Advanced Chemical Engineering (ACE) Plant Optimization & Decision Support Systems KBR Technology Conference – Delhi 12 September 2013 ©2013 KBR, Inc. All Rights Reserved 1 Topics ©2013 KBR, Inc. All Rights Reserved 2 What We Will Talk About Challenges Who We Are Value Proposition Advanced Simulation Operator Training Simulator Performance Monitoring Operations Management Systems Fertilizer Automation Package Conclusion Q&A What We Will Talk About Plant Optimization Plant optimization is to find an alternative to adjust some specific set of parameters under given constraints to minimize cost, maximize production and/or efficiency/energy. • Equipment Design • Control Strategy • Operating Procedures • … Decision Support Systems Decision Support Systems are information systems which supports business or organizational decision making – management, operational, planning, etc • • • • Performance Monitoring Systems Operations Management Systems Maintenance Systems … ©2013 KBR, Inc. All Rights Reserved 3 Industry Challenges General • • • • Project Complexity – Global Execution Build Cost Effective Facility – Maximizing Return on Investment (ROI) Manage Risk at Every Step Sustain Operations People • Availability of Skilled Resources • Training Process • Well Defined Business Processes • Project Management Processes • Selection of Process License Technology Technology • Selection of Information Technology ©2013 KBR, Inc. All Rights Reserved 4 Why ACE? Benchmarking studies show that top performing companies also invest in building world-class systems and tools to ensure sustainable performance. Plant Optimization AND Decision Support Systems ©2013 KBR, Inc. All Rights Reserved 5 Technology Portfolio Refining Coal Monetization • FCC • TRIG™ • HDP • Power applications • ROSE • Industrial applications • VCC Olefins Chemicals • ACO • Aniline • SUPERFLEX • Phenol • SCORE • SK-KBR JV Proprietary Equipment • Refining • Coal Monetization • Olefins • Chemicals Ammonia and Syngas Advanced Chemical Engineering • • • • • • • • Ammonia Fertilizers Syngas Hydrogen ©2013 KBR, Inc. All Rights Reserved 6 Advanced Simulation OTS OMS Technical Services • Ammonia and Syngas ACE Services Portfolio Advanced Simulation Operator Training Simulator (OTS) Operations Management Systems (OMS) Performance Monitoring (PM) Technical Services Fertilizer Automation Package (FAP) ACE TECHNOLOGY OIL & GAS DOWNSTREAM ©2013 KBR, Inc. All Rights Reserved 7 GAS MONETIZATION Advanced Chemical Engineering Advanced Simulation • Verify Designs and Control Strategies • In-Depth Process Knowledge for Operation • Foundation for Life-Cycle Plant Models OTS • • • • OMS PM FAP Operator Training w/ Certification Improve Plant Start-Up Consistent Operational Response Risk free and Safe Environment • Information transformation between business and engineering • Data Repository for operations intelligence • Intelligence in operations with analytical and optimization engines • • • • Analyze Process and Equipment Performance Business Decisions Based on Real-time Data Calculation of KPI’s Weekly & Monthly Reports • One-Stop Shop for Ammonia Producers • Embedded KBR Process “Know-How” • Integrated solution offering ©2013 KBR, Inc. All Rights Reserved 8 ACE • Team of 50 professionals - Houston, London, India (Delhi, Pune) • Process technology expertise in Refining, LNG, Oil & Gas, Ammonia, Olefins, Phenol, Gasification… • Experts in plant optimization and plant safety & reliability improvement • KBR Know-How built into solutions • Proven project management capabilities • Software and Information Technology Independent ACE and the Project Lifecycle ©2013 KBR, Inc. All Rights Reserved 9 Value Proposition Optimize investment between CAPEX and OPEX Make business and operations decisions based on real time data Mitigate risk throughout the project life cycle – Licensor Support Train operators with consistent operations guidelines Agility to respond to business climate changes Achieve Top Tier Performance Optimize Stabilize ©2013 KBR, Inc. All Rights Reserved 10 Sustained Growth ADVANCED SIMULATION ©2013 KBR, Inc. All Rights Reserved 11 Advanced Simulation Advanced Simulation ASV HGBP Dynamic Simulation TI IBV In the last 10 years HV-861 PI PI FI TI 100+ Dynamic Studies Discrete Simulation 50+ Liquid Transient Studies Liquid Transient Analysis 7 km Mix er 36" parallel loading lines 1 km 60" On-s hore ESD shore Computational Fluid Dynamics ©2013 KBR, Inc. All Rights Reserved 12 Platform R Vs 7 km On-s hore R Vs 36" Surge v es s el Off-s hore ESD platf orm 30+ Logistics Studies Over 150+ CFD Studies Advanced Simulation A critical link between design and safe operation Benefits: • • • • • • • • • Understanding of complex problems and accurate diagnostics Critical equipment sizing & design confidence Process control & system validation Execution consistency Operations assistance Field trouble shooting Address key risks Operational optimization Process knowledge for operator training ©2013 KBR, Inc. All Rights Reserved 13 Plantwide Dynamic Modeling Better understanding of process and controls • Study dynamic response of the overall system to various plant upsets • Establish operational guidelines to minimize pressure excursions during upset conditions • Minimize steam venting • Reduce potential for process trips • Minimize unit-to-unit interactions • Validate control philosophy and valve sizes • Establish minimum ramp up rates for boilers • Establish requirements for swing boilers • Validate procedures for startup • Establish minimum firing rates for standby boilers • Establish reasonable tuning parameters for controllers Typical Conceptual Scope of KBR Ammonia OTS Fuel Gas Gas Compression Primary Reformer Secondary Reformer 1st Stg Water Removal Shift Conversion CO2 Removal 2nd Stg Water Removal Air Compression Steam System Methanation Dehydration Ammonia Refrigeration H2 Recovery Ammonia Recovery Purifier Syngas Compression ©2013 KBR, Inc. All Rights Reserved 14 Ammonia Converter Ammonia Cooling Ammonia Chiller Ammonia Knockout Ammonia Storage Advanced Simulation Offerings Dynamic Simulation • • • • Steam system dynamics Plant wide flare and relief systems analysis & design Emergency depressuring Control strategy studies ASV HGBP TI IBV HV-861 PI PI FI TI Logistics Studies • Plant throughput, availability and supply chain studies • Optimize sizing of storage and transportation resources Computational Fluid Dynamics • In-depth analysis of fluid flow, thermal and heat transfer issues 7 km Mix er 36" parallel loading lines 1 km 60" On-s hore RVs On-s hore ESD shore ©2013 KBR, Inc. All Rights Reserved 15 Platform RVs 7 km 36" Surge v es sel Off-s hore ESD platform OPERATOR TRAINING SIMULATORS ©2013 KBR, Inc. All Rights Reserved 16 Training Methodologies Classroom Training Simulator Training Builds Knowledge Accelerates development of unit specific Skills and Knowledge Provides consistency to strengthen Behaviors Lacks “hands-on” element to develop and reinforce Skills Behaviors Knowledge On-The-Job Training Enhancement of Skills through wide range of scenarios Knowledge reinforced through practical exercises Focus on reasoning and judgment promote desired Behaviors Skills Strengthens Behaviors such as teamwork and confidence Development of Skills and Knowledge through mentoring Risk free and safe environment Subject to variability of student / mentor Behaviors Assess and certify competence Skills limited to actual plant events so duration extended ©2013 KBR, Inc. All Rights Reserved 17 17 Operator Training Simulator (OTS) Plant Plant Dynamic Model Instructor Plant DCS consoles Training DCS Consoles ©2013 KBR, Inc. All Rights Reserved 18 OTS Training Program Unit Familiarization Scenarios Startup & Shutdown • Panel Familiarization • Major control loops • Major shutdown logics • Production changes • Feed changes • Utility changes • Reactors • Separation systems • Integrated plant Emergency Situations • Compressor trip • Equipment malfunction • Power loss Dynamic model inclusive of all basic controls, all field operations, all panel operations and relevant safety logic. Comprehensive training of plant operators Validation and optimization of plant operating procedures Control system refinement Strengthen IMPROVED PLANT SAFETY AND RELIABILITY ©2013 KBR, Inc. All Rights Reserved 19 Top Reasons to Have OTS Efficient & faster start-up – Well Trained Operators Onboard new hires more quickly & efficiently with certification Mimic look and feel of the real plant DCS and Control System Validate control strategy Perform engineering studies / analysis Built-in KBR knowledge & experience ©2013 KBR, Inc. All Rights Reserved 20 PERFORMANCE MONITORING ©2013 KBR, Inc. All Rights Reserved 21 Performance Monitoring A continuous and comprehensive equipment and process oversight solution incorporating KBR expertise Provides operational intelligence to ensure ideal performance and confidence in meeting production targets Real-time data availability to make business decisions Web based, secure and user friendly ©2013 KBR, Inc. All Rights Reserved 22 Performance Monitoring System Performance Dashboard KPIs Alerts Access To Performance Reports KBR Technical Library KBR Technical Bulletins Simulation Results ©2013 KBR, Inc. All Rights Reserved 23 Interact With KBR Process Specialists Technical Manuals Technical Papers Procedures Performance Monitoring System Collaborate With Other Operators Plant Data Plant Data Your Specialist Has Your Data At His Finger Tips Performance Monitoring System Architecture & Security Key FEATURES Performance Monitoring Customer Plant Process Data Sent to Central Data Center via secure link daily Daily calculations performed and results published on Web server Monthly review of summarized data utilizing Plant simulation software and proprietary analysis tools performed by KBR experts. Results published on Web server Report produced summarizing results and recommendations published on Web server Customer views calculation results and reports using Web browser Hosting Service Web Technician Process Engineer Firewall Firewall Web Access DCS Secure VPN Tunnel DCS Data Collector PI Server DCS Operator PROII Simulation Workstation KBR PI Server Firewall Ammonia Expert Simulation Server (Future) ©2013 KBR, Inc. All Rights Reserved 24 Performance monitoring KBR Expert • Review process and equipment performance • Customized reports on plant performance and equipment performance • Advice and recommendations on process improvements • Site visits ©2013 KBR, Inc. All Rights Reserved 25 PM System • Comprehensive calculations around critical equipment • Secure trending and visualization of key performance indicators • Summary dashboard • Production, Energy Utilization, EHS, etc reports OPERATIONS MANAGEMENT SYSTEMS ©2013 KBR, Inc. All Rights Reserved 26 Business Processes Invoices Analysis Performance Customers Business Enterprise Shipment Information Turnaround Schedule Quality Production Equipment Orders Process Data Operating Data Knowledge SOPs Environmental Reports Maintenance Lab Lab Results Compressor Data Training Operator REFINERY ©2013 KBR, Inc. All Rights Reserved 27 Inventory Position Emissions Data EH&S Tank Farm Transportation Operations Management Systems (OMS) Production Operations Asset Reliability & Integrity Planning & Scheduling Inventory Operations Quality Operations Regulatory Compliance Process Control Systems (DCS) ©2013 KBR, Inc. All Rights Reserved 28 Enterprise Visibility Integration & Work Flow Business Systems (ERP) Operations Management System (OMS) Information Technology / Telecommunications Level 4 Level 3 Manufacturing Operations Management Business Planning & Logistics Level 3 Manufacturing Operations Management 4 – Establishing the basic plant schedule – production, material use, delivery, and shipping. Determining inventory le Time Frame – Months, Weeks, days 3 – Work flow / recipe control to produce the desire end products. Maintaining records and optimizing the production process. Time Frame – Days, shifts, hours,minutes,econds Level 2 Discrete Control Continuous Control Level 1 3 – Work flow / recipe control to produce the Level 0 desire end products. Maintaining records and optimizing the production process. Batch Control 2 – Monitoring, supervisory control and automated control of the production process Time Frame – Hours, minutes, econds,ubseconds 1 – Sensing the production process, manipulating the production process 0 – The actual production process Time Frame – Days, shifts, hours, minutes, seconds Technology Advances Fast connection of data sources, complex manipulation and intelligent presentation of information ©2013 KBR, Inc. All Rights Reserved 29 Standard Functional Hierarchy ISA 95 Level 3 – Manufacturing Operations Management What is Operations Management System? Business Objectives • Information transformation between business objectives and engineering control targets • Repository for granular process data to support regulatory compliance and foundation for operations intelligence • Intelligence in operations with analytical and optimization engines Technically • • • • Set of industry standard software applications Configured together to provide intelligence to refinery/plant operations With connections of applications from DCS to ERP In the ISA 95 MOM Level 3 domain area Characteristics • Finite number of Commercial Off-the-shelf products available • Each implementation is unique to specific business strategies ©2013 KBR, Inc. All Rights Reserved 30 Rollout Synchronization Of OMS Components Deploy Capability Production Operations Functional Area OMS JIT Deployment DeploymentofofSub Sub Functional Areas R e v i e w Initiation & Planning B u i l d S u p p o r t Deploy Timeline R e q u i r e m e n t s R e v i e w U s e r I n t e g r a t e d F u n c t i o n a l D e s i g n R e v i e w D e t ai le d D e si g n R e vi e w A c c e p t a n c e T e s t A c c e p t a n c e A c c e p t a n c e H a n d o v e r Emissions Monitoring T e s t Operations Support T e s t Lab System Hydrocarbon Accounting Real Time Historian Systems Project P l a n Requirement s Definition System Track System Project Management D e s i g n KPI Improvement Asset Reliability First Product Pre-commissioning Commissioning Design Construction ©2013 KBR, Inc. All Rights Reserved 31 Commissioning Start-up Mechanical Completion Ready For Startup Operate & Maintain EPC Project Timeline OMS Implementation Methodology Scoping Study / Conceptual Design Functional Design Procurement / Detail Design Development / Configure Deploy / Test Support Program / Project Management Strategic Problem Study Detailed Requirements Operational Work Processes Development Infrastructure Operational Infrastructure Infrastructure Support Business Opportunity Functional Architecture Functional Design Proof Of Concept Installation Software Support Project Charter Interaction Plan Vendor Selection Configuration Integration Application Support Project Roadmap Project Roadmap Detailed Design Integration Development Commissioning & Go Live Preliminary Estimate Logical Infrastructure Roll Out Plan Testing Testing Scope Definition Budgetary Estimate Support Plan Data Migration Data Migration Plan Owner Resource Plan Data Quality Validation Data Population Handover Training Management Of Change Risk Management ©2013 KBR, Inc. All Rights Reserved 32 KBR OMS Projects Sadara Petrochemical Complex Jazan Refinery Complete Refinery Jazan IGCC Kitimat LNG YASREF Ammonia Plants (4) ©2013 KBR, Inc. All Rights Reserved 33 • Manufacturing Operations Management (MOM) Specification & Design • Engineering Systems Specification • Program Management • Integrated Refinery Information System (IRIS) Specification & Design • Four phase design and implementation • Handle commercial aspects • IRIS Specification & Design • Grassroots Liquefied Natural Gas (LNG) Export Facility • Operator Management System (OMS) Specification and Implementation Strategy • Program Management and Implementation Support • Grassroots Ammonia Plants • Performance Monitoring System Implementation FERTILIZER AUTOMATION PACKAGE ©2013 KBR, Inc. All Rights Reserved 34 Fertilizer Automation Package Layered Applications Automation Systems ©2013 KBR, Inc. All Rights Reserved 36 Fertilizer Business Offering Fertilizer Automation Package DCS and Safety Systems • DCS, SIS, F&G • Yokogawa Alliance ©2013 KBR, Inc. All Rights Reserved 37 Integrated Analyzers • Integrated Analyzers for Ammonia Process Critical Valves • Critical / Severe Service Valves for Ammonia Process KBR Playbook • KBR ‘Know-How’ For Ammonia Captured in a Playbook • Graphics • Control Strategies • Reports and Calculations Layered Applications • KBR Developed Applications • OTS • Performance Monitoring • APC Summary/Conclusion Working as a team with expertise, knowledge, and experience ACE can help: Minimize CAPEX and OPEX Accelerate business and operations decisions based on real time data Mitigate risk throughout the project life cycle – Licensor Support Train operators with consistent operations guidelines Provide agile response to business climate changes Achieve Top Tier Performance Optimize Stabilize ©2013 KBR, Inc. All Rights Reserved 38 Sustained Growth Q&A ©2013 KBR, Inc. All Rights Reserved 39