GESP Contracting Model Guaranteed Energy Savings Performance GESP Contracting Model Overview: • A turnkey project where an accredited Energy Services Company (ESCO) will: • carry out an energy audit • recommend and implement measures • guarantee system efficiency / annual savings Initial energy audit phase 1st Phase Implementation of energy savings measures 2nd Phase Measurement and verification (Declared Chilled-water Plant Efficiency/ Annual Guaranteed Savings) Over the term of contract: Usually 5 years GESP Contracting Model Overview: Agency’s investment: Consultancy fee • Fee for ESCO to carry out Investment Grade Energy Audit Contract price • Total implementation cost of GESP contract • Maintenance cost over term period ESCO’s offer: Declared Chilled-water Plant Efficiency, DCPE (kWhE/kWhT or kW/RT) • For chilled-water plant retrofit Annual Guaranteed Savings, AGS ($) • For other energy consuming systems ESCO is obliged to pay the agency any shortfall in realised savings GESP Contracting Model Project Phases: 1st Phase Consultancy agreement phase Energy audit work DCPE cannot be achieved Project ends DCPE can be achieved ESCO is not entitled to ANY payment ESCO is paid 50% of consultancy fee Agency decides NOT to enter 2nd Phase Project ends Agency decides to enter 2nd Phase Development of GESP contract ESCO is paid balance 50% of consultancy fee GESP Contracting Model 2nd Phase Project Phases: GESP Contract Implementation of energy saving measures Term of Contract: Usually 5 years Continuous monitoring of actual efficiency Installation of permanent instrumentation for chilled-water plant Upon commissioning Comprehensive maintenance (new equipment) Non-comprehensive maintenance (existing chilled-water plant equipment) Annual reconciliation report GESP Contracting Model Benefits Conventional Contracting Model GESP Contracting Model Lack of accountability Obliges the ESCO to take accountability No guarantee in achieving energy efficiency and savings Enjoys the DCPE and AGS throughout the term of the GESP Contract Defects Liability Period (DLP) Defects Liability Period (DLP) 1. Excludes preventive maintenance 1. Includes 5-yr preventive maintenance for (a) equipment supplied under the contract and (b) existing chiller plant equipment 2. Includes 1-yr warranty for equipment and parts supplied under the contract 3. Excludes continuous monitoring 2. Includes 5-yr warranty for equipment and parts supplied under the contract 3. Includes continuous monitoring through permanent instrumentation GESP Contracting Model 9 agencies (15 buildings) are using GESP contracts to implement their building retrofits