 1 . 1 6 OF: Back of Curb STEEL COVER BECK PROPERTIES 1 LP CONDOMINIUMS PHASE 2 PORT ISABEL, TEXAS S 27° 14' 00" E SIDEWALK OPENING PROJECT: DETENTION POND 528 C.F. S 54° 51' 30" W SIDEWALK OPENING 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 F.F.:5.10 TEL No. (956) 283-8847 ident@trevinoengineering.com F.F.:4.60 PROPOSED BUILDING FIRM No. F-7906 PROPOSED BUILDING TREVIÑ0 ENGINEERING DETENTIO N PO 1,080 C. ND F. SEAL N DETENTIO F. 1,020 C. STEEL COVER * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT E " 0 3 ' 5 5 ° 8 4 S POND (60 Ft. R.O.W.) Disp. Phase Two Block 78 JEFFERSON ST. 146.18' VALLEY GUTTER 120.0' Waste 20' Alle y 120.0' N 27° 14 ' 00" W ' 2 6 . 118 ey l l A 20' STEEL COVER 5.0' CON CRETE WA LK VALLEY GUTTER 5.0' CON C. WALK S 27° 14' 00" E 227.16' MARINA D RIVE (60 Ft. R.O.W.) VALLEY GUTTER Back of Curb DETENTION POND 480 C.F. F.F.:5.50 TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 FIRM No. F-7906 PROPOSED BUILDING TREVIÑ0 ENGINEERING (60 Ft. R.O.W.) F.F.:6.00 MADISON ST. PROPOSED BUILDING OF: Back of Curb SEAL 120.0' PROPOSED BUILDING N 54° 51' 30" E PROPOSED BUILDING VALLEY GUTTER 11/18/2019 Waste VALLEY GUTTER 120.0' DETENTIO 1,308 NC.POND F. BECK PROPERTIES 1 LP CONDOMINIUMS PHASE I PORT ISABEL, TEXAS SIDEWALK OPENING 5.0' CONCRETE WALK F.F.:6.50 DETENTIO N PON 1804 C.F D . F.F.:6.75 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT 20' Alle y PROJECT: S 54° 51' 30" W Phase One Block 79 N 27° 14 ' 00" W 227.16' DETENTIO N PON 780 C.F. D Disp. STEEL COVER N 54° 51' 30" E 5.0' CONCRETE WALK PROPOSED BUILDING F.F.:5.00 PROPOSED BUILDING F.F.:4.60 PROPOSED BUILDING F.F.:5.00 MARINA D RIVE (60 Ft. R.O.W .) E " 0 3 ' 5 5 ° 8 4 S 88.71' 1: 2: 3: 4: 11/18/2019 SIDEWALK OPENING R=300' L=113.58 VE I R D A R.O.W.) N I R A M (60 Ft. ' 5 1 . 1 6 OF: Back of Curb STEEL COVER BECK PROPERTIES 1 LP CONDOMINIUMS PHASE 2 PORT ISABEL, TEXAS S 27° 14' 00" E SIDEWALK OPENING PROJECT: DETENTION POND 528 C.F. S 54° 51' 30" W SIDEWALK OPENING 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 F.F.:5.10 TEL No. (956) 283-8847 ident@trevinoengineering.com F.F.:4.60 PROPOSED BUILDING FIRM No. F-7906 PROPOSED BUILDING TREVIÑ0 ENGINEERING DETENTIO N PO 1,080 C. ND F. SEAL N DETENTIO F. 1,020 C. STEEL COVER * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT E " 0 3 ' 5 5 ° 8 4 S POND (60 Ft. R.O.W.) Disp. Phase Two Block 78 JEFFERSON ST. 146.18' VALLEY GUTTER 120.0' Waste 20' Alle y 120.0' N 27° 14 ' 00" W ' 2 6 . 118 ey l l A 20' HANDICAP PARKING SIGN INSTALLATION TEXAS FIRM No. F-7906 TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 TREVIÑ0 ENGINEERING CONTRACTION JOINT BECK PROPERTIES 1 LP CONDOMINIUMS SIDEWALK PLAN PORT ISABEL, PROJECT: SIDEWALK SECTION OF: TYPICAL DETAIL FOR HANDICAP PARKING EXPANSION JOINT TYPICAL HANDICAP SYMBOL DIMENSIONS SEAL 11/18/2019 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT OF: TEXAS BECK PROPERTIES 1 LP CONDOMINIUMS PORT ISABEL, PROJECT: TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 FIRM No. F-7906 TREVIÑ0 ENGINEERING SEAL 11/18/2019 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT OF: TEXAS BECK PROPERTIES 1 LP CONDOMINIUMS PORT ISABEL, PROJECT: TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 FIRM No. F-7906 TREVIÑ0 ENGINEERING SEAL 11/18/2019 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT OF: TEXAS BECK PROPERTIES 1 LP CONDOMINIUMS PORT ISABEL, PROJECT: TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 FIRM No. F-7906 TREVIÑ0 ENGINEERING SEAL 11/18/2019 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT OF: TEXAS BECK PROPERTIES 1 LP CONDOMINIUMS PORT ISABEL, PROJECT: TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 FIRM No. F-7906 TREVIÑ0 ENGINEERING SEAL 11/18/2019 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT OF: TEXAS BECK PROPERTIES 1 LP CONDOMINIUMS PORT ISABEL, PROJECT: TEL No. (956) 283-8847 ident@trevinoengineering.com 200 S. 10th. St. Ste. 1207 McALLEN, TEXAS 78501 FIRM No. F-7906 TREVIÑ0 ENGINEERING SEAL 11/18/2019 1: 2: 3: 4: * REVISION: PROJECT #: 19-273 DATE: 11/18/19 DRAWN BY: IIT CHECKED BY: IIT