SEWAGE-SLUDGE MANAGEMENT AND DISPOSAL PLAN FOR THE SEWAGE TREATMENT PLANT (STP) OF EASTERN HAWII LEISURE LIMITED COMPANY LOCATED AT CEZA COMPLEX, CENTRO, STA. ANA, CAGAYAN This plan has been prepared to offer guidance to the Management, Pollution Control Officer (PCO) and person responsible to ensure sufficient information contained in this Sewage-Sludge Management Plan to satisfy requirement in the Wastewater Discharge Permit conditions. BACKGROUND: The development of a sewage sludge management plan for a STP is an opportunity to holistically consider sludge management for an individual wastewater treatment treatment facility (WWTF), taking into consideration sludge accumulation rates, sludge quality management, suitable dewatering technologies and appropriate end use or disposal is considered. Since Eastern HawiiLeisure Limited Companyoperation is more on leisure and gaming, the expected wastewater generated is domestic wastewater. Thus, this Sewage-Sludge Management Plan. This Sewage Sludge Management Plan is submitted in compliance to the permit condition with the components and activities for the STP. Activity 1. Desludging Component Spetic tanks 2. Desludging STP 3. Dsludging Kitchen Sink 4. Transport of Septic Schedule/Frequency Remarks Every three (3) Depend on the years volume of guest. This activity involves dewatering or siphoning depending on the characteristic of the septic tank Every maintenance This applies on-site period monitoring of the STP to ensure efficiency Monthly This is part of routine regular cleaning and maintenance Once conducted Taken by the third sludge material 5. Reporting tanks/STP party service provider Reporting will be included from what quarter the activity conducted to be integrated in the SelfMonitoring Report submitted. Furthermore, on-going rehabilitation of centralize STP is part of this management plan to maintain and ensure quality discharge of wastewater to the environment. Prepared by: ENGR. TEODY L. PEÑAS Engineering Supervisor/PCO