ControTrace Data Sheet- Piping

advertisement
Controls Southeast, Inc.
Mailing: Post Office Box 7500, Charlotte, NC 28241
Shipping: 12201 Nations Ford Road, Pineville, NC 28134
www.csiheat.com
Phone:
Fax:
704-644-5000
704-644-5100
CONTROTRACE DATA SHEET
Client Information
Company:
Contact Name:
Phone Number:
Email:
Date completed:
Drawings provided?
Line list provided?
P&ID’s provided?
YES
YES
YES
NO
NO
NO
N/A
N/A
N/A
Thermal Objective (Check one)
1.
Maintain bulk process temperature?
2.
Maintain pipe/tank/vessel wall temperature to prevent condensation?
3.
Maintain above 32°F / 0°C for freeze protection?
4.
CSI to recommend
5.
Other:
Process
6. Chemical Name:
7. Normal Operating Temperature:
8. Target Maintenance Temperature:
9. Upper Limit Temperature:
10. Lower Limit Temperature:
11. Density (ρ):
12. Viscosity (μ):
15. Process flow rate:
F /
F /
F /
F /
Heating Medium
16. Media Type:
Steam
17. Operating Temperature:
F /
18. Operating Pressure:
psig /
19. Type of steam trap to be used:
Bucket
20. Maximum expected condensate return pressure:
Vapor
Liquid (Check one)
C
C
C
C
13. Thermal Conductivity (k):
14. Specific heat of process (Cp):
Hot Oil
Other:
(Check one)
C
barg
Float
Disc
Thermostatic
Other:
psig /
barg
(Check one)
Environment/Other
21. Standard ControTrace is constructed from ASME SA-178 Gr.A carbon steel boiler tubing. (Other materials may be
available.) Is this material acceptable for your application?
YES
NO (Check one)
22. Standard ControTrace pressure/temperature rating is 150 psig at 400F. Is this rating acceptable for your application?
YES
NO (Check one)
23. Is the ControTrace for Indoor or Outdoor use?
Indoor
Outdoor (Check one)
24. Ambient Design Temperature?
F /
C
25. Other comments:
Rev.1 19-Feb-2010
Piping Design (if applicable)
NOTE: If the information requested below is contained in documentation submitted within the RFQ, it is not required to
complete these additional fields.
26. Piping Details:
Pipe Size
Pipe
Sch.
Pipe
Material
Process Flow
Rate
Insulation Type
Insulation
Thickness
Are supports located on the piping?
Is the piping flanged or field welded?
Is the piping in a congested area?
New or existing piping?
Describe pipe routing:
Mostly rack piping (straight)
Lots of changes in direction
Other:
32. Where will installation of ControTrace take place?
On the ground, prior to piping erection
In place, after piping erection
Notes
27.
28.
29.
30.
31.
Other:
Additional Notes / Comments
33.
34.
35.
36.
37.
Rev.1 19-Feb-2010
Download