BUILDING CIVIL STANDARD NOTES & DETAILS ADELAIDE CITY COUNCIL DETAILS: BITUMEN PAVING HARDWOOD EDGING CATCH PIT - INVERT DRAIN CATCH PIT - KERB AND WATERTABLE CHECKER PLATE DRAIN (1) CHECKER PLATE DRAIN (2) DRIVEWAY CROSSOVER INVERT DRAIN - 450mm INVERT DRAIN - 600mm KERB KERB AND WATERTABLE KERB MEDIAN KERB RAMP PROPERTY CONNECTION (1) PROPERTY CONNECTION (2) TACTILED CROSSOVER 75 HARDWOOD. 75mm WIDE x 25mm THICK 1200 CENTRES 25 8mmØ BOLT GALVANISED 7mm AGGREGATE ASPHALTIC CONCRETE 300 MIN. 150 GRASS 100mm TAPER HARDWOOD. 75mm WIDE x 25mm THICK PM1 FINE CRUSHED ROCK (98% MODIFIED COMPACTION) SUBGRADE (100% STANDARD COMPACTION) BITUMEN PAVING HARDWOOD EDGING 1:10 10/08/11 JAS FRAME DEPTH PLUS BEDDING FOR FABRIC REINFORCEMENT TYPE SEE TABLE 150 CATCHPIT INVERT TO EQUAL PIPE INVERT 150 FABRIC REINFORCEMENT CENTRALLY PLACED 500 DEPTH REINFORCEMENT 00-1000 1001-3000 1301-1600 1601-1900 >1900 F62 F82 F92 F102 DESIGN 150 800 550 INVERT CATCHPIT FRAME AND GRATE 1 LUGS NOTES: 1. MINIMUM CONCRETE COMPRESSIVE STRENGTH (f'c=MPa). 2. REINFORCEMENT MESH TO BE PLACED CENTRALLY. COVER 50mm TYPICAL 150 850 150 SECTION 1 TYPICAL CONCRETE PIPE PLAN CATCH PIT INVERT DRAIN 1:20 10/08/11 JAS CATCHPIT FRAME AND GRATE (SLOPE TO MATCH CONCRETE WATERTABLE) DE BK SIGN LE VE L LINTEL FRAME DEPTH PLUS BEDDING 75 150 STANDARD KERB HEIGHT 100, 140 & 200 NOTES: 100mm MIN CONCRETE BANDAGE FOR FABRIC REINFORCEMENT TYPE SEE TABLE 150 CATCHPIT INVERT TO EQUAL PIPE INVERT 150 150 FABRIC REINFORCEMENT CENTRALLY PLACED 500 1. MINIMUM CONCRETE COMPRESSIVE STRENGTH (f'c=MPa). 2. REINFORCEMENT MESH TO BE PLACED CENTRALLY. COVER 50mm TYPICAL 150 800 SECTION 1 SECTION 2 2 550 1 LUGS 150 850 150 TYPICAL REINFORCED CONCRETE PIPE CATCHPIT FRAME AND GRATE LINTEL DEPTH REINFORCEMENT 00-1000 1001-3000 1301-1600 1601-1900 >1900 F62 F82 F92 F102 DESIGN PLAN CATCH PIT KERB AND WATERTABLE 1:20 10/08/11 JAS CHECKER PLATE DRAIN. REFER NOTES 4 AND 5 90 ° MINIMUM 600mm MINUS 20mm VERANDAH POST WITH INTERNAL STORMWATER PIPE PLACE ACCESS LID IN FRONT OF DOWNPIE A STREET PROPERTY BOUNDARY VERANDAH STREET PROPERTY BOUNDARY POST KERB FACE DRAIN PIPE TYPE TO BE SEALED AT C.P.D JUNCTION A 50mm (APPROX) THICK SAND/CEMENT BASE SQUARE ACCESS LID WITH 10mmØ LIFTING HOLE IN THE CENTRE REFER NOTE 3 FINISHED FOOTPATH LEVEL. REFER NOTE 2 EQUAL TO KERB DEPTH COVER SUPPORT 16mmØ PLAIN ROD WELDED TO C.P.D. FOR FULL LENGTH OF LID. REFER NOTE 5 SECTION A-A CHECKER PLATE DRAIN NTS NOTES: 1. CHECKER PLATE DRAIN (C.P.D.) TO BE CONSTRUCTED OF 6mm THICK STEEL PLATE WITH STEEL CHECKER PLATE TOP ALL FULLY WELDED AND HOT DIPPED GALVANISED. 2. TOP OF C.P.D. AND CHECKER PLATE ACCESS LID TO BE FLUSH WITH FOOTPATH SURFACE. 3. ANY C.P.D. WIDER THAN 300mm TO BE PROVIDED WITH AN INTERNAL STIFFENER, PLACED CENTRALLY AND FULLY WELDED. 4. ALL C.P.D.'S TO BE INSTALLED PERPENDICULAR TO THE STREET PROPERTY BOUNDARY. 5. WIDTH DIMENSION TO BE EQUAL TO EXISTING C.P.D. OR SIMILAR X-SECTIONAL AREA OF EXISTING PIPE, BUT NOT LESS THAN MINIMUM WIDTH. 6. C.P.D. MINIMUM WIDTH 150mm. 10/08/11 JAS 90 ° CHECKER PLATE DRAIN. REFER NOTES 4 AND 5 STREET PROPERTY BOUNDARY LENGTH EQUAL TO FOOTPATH WIDTH MINUS 20mm PROPERTY BOUNDARY KERB FACE USE L-SHAPED CHECKER PLATE DRAIN TO AVOID SERVICE COVERS, POSTS NAD DRIVEWAYS 1000 REFER NOTE 3 STREET PROPERTY BOUNDARY CROSSING PLACE A 20mm 50mm (APPROX) THICK SAND/CEMENT BASE A DRAIN PIPE TYPE SITUATIONS TO BE SEALED AT THE INTERNAL PIPE AND C.P.D JUNCTION CHECKER PLATE DRAIN MUST STOP AT STREET PROPERTY LINE SQUARE ACCESS LID WITH 10mmØ LIFTING HOLE IN THE CENTRE REFER NOTE 3 FINISHED FOOTPATH LEVEL. REFER NOTE 2 EQUAL TO KERB DEPTH COVER SUPPORT 16mmØ PLAIN ROD WELDED TO C.P.D. FOR FULL LENGTH OF LID. REFER NOTE 5 SECTION A-A CHECKER PLATE DRAIN NTS NOTES: 1. CHECKER PLATE DRAIN (C.P.D.) TO BE CONSTRUCTED OF 6mm THICK STEEL PLATE WITH STEEL CHECKER PLATE TOP ALL FULLY WELDED AND HOT DIPPED GALVANISED. 2. TOP OF C.P.D. AND CHECKER PLATE ACCESS LID TO BE FLUSH WITH FOOTPATH SURFACE. 3. ANY C.P.D. WIDER THAN 300mm TO BE PROVIDED WITH A 500mm LONG INTERNAL STIFFENER, FULLY WELDED PLACED CENTRALLY AT KERB AND AT 500mm INTERVALS. 4. ALL C.P.D.'S TO BE INSTALLED PERPENDICULAR TO THE STREET PROPERTY BOUNDARY AND A MINIMUM OF 1.0m CLEAR OF ANY CROSSING PLACE. 5. WIDTH DIMENSION TO BE EQUAL TO EXISTING C.P.D. OR SIMILAR X-SECTIONAL AREA OF EXISTING PIPE, BUT NOT LESS THAN MINIMUM WIDTH. 6. C.P.D. MINIMUM WIDTH 150mm. 7. L-SHAPED C.P.D. MUST BE IN THE FOOTPATH WITHIN THE PROPERTY BOUNDARY ALIGNMENT DRAINING THAT PROPERTY. 10/08/11 JAS 600 150 450 5mm CHAMFER 300 40 40 5mm CHAMFER REFER NOTE 3 REFER NOTE 1 REFER NOTE 2 DRIVEWAY CROSSOVER 1:10 NOTES: 1. MINIMUM CONCRETE COMPRESSIVE STRENGTH (f'c=32MPa). BRIGHTON LITE OR EQUIVALENT TO BE USED WHEN FULL LENGTH OF KERBING IS CONSTRUCTED 2. RF11TM FABRIC REINFORCED MESH, WITH 50mm COVER. 3. 4-Y12 DOWELS, 300 LONG AT CONSTRUCTION JOINTS WHERE JOINING INTO EXISTING WATERTABLE AND EVERY 4.0 METERS. CRACK JOINTS AS PER CONCRETE CODE. BED: 100mm THICK, 20mm QUARRY RUBBLE TO PM21, COMPACTED TO 98% MMDD. 10/08/11 JAS 450 225 225 5mm CHAMFER 300 35 5mm CHAMFER REFER NOTE 3 REFER NOTE 1 REFER NOTE 2 INVERT DRAIN 450mm 1:10 NOTES: 1. MINIMUM CONCRETE COMPRESSIVE STRENGTH (f'c=32MPa). BRIGHTON LITE OR EQUIVALENT TO BE USED WHEN FULL LENGTH OF KERBING IS CONSTRUCTED 2. RF11TM FABRIC REINFORCED MESH, WITH 50mm COVER. 3. 4-Y12 DOWELS, 300 LONG AT CONSTRUCTION JOINTS WHERE JOINING INTO EXISTING WATERTABLE AND EVERY 4.0 METERS. CRACK JOINTS AS PER CONCRETE CODE. BED: 100mm THICK, 20mm QUARRY RUBBLE TO PM21, COMPACTED TO 98% MMDD. 10/08/11 JAS 600 300 300 5mm CHAMFER 300 40 5mm CHAMFER REFER NOTE 3 REFER NOTE 1 REFER NOTE 2 INVERT DRAIN 600mm 1:10 NOTES: 1. MINIMUM CONCRETE COMPRESSIVE STRENGTH (f'c=32MPa). BRIGHTON LITE OR EQUIVALENT TO BE USED WHEN FULL LENGTH OF KERBING IS CONSTRUCTED 2. RF11TM FABRIC REINFORCED MESH, WITH 50mm COVER. 3. 4-Y12 DOWELS, 300 LONG AT CONSTRUCTION JOINTS WHERE JOINING INTO EXISTING WATERTABLE AND EVERY 4.0 METERS. CRACK JOINTS AS PER CONCRETE CODE. BED: 100mm THICK, 20mm QUARRY RUBBLE TO PM21, COMPACTED TO 98% MMDD. 10/08/11 JAS 5mm CHAMFER 150 25mm CHAMFER FOOTPATH REFER NOTE 3 CARRIAGEWAY REFER NOTE 1 100mm OR 140mm OR 200mm 50 COVER 300 REFER NOTE 2 KERB 1:10 NOTES: 1. MINIMUM CONCRETE COMPRESSIVE STRENGTH (f'c=32MPa). BRIGHTON LITE OR EQUIVALENT TO BE USED WHEN FULL LENGTH OF KERBING IS CONSTRUCTED 2. RF11TM FABRIC REINFORCED MESH, WITH 50mm COVER. 3. 4-Y12 DOWELS, 300 LONG AT CONSTRUCTION JOINTS WHERE JOINING INTO EXISTING WATERTABLE AND EVERY 4.0 METERS. CRACK JOINTS AS PER CONCRETE CODE. BED: 100mm THICK, 20mm QUARRY RUBBLE TO PM21, COMPACTED TO 98% MMDD. 10/08/11 JAS 150 5 FALL KERB HEIGHT 100 OR 140 OR 200 600 5mm CHAMFER 450 25mm CHAMFER 5mm CHAMFER 300 40 15mm CHAMFER REFER NOTE 3 REFER NOTE 1 REFER NOTE 2 KERB AND WATERTABLE 1:10 NOTES: 1. MINIMUM CONCRETE COMPRESSIVE STRENGTH (f'c=32MPa). BRIGHTON LITE OR EQUIVALENT TO BE USED WHEN FULL LENGTH OF KERBING IS CONSTRUCTED 2. RF11TM FABRIC REINFORCED MESH, WITH 50mm COVER. 3. 4-Y12 DOWELS, 300 LONG AT CONSTRUCTION JOINTS WHERE JOINING INTO EXISTING WATERTABLE AND EVERY 4.0 METERS. CRACK JOINTS AS PER CONCRETE CODE. BED: 100mm THICK, 20mm QUARRY RUBBLE TO PM21, COMPACTED TO 98% MMDD. 10/08/11 JAS 50 VARIOUS MEDIAN INFILL 150 50 R25 EXISTING ROAD SURFACE KERB MEDIAN 1:10 NOTES: 1. MINIMUM CONCRETE COMPRESSIVE STRENGTH 32MPa (f'c=MPa). 2. BRIGHTON LITE OR EQUIVALENT TO BE USED WHEN FULL LENGTH OF MEDIAN IS CONSTRUCTED. 10/08/11 JAS 1200 NOMINAL A LENGTH OF RAMP: 900mm MIN. TO 1520mm MAX 1200mm FOR 100mm HIGH KERB 1500mm FOR 140mm HIGH KERB 45° 45° 600mm TACTILE 300mm CLEARANCE A KERB FACE BRIGHTON LITE OR EQUIVALENT TO BE USED (NO REINFORCEMENT) MINIMUM CONCRETE COMPRESSIVE STRENGTH f'c=32MPa. BROOM SURFACE FINISH FOOTPATH CROSSFALL 150 SHARP TRANSITION WITH NO LIP AT WATERTABLE SHARP TRANSITION AT MEET POINT WITH FOOTPATH RAMP GRADIENT 1:8 MAX 100mm THICK, 20mm QUARRY RUBBLE TO PM21, COMPACTED TO 98% MMDD. TACTILE TYPE B INDICATOR. COLOUR: GREY REFER TO AS 1428.4-1992. DO NOT USE METAL TACTILES SECTION A-A SHARP TRANSITION BETWEEN RAMPS AND SLOPING SIDES KERB RAMP NTS NOTES: 1. KERB RAMP SHOULD BE LAID IN THE DIRECTION OF TRAVEL ACROSS THE ROAD ALIGNED WITH THE KERB RAMP ON THE FAR SIDE. 2. IT IS DESIRABLE THAT THE KERB RAMP AND SLOOPING SIDES BE KEPT FREE OF PENETRATIONS (ie. SERVICE COVERS), IF UNAVOIDABLE, THE COVERS MUST BE SLIP RESISTANT. 10/08/11 JAS STREET PROPERTY BOUNDARY REFER DETAIL A REINFORCED CONCRETE PIPE, MINIMUM SIZE 150 DIAMETER. (uPVC AND OTHER MATERIALS NOT PERMITTED) 200 MIN COVER FOR THE FULL LENGTH OF RCP 250 SQ. PIPE 100 MINIMUM CONCRETE BANDAGE 100 MINIMUM FALL OUTLET PIPE INVERT MUST BE EQUAL TO SUMP INVERT LEVEL PIPE TO BE CONNECTED INTO TOP HALF OF THE STORMWATER PIIPE AND FLUSH WITH INTERNAL WALL MAIN STORMWATER PIPE INSTALL JUNCTION CHAMBER IF THE DIAMETER OF THE PROPOSED CONNECTION PIPE IS EQUAL TO OR GREATER THAN HALF THE DIAMETER OF THE CORPORATIONS STORMWATER PIPE 300x300x6mm THICK CHECKER PLATE COVER WITH 10mmØ LIFTING HOLE IN THE CENTRE FINISHED FOOTPATH LEVEL COVER SUPPORT 16mmØ PLAIN ROD, 35mm LONG WELDED TO ANGLE AT CORNERS OF FRAME FRAME 25x25x3mm MILD STEEL ANGLE SUMP WALL (INSITU CONCRETE OR BRICK) 75 MIN. MINIMUM 25mm FIXINGS LUGS OR DYNABOLT IN EACH CORNER DETAIL A PROPERTY CONNECTION NTS 10/08/11 JAS STREET PROPERTY BOUNDARY REFER DETAIL A 200 MIN COVER FOR THE FULL LENGTH OF RCP REINFORCED CONCRETE PIPE, MINIMUM SIZE 150 DIAMETER. (uPVC AND OTHER MATERIALS NOT PERMITTED) 250 SQ. PIPE 100 MINIMUM CONCRETE BANDAGE 100 MINIMUM FALL OUTLET PIPE INVERT MUST BE EQUAL TO SUMP INVERT LEVEL CATCHPIT POSSIBLE EXISTING WET SUMP TYPE CATCHPIT 300x300x6mm THICK CHECKER PLATE COVER (HOT DIPPED GALVANISED) WITH 10mmØ LIFTING HOLE IN THE CENTRE) FINISHED FOOTPATH LEVEL COVER SUPPORT 16mmØ PLAIN ROD, 35mm LONG WELDED TO ANGLE AT CORNERS OF FRAME FRAME 25x25x3mm MILD STEEL ANGLE SUMP WALL (INSITU CONCRETE OR BRICK) 75 MIN. MINIMUM 25mm FIXINGS LUGS OR DYNABOLT IN EACH CORNER DETAIL A PROPERTY CONNECTION NTS 10/08/11 JAS 0.9m (TYP) THROAT WIDTH PREFERRED 3m MAXIMUM 6m (SUBJECT TO APPROVAL) YELLOW LINE (ONLY WHERE NO KERB EXISTS) 300mm WIDE STOP LINE BUILDING PROPERTY LINE 1.2m MIN. BITUMEN FINISH GRADE 1:48 TO 1:24 1m GRADE 1:10 MAX. REFER NOTE 1m RADIUS AND TAPER CONCRETE MARGIN (300-150) 600mm TACTILES 10m NO STANDING ZONE 30° CONCRETE KERB AND GUTTER 300mm CONCRETE MARGIN TACTILED CROSSOVER NTS NOTE: VEHICLE ACCESS MUST BE CHECKED IN ACCORDANCE WITH AUSTRALIAN STANDARDS 2890.1-1993 OR APPROPRIATE TO ENSURE THAT A VEHICLE WILL NOT SCRAPE THEIR UNDERSIDE WHEN NEGOTIATING THE CROSSOVER 10/08/11 JAS BOLLARDS AND RAILINGS DETAILS: BICYCLE PARKING RAIL-FRAME BOLLARD DETAIL COLLAPSABLE BOLLARD DETAIL CONCRETE / TIMBER SLEEPER RETAINING WALL DETAIL FENCE AND FOOTING DETAIL TYPICAL HANDRAIL CL 800 CL R1 0 GALVANISED 50 CHS 5.0 CAST 250mm INTO FOOTINGS 0 PROVIDE 30mm ASPHALT OVER FOOTING FINISHED SURFACE FLANGED END MASS CONCRETE FOOTINGS GRADE N20 BICYCLE PARKING RAIL-FRAME NTS 10/08/11 JAS 6mm CAP PLATE HOT DIP GALVANISED WELDED TO PIPE OR CONCRETE INFILL TO PIPE WITH MOUND TO TOP SURFACE 1200 152 CHS 6.3 HOT DIP GALVANISED MOUND CONCRETE 150 1000 FINISHED SURFACE 450Ø-500Ø BOLLARD DETAIL (BL ON PLAN) 1:20 10/08/11 JAS 6mm CAP PLATE HOT DIP GALVANISED WELDED TO CHANNEL. 1000 114 CHS (HOT DIP GALVANISED) PAINT TO SUIT. A 140 x 10 PL. x 200 LONG WELDED TO CHANNEL A HEAVY DUTY HINGE BOLTED TO BASE PL AND CHANNEL. 300 Sq. x 10 PL. BOLTED TO BASE PL. 4/M12 4.6/S H.D. BOLTS THREADED AT TOP FOR 40mm. 200 650 30 x 10 PL. x 40 LONG WITH 10mmØ HOLE WELDED TO BASE PL. MASS CONCRETE FOOTING CONCRETE GRADE N25 450Ø COLLAPSABLE BOLLARD DETAIL NTS 140 x 10 PL. x 200 WELDED TO CHANNEL WITH 40 x 15mm SLOT. 300 Sq. x 10 BASE PL. 30 x 10 PL x 40 LONG WITH 10mmØ HOLE WELDED TO BASE PL. SECTION A-A 10/08/11 JAS STEEL UPRIGHT CONCRETE PIER FOOTING SLEEPER NEW CONCRETE/TIMBER SLEEPER RETAINING WALL MAX. HEIGHT RETAINED =1.800m 300mm WIDE SELECTED GRANULAR BACKFILL MATERIAL (7mm) 150 UC 23 STEEL UPRIGHT AT 240mm CTS. CORNER DETAIL NTS SLEEPERS 200 x 100 x 2400mm LONG (TIMBER GRADE F1; CONCRETE GRADE N25) ON EDGE A A NEW HOTMIX PAVEMENT SURFACE SLEEPER FOR FOOTING SIZE/ REINF'T REFER PLAN. STEEL UPRIGHTS 2-150 PFC ALTERNATIVE CORNER DETAIL NTS SLEEPER MASS CONCRETE 600Øx 2500mm DEEP BORED CONCRETE PIER FOOTING f'c=20MPa G=20 kN/m³ STEEL UPRIGHT AGRICULTURAL DRAIN 125 MIN. COVER LOCAL SHAPING OF SLEEPER MAY BE REQUIRED TO SUIT THE STEEL UPRIGHT 200 CONCRETE PIER FOOTING SECTION A-A NTS CONCRETE/ TIMBER SLEEPER RETAINING WALL DETAIL NTS 10/08/11 JAS POSTS @ 2100 MAX CTRS 2100 MAX. NEW GOOD-NEIGHBOUR COLORBOND FENCE (REFER ARCHITECT'S DRAWINGS FOR DETAILS) MIN. 100 COVER 100 850 BELOW GROUND LEVEL MIN. 300Ø FENCE AND FOOTING DETAIL 1:20 10/08/11 JAS TRAFFICABLE SURFACE TO TOP OF HANDRAIL EXTENDED HANDRAIL 300 MIN. PARALLEL TO SURFACE BELOW KERB RAIL TURN HANDRAIL THROUGH A TOTAL OF 180° OR RETURN FULLY TO END POST OR WALL FACE. 175 TO TOP OF KERB RAIL WARNING TACTILE INDICATORS TO AS 1428.4 TRANSITION LANDING 300 ± 10 RAMP LANDING RAMP 600 TO 800 LANDING 1200 MIN. TYPICAL HANDRAIL ELEVATION NTS NOTES: 1. THE 300mm EXTENSION IS NOT REQUIRED WHERE THE HANDRAIL IS CONTINUOUS, E.G. ON THE INSIDE OF AN INTERMEDIATE LANDING. 2. HANDRAIL, STAUNCHION & KICKRAIL TO STRICTLY COMPLY WITH AS 1428.1. 3. ALL HANDRAIL, KICKRAIL, STAUNCHIONS & BRACKETS TO BE HOT DIP GALVANISED AFTER FABRICATION. ALL SITE WELDS TO HAVE THE WELD SLAG REMOVED & FINISH WITH 2 COATS OF COLD GALVANISED TREATMENT. 4. STANCHIONS AND HANDRAIL NOT SHOWN FOR CLARITY. 900 300 R16 ROD SUPPORT 42.3 CHS 4.0 HANDRAIL 6 CAP PL. 6 CAP PL., SEAL WELD 42.3 CHS 4.0 KICK RAIL 48.3 CHS 4.0 STAUNCHIONS, SPACING TO SUIT RAMP PROFILE (1.5m MAX CTS). 175 WALKWAY 300 MIN. 900 CONTINUE KERB AND HANDRAILS ACROSS/AROUND LANDING WHERE POSSIBLE. 190Ø x 8 BASE PL., 6mm CFW TO STAUNCHION 10mm NON-SHRINK GROUT, 4M12 DOME HEAD CHEMSET ANCHORS. TYPICAL HANDRAIL DETAIL 1:20 NOTE: 1. THE 300mm EXTENSION IS NOT REQUIRED WHERE THE HANDRAIL IS CONTINUOUS, E.G. ON THE INSIDE OF AN INTERMEDIATE LANDING. 2. HANDRAIL, STAUNCHION, KICKRAIL TO STRICTLY COMPLY WITH AS 1428.1. 3. ALL HANDRAIL, KICKRAIL, STAUNCHIONS & BRACKETS TO BE HOT DIP GALVANISED AFTER FABRICATION. ALL SITE WELDS TO HAVE THE WELD SLAG REMOVED & FINISH WITH 2 COATS OF COLD GALVANISED TREATMENT. 10/08/11 JAS ENVIRONMENTAL DETAILS: DIVERSION DRAIN GRATED INLET PIT SEDIMENT TRAP KERB FILTER FABRIC LEVEL SPREADER PROTECTION OF EXISTING STORMWATER INLETS SEDIMENT FENCE SIDE ENTRY PIT SEDIMENT TRAP STRAW BALE & GEOTEXTILE SEDIMENT FILTER TEMPORARY CONSTRUCTION EXIT TYPICAL SEDIMENT BASIN WORM SEDIMENT TRAP 1 0.3m MIN. NATURAL SURFACE 2.5 2.5 1.0m MIN. 2.5 300 MIN. 1 1 COMPACTED EARTH BANK TOP WIDTH 0.5m MIN. DIVERSION DRAIN NTS 10/08/11 JAS 50-75mm GRAVEL, 200mm MIN DEPTH SILT LADEN RUNOFF SILT LADEN RUNOFF GEOTEXTILE FILTER FABRIC HEAVY GAUGE WIRE MESH 12mm PITCH ALTERNATIVELY, DROP INLET MAY BE SURROUNDED BY HALE BALE BARRIERS OR A SILT FENCE REFER RELEVANT DETAILS FILTERED WATER GRATED INLET PIT SEDIMENT TRAP NTS 10/08/11 JAS MIN. 150 USE SPACER BETWEEN KERB & FILTER TO MAINTAIN EFFECTIVE OPENING 100 MIN. GEOFABRIC & GRAVEL EXTENDS 250mm MIN. PAST THE END OF THE WIRE MESH TO ENSURE SEAL WITH KERB. ROLL OF WIRE MESH & GEOFABRIC FILLED WITH 25-50Ø GRAVEL KERB FILTER FABRIC THIS PRACTICE ONLY TO BE USED WHERE SPECIFIED IN AN APPROVED SWMP. 10/08/11 JAS EARTH BANK E L GRAD CHANNE N IO S R m 6 DIVE OR LAST < 1.0% F DE, 0% GRA SILL AT NGTH 4m E MIN. L DIVERSION OR PERIMETER BANK ABLE VER ST FLOW O SHEET ISPOSAL AREA D PERSPECTIVE VIEW 2.0m MIN 0.15m MIN SILL EROSION CONTROL MATTING SECTION LEVEL SPREADER NTS 10/08/11 JAS STAKES EXISTING GRATE GEOTEXTILE FILTER FABRIC PROTECTION OF EXISTING STORMWATER INLETS NTS 10/08/11 JAS DISTURBED AREA UNDISTURBED AREA FASTEN WIRE MESH TO STAKES WITH HEAVY DUTY WIRE STAPLES FIX GEOFABRIC TO WIRE MESH. JOINTS TO HAVE MIN 300mm OVERLAP AND EITHER SEWN OR ATTACHED TO STAKES FLOW DIRECTION PROVIDE STAKES AT 2.0m MAX SPACING DRIVEN 500mm-700mm INTO GROUND. STAKES TO BE 100mm DIA TIMBER POSTS OR 1.5kg/m STEEL POSTS GEOFABRIC & WIRE MESH BURIED 200mm INTO GROUND, ROCKY GROUND, SET INTO CONCRETE PLINTH SILT FENCE INSTALLATION METHOD NTS STEEL STAKES OR SIMILAR 3000 WIRE OR STEEL MESH DISTURBED AREA OF FL OW STAKES DRIVEN 600 INTO GROUND 600 MAX TION 200 DIRE C MAX DETAIL OF OVERLAP UNDISTURBED AREA GEOTEXTILE FILTER FABRIC SEDIMENT FENCE DRAINAGE AREA 0.6HA MAX. SLOPE GRADIENT 1:2 MAX. SLOPE LENGTH 60M MAX. 10/08/11 JAS HEAVY GAUGE WIRE MESH 12mm PITCH PROVIDE 80 x 50 BATTEN SPACED 50mm FROM KERB FACE AND 70mm FROM WATERTABLE GEOTEXTILE FILTER FABRIC, FIXED TO REAR SIDE OF BATTEN FINISHED SURFACE 50-75mm GRAVEL SILT LADEN RUNOFF FINISHED SURFACE CONCRETE GUTTER FILTERED WATER SIDE ENTRY PIT SEDIMENT TRAP NTS 10/08/11 JAS DISTURBED AREA UNDISTURBED AREA PROVIDE 2 STAKES PER BALE, DRIVEN 600mm INTO GROUND. HAY BALES PLACED LENGTH WISE, END TO END. FLOW DIRECTION EMBED BALE 100mm INTO GROUND 100 GROUND LEVEL HAY BALE BARRIER NTS GEOTEXTILE FILTER FABRIC ANGLE FIRST STAKE TOWARDS PREVIOUSLY LAID STAW BALE DRIVE IN THREE STAKES PER BALE STAPLE GEOTEXTILE FILTER ON TOP EDGE OF BALE. DISTURBED AREA OF FL OW 200 TION 100 DIRE C FACE BALE TWINE AWAY FROM DIRECT SUNLIGHT UNDISTURBED AREA STAKES DRIVEN 600 INTO GROUND DRAINAGE AREA 0.5HA. SLOPE GRADIENT 1:2 MAX. SLOPE LENGTH 50m MAX. STRAW BALE & GEOTEXTILE SEDIMENT FILTER NTS 10/08/11 JAS 15.0m LE NGTH ENTRY TO SITE IDTH W 3.0m ) . N I (M BERM MIN OF 5 STEEL OR TIMBER "CATTLE GRID" SHAKER AT 3.0m CTS. 50-75mm BALLAST 300mm 0.2m MIN 3.0m (MIN.) EXIT TO PUBLIC R OAD GEOFABRIC BIDMIN A12 TO UNDERLINE BALLAST. TEMPORARY CONSTRUCTION EXIT NTS 10/08/11 JAS RISER PIPE OPEN AT TOP STORAGE VOLUME 300 TWL MAX SLOPE 2:1 600 MAX SIDE SLOPE 2:1 CREST OF OVERFLOW OUTLET 1000 750 SETTLING VOLUME IN FL OW PRIMARY 100 OUTLET UPVC PIPE Ø250 2 x Ø35mm HOLES 200 200 2 x Ø30mm HOLES STEEL REINFORCED CONCRETE BASE 400 x 400 x 400. 100 2 x Ø25mm HOLES WIRE MESH OUTLET PROTECTION PROVIDE 2m x 2m x 0.17m RIP-RAP. STONE GRADING d50=0.110m. 25 TO 50mm OPENING GEOTEXTILE FILTER - BIDIM A24 OR EQUIVALENT PERFORATED PIPE PROVIDE 20 x Ø10mm HOLES TYPICAL CROSS SECTION OF SEDIMENT BASIN 250 NOTE: OUTLET PIPE IS ONLY USED FOR THE ARRANGEMENT AT THE PROPOSED RESIDUALS LAGOON AREA. CONSTRUCT DENSELY GRASSED OVERFLOW SPILLWAY. MAX. SLOPE 6.5%. CREST 300 ABOVE TOP OF WATER LEVEL 1 4 4 1 1000 FLOW SEDIMENT STROAGE ZONE LENGTH WIDTH INFLOW EARTH EMBANKMENT LENGTH/WIDTH RATIO 3:1 MIN. PLAN VIEW OF TYPICAL SEDIMENT BASIN NTS 10/08/11 JAS WIRE MESH FILTER FABRIC SEMI-PORTABLE VERSION (SEALED BOTH ENDS) GRAVEL (50-75mm) WORM SEDIMENT TRAP NTS 10/08/11 JAS KERBING DETAILS: 100mm KERB / 100mm KERB & GUTTER 150mm KERB / 150mm KERB & GUTTER 200mm KERB / 200mm KERB & GUTTER 300mm CONCRETE INVERT DRAIN 450mm CONCRETE INVERT DRAIN 600mm CONCRETE INVERT DRAIN BLOCK PAVE INVERT DRAIN DETAIL CONCEALED EDGE STRIP CROSSOVER EDGE STRIP EXTENDED HEIGH KERB / EXTENDED HEIGHT KERB & GUTTER KERB RAMP (1) KERB RAMP (2) KERB RAMP (3) MEDIAN KERB MOUNTABLE KERB & GUTTER NEW KERB ON EXISTING PAVEMENT DETAIL PRECAST CONCRETE WHEEL STOP RAMPED THRESHOLD ROLLOVER KERB & GUTTER 100 50 R15 100 FSL FINISHED PAVEMENT 150 CLEAN BACKFILL BEHIND KERB U.N.O. 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) 300 SUBGRADE (100% STANDARD COMPACTION) 100mm KERB (100K ON PLAN) 1:10 100 50 300 R15 FSL 5mm LIP ON PAVEMENT 20 40 CLEAN BACKFILL BEHIND KERB U.N.O. 150 100 FINISHED PAVEMENT 300 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) SUBGRADE (100% STANDARD COMPACTION) 100mm KERB AND GUTTER (100K&G ON PLAN) 1:10 10/08/11 JAS 100 50 R15 150 FSL FINISHED PAVEMENT 150 CLEAN BACKFILL BEHIND KERB U.N.O. 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) 300 150mm KERB SUBGRADE (100% STANDARD COMPACTION) (150K ON PLAN) 1:10 100 50 300 R15 150 FSL FINISHED PAVEMENT 40 CLEAN BACKFILL BEHIND KERB U.N.O. 150 5mm LIP ON PAVEMENT 300 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) SUBGRADE (100% STANDARD COMPACTION) 150mm KERB AND GUTTER (150K&G ON PLAN) 1:10 10/08/11 JAS 100 50 R15 200 FSL CLEAN BACKFILL BEHIND KERB U.N.O. 200 FINISHED PAVEMENT 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) SUBGRADE (100% STANDARD COMPACTION) 300 200mm KERB (200K ON PLAN) 1:10 100 300 R15 FSL R15 5mm LIP ON PAVEMENT FINISHED PAVEMENT 40 200 25 200 CLEAN BACKFILL BEHIND KERB U.N.O. 50 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) 300 SUBGRADE (100% STANDARD COMPACTION) 200mm KERB AND GUTTER (200K&G ON PLAN) 1:10 10/08/11 JAS R75 5mm LIP ON ASPHALTIC CONCRETE PAVEMENT (TYP.) 25 300 50 125 20mm CHAMFER (TYP.) 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) SL72 MESH SUBGRADE (100% STANDARD COMPACTION) 300mm CONCRETE INVERT DRAIN (300ID ON PLAN) 1:10 10/08/11 JAS 20mm CHAMFER (TYP.) 150 R75 35 450 5mm LIP ON ASPHALTIC CONCRETE PAVEMENT (TYP.) 50 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) SL72 MESH SUBGRADE (100% STANDARD COMPACTION) 450mm CONCRETE INVERT DRAIN (450ID ON PLAN) 1:10 10/08/11 JAS 20mm CHAMFER (TYP.) 150 R75 40 600 5mm LIP ON ASPHALTIC CONCRETE PAVEMENT (TYP.) 50 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) SL72 MESH SUBGRADE (100% STANDARD COMPACTION) 600mm CONCRETE INVERT DRAIN (600ID ON PLAN) 1:10 10/08/11 JAS POLYMER MODIFIED ADHESIVE MORTAR TO SUPERINTENDENT'S APPROVAL 1:20 3 10 1:8 150 100 20 25mm BEDDING SAND 20 3 WIDTH OF INVERT DRAIN 20mm F.C.R. (PM.1/20QM) BASECOURSE (98% MODIFIED COMPACTION) GRADE N20 CONCRETE SL82 MESH CENTRAL WIDTH OF CONCRETE BASE SHALL NOT EXCEED WIDTH OF INVERT DRAIN SUBGRADE (100% STANDARD COMPACTION) BLOCK PAVE INVERT DRAIN DETAIL (VEHICULAR) 1:10 10/08/11 JAS EQUAL SELECTED PAVING UNITS 100 CONCRETE EDGE STRIP 25mm BEDDING SAND 100 EQUAL CAST EDGE AGAINST PAVING UNITS CONCEALED EDGE STRIP (NON-VEHICULAR) 1:10 10/08/11 JAS STANDARD KERBING BEYOND 125 20mm CHAMFER (TYP.) FINISHED SURFACE 150 R25 80 80 600 R40 270 FINISHED SURFACE 290 250 600 CROSSOVER 1:10 10/08/11 JAS 125 N25 CONCRETE. TOOLED JOINTS AT 2.0m CTRS. 2xN16, 200 LAP CONTINUOUS. LANDSCAPING 200 PAVEMENT 100mm MIN. Q.R. PM(2/20QR) SUBBASE COURSE (98% MODIFIED COMPACTION) SUBGRADE (100% STANDARD COMPACTION) EDGE STRIP (ES ON PLAN) 1:10 10/08/11 JAS 110 25 TWO PART POLYURETHANE SEALANT SEAL-N-FLEX TRAFFICABLE OR APPROVED EQUIVALENT 300mm MIN. 750mm MAX. 150 LAP SL.72 MESH 150 FINISHED SURFACE HEIGHT VARIES N12 CONTINUOUS N12 BARS AT 300 CTS. C.J 530 COMPRESSIBLE FILLER NOMINAL 12mm WIDE 1.N12 BAR 200Ø PIERS AT 1200mm CTS. AND AT EACH SIDE OF JOINT 200 EXTENDED HEIGHT KERB & GUTTER (EHK&G ON PLAN) 1:10 150 SL82 MESH C.J (OPTIONAL) 2N12 BARS 530 FINISHED SURFACE 25 HEIGHT VARIES 300mm MIN. 750mm MAX. 100 200Ø PIERS AT 1200mm CTS. AND AT EACH SIDE OF JOINT 200 EXTENDED HEIGHT KERB (EHK ON PLAN) 1:10 10/08/11 JAS A 2000 MIN. 1500 MIN. BUILDING LINE LANDING 1500 MIN. FROM TOP OF RAMP TO ANY OBSTRUCTION UPPER LANDING 1520 MAX. KERB RAMP 1 IN 8 MAX. 1200 MIN. B 45° WARNING UNIT AS SPECIFIED IN AS1428.4 45° KERB FACE LOWER LANDING B 1000 MIN. A PLAN INCLUDED ANGLE BETWEEN RAMP SURFACE AND LOWER SURFACE 166° MIN. SHARP TRANSITION AT CHANGE OF GRADE TOP AND BOTTOM OF RAMP 190 MAX. FOOTPATH TOP LANDING 1500 MIN. ROADWAY 1 IN 8 KERB RAMP 1520 MAX. LOWER LANDING 1200 MIN. SECTION A-A KERB SLOPING SIDE RAMP SECTION B-B KERB RAMP DETAIL 1:50 NOTE: THE RAMP AND SLOPING SIDES SHOULD BE SLIP RESISTANT AND OF A COLOUR THAT CONTRASTS WITH THE ADJOINING SURFACES. 10/08/11 JAS A 1200 WARNING UNIT AS SPECIFIED IN AS1428.4 JOINT JOINT A PLAN OF KERB RAMP 150 1050 25mm FALL 75 1:20 FINISHED SURFACE 25 RAMP 100 125 FINISHED SURFACE SECTION A-A 1:10 10/08/11 JAS WARNING UNIT AS SPECIFIED IN AS1428.9 DIRECTION AND LOCATION OF FOOTPATH RAMP DOWN A 1500 45° A LANDING: SLOPE SHALL NOT EXCEED 1 IN 50 IN ANY DIRECTION 1200 (MIN.) UTTER AND G KERB PLAN 1:50 VARIES (GRADIENT 1:10 MAX.) FINISHED SURFACE SECTION A-A 1:10 KERB RAMP CROSSING SECTION SCALE 1:10 NOTES: 1. RAMPS GIVING ACCESS TO ROADWAYS HAVING KERB AND FOOTPATHS EACH SIDE SHALL BE PROVIDED IN PAIRS, ONE IN EACH FOOTWAY AND DIRECTLY OPPOSITE EACH OTHER. 2. THE RAMP AND SLOPING SIDES SHALL BE SLIP RESISTANT. (ie. CONCRETE TEXTURED SURFACE) TO AS 3661. 3. TACTILE DIRECTIONAL INDICATORS (WARNING UNITS) SHALL BE AS SPECIFIED IN AS 1428.4 10/08/11 JAS 255 25 110 R40 R40 R20 190 225 140 FINISHED PAVEMENT 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) 300 SUBGRADE (100% STANDARD COMPACTION) MEDIAN KERB (MK ON PLAN) 1:10 10/08/11 JAS 530 20mm CHAMFER (TYP.) 230 65 300 165 5mm LIP ON ASPHALTIC CONCRETE PAVEMENT R20 FSL 125 CLEAN BACKFILL BEHIND KERB U.N.O. 100 200 FINISHED PAVEMENT 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) 300 SL.72 MESH SUBGRADE (100% STANDARD COMPACTION) MOUNTABLE KERB & GUTTER (MK&G ON PLAN) 1:10 10/08/11 JAS SAWCUT SAWCUT WIDTH Q.R. EXISTING BITUMEN SURFACE PROFILE KERBING REMOVE HOT MIX LAYER F.C.R. EXISTING PAVEMENT WIDTH OF SAWCUT DEPENDENT ON COMPACTION PLANT EXISTING BITUMEN SURFACE EXIST PAVEMENT DEPTH 5mm LIP ON PAVEMENT NEW ISLAND RETAIN EXISTING PAVEMENT 300 MIN. 100mm MINIMUM THICKNESS NEW KERB ON EXISTING PAVEMENT DETAIL FCR (PM1) (98% MODIFIED COMPACTION) EXTEND 300mm BEHIND BACK OF KERB. SUBGRADE (100% STANDARD COMPACTION) NTS 10/08/11 JAS 165 30 15 30 75 15 EPOXY GROUT 30 110 SEAL DOWEL HOLE WITH EPOXY MORTAR TWO HOLES PER UNIT FINISHED SURFACE 2 R12 DOWELS 400 LONG 300mm INTO PAVING (250 FROM EACH END) EACH UNIT 1770 LONG PRECAST CONCRETE WHEEL STOP 1:5 10/08/11 JAS DOOR RAMP GRADIENT 1:8 MAX 35 20 MAX 280 MAX RAMPED THRESHOLD 1:10 NOTE: THE EDGES OF THE THRESHOLD RAMP SHALL BE TAPERED OR SPLAYED AT A MINIMUM OF 45° WHERE THE RAMP DOES NOT ABUT A WALL. 10/08/11 JAS 5mm LIP ON PAVEMENT 70 160 300 25 FSL 25 CLEAN BACKFILL BEHIND KERB U.N.O. 125 75 FINISHED PAVEMENT 100mm MIN. COMPACTED Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) 300 SUBGRADE (100% STANDARD COMPACTION) ROLLOVER KERB & GUTTER (RK&G ON PLAN) 1:10 10/08/11 JAS NOTES & LEGENDS NOTES: GENERAL COMPACTION NOTES GENERAL NOTES PAVEMENT NOTES REFERENCE DOCUMENTATION SIGNAGE AND LINEMARKING NOTES SITE CONTAMINATION - CONTRACTORS RESPONSIBILITIES STORMWATER NOTES SUBGRADE PREPARATION FOR PAVEMENT SURFACE AND SUBSURFACE DRAINAGE AND SEDIMENT CONTROL LEGENDS: EXISTING SERVICES LEGEND LEGEND (1) LEGEND (2) SURVEY LEGEND (1) SURVEY LEGEND (2) GENERAL COMPACTION NOTES 1. ALL AREAS TO BE FILLED SHALL BE COMPLETELY CLEARED OF ALL DELETERIOUS MATERIAL, INCLUDING THE FOLLOWING : TREES, ROOTS AND ALL OTHER DECAYED VEGETATION. 2. PRIOR TO THE COMMENCEMENT OF ANY CIVIL OR STRUCTURAL CONSTRUCTION, THE ENTIRE SITE AREA IS TO BE COMPACTED AND TESTED IN ACCORDANCE WITH AS1289.5.1.1 TO PRODUCE THE FOLLOWING: - 98% STANDARD COMPACTION AT THE SURFACE AND AT 300mm BELOW SURFACE LEVEL, WHEN PAVEMENTS AND STRUCTURES ARE TO BE CONSTRUCTED, ELSEWHERE 95%. - TESTING SHALL BE CARRIED OUT A RATE OF 1 TEST PER 150 Sq/m AT EACH 200mm LAYER OF FILL (MIN 5 TESTS PER LAYER). TESTING SHALL BE EVENLY SPACED OVER THE ENTIRE SITE, AND AT RANDOM LOCATIONS. TEST RESULTS SHALL BE FORWARDED TO THE SUPERINTENDENT FOR APPROVAL PRIOR TO COMMENCEMENT OF WORKS. 3. ALL NEW FILL SHALL BE COMPACTED TO PRODUCE 98% OF THE STANDARD COMPACTION TO AS 1289.5.1.1 (U.N.O.) WHEN BENEATH PAVING AND STRUCTURES, ELSEWHERE 95%. FILL MATERIAL TO BE APPROVED BY THE SUPERINTENDENT. THE LOOSE THICKNESS OF EACH LAYER BEFORE COMPACTION SHOULD NOT EXCEED 200mm WITHOUT THE APPROVAL OF THE SUPERINTENDENT. PROVIDE COMPACTION TESTS FOR NEW FILL AS PER NOTE 2. 4. ALL EXISTING FILL WITHIN THE CONSTRUCTION AREA SHALL BE COMPLETELY REMOVED. MATERIAL SHALL BE REPLACED AND COMPACTED IN LAYERS NOT EXCEEDING 200mm WHEN MEASURED LOOSE. EACH LAYER SHALL BE COMPACTED TO ACHIEVE A DENSITY OF NOT LESS THAN 98% STANDARD COMPACTION WHEN BENEATH PAVING AND STRUCTURES, ELSEWHERE 95% 10/08/11 JAS GENERAL NOTES 1. THESE DRAWINGS ARE NOT CADASTRAL PLANS AND MUST NOT BE USED IN DETERMINING PRECISE DETAILS WITH RESPECT TO BOUNDARIES. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE. 4. ALL LEVELS ARE EXPRESSED IN METRES. 5. ALL CO-ORDINATES ARE A.M.G. BASED, UNLESS NOTED OTHERWISE. 6. LEVEL DATUM IS A.H.D. SUPPLIED SETOUT INFORMATION 7. SET OUT OF CARPARKS AND ASSOCIATED FEATURES SHALL BE SUPPLIED TO THE CONTRACTOR IN AN ELECTRONIC 2D FORMAT (AutoCAD 2007) WHICH CONTAINS CONTROL POINTS AND T.B.M. NO TABULATED SET OUT INFORMATION IN HARD COPY WILL BE ISSUED. CAD FILES WILL BE ISSUED IN MILLIMETRES. CONTRACTOR TO ALLOW FOR FILE CONVERSION AS REQUIRED. ORIGINAL FULL SIZE AURECON DRAWING MAY BE SCALED SUBJECT TO CORRECT BAR SCALE VERIFICATION. 8. REFER TO DIMENSIONED ARCHITECTURAL BUILDING DETAILS FOR ALL SET OUT DIMENSIONS OF BUILDINGS, KERBING, PAVING, ETC. 9. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT SPECIFICATIONS. 10. REFER TO STRUCTURAL ENGINEERS DRAWINGS FOR DETAILS OF CONCRETE FLOOR AND BEAMS BEFORE SETTING OUT. 11. REFER TO HYDRAULICS DRAWINGS FOR ALL UNDERGROUND PIPEWORK AND DETAILS. 12. SPOIL TO BE STOCKPILED AS DIRECTED BY THE SUPERINTENDENT AND EXCESS NOT USED IS TO BE REMOVED FROM SITE BY CONTRACTOR. 13. THESE DRAWINGS ARE A SCHEMATIC REPRESENTATION OF SERVICES INFORMATION CONTAINED IN DRAWINGS ISSUED BY THE RELEVANT AUTHORITIES. THE INFORMATION CONTAINED IN THESE DRAWINGS IS INDICATIVE ONLY, AND REFERENCE SHOULD BE MADE TO THE RELEVANT AUTHORITIES DOCUMENTATION TO CONFIRM ACCURACY AND COMPLETENESS. WHERE INFORMATION IS AVAILABLE, THE SUB-SURFACE SERVICES INSTALLED BY CONTRACTORS OTHER THAN THE AUTHORITIES HAVE BEEN SHOWN, BUT ADDITIONAL UNDOCUMENTED SERVICES MAY BE PRESENT. SHOULD THE CONTRACTOR BELIEVE THAT SUB-SURFACE SERVICES ARE AT RISK OF DAMAGE DURING CONSTRUCTION, THE CONTRACTOR SHOULD NOTIFY THE RELEVANT AUTHORITIES AND ESTABLISH THE EXACT LOCATION OF THE SERVICES. 14. THE FINISHED SURFACE SHALL BE EVENLY GRADED BETWEEN DESIGN SURFACE LEVELS. 15. DEMOLISH AND REMOVE ALL EXISTING INSTALLATIONS WHICH ARE TO BE AFFECTED BY NEW WORKS. EXTENT OF DEMOLITION TO BE CONFIRMED ON SITE WITH THE SUPERINTENDENT PRIOR TO COMMENCEMENT OF WORKS. 16. CONTRACTOR TO ADJUST LIDS OF EXISTING SERVICE PITS TO MATCH FINISHED SURFACE LEVEL. PROVIDE HEAVY DUTY COVER IF IN PAVED AREA TO THE REQUIREMENTS OF THE RELEVANT AUTHORITY, IF APPLICABLE. RELOCATE SERVICE AS REQUIRED. 17. WORKMANSHIP AND MATERIALS ARE TO BE IN ACCORDANCE WITH THE RELEVANT CURRENT S.A.A. CODES INCLUDING ALL AMENDMENTS, AND THE LOCAL STATUTORY AUTHORITIES, EXCEPT WHERE VARIED BY THE CONTRACT DOCUMENTS. 18. ANY DISCREPANCY BETWEEN DRAWINGS SHALL BE REPORTED TO THE SUPERINTENDENT BEFORE WORK PROCEEDS. 10/08/11 JAS PAVEMENT NOTES 1. EXISTING PAVERS THAT ARE INDICATED TO BE RELAID ARE TO BE NEATLY STOCKPILED ON SITE TO AVOID DAMAGE DURING CONSTRUCTION. 2. AREAS OF RELAID PAVERS SHALL HAVE BASE MATERIAL CUT TO NEW LEVEL WITHIN EXISTING BASE MATERIAL AND NEW 25mm SAND LAYER. 3. PAVER LOC OR SIMILAR PRODUCT SHALL BE USED ON ALL RELAID PAVERS. 4. PAVERS RELAID SHALL BE CLEANED PRIOR TO RE-INSTALLATION. DAMAGED PAVERS ARE TO BE REPLACED. 5. IN AREAS WHERE ASPHALT PAVEMENT EXISTS AND NEW PAVEMENT IS BEING LAID THE CONTRACTOR SHALL REMOVE THE EXISTING TOP COAT AND PAVEMENT DOWN 100mm FROM SURFACE LEVEL. 6. RE-ASPHALTED AREAS SHALL HAVE EXISTING BASE MATERIAL EXCAVTED (GENERALLY 100mm) REPLACED WITH A DTEI SPEC PM1/20QG AND COMPACTED (98% MODIFIED) TO NEW DESIGN LEVEL AND HOTMIX PLACED TO MATCH NEW LEVELS. 7. ALL PAVERS UPON COMPLETION OF INSTALLATION SHALL BE TREATED WITH A STAIN RESISTANT COATING/SEALANT TO ASSIST WITH CLEANING OF PAVERS. CONTRACTOR TO SUBMIT TREATMENT AND WORK METHOD TO SUPERINTENDENT FOR APPROVAL. 10/08/11 JAS REFERENCE DOCUMENTATION 1. REFER TO THE GEOTECHNICAL ENGINEERS RECOMMENDATIONS FOR ALL SITE AND SOIL EXCAVATION EXTENTS. 2. THE CIVIL SPECIFICATION SHALL BE READ IN CONJUCTION WITH THE GEOTECHNICAL REPORT FOR SOIL EXCAVATION AND WITH THE DRAWINGS PROVIDED. 3. STRUCTURAL DRAWINGS FOR ALL BUILDING STRUCTURAL DETAILS. 4. LANDSCAPE ARCHITECTURAL DRAWINGS FOR ALL TREE LOCATIONS, TREE PROTECTION AND LANDSCAPE DETAILS. 5. ARCHITECTURAL DRAWINGS FOR FINAL COORDINATION OF PROJECT DETAILS AND ALL BUILDING DETAILS. 6. REFER TO THE ENVIRONMENTAL ENGINEERS REPORT FOR ALL SITE SOIL CONTAMINATION REPORTS AND REQUIREMENTS. 10/08/11 JAS SIGNAGE & LINEMARKING NOTES 1. TRAFFIC CONTROL DETAILS IN ACCORDANCE WITH AUSTRALIAN STANDARD AS1742 MANUAL OF TRAFFIC CONTROL DEVICES AS MODIFIED BY THE "CODE OF TECHNICAL REQUIREMENTS FOR THE LEGAL USE OF TRAFFIC CONTROL DEVICES (TSA)" AND "INTERIM GUIDELINES FOR PAVEMENT MARKING MANUAL IN SOUTH AUSTRALIA (TSA)". 2. FINAL LOCATION OF SIGNS TO BE DETERMINED ON SITE. 3. SIGNS TO BE INSTALLED IN ACCORDANCE WITH AS 1742-APPENDIX C. 4. ALL LINE DIMENSIONS QUOTED ARE TO THE CENTRE OF LINEMARKING OR TO THE FACE OF KERB. 5. ALL LINEMARKING 100mm WIDE UNLESS NOTED OTHERWISE. PAVEMENT MARKING TABLE LINE TYPE COLOUR DESCRIPTION STOP LINE WHITE 450mm WIDE. (RECESS 300 BACK FROM FACE OF KERB) HOLDING LINE WHITE 450mm WIDE, 600mm LINE 600 GAP. (RECESS 300 BACK FROM FACE OF KERB) NO STANDING LINE YELLOW 100 WIDE CONTINUOUS TURNING LINE WHITE 100mm WIDE 600mm LINE 600mm GAP SEPARATION LINE A WHITE 100mm WIDE 3.0m LINE 9.0m GAP SEPARATION LINE B WHITE 100mm WIDE 6.0m LINE 6.0m GAP UNBROKEN SEPARATION LINE WHITE 100mm WIDE CONTINUOUS BROKEN LANE LINE WHITE 100mm WIDE 3.0m LINE 9.0m GAP CONTINUITY LINE WHITE 100mm WIDE 1.0m LINE 3.0m GAP CHEVRON/ DIAGONAL MARKING WHITE L=100mm B=600mm W=200mm S=3000mm A=45° CARPARKING LINE WHITE 100mm WIDE CONTINUOUS (NOTE: REFER TO ARCHITECT'S DRAWINGS FOR CARPARK SETOUT & DIMENSIONS) CROSSWALK LINE WHITE 150mm WIDE 600 LINE, 300 GAP EDGE LINE WHITE 100mm WIDE 23.0m LINE, 1.0m GAP REFER DIAGRAM SIGNAGE LEGEND No. A B C D E El Er F G H I J K L M N O CODE & SIZE R1-2A R2-4A R2-7A R1-1A R5-35 R5-35l R5-35r D4-2-2 RS-10 R5-23 R5-20 R5-16 R5-13 R3-1 TYPE GIVE WAY NO ENTRY ONE WAY TRAFFIC STOP NO STOPPING -BOTH WAYS NO STOPPING -LEFT NO STOPPING -RIGHT HAZARD DIRECTIONAL SIGN DISABLED PARKING BAY LOADING ZONE BUS ZONE PRAM PARKING BAY 1/2 HOUR PARKING MANAGERS PARKING NIGHT STAFF PARKING 5 MINUTE PARKING WOMBAT CROSSING 10/08/11 JAS SITE CONTAMINATION CONTRACTORS RESPONSIBILITIES 1. CREATE AND ADHERE TO A SITE SPECIFIC CEMP (CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN). THIS DOCUMENT SHALL CONTAIN THE NATURE AND IMPLICATIONS OF THE CONTAMINATION. 2. APPOINT A CEMP ADMINISTRATOR TO IMPLEMENT AND MANAGE THE CEMP. PREPARE AN ORGANISATIONAL CHART (TO BE ADDED INTO THE CEMP) OUTLINING RESPONSIBILITIES FOR THE ONGOING MANAGEMENT OF THE SITE DURING CONSTRUCTION WORKS. IMPLEMENT A FORMAL PROCESS OF APPROVAL AND DOCUMENTATION UNDER THE CEMP. 3. IMPLEMENT A SYSTEM OF ONGOING MONITORING AND REVIEW OF THE EFFECTIVENESS OF THE CEMP, INCLUDING INTERNAL OR EXTERNAL AUDITS. 4. PREPARE AND IMPLEMENT A CONSTRUCTION OH&S PLAN COGNISANT OF THE SITE CONTAMINATION. IMPLEMENT A REVIEW PROCESS FOR ASSOCIATED DOCUMENTS. IMPLEMENT A RECORD KEEPING SYSTEM FOR ASSOCIATED DOCUMENTS, INCLUDING NON-CONFORMANCES. 5. ENSURE EVERY RELEVANT PARTY IS AWARE OF THE CONTENT AND REQUIREMENTS OF THE CEMP. CONDUCT FORMAL DOCUMENTED INDUCTIONS FOR RELEVANT PEOPLE; MAKE COPIES OF THE CEMP AND OTHER DOCUMENTATION AVAILABLE TO ALL RELEVANT PEOPLE. 6. REQUIRE THE FOLLOWING OF ANYONE WHO MAY DISTURB THE CONTAMINATED SOIL (E.G. CONTRACTOR'S STAFF, SUBCONTRACTORS, GEOTECHNICAL CONSULTANTS): INDUCTION; PROVISION OF WRITTEN PLAN OF HOW EXPOSURE TO CONTAMINATED SOIL WILL BE MANAGED; CEMP ADMINISTRATOR APPROVAL OF PLAN; CEMP ADMINISTRATOR SIGNOFF ON COMPLETED WORKS; REPORTING OF INCIDENTS AND IMPLEMENTATION OF CORRECTIVE ACTION AND DOCUMENTATION. 7. TEMPORARY VEHICLE WASHDOWN REQUIRED AT SITE EXIT TO PREVENT TRACKING OF CONTAMINATED SOIL OFF SITE. 8. RESTRICT VEHICLE ACCESS TO THE SITE TO ESSENTIAL VEHICLES ONLY. 9. CONTROLLED DEMOLITION OF CONCRETE ON-GROUND SLABS TO AVOID BREAKING THE CONCRETE UP INTO SMALL PIECES AND MIXING THEM WITH THE SITE SOILS. 10. DEMOLISHED CONCRETE TO BE WASHED FREE OF SOIL PRIOR TO DISPOSAL, IN ORDER TO BE CONSIDERED NON-CONTAMINATED. 11. AVOID STOCKPILING CONTAMINATED SOILS. WHERE STOCKPILING IS UNAVOIDABLE, KEEP STOCKPILES DAMP AND COVER WITH WATERPROOF TARPAULINS TO PREVENT DUST GENERATION. 12. ANY EXCAVATION WORK WILL REQUIRE WORKERS TO WEAR "APPROPRIATE" PPE, PLUS CONSTANT DAMPING-DOWN TO PREVENT DUST GENERATION. 13. IF EXCAVATED SOILS ARE SUITABLE FOR RE-USE AS FILL AND ARE GOING TO BE USED AS SUCH, ENSURE PROMPT MOISTURE CONDITIONING AND PLACEMENT TO AVOID DUST GENERATION. 14. EXCAVATED SITE SOILS THAT NEED TO BE DISPOSED OF OFF SITE WILL REQUIRE TRANSPORT BY OPERATORS LICENSED TO TRANSPORT CONTAMINATED SOILS, UNDER THE APPROPRIATE TRANSPORT CERTIFICATES. (IMPLICIT IN THIS IS THAT WASTE SOIL WILL HAVE TO BE CHARACTERISED (BY SAMPLING, LABORATORY ANALYSIS AND INTERPRETATION) FOR DISPOSAL, AND, IF EXCEEDING THE WASTE FILL CRITERIA, WILL HAVE TO BE DISPOSED OF TO A SUITABLY LICENSED FACILITY. 15. CONSTRUCT A CUT-OFF BUND WITH CLEAN MATERIAL TO PREVENT RUNOFF OF SITE STORMWATER OFF-SITE. (PRESUMABLY ALTERNATIVE SITE STORMWATER MANAGEMENT ACHIEVING THIS AIM WOULD BE ACCEPTABLE.) 16. MONITOR THE INTEGRITY OF SITE SURFACES. 17. AVOID DEWATERING OF EXCAVATIONS. WATER COLLECTED FROM ANY DEWATERING TO BE TESTED TO DETERMINE APPROPRIATE DISPOSAL METHOD. 18. AVOID OFF-SITE DISPOSAL OF ANY WATER FROM THE SITE. WATER COLLECTING ON THE SITE FROM ANY SOURCE TO BE TESTED TO DETERMINE APPROPRIATE DISPOSAL METHOD. 19. MANAGE DUST GENERALLY. 20. MANAGE EROSION OF EXPOSED SURFACES GENERALLY. 21. MANAGE NUISANCE ODOUR ISSUES. 22. ENSURE THAT CROSS-CONTAMINATION OF CLEAN IMPORTED MATERIALS BY THE IN SITU CONTAMINATED SOIL DOES NOT OCCUR. 23. MAINTAIN THE SITE IN GOOD ORDER GENERALLY. 24. MANAGE COMPLAINTS FROM MEMBERS OF THE PUBLIC AND OTHERS. 10/08/11 JAS STORMWATER NOTES 1. INLET PIPES SET 20mm ABOVE PIT INVERT LEVEL UNLESS NOTED OTHERWISE. 2. OUTLET PIPE I.L. ARE SET AT PIT I.L. UNLESS NOTED OTHERWISE. 3. TOP R.L. FOR SIDE ENTRY PITS IS WATER TABLE LEVEL. 4. TRENCH GRATES TO BE STAINLESS STEEL HEELPROOF AND SLIP-PROOF TYPE BY ACO OR APPROVED EQUIVALENT. 5. ALL STORMWATER PIPES SHALL BE uPVC PIPES SHALL BE SEWER CLASS DWV UNLESS NOTED OTHERWISE. 6. ALL STORMWATER PITS GREATER THAN 600x600 SHALL BE PROVIDED WITH A SPLIT LID TO ENSURE MAXIMUM LID "LIFT" IS 600x600. 7. ALL STORMWATER PITS ON PLAN DRAWINGS TO HAVE HEELPROOF GRATE OR PAVER INFILL LID WHERE LOCATED ON PAVEMENT OR FOOT TRAFFIC AREA. 8. ALL STORMWATER PITS TO HAVE ACCESS STEP IRONS INSTALLED IN ACCORDANCE WITH AS1657 AND AS4198 WHERE DEPTH IS GREATER THAN 1200mm. 9. AG DRAINS TO BE INSTALLED BEHIND ALL RETAINING WALLS AND LOCATIONS SHOWN ON DRAWINGS. 10. ALL AG DRAINS TO 100Ø, WRAPPED IN 200 MICRON GEOTEXTILE (BIDIM A24 OR SIMILAR) AND MINIMUM 300mm THICKNESS OF 20mm DRAINAGE SCREENINGS U.N.O. 11. ALL DOWNPIPE RISERS TO BE AS SHOWN ON ARCHITECTURAL DRAWINGS. CONNECT TO 150Ø UNDERGROUND CONNECTION UNLESS NOTED OTHERWISE. 10/08/11 JAS SUBGRADE PREPARATION FOR PAVEMENT 1. THE EXISTING GROUND SURFACE IS TO BE STRIPPED TO REMOVE ANY LOOSE SURFICIAL SOIL OR TOPSOIL AND/OR ASSOCIATED ORGANIC MATTER. ALL TOPSOIL AND UNCONTROLLED FILL IS TO BE STRIPPED AND THE UPPER 200mm OF EXPOSED SUB-GRADE COMPACTED TO ACHIEVE 98% STANDARD COMPACTION. ANY EXPOSED SOIL IS TO BE PROOF ROLLED, IN THE PRESENCE OF THE SUPERINTENDENT AND ENGINEER, WITH A NON-VIBRATING 20t SMOOTH DRUM ROLLER ( OR APPROVED OTHER) TO IDENTIFY ANY SOFT OR WEAK AREAS. 2. DURING PROOF ROLLING, ALL SOFT, WET, WEAK OR ORGANIC MATERIALS ARE TO BE REMOVED AND REPLACED WITH SELECTED COMPACTED FILL. 3. ALL EXCAVATED AREAS BEFORE BACKFILL ARE TO BE SURVEYED BY LICENSED SURVEYOR TO QUALIFY SELECTED FILL QUANTITY. CONTRACTOR TO ALLOW THIS SURVEYING IN THEIR CONTACT. 4. THE SELECTED FILL IS TO BE A WELL GRADED GRANULAR FILL SIMILAR IN COMPOSITION TO A QUARRY WASTE PRODUCT. THE SELECTED FILL IS TO BE PROPERLY MOISTURE CONDITIONED PRIOR TO PLACEMENT AND COMPACTION. 5. THE FILL IS TO BE PLACED AND COMPACTED IN LAYERS NOT EXCEEDING 200mm COMPACTED THICKNESS, TO A DENSITY NOT LESS THAT 98% OF STANDARD COMPACTION FOR GRAVELY FILL. 6. FIELD AND LABORATORY DENSITY TESTING ARE REQUIRED AFTER PROOF ROLLING OF STRIPPED GROUND, AFTER BACK FILLING ANY AREAS OF UNSUITABLE FOUNDATION SOIL AND DURING THE PLACEMENT OF ANY SELECTED FILL AND PAVEMENT LAYERS. TESTING AGENT TO BE NATA APPROVED AND TESTS TO BE CONDUCTED IN ACCORDANCE WITH GUIDELINES. 7. PROOF ROLL PAVEMENT SUBGRADES PRIOR TO PAVEMENT INSTALLATION. CONTRACTOR TO HAVE A GEOTECHNICAL ENGINEER TEST THE WHOLE PAVEMENT SUB-SURFACE ONCE SUBGRADE LEVELS ARE REACHED FOR CBR VALUE. DESIGN CBR IS 3.0%. CONTRACTOR TO INFORM SUPERINTENDANT OF CBR VALUE ON SITE PRIOR TO NEW PAVEMENT CONSTRUCTION. 10/08/11 JAS SURFACE AND SUBSURFACE DRAINAGE AND SEDIMENT CONTROL 1. IT'S ESSENTIAL THAT PROPER SITE DRAINAGE AND WATERPROOFING IS IMPLEMENTED AND MAINTAINED DURING AND AFTER CONSTRUCTION. 2. AT ALL STAGES OF CONSTRUCTION (INCLUDING DEMOLITION WORKS), CONTRACTOR SHALL TAKE MEASURES TO ENSURE ALL STAGNANT WATER FROM THE CONSTRUCTION SITE (BUILDING AND CARPARK AREAS) IS REMOVED FROM THE SITE (TO THE SATISFACTION OF THE SUPERINTENDENT) BEFORE AFFECTING THE EXISTING EXPOSED SOIL. THE CONTRACTOR SHALL ALLOW FOR THIS IN THEIR TENDER. 3. SURFACE RUNOFF SHOULD BE PREVENTED FROM ENTERING CONSTRUCTION AREAS, PARTICULARLY EXCAVATIONS AND FOOTING LOCATIONS, BY GRADING THE GROUND SURFACE AWAY FROM SUCH AREAS, OR USING SURFACE INTERCEPTOR DRAINS. RUNOFF THAT IS GENERATED WITHIN THE CONSTRUCTION AREAS MUST BE DIRECTED TO COLLECTOR DRAINS THROUGH THE PROVISION OF SUITABLE GROUND SURFACE FALLS AND THEN CARRIED AWAY FROM THE WORKS IN SEALED STORMWATER PIPES TO AN APPROPRIATE DISPOSAL OUTLET. 4. THE USE OF SUBSURFACE CUT-OFF DRAINS OR DRAINAGE BLANKETS WILL HELP PREVENT POSSIBLE SUBSURFACE SEEPAGE FROM EXCAVATION FACES. 5. SHOULD WATER BE ALLOWED TO SOAK INTO EXISTING SOIL, THE CONTRACTOR IS TO EXCAVATE AND REMOVE THE WATER-AFFECTED SOIL UNTIL SOIL WITH EXISTING, EQUILIBRIUM MOISTURE CONTENT IS FOUND. THE EXCAVATED AREA IS THEN TO BE BACKFILLED WITH SELECTED FILL AND COMPACTED IN ACCORDANCE WITH THE CIVIL SPECIFICATION. 6. FOR MORE DETAILS ON SITE RUN OFF CONTROL REFER TO GEOTECHNICAL INVESTIGATION REPORT AND CIVIL SPECIFICATION. 7. SEDIMENT CONTROL DEVICES SHOULD BE INSTALLED AS A STANDARD POLLUTION CONTROL FOLLOWING RECCOMENDATIONS BY THE E.P.A. IT IS RECOMMENDED THAT THESE METHODS ARE ADOPTED ON SITE. 8. THE CONTRACTOR IS TO INSTALL APPROPRIATE SEDIMENT TRAPS AT ALL ENTRIES (AT SEP AND GIP) TO THE UNDERGROUND STORMWATER DRAINS AND IN SWALES. INSTALL SEDIMENT FENCE AT SITE PERIMETER WHERE SITE RUNOFF COULD CROSS. THE CONTRACTOR TO MAINTAIN THESE TRAPS REGULARLY. 9. A "TEMPORARY CONSTRUCTION EXIT" SHALL BE INSTALLED AT A LOCATION AGREED WITH THE SUPERINTENDENT ON SITE. 10/08/11 JAS LEGEND (EXISTING SERVICES LINETYPES) T T E E EUG EUG EXISTING TELSTRA SERVICES EXISTING ETSA SERVICES EXISTING OVERHEAD ETSA SERVICES COMMON SERVICES TRENCH F SSD F SSD G G S S SWD SWD W W EXISTING FIRE MAIN SUB SURFACE DRAIN EXISTING GAS MAIN EXISTING SEWER MAIN EXISTING STORMWATER PIPE EXISTING WATER MAIN 10/08/11 JAS LEGEND 100K 600ID NEW KERB: 100K = 100mm HIGH KERB 100K&G = 100mm HIGH KERB AND GUTTER 150K = 150mm HIGH KERB 150K&G = 150mm HIGH KERB AND GUTTER 200K = 200mm HIGH KERB 200K&G = 200mm HIGH KERB AND GUTTER ES = EDGE STRIP EHK = EXTENDED HEIGHT KERB EHK&G = EXTENDED HEIGHT KERB AND GUTTER TK = TRANSITION KERB KB = KERB BREAK RK&G = ROLLOVER KERB AND GUTTER MK = MEDIAN KERB MK&G = MOUNTABLE KERB AND GUTTER INVERT DRAIN JOINTING: IJ = ISOLATION JOINT TJ = TOOL JOINT CJ = CONSTRUCTION JOINT SCJ = SAW CUT JOINT DCJ = DOWELLED CONSTRUCTION JOINT RW RETAINING WALL NEW STORMWATER PIPE AG DRAIN EXISTING STORMWATER TO REMAIN EXISTING STORMWATER TO BE REMOVED SWALE GRATED INLET PIT (GIP) JUNCTION PIT (JP) SIDE ENTRY PIT (SEP) I.O. DP F/W INSPECTION OPENING DOWN PIPE FLOOR WASTE TRENCH GRATE CHEQUER PLATE DRAIN 100.000 FFL 9.990 DESIGN LEVEL: T.K. = TOP OF KERB W.T. = BOTTOM OF KERB I.L. = INVERT LEVEL TOW = TOP OF WALL BOW = BOTTOM OF WALL BEW = BULK EARTHWORKS FINISHED FLOOR LEVEL SIGN BL BOLLARD FENCE TREE TO REMAIN TREE TO BE REMOVED BATTER SLOPE HEADWALL BRICK/BLOCK PAVING (NON VEHICULAR). REFER DRAWING ??? FOR DETAIL BRICK/BLOCK PAVING (VEHICULAR). REFER DRAWING ??? FOR DETAIL CONCRETE PAVEMENT (LIGHT DUTY). REFER DRAWING ??? FOR DETAIL CONCRETE PAVEMENT (MEDIUM DUTY). REFER DRAWING ??? FOR DETAIL CONCRETE PAVEMENT (HEAVY DUTY). REFER DRAWING ??? FOR DETAIL HOTMIX PAVEMENT (LIGHT DUTY). REFER DRAWING ??? FOR DETAIL HOTMIX PAVEMENT (MEDIUM DUTY). REFER DRAWING ??? FOR DETAIL HOTMIX PAVEMENT (HEAVY DUTY). REFER DRAWING ??? FOR DETAIL RUBBLE PAVEMENT. REFER DRAWING ??? FOR DETAIL SPRAY SEAL PAVEMENT. REFER DRAWING ??? FOR DETAIL 10/08/11 JAS 5T K 41 EXISTING SPOT LEVEL AT BACK OF KERB 41 .3 MOUNTABLE KERB & GUTTER K .35 150 HIGH KERB & GUTTER 150 HIGH KERB 100K&G 100 HIGH KERB & GUTTER 100K ES 100 HIGH KERB 41 K&G EXISTING SPOT LEVEL 41.3 EXISTING CONTOUR 40.600 DESIGN SPOT LEVEL I.L. 9.990 INVERT LEVEL 40.600 DESIGN CONTOUR INDICATES DIRECTION OF SURFACE FALL (SWALE) EDGE STRIP SEP ID INVERT DRAIN SEP EXISTING KERB AND GUTTER GIP EXISTING KERB AND GUTTER TO BE REMOVED RW EXISTING SPOT LEVEL AT TOP OF KERB EXISTING SPOT LEVEL AT WATERTABLE 41 MOUNTABLE KERB .35 MK W T MK&G .35 BK LEGEND RETAINING WALL JP DP SIDE ENTRY PIT EXISTING SIDE ENTRY PIT GRATED INLET PIT JUNCTION PIT DOWNPIPE TREE TRENCH GRATE EXISTING TREE TO BE RETAINED PLATE DRAIN EXISTING TREE TO BE REMOVED 375Ø FENCELINE FFL 9.990 STORMWATER PIPE FINISHED FLOOR LEVEL 10/08/11 JAS SURVEY LEGEND S.E.P. WATER METER STOBIE LITTER BIN TELSTRA PIT (SMALL) TRAFFIC LIGHT SIGN POST INSPECTION OPENING BOLLARD MAIL BOX SEWER I.P. H HYDRANT INSPECTION COVER GRATE SUMP GAS METER SURVEY MARK TELSTRA PIT (MEDIUM) MANHOLE INSPECTION POINT TELSTRA PIT STREET LIGHT ELECTRIC CABLE COVER S.E.P. (DOUBLE) SIGNAL BOX MANHOLE (STORMWATER) FENCE LEVEL INFORMATION WATER TABLE TOP OF KERB EDGE OF CONCRETE UPRIGHT KERB NAT. SURF (BITUMEN) X-OVER EDGE OF PAVERS INVERT 10/08/11 JAS SURVEY LEGEND 128.53 WT WATERTABLE LEVEL CATHODIC PROT.MARKER SIGN - HOARDING MARKER POST CABLE MARKER TAP IRRIG CONT.VALVE-SPRINKLER TRAFFIC LIGHT STOBIE POLE SEWER MH - VENT LIGHTPOLE SEWER IP - IO ETSA CONNECTION EWS WATER METER - FP/SV ETSA METER BOX TELECOM PIT - PILLAR STORM WATER MANHOLE 10/08/11 JAS PAVEMENT DETAILS: ASHALTIC OVERLAY BRICK / BLOCK PAVING CONCRETE PAVEMENT CONCRETE STEP DETAIL HOTMIX PAVEMENT RUBBLE PAVEMENT SPRAY SEAL PAVEMENT TIMBER EDGING TOOLED JOINT TURF / LANDSCAPING TYPICAL ROAD CROSS SECTION FINISHED SURFACE PLANE EXISTING ASPHALT TO ENABLE NEW OVERLAY TO FINISH FLUSH WITH EXISTING FEATURES. 25mm HOTMIX AC10 OVERLAY 300 EXISTING ASPHALT EXISTING BASE EXISTING FEATURE WHICH REMAIN. (KERB AND GUTTER IS SHOWN FOR ILLUSTRATION) NEW BASECOURSE (THIN BASE SHOWN FOR ILLUSTRATION) ASPHALTIC OVERLAY NTS NOTE: EXCAVATE EXISTING PAVEMENT, COMPACT SURFACE AND KEY IN NEATLY 10/08/11 JAS CONCEALED CONCRETE EDGE STRIP. EMBEDDED MIN. 100mm INTO FIRM GROUND (INSTALLED AT ENGINEERS DISCRETION) SELECTED PAVING UNITS ED N IG 25mm BEDDING SAND SUBGRADE (100% STANDARD COMPACTION) 125 S E D E B O T T 20mm Q.R. (PM.2/20QG) BASECOURSE (95% MODIFIED COMPACTION) YE BRICK/BLOCK PAVING (NON-VEHICULAR) 1:10 D E N 20mm F.C.R. (PM.1/20QM) BASECOURSE (98% MODIFIED COMPACTION) 20mm Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) SUBGRADE (100% STANDARD COMPACTION) E B O Y T T E IG S DE 175 25mm BEDDING SAND 150 SELECTED PAVING UNITS (80mm THK) BRICK/BLOCK PAVING (VEHICULAR) 1:10 10/08/11 JAS CONCRETE SL52 MESH CENTRAL GRADE N25 SUBGRADE (100% STANDARD COMPACTION) T T E Y E B O S E D 75 100 20mm Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) D E N IG CONCRETE PAVEMENT LIGHT DUTY 1:10 CONCRETE SL72 MESH CENTRAL GRADE N25 E D E B O T SUBGRADE (100% STANDARD COMPACTION) S 100 125 20mm Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) D E N G I T E Y CONCRETE PAVEMENT CONCRETE SL82 MESH CENTRAL GRADE N32 O T T YE SUBGRADE (100% STANDARD COMPACTION) IG S E D E B 150 20mm Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) D E N 150 MEDIUM DUTY 1:10 CONCRETE PAVEMENT 20mm Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) SUBGRADE (100% STANDARD COMPACTION) O T T YE D E N D E B IG S E 150 CONCRETE 2 LAYERS SL82 MESH 50mm COVER GRADE N40 200 HEAVY DUTY (TYPE 1) 1:10 CONCRETE PAVEMENT HEAVY DUTY (TYPE 2) 1:10 10/08/11 JAS 600 FINISHED SURFACE 25 5mm WIDE x 3mm DEEP GROOVES AT 10mm CTS. IN 75mm GROUPING 300 LAP GTH LEN 160 AT SS RO TH CKNE I TH SL72 MESH, 30mm COVER COMPACTED SUBGRADE 200 FINISHED SURFACE 400 LAP GTH LEN CONCRETE STEP DETAIL 1:10 10/08/11 JAS HOT MIX AC.10 E B O T T YE 25 LIGHT DUTY 1:10 20mm F.C.R. (PM.1/20QM) BASECOURSE (98% MODIFIED COMPACTION) SUBGRADE (100% STANDARD COMPACTION) 75 HOTMIX PAVEMENT HOT MIX AC.10 20mm Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) 75 T ED N IG S DE 100 SUBGRADE (100% STANDARD COMPACTION) T YE 100 20mm Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) 25 D E N SIG E D E OB 20mm F.C.R. (PM.1/20QM) BASECOURSE (98% MODIFIED COMPACTION) HOTMIX PAVEMENT MEDIUM DUTY 1:10 20mm Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) SUBGRADE (100% STANDARD COMPACTION) E N G SI E ED B O T T YE 230 D 20mm F.C.R. (PM.1/20QM) BASECOURSE (98% MODIFIED COMPACTION) 150 35 HOT MIX AC.14 HOTMIX PAVEMENT HEAVY DUTY 1:10 10/08/11 JAS SUBGRADE (100% STANDARD COMPACTION) Y T T E E B O IG S DE 150 D E N 20mm Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) RUBBLE PAVEMENT 1:10 10/08/11 JAS 20mm Q.R. (PM.2/20QG) SUBBASE (95% MODIFIED COMPACTION) SUBGRADE (100% STANDARD COMPACTION) D E OB D E N IG S E 100 2 COAT 14/7 SPRAY SEAL T T YE SPRAY SEAL PAVEMENT 1:10 10/08/11 JAS FINISHED SURFACE 200 x 35 PERMAPINE 50 x 50 x 300 PERMAPINE STAKE GALVANISED FASTENER TIMBER EDGING (TE ON PLAN) NTS 10/08/11 JAS CUT EVERY SECOND WIRE IN FABRIC ALONG LINE OF JOINT 10 x 20 DEEP GROOVE TROWELLED IMMEDIATELY TOOLED JOINT DETAIL (TJ ON PLAN) 1:20 10/08/11 JAS 150 MIN. 150 THICK CLEAN TOPSOIL/LOAM MIX. SEEK DIRECTION FROM SMA SUBGRADE (95% COMPACTION) TURF/LANDSCAPING 1:10 10/08/11 JAS 20.00m 3.50m 3.50m 3.50m 3% 3% 2.5% =5H N.S. 0.000 X 1V 3.50m X x 100K 2.5% X X X 100K 5H 1V= x X TYPICAL CROSS SECTION ROAD ONE NTS 10/08/11 JAS STORMWATER DETAILS: BANDAGE JOINT CHEQUER PLATE DRAIN DETAIL DOWNPIPE CONNECTION DOWNPIPE ENTRY TO REINFORCED CONCRETE PIPE ENTRY TO RCP AT T-JUNCTION GRATED TRENCH DRAIN DETAIL HEADWALL DETAIL INSPECTION OPENING IRRIGATION DUCT FINISH JUNCTION BOX WITH OPENING JUNCTION PIT / GRATED INLET PIT DETAIL ROCK FACE DETAILS - SCOUR PROTECTION ROCK FILLED MATTRESS DETAIL SADDLE PIT SIDE ENTRY PIT 900 x 600 SIDE ENTRY PIT 1800 x 600 (1) SIDE ENTRY PIT 1800 x 600 (2) SIDE ENTRY PIT 1800 x 900 SIDE ENTRY PIT ON TRUNK DRAIN STORMWATER SOAKAGE WELL SUBSOIL DRAIN DETAIL TRENCH GRATE SUMP TRENCH INSTALLATION TYPICAL RIP RAP DETAIL TYPICAL SWALE CROSS SECTION TYPICAL TRENCH DETAIL A 200 150 PIPE 150 PIPE SHALL STOP AT THE EXTERNAL FACE OF BIG PIPE. 2N12 'U' BARS. 25MPa CONCRETE A 2N12 'U' BARS. 300 COG. 75 75 SECTION A-A BANDAGE JOINT NTS 10/08/11 JAS WELD COVER TO SIDES 6mm FLOOR PLATE COVER. 300 100 DEEP FINISHED SURFACE 6mm MILD STEEL HOT DIP GALVANISED PLATE DRAIN 50mm BEDDING SAND CHEQUER PLATE DRAIN DETAIL 1:10 10/08/11 JAS 100 15 300 x 300 x 6mm CHECKER PLATE COVER A 15 100 25 OPENING TO SUIT DOWNPIPE 450 250 25 A PLAN NOTE: DOWNPIPE OMITTED FOR CLARITY. DOWNPIPE EXPANSION JOINT ALTERNATIVE POSITIONS FOR DOWNPIPE 6mm MILD STEEL CHECKER PLATE COVER 25 25 15 MIN. 300 COVER DEPTH VARIES - MIN. 420 PAVEMENT LEVEL 100 RCP OUTLET-GRADE TO MAIN STORMWATER DRAIN 15 100 250 100 450 SECTION A-A DOWNPIPE CONNECTION DETAIL 1:10 10/08/11 JAS 100 30 FINISHED PAVEMENT LEVEL 150Ø DOWN PIPE ENTRY ROCLA SADDLE SLOPE JUNCTION TO SUIT RCP 150Ø TAKE OFF CORE 180mm OPENING TO RCP PIPE AS CLOSE AS POSSIBLE TO OBVERT SECTION FIX SADDLE TO RCP PIPE IN ACCORDANCE WITH MANUFACTURERS DETAILS 30 150Ø DOWN PIPE 150Ø DOWN PIPE ENTRY 150Ø TAKE OFF PLAN DOWNPIPE ENTRY TO REINFORCED CONCRETE PIPE NTS 10/08/11 JAS CL CENTRE LINE ROCLA SADDLE SLOPE JUNCTION TO SUIT IPE P VC UP RCP Ø150 (OR 100) TAKE OFF CORE 180mm OPENING TO RCP PIPE Ø150 (OR 100) TAKE OFF FIX & SEAL TIGHT SADDLE TO RCP PIPE IN ACCORDANCE WITH MANUFACTURERS DETAILS PLAN SECTION ENTRY TO RCP AT T-JUNCTION NTS 10/08/11 JAS ACO HEELGUARD COMPOSITE COVER TO DRAIN FINISHED SURFACE ACO DRAIN K100S PRESLOPED SYSTEM IN LINE SUMP AT END OF TRENCH 100mm THK. CONCRETE ALL AROUND ACO DRAIN (N25 GRADE CONCRETE) SUBGRADE (100% STANDARD COMPACTION) NOTE: ACO DRAIN SHALL BE ASSEMBLED AND LAID TO MANUFACTURER'S SPECIFICATIONS. GRATED TRENCH DRAIN DETAIL NTS 10/08/11 JAS 60° 2 x PIPE Ø 200 PLAN DISSIPATOR (DELETE DISSIPATOR TO INLET HEADWALL) A EØ PIP NOTE: DISSIPATOR NOT SHOWN. A ELEVATION Ø OR 150 MIN. 4 300 DISSIPATOR (DELETE DISSIPATOR TO INLET HEADWALL) 150 Ø OR 300 MIN. 3 600 2 x SL.82 MESH 200 SL82 MESH CENTRAL GRADE N40 CONCRETE (TYP.) SECTION A-A HEADWALL DETAIL NTS NOTE: FLOODGATE INSTALLATION INFRONT OF HEADWALL TO MANUFACTURERS SPECIFICATION. 10/08/11 JAS LIFTING SOCKET WITH BYLON PLUG COVER 445Ø GATIC CAST IRON IP COVER AND CONCRETE SURROUND OR APPROVED EQUIVALENT 368Ø 237Ø A FINISHED SURFACE A 150Ø UPVC RISER WITH REMOVABLE SEALING CAP CAST IRON COVER TO BE MARKED 'SEWER' WITH 3mm HIGH LETTERS SECTION A-A PLAN SURFACE INSPECTION OPENING DETAIL NTS 75x50 HARDWOOD SUPPORTS TO EXTEND 300mm PAST EACH SIDE OF TRENCH. CAST IRON COVER TO BE MARKED "STORMWATER" WITH 10mm HIGH LETTERING. A Ø370 COVER LEVEL A PROVIDE 2 OFF Ø6mm LOCKDOWN S/S ALLENHEAD SCREWS. GROUND LEVEL REINFORCED PRECAST CONCRETE. Ø100mm OR Ø150mm PVC RISER WITH SCREWED CAP. LIFTING LUG WITH NYLON PLUG. Ø445 PLAN CLEAR OPENING : 150 FOR 100 RISER 230 FOR 150 RISER SECTION A-A SURROUNDING GROUND OMITTED FOR CLARITY. INSPECTION OPENING (I.O. ON PLAN) NTS 10/08/11 JAS RISER TO BE CAPPED AT FINISHED SURFACE LEVEL TO ENABLE FUTURE LOCATION BY OTHERS (APPLIES TO BOTH END OF DUCT) MARK KERB WITH YELLOW PAINT FINISHED SURFAC E 200 500 BASECOURSE SUBBASE 100Ø UPVC IRRIGATION DUCT NOTE: SAND BACKFILL TO IRRIGATION DUCT AND COMPACT TO 100% STD. MDD. IRRIGATION DUCT FINISH NTS NOTE: REFER TO ELECTRICAL DRAWINGS FOR LOCATIONS 10/08/11 JAS A 150 A 900 150 GATIC TYPE 'E' COVER AND FRAME 400 x 600 PLAN GATIC TYPE 'E' COVER AND FRAME 400 x 600 BRICKWORK OR MAKEUP UNITS TO SUIT TWO LAYERS OF A.R.C. No. SL62 MESH (50mm COVER) 750 PRECAST UNITS C.J. 150 C.J. SL62 MESH (50mm COVER) 150 900 150 SECTION A-A JUNCTION BOX WITH OPENING 1:20 10/08/11 JAS GATIC COVER TO SUIT OR APPROVED EQUIVALENT REBATE TO SUIT FINISHED SURFACE DEPTH VARIES SL72 MESH CENTRAL MIN. 250 LAP CJ 100 CJ 100 WIDTH VARIES REFER PLAN FOR SIZE & ALIGNMENT OF INLET/ PIPE OUTLET. 100 JUNCTION PIT (<0.8m) GRATED INLET PIT DETAIL (<0.8m) 1:20 GATIC COVER TO SUIT OR APPROVED EQUIVALENT REBATE TO SUIT FINISHED SURFACE DEPTH VARIES REFER TABLE MAX PIT DEPTH MESH 1200 1500 1800 2500 SL 72 SL 82 SL 92 SL 102 NOTES: PROVIDE STEP IRONS IN ACCORDANCE WITH AS1657 FOR PITS. MIN. 400 LAP CJ 150 CJ 150 WIDTH VARIES 150 REFER PLAN FOR SIZE & ALIGNMENT OF INLET/ PIPE OUTLET. JUNCTION PIT (>0.8m) GRATED INLET PIT DETAIL (>0.8m) 1:20 10/08/11 JAS DRAIN FINISHING LEVEL 500 MIN. VARIES 1 ROCK TO BE Ø150 MIN. & Ø300 MAX. EXCAVATION PROFILE DRAIN INVERT 500 MIN. BIDIM A34 GEOTEXTILE UNDER ROCK OR APPROVED SIMILAR COARSE QUARRY WASTE COMPACTED AROUND ROCK 500 MIN. ROCK FACE DETAILS SCOUR PROTECTION NTS 10/08/11 JAS ROCK FILLED RENO MATTRESS 6.0m x 2.0m x 170mm 200 FINISHED SURFACE BIDIM A24 GEOTEXTILE OR APPROVED EQUIVALENT ROCK FILLED MATTRESS DETAIL NTS 10/08/11 JAS N12 BARS A A PLAN GATIC COVER & FRAME TO SUIT OR EQUIVALENT APPROVED HEAVY DUTY IN CARPARK & ROADWAY LIGHT DUTY IN FOOTPATH & LANDSCAPED AREAS. FINISHED SURFACE SL72 MESH CENTRAL 100 N12 BAR 200 N25 CONCRETE 250 x 250 SAWCUT HOLE 100 300 x 300 100 PIPE AS SPECIFIED SECTION A-A STORMWATER PIT (SADDLE PIT) NTS 10/08/11 JAS A 150 900 150 600 REFER PLAN FOR SIZE AND ALIGNMENT OF INLET/OUTLET PIPE KERB AND GUTTER A PLAN HEAVY DUTY CAST IRON COVER AND FRAME REBATE TO SUIT FINISHED SURFACE FINISHED SURFACE 250 LAP SL72 MESH CENTRAL (TYP.) CJ 150 CJ 600 150 SECTION A-A SIDE ENTRY PIT DETAIL 900 x 600 1:20 10/08/11 JAS 150 A 900 300 80 FALL 1200 40 FALL 300 600 FLOW DIRECTION 80 FALL 40 FALL 100 600 REBATE TO SUIT. 900 600 A PLAN GATIC COVER OR APPROVED EQUIVALENT. REBATE TO SUIT FINISHED SURFACE DEPTH VARIES FINISHED SURFACE 2. COVERS TO BE BOLT DOWN TYPE BOLTS TO BE STAINLESS STEEL WITH HEADS FOR 1/4" ALLEN KEY AND 5/16" WHITWORTH THREADS. CJ CJ 150 NOTES: 1. COVER AND FRAME TO BE STANDARD MANUFACTURE OF GATIC AUSTRALIA OR SIMILAR APPROVED. REINFORCEMENTS TO BE SL62 MESH UNLESS NOTED OTHERWISE. 250 LAP SL.72 MESH CENTRAL (TYP.) 150 600 150 SECTION A-A SIDE ENTRY PIT DETAIL 1800 x 600 1:20 1. 1 BAY SIDE ENTRY PIT = 900 x 600. 2 BAY SIDE ENTRY PIT = 1800 x 600. 2. CONCRETE UNDULATIONS ARE ONLY NEEDED WHEN ROAD FALL EXCEEDS 3%. 10/08/11 JAS 150 B 100 600 REBATE TO SUIT. 40 FALL 300 45° 80 FALL 80 FALL FLOW DIRECTION CO UN NC DU RE LA TE TIO NS 600 300 A 40 FALL A B 1200 900 900 600 KERB INVERT 140 50 INVERT 450 225 225 225 225 225 225 SECTION A-A GATIC COVER OR APPROVED EQUIVALENT. REBATE TO SUIT FINISHED SURFACE DEPTH VARIES FINISHED SURFACE SL.72 MESH CENTRAL (TYP.) 250 LAP NOTE: COVER AND FRAME TO BE STANDARD MANUFACTURE OF GATIC AUSTRALIA OR SIMILAR APPROVED. REINFORCEMENTS TO BE SL62 MESH UNLESS NOTED OTHERWISE. CJ CJ 150 100 TOP 200 PLAN 150 600 150 SECTION B-B SIDE ENTRY PIT DETAIL 1800 x 600 1:20 1. 1 BAY SIDE ENTRY PIT = 900 x 600. 2 BAY SIDE ENTRY PIT = 1800 x 600. 2. CONCRETE UNDULATIONS ARE ONLY NEEDED WHEN ROAD FALL EXCEEDS 3%. 10/08/11 JAS C 150 1800 * 150 GUTTER WIDTH AS PER DESIGN. (REFER DETAIL) ** FOR W=600, X-FALL=80mm FOR W=680, X-FALL=90mm A B A B TOP OF KERB (BACK) 1200 X-FALL 40mm 300 300 * * X-FALL APRON * * X-FALL APRON FLOW DIRECTION W=600 OR 680 X-FALL 40mm INVERT OF KERB G=300 OR 380 TOP OF KERB (FRONT) 600 1800 C PLAN NOTE: COVER AND FRAME TO BE STANDARD MANUFACTURE OF GATIC AUSTRALIA OR SIMILAR APPROVAL. REINFORCEMENOT TO SCALE TO BE RF.62 FABRIC, UNLESS NOTED OTHERWISE. (CAST IN LINTEL TO FRONT EDGE OF COVER) CENTRAL SUPPORT BRACKET. (FOR 1800 WIDE ONLY) DEPTH VARIES SL72 MESH CENTRAL. 300Ø RCP U.N.O. INLET / OULET PIPE. C.J. 150 C.J. SECTION A-A TOP OF KERB TH= FOR H=100, TH=150mm FOR H=150, TH=200mm 100 OR 150 150 INVERT OF KERB BASE OF KERB SECTION B-B PAVING INDICATIVE ONLY DEPTH VARIES * * 1800 TH= 100 OR 150 150 SL72 MESH CENTRAL. INLET / OULET PIPE. C.J. GRADE N25 CONCRETE BENCHING IN PIT TO A HEIGHT OF 1/3 DIAMETER OF RC PIPE (BENCHING TO BE HAND TROWELLED TO SUIT PIPE ARRANGEMENT) C.J. 150 300/380 (G=300) (G=380) 150 600 150 SECTION C-C 900mm/1800mm SIDE ENTRY PIT DETAIL (TYPE A) 1:20 10/08/11 JAS 210 50 CONSTRUCTION JOINT SL62 MESH CENTRAL BREAK & FORM 450 SQ. HOLE MORTAR 1950 Ø TRUNK DRAIN SECTION B FOR SIDE ENTRY PIT ON TRUNK DRAIN NTS 10/08/11 JAS CONCRETE COVER WITH LIFTING HOLE PAVEMENT/GROUND LEVEL 1 PIPE LENGTH (2440mm) DEPTH VARIES SOCKETED CONCRETE DRAINAGE PIPE INLET PIPE- REFER CONTRACT DRAWINGS FOR ALIGNMENT, SIZE AND REDUCED LEVEL VARIES - 1050 MIN. PERVIOUS SOIL (EG. SAND STRATUM) 40-65mm AGGREGATE STORMWATER SOAKAGE WELL NTS 10/08/11 JAS DAMP PROOF MEMBRANE ALONG SIDE MASONRY WALL TOPSOIL OR PAVING GRANULAR FREE DRAINING MATERIAL (SAND OR SIMILAR) FILTER GEOTEXTILE GEOFABRICS BIDIM A24 OR APPROVED EQUIVALENT 10-14mm SCREENINGS 300 MIN. LAP GEOTEXTILE 100mmØ SLOTTED CORRUGATED POLYETHYLENE SUBSOIL DRAIN LAID ON MIN. 1% GRADE FINISHED FLOOR LEVEL 300 MIN. NOTE: CROWN OF DRAIN TO BE BELOW UNDERSIDE OF SLAB. (WRAP DRAIN WITH BIDIM A24 GEOTEXTILE FABRIC) OR AT SCREENINGS/N.S. INTERFACE SUBSOIL DRAIN DETAIL NTS 10/08/11 JAS 150 EVERLEVEL OR APPROVED EQUIVALENT TRANSVERSE BAR MEDIUM DUTY TRENCH GRATING (GALVANISED) DEPTHVARIES FINISHED SURFACE C.J. 100 C.J. 100 150 100 SL72 MESH CENTRAL (TYP.) TRENCH GRATE SUMP MEDIUM DUTY 1:10 10/08/11 JAS E A D A ALTERNATIVE SIDE SLOPE TO SUIT NATURAL STABILITY 300 MIN. 0.7 D OVERLAY ZONE SIDE ZONE B HAUNCH ZONE 100 MIN FOUNDATION BEDDING ZONE TRENCH INSTALLATION NTS NOMINAL EXTERNAL DIAMETER D ( mm ) MINIMUM WIDTH A (mm ) HAUNCH DEPTH B (mm) (0.3 x D mm) MAXIMUM ALLOWABLE WIDTH E (mm) TRENCH INSTALLATION 300 375 450 525 600 750 900 300 110 1.1 300 135 1.2 300 160 1.3 300 180 1.5 300 205 1.6 450 255 1.8 450 310 1.9 TYPICAL CONCRETE PIPE BEDDING SUPPORT BACKFILL 10/08/11 JAS VARIES 1 300 THICK LAYER OF ROCK ROCK TO BE Ø150 MIN & Ø300 MAX. EXCAVATION PROFILE 500 MIN. BIDIM A34 GEOTEXTILE UNDER ROCK OR APPROVED SIMILAR 100mm THICK LAYER OF Ø65 BALLAST (PM3) 500 MIN. TYPICAL RIP RAP DETAIL NTS ROCK TO BE 150Ø MIN. & 300Ø MAX. DRAIN INVERT BIDIM A34 GEOTEXTILE UNDER ROCK OR APPROVED SIMILAR COARSE QUARRY WASTE COMPACTED AROUND ROCK RIP RAP DETAIL NTS 10/08/11 JAS BOUNDARY TURN DOWN MIN. 300mm FOR ANCHORAGE CENTRELINE 5000 EXTEND TENSAR MAT MIN. 350mm INTO PAVEMENT. LOCATE AT THE SUBBASE/BASE INTERFACE TENSAR MAT SCOUR PROTECTION. COVER WITH 100mm OF TOP SOIL SLOPE VARIES FOR DEPTH OF SWALE REFER PLANS 900 TWO LAYERS OF 100mm RIVER PEBBLES TO INVERT OF SWALE (FULL LENGTH) TYPICAL SWALE CROSS SECTION DETAIL NTS 10/08/11 JAS FINISHED SURFACE TRENCH WIDTH BACKFILL 300 OVERLAY ZONE * COMPACTED ORDINARY FILL 100 110 VARIES REINFORCED CONCRETE PIPE * MAXIMUM DEPTH IN METRES NATURAL GROUND SURFACE HAUNCH ZONE * COMPACTED SELECT FILL BED ZONE * COMPACTED SELECT FILL ROCK/SOIL FOUNDATION * 300 MIN. CL TYPICAL TRENCH DETAIL - RIGID PIPE NTS * :- REFER TO SPECIFICATION FOR INSTALLATION DETAILS. FINISHED SURFACE TRENCH WALL TRENCH FILL (COMPACTED SELECT FILL) B B A D C EMBEDMENT ZONE (BEDDING SAND COMPACTED TO 95% MODIFIED COMPACTION) ZONE OF INFLUENCE FOR SIDE SUPPORT 2.5 D D >75 <150 >150 <300 >300 <450 >450 <900 2.5 D A MINIMUM VALUES B C 75 100 100 100 150 150 100 200 150 150 300 150 TYPICAL TRENCH DETAIL - FLEXIBLE PIPE NTS NOTES: REFER TO CIVIL SPECIFICATION FOR FURTHER REQUIREMENTS 10/08/11 JAS