Controls Southeast, Inc.
Mailing: Post Office Box 7500, Charlotte, NC 28241
Shipping: 12201 Nations Ford Road, Pineville, NC 28134
www.csiheat.com
Phone:
Fax:
704-644-5000
704-644-5100
CONTROTRACE DATA SHEET
Client Information
Company:
Contact Name:
Phone Number:
Email:
Date completed:
Drawings provided?
Line list provided?
P&ID’s provided?
YES
YES
YES
NO
NO
NO
N/A
N/A
N/A
Thermal Objective (Check one)
1.
Maintain bulk process temperature?
2.
Maintain pipe/tank/vessel wall temperature to prevent condensation?
3.
Maintain above 32°F / 0°C for freeze protection?
4.
CSI to recommend
5.
Other:
Process
6. Chemical Name:
7. Normal Operating Temperature:
8. Target Maintenance Temperature:
9. Upper Limit Temperature:
10. Lower Limit Temperature:
11. Density (ρ):
12. Viscosity (μ):
15. Process flow rate:
F /
F /
F /
F /
Heating Medium
16. Media Type:
Steam
17. Operating Temperature:
F /
18. Operating Pressure:
psig /
19. Type of steam trap to be used:
Bucket
20. Maximum expected condensate return pressure:
Vapor
Liquid (Check one)
C
C
C
C
13. Thermal Conductivity (k):
14. Specific heat of process (Cp):
Hot Oil
Other:
(Check one)
C
barg
Float
Disc
Thermostatic
Other:
psig /
barg
(Check one)
Environment/Other
21. Standard ControTrace is constructed from ASME SA-178 Gr.A carbon steel boiler tubing. (Other materials may be
available.) Is this material acceptable for your application?
YES
NO (Check one)
22. Standard ControTrace pressure/temperature rating is 150 psig at 400F. Is this rating acceptable for your application?
YES
NO (Check one)
23. Is the ControTrace for Indoor or Outdoor use?
Indoor
Outdoor (Check one)
24. Ambient Design Temperature?
F /
C
25. Other comments:
Rev.1 19-Feb-2010
Piping Design (if applicable)
NOTE: If the information requested below is contained in documentation submitted within the RFQ, it is not required to
complete these additional fields.
26. Piping Details:
Pipe Size
Pipe
Sch.
Pipe
Material
Process Flow
Rate
Insulation Type
Insulation
Thickness
Are supports located on the piping?
Is the piping flanged or field welded?
Is the piping in a congested area?
New or existing piping?
Describe pipe routing:
Mostly rack piping (straight)
Lots of changes in direction
Other:
32. Where will installation of ControTrace take place?
On the ground, prior to piping erection
In place, after piping erection
Notes
27.
28.
29.
30.
31.
Other:
Additional Notes / Comments
33.
34.
35.
36.
37.
Rev.1 19-Feb-2010