LAB 3 FAKULTI TEKNOLOGI KEJURUTERAAN MEKANIKAL DAN PEMBUATAN UNIVERSITI TEKNIKAL MALAYSIA MELAKA BMMP 2333 QUALITY CONTROL (KAWALAN KUALITI) LAB REPORT 3 ACCEPTANCE SAMPLING INSTRUCTOR’S NAME TS. DR. AMIR HAMZAH/ TS. DR. ROHANA S1. STUDENT’S NAME MUHAMMAD ADIB BIN NORMAN MATRIX NO: B091910035 S2. BAZIL SUHAIMI BIN BUANG B091910225 S3. MUHAMMAD HAMIZAN BIN ZAINAL B091910435 S4. MUHAMAD MAHFIZ BIN SABARDAN B091910046 S5. NUR MAHIRAH BINTI AZMAN B091910295 ASSESSEMENT RUBRICS ASSESSMENT TASK/ITEMS MARK ALLOCATION 1. Abiltiy to apply Knowledge (Introduction, use the equipment with proper technique). 2. Group Communication (Distriburion of tasks among members) 3. Proper Method and Approach (Construct and understanding of gemba activity with process flow) 4. Outcome (Results) 15 5. Outcome (Discussion). 6. Discipline (Safety regulation during gemba). 20 TOTAL MARKS GIVEN MARKS S1 S2 S3 S4 S5 5 30 20 10 100 Approved By: ………………………………………………..….. (Instructor’s Signature & Stamp) Date: ……………………………………………......... Abiltiy to apply Knowledge (Introduction, use the equipment with proper technique). i. Introduction This experiment is designed to give practical experiences for students in doing experiment by doing inspection based on the determined sampling plan. This is a simple experiment where students are required to do visual inspection on provided samples. Other than that, this experiment required student to apply the learning outcome from chapter Acceptance Sampling by using of MIL-STD-105E III table based on lot size and general inspection level to get the Code Letter. After that, based on this experiment data given, student should know to use the correct Military Standard Table Inspection for the experiment such as Normal, Tightened or Reduced. This to get the RE Reject and AC Accept number for the sample lot size. ii. Ability to use the equipment given with proper technique Tools / Equipments Usage Provided data (Set 1) To carry out the lab Pen/Pencil To do the flowchart Paper To do the flowchart Container To put the clips inside the container MIL-STD-105E III To refer the code letter Military standard table To find the reject and accept Group Communication (Distribution of tasks among members) Distribution of tasks among members MUHAMMAD ADIB BIN NORMAN 1. Introduction 2. Prepare the proper method and technique in presenting the inspection result. BAZIL SUHAIMI BIN BUANG 1. Undergo the procedures and use the equipment given with proper technique 2. Manage the distribution of tasks among members. MUHAMMAD HAMIZAN BIN ZAINAL 1. P r e s e n t comments on the necessary actions taken MUHAMAD MAHFIZ BIN SABARDAN if the lot is rejecting or OK 2. Describing their technique/ method to ensure the sample selection during this lab is random. 3. Ability to perform lab and safety regulations NUR MAHIRAH BINTI AZMAN 1. Proper method in conducting experiment- process flow 2. Determine the quantity of the clip shirt given 3. Determine the correct sampling plan as per instructed (10) Proper Method and Approach (Construct and understanding of gemba activity with process flow) i. Proper method in conducting experiment- process flow ii. Determine the quantity of the clip shirt given • Lot Size, N=100 • Reject Part=3 iii. Determine the correct sampling plan as per instructed (10) Single sampling plan is used to conduct the experiment where by the number of defective exceeds the specified acceptance level(c) the entire lot is rejected. If no, the entire lot will be accepted. Normal inspection and tightened inspection will be targeted for carrying out this acceptance sampling. Outcome (Results) i. Proper method and technique in presenting the inspection result. Sampling plan #1 Sampling plan #2 ii. • Inspection level : 1 • Inspection : Normal • AQL : 0.65% • Inspection level : II • Inspection : Tightened • AQL : 10% Code letter: D Sample size: 8 Ac: 0 Re: 1 Code letter: F Sample size: 20 Ac: 3 Re: 4 Final judgement on the inspection results For sampling plan #1, ● Acceptance level, c = 0, accept if the defects < 0 ● Rejection number, Re = 1, reject the entire lot if the defects > 1 According to the sample size of 8 out of 100 lot the quantity of reject part(defect) is more than rejection number, reject part = 3 > rejection number= 1. The result shows that the entire lot is rejected. For sampling plan #2, ● Acceptance Level c = 3, accept if the defect < 3 ● Rejection Number, Re= 4, reject the entire lot if the defect > 4. According to the sample size of 20 out of 100 lot the quantity of reject part(defect) is less than rejection number, reject part = 3 < rejection number = 4. The result shows that the entire lot is accepted. Outcome (Discussion) i. Comments on the necessary actions taken if the lot is rejecting or OK As what is proved above with Sampling Plan 1 and Sampling Plan 2, we can ensure that the c or less nonconforming units are found in the sample, the lot is accepted, or else it is rejected. Each item in the sample is examined and classified as good and also defective. If the number of defective exceed a specified rejection number, the whole lot is rejected, otherwise the whole lot is accepted. The necessary actions to be taken if the lot is rejecting is to loosen up the type of inspection from tighten (Sampling Plan 2) but only after a certain period of time. For the rejected part we still can re-work on it or totally reject it because that part are total lost. ii. Describing their technique/ method to ensure the sample selection during this lab is random. There are several method to ensure the sample is selected is random such as using a random number table or sampling with replacement were lets say a 100 clips are placed in a basket, the inspector picks a clip record the information that particular clip in the sample, then put the clip back in the basket, mixed the clips in the basket. The clip that was just inspected has the same chance of being selected again. This is known as sampling with replacement. In other words, we can do it either simple random sampling or systematic sampling. Systematic sampling is a statistical method involving the selection of clips from a given lot, the most common form of systematic sampling is an equal-probability method. In the end, with certain limits of rejected or accepted parts determined on the actual values. The decision of to accept a lot or to reject depends on the basis of calculation of average and the variability of the measurement referring to the given AQL procedures. Discipline i. Ability to perform lab and safety regulations i. Ensure to wear safety shoes while in the lab. ii. Ensure to wear a lab coat. iii. It is forbidden to wear jewelry such as rings and necklace. iv. Ensure tie the hair for the long haired. v. Follow the instructions FAKULTI TEKNOLOGI KEJURUTERAAN QUALITY CONTROL (BMMP 2333) RUBRIC FOR LAB ACTIVITY ASESSMENT Lab No. / Name: Lab 3/ ACCEPTANCE SAMPLING 1. Student 1: MUHAMMAD ADIB BIN NORMAN Matrix No.: B091910035 2. Student 2: MUHAMAD MAHFIZ BIN SABARDAN Matrix No.: B091910046 3. Student 3: BAZIL SUHAIMI BIN BUANG Matrix No.: B091910225 4. Student 4: MUHAMMAD HAMIZAN BIN ZAINAL Matrix No.: B091910435 5. Student 5: NUR MAHIRAH BINTI AZMAN Matrix No.: B091910295 6. Course/Group / Section: S 1/1 1st rank – WORST 2nd rank – POOR 3rd rank – SATISFIED 4th – GOOD 5th rank - EXCELLENT CRITERIA A. Abiltiy to apply Knowledge (15) B. Communication (5) EVALUATION GIVEN MARK STUDENT 1 Introduction (10) Ability to use the apparatus given with proper technique (5) 1 2 3 4 5 ×2 1 2 3 4 5 ×1 Distribution of tasks among members (5) 1 2 3 4 5 ×1 Proper method in conducting experimentprocess flow (15) 1 2 3 4 5 ×3 STUDENT 2 STUDENT 3 STUDENT 4 C. Proper Method and Approach (30) D. Outcome (20) E. Outcome (20) F. Discipline (10) Determine the quantity of the clip shirt given (5) Determine the correct sampling plan as per instructed (10) Proper method and technique in presenting the inspection result (10) Final judgement on the inspection results (10) Commnents on the necessary actions taken if the lot is rejecting or OK (10) Describing their technique/ method to ensure the sample selection during this lab is random. (10) Ability to perform lab and safety regulations Attendance (Punctuality) (2) Attire (3) 1 2 3 4 5 ×1 1 2 3 4 5 ×2 1 2 3 4 5 ×2 1 2 3 4 5 ×2 1 2 3 4 5 ×2 1 2 3 4 5 ×2 1 2 3 4 5 ×1 YES/ NO 2 OK/ NOT GOOD 3 Total Marks (100) Total Marks (5%) Examiner Comments: Instructor Signature: …………………………………………… Date: ……………………….. Name: