RISK ASSESMENT FORM
Task: Annual Maintainance of Asset : Boiler, Feed Tank, Heat Exchanger, e.t.c
Date:-12/12/2021
Ref No.
Items that are considered to be Medium and High Risks shall be controlled by plans to eliminate or reduse the impact
S.No
1
2
Activity
NON-CONFORMANCE/ IMPACT/
HAZARD
WHO/WHAT MAYBE
EXPOSED
Boiler Furnace
Cleaning
Workers, Assistant,
Burn, Suffocation, Cut, Wear and Tear Engineer, Employee
Boiler Maintenance
and Overhauling
Burn, Suffocation, Cut, Electrocuted.
Workers, Assistant,
Explosion and Property Damage, Cut,
Engineer, Employee
Abrasion and Entaglement
Pro
QD,
Risk L/
Seve ba
QC,
Ratin M
irty bilt
E,S
g /H
y
Page 1 of 5
3
2
3
4
CONTROLS
Inspection to be done inside the boiler to identify
the temprature, oxgen level and safe working
condition.
Proper PPE to be worn at all time.
Proper inspection of all cleaning tools to be done
6M
by the supervisor.
Proper air ventilation to be provided inside the
boiler to avoid suffocation.
Houskeeping to be done regularly to avoid human
contact with the boiler ash waste.
Proper PPE must be worn all time.
Ensure proper Ventillation and oxgen availibilty at
the area of job.
All the cables and sockets should be checked for
any damage by a competent person and replaced
5 M if found damaged.
Cables should not be left lying around on the
ground but managed on such a way so as to avoid
trips, falls and entanglement.
All shifting and work to be done with proper
inspection.
HSE/MS/RA/002
Pr
Risk L/
Seve ob
Ratin M
irty abi
g /H
lty
3
1
3L
3
1
2L
RISK ASSESMENT FORM
Task: Annual Maintainance of Asset : Boiler, Feed Tank, Heat Exchanger, e.t.c
Date:-12/12/2021
Ref No.
Items that are considered to be Medium and High Risks shall be controlled by plans to eliminate or reduse the impact
S.No
3
Activity
Hot Work: Welding,
Grinding, Cutting
NON-CONFORMANCE/ IMPACT/
HAZARD
Fire Hazard. Worker getting
electrocuted. Suffocation due to
accumulation of to much smoke.
Worker getting burn. Explosion and
Property Damage Cut, Abrasion or
Entanglement.
WHO/WHAT MAYBE
EXPOSED
Pro
QD,
Risk L/
Seve ba
QC,
Ratin M
irty bilt
E,S
g /H
y
Workers, Assistant,
Engineer, Employee
Page 2 of 5
3
4
CONTROLS
Proper PPE to be worn at all time. For example a
welder must wear safety apron, safety goggles,
face shield, gas mask, welding gloves, welding
sleeves apart from wearing safety helmet and
safety boot.
The area should be checked for any combustible
material before starting hot work. Fire
extinguisher must present around the work area
along with fire blankets, sand buckets, and water
buckets.
Proper TBT to all personalls involved.
Adequate supervision.
Proper barricading and sinages must be provided.
Fire watch also be provide. The area should be
14 H
continously checked for every hour and
monitored for 3 hours after completion of hot
work.
All the powered hand tools such as grinder should
be without any damage and provided with
monthly colour code.
Proper Hot Work Permit and PTW are obtained
and displayed at the work area.
Visual checks must be completed by operatives
on tools prior to their use.Ensule work area is
clear of any material which can cause trips or
snagging/ damage to equipment.
Suitable signages in place " HOT WORK UNDER
PROGRESS" must be posted on work place.
HSE/MS/RA/002
Pr
Risk L/
Seve ob
Ratin M
irty abi
g /H
lty
3
1
3L
RISK ASSESMENT FORM
Task: Annual Maintainance of Asset : Boiler, Feed Tank, Heat Exchanger, e.t.c
Date:-12/12/2021
Ref No.
Items that are considered to be Medium and High Risks shall be controlled by plans to eliminate or reduse the impact
S.No
4
Activity
Using electrical
equipments
NON-CONFORMANCE/ IMPACT/
HAZARD
Electrocution. Trips and Falls due to
cable mismanagements
WHO/WHAT MAYBE
EXPOSED
Pro
QD,
Risk L/
Seve ba
QC,
Ratin M
irty bilt
E,S
g /H
y
Workers, Assistant,
Engineer, Employee
Page 3 of 5
3
2
CONTROLS
All the cables and sockets should be checked for
any damage by a competent person and replaced
if found damaged.
Cables should not be left lying around on the
ground but managed on such a way so as to avoid
trips, falls and entanglement.
All the tools must be inspected and coded with
monthly colour sticker.
6M
Worker must be fully trained, competent to use
all kind of tools.
Do not work in wet area. Lock out/ Tag out
system must be followed where applicable.
Ensure gaurds are correctly fitted and fully
functional before using power tools.
Supervisor must continously monitor their areas
for compliance by all teams.
HSE/MS/RA/002
Pr
Risk L/
Seve ob
Ratin M
irty abi
g /H
lty
3
1
3L
RISK ASSESMENT FORM
Task: Annual Maintainance of Asset : Boiler, Feed Tank, Heat Exchanger, e.t.c
Date:-12/12/2021
Ref No.
Items that are considered to be Medium and High Risks shall be controlled by plans to eliminate or reduse the impact
S.No
Activity
5
Using Manual tools
6
Working at hieght
NON-CONFORMANCE/ IMPACT/
HAZARD
WHO/WHAT MAYBE
EXPOSED
Pro
QD,
Risk L/
Seve ba
QC,
Ratin M
irty bilt
E,S
g /H
y
Blows and cuts to the hands or other
parts of the body . Eye injuries due to
the projection of fragnents or
Workers, Assistant,
particles. Sprains due to very abrupt Engineer, Employee
movements or strains. Electrical
contacta
Fall of Personnel. Fall of Material
Workers, Assistant,
Engineer, Employee
Page 4 of 5
3
2
3
5
CONTROLS
Use quality tools in accordance with the type of
work to be carried.
Proper instruction must be given to the personnal
about the usage of tool.
Use tools with an insulating cover during working
in vicinity of live parts.
Use protective googles in all cases and above all
6 M when there is a risk of projected particles.
Use gloves to handle sharp tools.
Periodically check tools ( repair, sharpening,
cleaning,e.t.c)
Periodically check the state of handles, insulating
coverings, e.t.c. Store and/or transport tools in
boxes, tool bags or on suitable panels, where
each tool has its place
Wear full body harness at 2.5 meters hieght.
User to ensure acess equipment is of adequate
height and suitable for job.
All workers to be trained in working at hieght .
All acess equipment suitable for pupose,
15 H
inspected before use and maintained in good
condition.
Safe working load must be marked on the
equipment. All users trained in use of mobile
towers for inspection/ maintenance tasks.
HSE/MS/RA/002
Pr
Risk L/
Seve ob
Ratin M
irty abi
g /H
lty
1
3L
1
5L
RISK ASSESMENT FORM
Task: Annual Maintainance of Asset : Boiler, Feed Tank, Heat Exchanger, e.t.c
Date:-12/12/2021
Ref No.
Items that are considered to be Medium and High Risks shall be controlled by plans to eliminate or reduse the impact
S.No
7
Activity
COVID-19
NON-CONFORMANCE/ IMPACT/
HAZARD
Headache, Muscle pain, High Fever,
Cough, Shortness of breath, e.t.c
WHO/WHAT MAYBE
EXPOSED
Pro
QD,
Risk L/
Seve ba
QC,
Ratin M
irty bilt
E,S
g /H
y
Workers, Assistant,
Engineer, Employee,
Visitors
Page 5 of 5
3
3
CONTROLS
Protocols should be followed according to MOPH
and Who guidlines.
The awareness consist of MOPH and WHO
guidelines informative material must be
circulated to the workers.
Display information posters in all areas.
9 M Awareness through signages, poster.
Increase the frequency of hand wash and
sanitization.
Personnal should wear the minimum PPE like
mask, disposal coverall, eye protection and
gloves.
Proper disposal of waste.