LSP COMPLEX PROJECT L SON, PETROCHEM/CAIS Lorin Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 Contract name : PACKAGE G CENTRAL UTILITY PLANT Page:1 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping ANNEX C - PIPING SPECIFICATION PIP-006: STEAM TRACING PIPING Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. Cs LSP COMPLEX PROJECT LOAfGSON,. Contract name : PETROCHEAUCALS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 PACKAGE G CENTRAL UTILITY PLANT Page:2 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping INDEX 1. 2. 3. GENERAL 3 1.1. Scope 3 1.2. Codes and Standards 3 1.3. Related Engineering Specifications 3 BASIC DESIGN 4 2.1. General 4 2.2. Materials 4 2.3. Tracer Manifolds and Tracer Manifold Supplies 8 2.4. Tracer 8 2.5. Condensate Pipes 10 2.6. Supports 11 ADDENDUM 25 VA Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. PCS LSP COMPLEX PROJECT LOAIC SON, Contract name : PETROCNEAVOILS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 PACKAGE G CENTRAL UTILITY PLANT Page:3 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping 1. GENERAL 1.1. Scope 1.1.1. This specification contains requirements for the design and materials of steam tracing to be provided for the Equipment, piping, in-line instrument. 1.1.2. This specification covers all items requiring steam tracing, such as process and utility piping, in-line instrument and Equipment as shown on the P & I Flow diagram (hereinafter referred to as P & I) and Utility Flow Diagram (hereinafter referred to as UFD). However, steams tracing piping to be supplied with the manufacturer's proprietary or standardized Equipment are excluded in general. 1.2. Codes and Standards Design, fabrication, inspection and tests of steam tracing piping materials and its accessories, unless otherwise specified in this specification, shall be in accordance with the applicable codes and standards. 1.3. Related Engineering Specifications The related Engineering Specifications to supplement this specification are as follows: ■ Project specification of Piping Design Basis (PIP-001) ■ Project specification of Piping Material (PIP-008 or PIP-009 or PIP-010) ■ Project specification of Thermal Insulation Design (SP-006) VR • Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. pc5 LSP COMPLEX PROJECT LONGSON! Contract name : PETROCHEM/CALS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 PACKAGE G CENTRAL UTILITY PLANT Page:4 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping 2. BASIC DESIGN 2.1. General 2.1.1. Steam tracing shall be provided on all lines, Equipment, instruments, where, under expected ambient temperature, freezing, solidification, rise in viscosity or separation of fluid or condensation of water in corrosive gas etc., would cause trouble in normal operations and shut- down unless they are externally heated. 2.1.2. All items requiring steam tracing, such as Equipment, in-line instruments and piping shall be as shown on the applicable P & I and UFD by symbol. 2.1.3. Insulation thickness shall be in accordance with the Thermal Insulation Design Specification (SP-006) based on the operation temperature of the line to be traced. 2.1.4. Typical steam tracing piping system is as shown in Figure 1 of Attached figures. 2.2. Materials 2.2.1. Pipes, Valves and Fittings In general specifications of piping materials for steam tracing shall be the same as those applicable to the steam mains. However, the tracer (including tracer supply and return) may be connected with butt-weld and the branch of manifold fabricated with nozzle weld. Stainless steel tubes may be used in accordance with the requirements of this specification. 2.2.2. Traps for steam Tracing System Traps shall be the thermostatic type with strainer. VA Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. Pcs LSP COMPLEX PROJECT LONG"" SON, Contract name : PETROCHEM/CALS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 2.2.3. PACKAGE G CENTRAL UTILITY PLANT Page:5 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Fastening Materials Fastening materials for the tracers shall be as follows: MATERIAL DIMENSION Galvanized anneal steel wires S.W.G. #18 Galvanized steel bands 0.4 mm x 13 mm 304 Stainless steel wires S.W.G #18 304 Stainless steel bands 0.4 mm x 13 mm Note: Stainless steel wires and bands shall be used for stainless steel piping and Equipment. 2.2.4. Stainless Steel Tube • Stainless steel tube size shall generally be the inside diameter of 8mm and the outside diameter of 10mm. • Stainless tube shall be soft annealed seamless tube of equal or higher grade than 304SS specified in ASTM, "Stainless Steel Pipes". All tube fittings shall be of bite type. Confidential: Ng\ This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. Pcs LSP COMPLEX PROJECT LOA/C SON, Contract name : PACKAGE G CENTRAL UTILITY PLANT PETROCHEM/CALS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 --S Traced Item Block Tracer Return Page:6 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping t. e—Valve Tracer—r Tracer Manifold Tracer Supply rio Top of Connection Block Valve \—Steam Main Tracer Manifold —Supply Shut-off Valve \4 Tracer Supply Line v\Top of Connection Tracer Supply Tracer Supply Lines Tracer Shut-off Valve I I I I -t. I A I Tracer Manifold Condensate Traced Item Spare Nozzle Tracer Manifold ice . Tracer Return 4 Condensate Manifold Condensate Manifold Return 1 4 4 1 4 Condensate Main VA Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. PCS LSP COMPLEX PROJECT LOAIC SON, Contract name : PACKAGE G CENTRAL UTILITY PLANT PETROCHEAVCALS Long Son Petrochemicals Co., Ltd. Page:7 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Contract No : LSP-CA-134 Figure 1 Steam Tracing Piping System Insulation Insulation Spacer Tracer Figure 2 Tracer Insulated with Spacer Wire or Band ! M! Horizontal Loop 111 I!R EM t\— Flange or Coupling At Flange Tracer Expansion Loop At changes in direction At Valve Figure 3 Tracer Expansion Loop (1) Horizontal line Single Tracer Double Tracers Triple Tracers VR Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. PCs LSP COMPLEX PROJECT LONGSON" PETROCHEMICALS Lonq Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 Contract name : PACKAGE G CENTRAL UTILITY PLANT Page:8 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping (2) Vertical line Insulation Single Tracers Tracer Double Tracers Triple Tracers Figure 4 Standard locations of Tracers 2.3. Tracer Manifolds and Tracer Manifold Supplies 2.3.1. Tracer manifold shall be provided only where there are a minimum 3 tracer supplies grouped within a 3 m radius, and its size shall generally be 2". Tracer supply other than stated above shall be directly branched from the steam mains. 2.3.2. Block valves for tracer manifold supplies shall generally be installed at vicinity and horizontal of the branch part of the steam mains. 2.3.3. Tracer manifold supply shall be branched from the top of steam main, and tracer supplies branched from the top or horizontal of tracer manifold. 2.4. Tracer 2.4.1. Size of tracer shall generally be of 1/2 (NPS). The tracer of size 3/4 (NPS) may be applied for large diameter piping and/or long distance piping such as interconnecting piping. Tube of outside diameter 10 mm and inside diameter 8 mm may be used for traced line size 4 (NPS) and smaller, Equipment having irregular surface and in-line instrument. Confidential: VA This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. LSP COMPLEX PROJECT LONG' SON, PETROCHEM/CALS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 Contract name : PACKAGE G CENTRAL UTILITY PLANT Page:9 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Note: When tube tracers of outside diameter 10 mm are applied, the tracer supplies and tracer returns shall be 1/2 (NPS). When tracers of 3/4 (NPS) are applied, the block valves and their up - stream in the tracer supplies, and the condensate traps and their down-stream in the tracer returns shall be 1/2 (NPS). 2.4.2. The minimum number of parallel steam tracers for each tracer size shall be as shown in Attached Table 1 to Table 7. 2.4.3. The maximum allowable length of tracer (total length from tracer supply line to condensate trap) by LS1 or MS2 are respectively as follows: MAXIMUM ALLOWABLE LENGTH (M) TRACER SIZE LS1 MS2 Tube 10/8 60 60 Pipe 1/2 (NPS) 60 100 Pipe 3/4 (NPS) 70 120 2.4.4. The pocket height of tracers shall not exceed 2 m for LS1 steam and 7m MS2 steam. 2.4.5. Tracers need not have drains even if there should be any pocket. 2.4.6. Each tracer line shall generally have its own steam supply valve and condensate trap. Where the tracers have no pocket and possibility of gravity flow of condensate from all connected tracer condensate lines (including horizontal piping) is assured, more than 2 tracers may be connected with one trap. In this case, each tracer shall have equivalent length and the sum of tracer length shall not exceed the allowable length specified in Paragraph 2.4.2. vp‘ Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. PCs LSP COMPLEX PROJECT LONGSON, Contract name : PETROCHEM/CALS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 2.4.7. PACKAGE G CENTRAL UTILITY PLANT Page:10 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Sampling connections, drains, vents, and in-line instruments, such as pressure gauge etc., attached to piping or Equipment shall generally be traced with the tracer for the piping or Equipment. 2.4.8. The safety valves shall be traced as close as possible to valve seat to avoid malfunction. 2.4.9. The tracer insulated with adequate spacer shall be applied for the following items. (Refer to Figure 2 of Attached Figures) Items to be protected from excessive heating, e.g. valves with non — metallic seals, caustic lines. 2.4.10. All tracers (including tracer supply and return) shall be extremely flattened. 2.4.11. Tracers shall be fixed with steel bands or steel wire at approximately 1 m intervals; however such intervals shall be adequately shortened at the bent place where tracers are not contacted sufficiently with the pipe. 2.4.12. Expansion loops shall be provided at approx. 24 m intervals. Loops at pipe fittings, changes in direction, valves, and flanges shall serve as expansion loops. (Refer to Figure 3 of Attached Figures) 2.4.13. The standard locations of tracers are shown in Figure 4 of Attached Figures. 2.5. Condensate Pipes 2.5.1. If condensate is recovered, a block valve shall be installed in each outlet line of the condensate trap. 2.5.2. Where condensate is recovered, the condensate manifold shall be, in general, provided only where there are a minimum 3 condensate or return lines grouped within a 3 meter radius and its size shall generally be 2(NPS). VA Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. GCS LSP COMPLEX PROJECT LONGSON, PETROCHEM/CALS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 2.5.3. Contract name : PACKAGE G CENTRAL UTILITY PLANT Page:11 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping In case of condensate, the condensate shall be discharged to the sewer where the condensate discharge does not give hazard for personnel and not make corrosive environment for piping and steel structure. 2.6. Supports All pipes including tracer supplies and returns shall be adequately supported in the field. Confidential: \11 . This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. cts LSP COMPLEX PROJECT LONGSON, Contract name : PETROV/FM/C.41S Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 PACKAGE G CENTRAL UTILITY PLANT Page:12 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Table 1: Minimum numbers of tracers vp Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. PCS LSP COMPLEX PROJECT LONG' SON, Contract name : PETROCHEAOCAIS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 PACKAGE G CENTRAL UTILITY PLANT Page:13 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Note: 1. S: Single 2. D: Double 3. T: Triple 4. Steam (LS 1): 147°C 5. Fluid Temperature: 5 50°C 6. Maintained Temperature: 50°C Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. LSP COMPLEX PROJECT LONGSON" Contract name : PETROCHEAUCALS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 PACKAGE G CENTRAL UTILITY PLANT Page:14 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Table 2: Minimum numbers of tracers Trace size 10 mm /4” /2" 3 1 /4 3 1'/2 2 2 1/2 3 5 Pipe size (Inch) 6 8 I3 10 12 14 16 18 - -a 20 22 24 D 26 • 28 T 30 T , - 14 D - Note: A Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. LSP COMPLEX PROJECT LONGSON, Contract name : PACKAGE G CENTRAL UTILITY PLANT PETROCHEM/CALS Lona Son Petrochemicals Co., Ltd. Page:15 of 25 Annex C - Piping Specification PIP-006: Steam Tracing Piping Contract No : LSP-CA-134 1. S: Single 2. D: Double 3. T: Triple 4. Steam (LS 1): 147°C 5. Fluid Temperature: 50°C T 100°C 6. Maintained Temperature: 50°C VA Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. PcS LSP COMPLEX PROJECT LONGSON! Contract name : PETROCHEM/CALS Long Son Petrochemicals Co., Ltd. PACKAGE G CENTRAL UTILITY PLANT Page:16 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Contract No : LSP-CA-134 Table 3: Minimum numbers of tracers Trace size 2 2 3 4 5 Pipe size ( Inch) 6 8 10 12 14 16 18 20 22 24 26 28 30 Note: Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. Pcs LSP COMPLEX PROJECT LOA/GSON, Contract name : PETROCNEM/CALS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 PACKAGE G CENTRAL UTILITY PLANT Page:17 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping 1. S: Single 2. D: Double 3. T: Triple 4. Steam (LS 1):.147°C 5. Fluid Temperature: T 5 50°C 6. Maintained Temperature: 80°C Ufi Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. Pcs LSP COMPLEX PROJECT LONGSON! Contract name : PETROCHEM/CALS Long Son Petrochemicals Co., Ltd. PACKAGE G CENTRAL UTILITY PLANT Page:18 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Contract No : LSP-CA-134 Table 4: Minimum numbers of tracers Trace size 10 mm 3/4o 3/4 1 2 2 1/2 3 4 5 Pipe size ( Inch) 6 8 10 12 14 16 18 20 22 24 26 28 30 Note: tvP, Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. Pcs LSP COMPLEX PROJECT Contract name : PETROCHEAUCALS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 PACKAGE G CENTRAL UTILITY PLANT Page:19 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping 1. S: Single 2. D: Double 3. T: Triple 4. Steam (LS 1): 147°C 5. Fluid Temperature: 50°C 5 T 100°C (CKB, QOD) 6. Maintained Temperature: 80°C vo Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. Pcs IA LSP COMPLEX PROJECT LONGSON7 PETROCHEM/CAIS Lonq Son Petrochemicals Co, Ltd. Contract No : LSP-CA-134 Contract name : PACKAGE G CENTRAL UTILITY PLANT Page:20 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Table 5: Minimum numbers of tracers VA Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. Pcs LSP COMPLEX PROJECT LONGSON! PETROCHEN/CAIS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 Contract name : PACKAGE G CENTRAL UTILITY PLANT Page:21 of 25 Annex C - Piping Specification PIP-006: Steam Tracing Piping 1. S: Single 2. D: Double 3. T: Triple 4. Steam (MS 2): 191°C 5. Fluid Temperature: 50°C 5 T 5 100°C 6. Maintained Temperature: 80°C v4 Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. PCS k LSP COMPLEX PROJECT LONG' SON, Contract name : PETROCHEAMOILS Lone Son Petrochemicals Co. Ltd. PACKAGE G CENTRAL UTILITY PLANT Page:22 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Contract No : LSP-CA-134 Table 6: Minimum numbers of tracers Trace size 10 mm 3/ 1, 4 /4 3 1 2 2% 3 4 5 Pipe size ( Inch) 6 8 10 12 14 16 18 20 22 24 26 28 30 Note: VA Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. ( LSP COMPLEX PROJECT LONGSON, PETROCHEAUCALS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 Contract name : PACKAGE G CENTRAL UTILITY PLANT Page:23 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping 1. S: Single 2. D: Double 3. T: Triple 4. Steam (MS 2): 191°C 5. Fluid Temperature: 100°C 5 T 5 150°C 6. Maintained Temperature: 80°C Vig Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. PCs LSP COMPLEX PROJECT LONGSON! Contract name : PETROCHEM/CALS Long Son Petrochemicals Co., Ltd. PACKAGE G CENTRAL UTILITY PLANT Page:24 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping Contract No : LSP-CA-134 Table 7: Minimum numbers of tracers Trace size 10 mm IN, /4" 3 /4 3 1 1'% 2 2% 3 4 5 6 2' o c ..=. N — 8 10 u) a) a 'cr. 12 14 16 18 20 22 24 26 28 30 Note: VA Confidential: This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd. PCS LSP COMPLEX PROJECT L 0/1/6 SON, PETROCHEM/CAIS Long Son Petrochemicals Co., Ltd. Contract No : LSP-CA-134 Contract name : PACKAGE G CENTRAL UTILITY PLANT Page:25 of 25 Annex C - Piping Specification PIP-006 : Steam Tracing Piping 1. S: Single 2. D: Double 3. T: Triple 4. Steam (MS 2): 191°C 5. Fluid Temperature: 150°C 5 T 200°C 6. Maintained Temperature: 80°C 3. ADDENDUM None. Confidential: , This document is confidential and must not be copied or reproduced except with the express permission of Long Son Petrochemicals Co., Ltd.